Modifications etc. (not altering text)
C1Part III: definition of "consumer" applied (01.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 176(7), 225(2).
C2Part III: definition of "water fittings" applied (01.12.1991) by Statutory Water Companies Act 1991 (c. 58, SIF 130), ss. 15(1), 17(2).
C3Pt. 3 modified (E.) (24.3.2011) by The Hull and Goole Port Health Authority Order 2011 (S.I. 2011/939), arts. 1(1), 9, Sch. 2
C4Pt. 3 functions transferred and modified (14.6.2016) by The River Tees Port Health Authority Order 2016 (S.I. 2016/644), arts. 1(1), 9, Sch. 2
C5Pt. 3: functions etc. assigned to the port health authority and modified (31.3.2017) by The Weymouth Port Health Authority Order 2017 (S.I. 2017/558), arts. 1(1), 9, Sch. 2 (with art. 9(3))
Textual Amendments
F1Word in Pt. 3 Ch. 1 heading inserted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 46; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)It shall be the duty of every water undertaker to develop and maintain an efficient and economical system of water supply within its area and to ensure that all such arrangements have been made—
(a)for providing supplies of water to premises in that area and for making such supplies available to persons who demand them; and
(b)for maintaining, improving and extending the water undertaker’s water mains and other pipes,
as are necessary for securing that the undertaker is and continues to be able to meet its obligations under this Part.
(2)The duty of a water undertaker under this section shall be enforceable under section 18 above—
(a)by the Secretary of State; or
(b)with the consent of or in accordance with a general authorisation given by the Secretary of State, by [F2the Authority.
(3)The obligations imposed on a water undertaker by the following Chapters of this Part, and the remedies available in respect of contraventions of those obligations, shall be in addition to any duty imposed or remedy available by virtue of any provision of this section or section 38 below and shall not be in any way qualified by any such provision.
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
Modifications etc. (not altering text)
C6S. 37 saved (01.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 19(2), 225(2).
C7S. 37 applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 10(1) (with reg. 1(1)(c))
(1)It shall be the duty of each water undertaker to prepare [F4, publish] and maintain a water resources management plan.
(2)A water resources management plan is a plan for how the water undertaker will manage and develop water resources so as to be able, and continue to be able, to meet its obligations under this Part.
(3)A water resources management plan shall address in particular—
(a)the water undertaker’s estimate of the quantities of water required to meet those obligations;
(b)the measures which the water undertaker intends to take or continue for the purpose set out in subsection (2) above (also taking into account for that purpose the introduction of water into the undertaker’s supply system by or on behalf of [F5water supply licensees]);
(c)the likely sequence and timing for implementing those measures; and
(d)such other matters as the Secretary of State may specify in directions
[F6(and see also section 37AA).]
(4)The procedure for preparing [F7and publishing] a water resources management plan (including a revised plan) is set out in section 37B below.
(5)Before each anniversary of the date when its plan (or revised plan) was last published, the water undertaker shall —
(a)review its plan; and
(b)send a statement of the conclusions of its review to the Secretary of State.
(6)The water undertaker shall prepare [F8and publish] a revised plan in each of the following cases—
(a)following conclusion of its annual review, if the review indicated a material change of circumstances;
(b)if directed to do so by the Secretary of State;
(c)in any event, not later than the end of the period of five years beginning with the date when the plan (or revised plan) was last published,
and shall follow the procedure in section 37B below (whether or not the revised plan prepared by the undertaker includes any proposed alterations to the previous plan).
(7)The Secretary of State may give directions specifying—
(a)the form which a water resources management plan must take;
(b)the planning period to which a water resources management plan must relate.
(8)Before preparing its water resources management plan (including a revised plan), the water undertaker shall consult—
(a)the Environment Agency[F9, if the plan (or revised plan) would affect water resources in England;]
[F10(aa)the NRBW, if the plan (or revised plan) would affect water resources in Wales;]
(b)the Authority;
(c)the Secretary of State; and
(d)any [F11water supply licensee] which supplies water to premises in the undertaker’s area via the undertaker’s supply system.
