C1C2C3C4C5C6C7C8C9C10 Part III Control over development
Pt. 3 (ss. 55-106) modified (4.5.2005) by The Telford Railfreight Terminal (Donnington) Order 2005 (S.I. 2005/1163), art. 25(2) (with art. 30)
Pt. 3 modified (23.8.2007) by The Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), art. 17(1) (with arts. 3(6), 12(3))
Pt. 3 modified (28.9.2007) by The London Gateway Logistics and Commercial Centre Order 2007 (S.I. 2007/2657), art. 27(1) (with art. 19, Sch. 3 para. 13(2))
Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), s. 10(1)
Pt. 3 modified (14.10.2008) by The Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), art. 34(1) (with art. 36(3))
Pt. 3 modified (20.7.2010) by The Network Rail (Nuneaton North Chord) Order 2010 (S.I. 2010/1721), art. 28(1)
Pt. 3 modified (27.8.2010) by The Llangollen and Corwen Railway Order 2010 (S.I. 2010/2136), art. 11(1)
Pt. 3 applied (1.2.2011) by The River Mersey (Mersey Gateway Bridge) Order 2011 (S.I. 2011/41), arts. 1, 47(1) (with art. 51, Sch. 10 paras. 68, 85)
Pt. 3 modified (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 1, 36(2)
Pt. 3 applied (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), arts. 1, 38(2)
F1Non-material changes to planning permission
S. 96A and cross-heading inserted (1.10.2009) by Planning Act 2008 (c. 29), ss. 190(2), 241 (with s. 226); S.I. 2009/2260, art. 3
96APower to make non-material changes to planning permission F7or permission in principle
1
2
In deciding whether a change is material, a local planning authority must have regard to the effect of the change, together with any previous changes made under this section, on the planning permission F9or permission in principle as originally granted.
3
The power conferred by subsection (1) includes power F13to make a change to a planning permission —
a
to impose new conditions;
b
to remove or alter existing conditions.
4
The power conferred by subsection (1) may be exercised only on an application made by or on behalf of a person with an interest in the land to which the planning permission F10or permission in principle relates.
5
An application under subsection (4) F5to a local planning authority in England must be made in the form and manner prescribed by development order.
F25A
A development order may provide that an application under subsection (4) to a local planning authority in Wales must be made—
a
in the form prescribed by the order or in a form published by the Welsh Ministers; and
b
in the manner prescribed by the order.
6
Subsection (7) applies in relation to an application under subsection (4) made by or on behalf of a person with an interest in some, but not all, of the land to which the planning permission F11or permission in principle relates.
7
The application may be made only in respect of so much of the planning permission F12or permission in principle as affects the land in which the person has an interest.
8
A local planning authority F6in England must comply with such requirements as may be prescribed by development order as to consultation and publicity in relation to the exercise of the power conferred by subsection (1).
F39
A development order may make provision about how a local planning authority in Wales are to deal with an application under subsection (4) (including provision imposing requirements as to consultation and publicity and as to when steps specified in the order are to be taken).
10
For the purposes of this section as it applies in relation to Wales, a person has an interest in land only if in relation to that land (or any mineral in, on or under it) the person—
a
is the estate owner of the fee simple;
b
is entitled to a tenancy granted or extended for a term of years certain of which not less than two years remain unexpired;
c
is the mortgagee of any interest or estate in the land; or
d
is a party to an estate contract within the meaning of section 2(4) of the Land Charges Act 1972.
Pt. 3 (ss. 55-106) except ss. 76, 90(2)(5) applied (with modifications) (17.7.1992) by S.I. 1992/1492, regs. 2(1)(b), 3-11
Pt. 3 (ss. 55-106): power to modify conferred (10.11.1993) by 1993 c. 28, s. 171(1)(a); S.I. 1993/2762, art. 3
Pt. 3 (ss. 55-106) applied (5.11.1993) by 1993 c. 42, s. 24(1) (with ss. 2, 30(1), Sch. 2 para.9)
Pt. 3 (ss. 55-106) extended (1.11.1995) by 1995 c. 25, s. 96(2) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2
Pt. 3 (ss. 55-106) modified (1.4.1996) by 1994 c. 19, s. 20(3), Sch. 5 Pt. III paras. 15(1), 20 (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1995/3198, art. 4, Sch. 2
Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 9(1)(2)
Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 51
Pt. 3 (ss. 55-106) modified (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), art. 20(1)
Pt. 3 (ss. 55-106) modified (31.10.2005) by The London Thames Gateway Development Corporation (Planning Functions) Order 2005 (S.I. 2005/2721), art. 4
Pt. 3 (ss. 55-106) modified (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 21(1) (with arts. 3(5), 15(3))
Pt. 3 (ss. 55-106) applied (7.6.2006) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 89, 121, Sch. 4 para. 3(2) (with s. 111); S.I. 2006/1281, art. 2
Pt. 3 (ss. 55-106) modified (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), art. 17(1) (with art. 43)
Pt. 3 (ss. 55-106) modified (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), art. 18(1)