C10C1C2C3C4C5C6C7C8C9C21C163C52C28C150C165C69C101C43C130C110C60C85C158C190C178C175C108C135C179C100C70C44C38C153C15C161C46C47C125C39C109C123C114C42C23C126C173C77C103C71C98C156C221C215C17C181C59C106C96C169C182C107C164C61C55C198C115C134C200C189C29C220C192C45C22C184C86C186C213C19C144C147C183C112C95C84C137C20C67C11C80C18C133Part III Street works in England and Wales

Annotations:
Modifications etc. (not altering text)
C1

Pt. 3 (ss. 48-106) applied (6.11.2000) by 2000 c. 26, s. 95, Sch. 6 para. 1(3); S.I. 2000/2957, art. 2(1), Sch. 1

Pt. 3 (ss. 48-106) modified (29.3.2001) by S.I. 2001/1348, art. 21(2)

Pt. 3 (ss. 48-106) amended (24.7.2001) by S.I. 2001/3627, art. 4(1)

C2

Definition in Pt. 3 (ss. 48-106) applied (1.12.1991) by Water Industry Act 1991 (c. 56, SIF 130), ss. 71-84, 162-172, 219(1), 223(2), Sch. 6 para. 6(3)(a).

C3

Definition in Pt. 3 (ss. 48-106) applied (1.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 178, 221(1), 225(2), Sch. 22 para. 3(2).

C4

Pt. 3 excluded (16.3.1992) by Avon Weir Act 1992 (c. v), s. 6(3) (with s. 61(1))

C5

Pt. 3 modified (1.1.1993) by Pipelines Act 1962 (c. 58), s. 16(1) (as substituted (1.1.1993) by New Roads and Street Works Act 1991 (c. 22), s. 168(1), Sch. 8 Pt. 3 para. 101(3); S.I. 1992/2984, art. 2(2), Sch.2)

Pt. 3 modified (27.7.1993) by 1993 c. xv, s. 4(1)

Pt. 3 (ss. 48-106) excluded (27.7.1993) by 1993 c. xv, s. 4(2)

C6

Pt. 3 applied (with modifications) (21.7.1994) by 1994 c. xv, s. 4(1)

Pt. 3 applied (21.7.1994) by 1994 c. xv, s. 45(5)(a)

Pt. 3 excluded (21.7.1994) by 1994 c. xv, s. 21(2)

Pt. 3 restricted (21.7.1994) by 1994 c. xv, s. 4(2)

C7

Pt. 3 excluded (18.12.1996) by 1996 c. 61, s. 52, Sch. 15 para. 1(3)

Pt. 3 modified (18.12.1996) by 1996 c. 61, s. 3, Sch. 3 para. 8

C8

Pt. 3 extended (28.7.1998) by 1998 c. iv, s. 3

C9

Pt. 3 applied (27.8.1998) by S.I. 1998/1936, arts. 1, 41, Sch. 10 paras. 2(8), 3(2)

Pt. 3 modified (13.1.1999) by S.I. 1998/3269, art. 4(1)

C178

Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 3 para. 8

C175

Pt. 3 excluded (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 17 para. 1(3)

C38

Pt. 3 applied (with modifications) (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), arts. 1, 9 (with arts. 48, 68, 79)

C161

Pt. 3 modified (20.11.2013) by The M1 Junction 10a (Grade Separation) Order 2013 (S.I. 2013/2808), arts. 1, 8(1)(2)

C164

Pt. 3 applied (with modifications) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 3(2) (with arts. 55-57, Sch. 8 para. 13)

C20

Pt. 3 modified (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 10(1)(2) (with arts. 5, 36) (as amended (7.2.2024) by S.I. 2024/129, art. 1, Sch.)

Provisions with respect to particular authorities and undertakings

C87C141C32C62C129C97C93C136C139C142C196C92C195C53C201C127C82C206C26C143C151C48C81C176C187C120C56C172C50C30C216C121C36C113C54C222C203C185C157C207C104C170C88C177C38C160C16C68C131C191C40C140C35C14C119C91C24C138C217C58C75C159C105C146C79C109C202C114C212C73C13C166C193C102C51C197C12C167C57C65C118C145C74C171C37C31C49C83C211C66C90C174C162C218C148C122C33C41C25C205C63C210C214C209C223C221C64C208C116C155C215C188C128C34C106C204C111C72C89C168C27C132C76C124C220C152C117C22C194C99C144C154C199C219C180C94C67C22489C38C46C47C125C109C114C221C215C106C220C22C144C67 Public sewers, sewer authorities and related matters.

1

In this Part—

a

sewer” and “public sewer” have the same meaning as in F1the M1Water Industry Act 1991, and

b

sewer authority”, in relation to a public sewer, means the sewerage undertaker within the meaning of that Act in whom the sewer is vested.

C78C1492

An undertaker proposing to execute street works affecting a public sewer shall consult the sewer authority before giving notice under section 55 (notice of starting date) F2, or making a notification under paragraph 2(1)(d) of Schedule 3A (notification of proposed works), in relation to the works.

3

References in this Part to apparatus include a sewer, drain or tunnel.

4

References to the undertaker in relation to such apparatus, or in relation to street works in connection with such apparatus, shall be construed—

a

in the case of a public sewer, as references to the sewer authority, and

b

in any other case, as references to the authority, body or person having the management or control of the sewer, drain or tunnel.

5

Section 69 (provisions as to works likely to affect other apparatus in the street) does not apply by virtue of subsection (3) above in relation to works likely to affect a public sewer if, or to the extent that, Schedule 4 (works in streets with special engineering difficulties) applies.