C1C2C3C4C5C6C7C8C9 Part III Control over development

Annotations:
Modifications etc. (not altering text)
C1

Pt. 3 (ss. 55-106) except ss. 76, 90(2)(5) applied (with modifications) (17.7.1992) by S.I. 1992/1492, regs. 2(1)(b), 3-11

Pt. 3 (ss. 55-106): power to modify conferred (10.11.1993) by 1993 c. 28, s. 171(1)(a); S.I. 1993/2762, art. 3

Pt. 3 (ss. 55-106) applied (5.11.1993) by 1993 c. 42, s. 24(1) (with ss. 2, 30(1), Sch. 2 para.9)

Pt. 3 (ss. 55-106) extended (1.11.1995) by 1995 c. 25, s. 96(2) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Pt. 3 (ss. 55-106) modified (1.4.1996) by 1994 c. 19, s. 20(3), Sch. 5 Pt. III paras. 15(1), 20 (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1995/3198, art. 4, Sch. 2

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 9(1)(2)

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 51

Pt. 3 (ss. 55-106) modified (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), art. 20(1)

Pt. 3 (ss. 55-106) modified (31.10.2005) by The London Thames Gateway Development Corporation (Planning Functions) Order 2005 (S.I. 2005/2721), art. 4

Pt. 3 (ss. 55-106) modified (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 21(1) (with arts. 3(5), 15(3))

Pt. 3 (ss. 55-106) applied (7.6.2006) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 89, 121, Sch. 4 para. 3(2) (with s. 111); S.I. 2006/1281, art. 2

Pt. 3 (ss. 55-106) modified (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), art. 17(1) (with art. 43)

Pt. 3 (ss. 55-106) modified (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), art. 18(1)

C4

Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), s. 10(1)

F1F2England: consultation before applying for planning permission F3or permission in principle

Annotations:
Amendments (Textual)
F1

Ss. 61W-61Y and cross-heading inserted (15.11.2011 for specified purposes, 17.12.2013 in so far as not already in force) by Localism Act 2011 (c. 20), ss., 122(1), 240(5)(l) (with ss. 122(3), 144); S.I. 2013/2931, art. 2

F2

Words in s. 61W cross-heading substituted (6.9.2015 for specified purposes, 1.3.2016 in so far as not already in force) by Planning (Wales) Act 2015 (anaw 4), ss. 17(5), 58(2)(b)(4)(b); S.I. 2016/52, art. 2(a) (with art. 6)

61YPower to make supplementary provision

1

A development order may make provision about, or in connection with, consultation which section 61W(1) requires a person to carry out on a proposed application for planning permission F4or permission in principle.

2

The provision that may be made under subsection (1) includes (in particular)—

a

provision about, or in connection with, publicising the proposed application;

b

provision about, or in connection with, the ways of responding to the publicity;

c

provision about, or in connection with, consultation under section 61W(3);

d

provision about, or in connection with, collaboration between the person and others on the design of the proposed development;

e

provision as to the timetable (including deadlines) for—

i

compliance with section 61W(1),

ii

responding to publicity under section 61W(2), or

iii

responding to consultation under section 61W(3);

f

provision for the person to prepare a statement setting out how the person proposes to comply with section 61W(1);

g

provision for the person to comply with section 61W(1) in accordance with a statement required by provision under paragraph (f).

3

Provision under subsection (1) may be different for different cases.