C1C4C5C6C7C8C9C11C12 Part III Control over development

Annotations:
Modifications etc. (not altering text)
C1

Pt. 3 (ss. 55-106) except ss. 76, 90(2)(5) applied (with modifications) (17.7.1992) by S.I. 1992/1492, regs. 2(1)(b), 3-11

Pt. 3 (ss. 55-106): power to modify conferred (10.11.1993) by 1993 c. 28, s. 171(1)(a); S.I. 1993/2762, art. 3

Pt. 3 (ss. 55-106) applied (5.11.1993) by 1993 c. 42, s. 24(1) (with ss. 2, 30(1), Sch. 2 para.9)

Pt. 3 (ss. 55-106) extended (1.11.1995) by 1995 c. 25, s. 96(2) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Pt. 3 (ss. 55-106) modified (1.4.1996) by 1994 c. 19, s. 20(3), Sch. 5 Pt. III paras. 15(1), 20 (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1995/3198, art. 4, Sch. 2

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 9(1)(2)

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 51

Pt. 3 (ss. 55-106) modified (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), art. 20(1)

Pt. 3 (ss. 55-106) modified (31.10.2005) by The London Thames Gateway Development Corporation (Planning Functions) Order 2005 (S.I. 2005/2721), art. 4

Pt. 3 (ss. 55-106) modified (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 21(1) (with arts. 3(5), 15(3))

Pt. 3 (ss. 55-106) applied (7.6.2006) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 89, 121, Sch. 4 para. 3(2) (with s. 111); S.I. 2006/1281, art. 2

Pt. 3 (ss. 55-106) modified (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), art. 17(1) (with art. 43)

Pt. 3 (ss. 55-106) modified (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), art. 18(1)

C6

Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), s. 10(1)

Determination of applications

C2C1072 Conditional grant of planning permission.

1

Without prejudice to the generality of section 70(1), conditions may be imposed on the grant of planning permission under that section—

C3a

for regulating the development or use of any land under the control of the applicant (whether or not it is land in respect of which the application was made) or requiring the carrying out of works on any such land, so far as appears to the local planning authority to be expedient for the purposes of or in connection with the development authorised by the permission;

b

for requiring the removal of any buildings or works authorised by the permission, or the discontinuance of any use of land so authorised, at the end of a specified period, and the carrying out of any works required for the reinstatement of land at the end of that period.

2

A planning permission granted subject to such a condition as is mentioned in subsection (1)(b) is in this Act referred to as “planning permission granted for a limited period”.

3

Where—

a

planning permission is granted for development consisting of or including the carrying out of building or other operations subject to a condition that the operations shall be commenced not later than a time specified in the condition; and

b

any building or other operations are commenced after the time so specified,

the commencement and carrying out of those operations do not constitute development for which that permission was granted.

4

Subsection (3)(a) does not apply to a condition attached to the planning permission by or under section 91 or 92.

5

Part I of Schedule 5 shall have effect for the purpose of making special provision with respect to the conditions which may be imposed on the grant of planning permission for development consisting of the winning and working of minerals F1or involving the depositing of refuse or waste materials, and subsection (2) has effect subject to paragraph 1(6)(a) of that Schedule.