[F12(9)Before giving a direction under subsection (6)(b), the Secretary of State shall consult—
(a)the Environment Agency, if the revised plan would affect water resources in England, and
(b)the NRBW, if the revised plan would affect water resources in Wales.
(9A)Before giving a direction under subsection (6)(b), the Welsh Ministers shall consult—
(a)the NRBW, if the revised plan would affect water resources in Wales, and
(b)the Environment Agency, if the revised plan would affect water resources in England.]
(10)In this section, in relation to a water resources management plan, “published” means published in accordance with section 37B(8)(a) below.
Textual Amendments
F3Ss. 37A-37D inserted (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2006 for specified provisions and further purposes and 1.4.2007 otherwise) by Water Act 2003 (c. 37), ss. 62, 105(3); S.I. 2004/2528, art. 2(j) (with art. 4); S.I. 2005/2714, art. 2(i) (with Sch. paras. 6, 8); S.I. 2006/984, art. 2(q) (with art. 3, Sch.); S.I. 2007/1021, art. 2(a)
F4Word in s. 37A(1) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(2)(a), 94(2)(g)
F5Words in s. 37A(3)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 47(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F6Words in s. 37A(3) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 27(2), 94(2)(g)
F7Words in s. 37A(4) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(2)(b), 94(2)(g)
F8Words in s. 37A(6) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(2)(c), 94(2)(g)
F9Words in s. 37A(8)(a) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 229(2)(a) (with Sch. 7)
F10S. 37A(8)(aa) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 229(2)(b) (with Sch. 7)
F11Words in s. 37A(8)(d) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 47(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F12S. 37A(9)(9A) substituted for s. 37A(9) (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 229(3) (with Sch. 7)
Modifications etc. (not altering text)
C8Ss. 37A-37D modified (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2007 otherwise) by S.I. 1999/672, Sch. 2 (as amended by Water Act 2003 (c. 37), ss. 100(3)(7), 105(3); S.I. 2004/2528, art. 2(s) (with savings in art. 4); S.I. 2005/2714, art. 2(k) (with Sch. 2 para. 8); S.I. 2007/1021, art. 2(c)
(1)The Secretary of State may give a direction about the basis on which a water resources management plan for England is to be prepared.
(2)A direction under this section may be given only where the Secretary of State considers it appropriate to do so with a view to securing that a water undertaker is able to meet the need for the supply of water to consumers in particular circumstances.
(3)A direction under this section may, in particular, require a plan to be prepared on the basis of a specified assumption, including—
(a)an assumption as to whether, and how often, specified circumstances are likely to arise;
(b)an assumption that a specified power would or would not be exercised by the water undertaker or another person in specified circumstances.
(4)Before giving a direction under this section, the Secretary of State must consult—
(a)the Authority,
(b)the Welsh Ministers,
(c)each water undertaker to which the direction would apply,
(d)the Environment Agency,
(e)the NRBW, and
(f)such other persons as the Secretary of State considers appropriate.
(5)In this section—
“specified” means specified in a direction under this section;
“water resources management plan for England” means a water resources management plan prepared by a water undertaker whose area is wholly or mainly in England.]
Textual Amendments
F3Ss. 37A-37D inserted (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2006 for specified provisions and further purposes and 1.4.2007 otherwise) by Water Act 2003 (c. 37), ss. 62, 105(3); S.I. 2004/2528, art. 2(j) (with art. 4); S.I. 2005/2714, art. 2(i) (with Sch. paras. 6, 8); S.I. 2006/984, art. 2(q) (with art. 3, Sch.); S.I. 2007/1021, art. 2(a)
F13S. 37AA inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 27(3), 94(2)(g)
(1)A water undertaker shall—
(a)send a draft water resources management plan to the Secretary of State;
(b)state whether it appears to the undertaker that any information contained in that plan is or might be commercially confidential (as regards itself or another person); and
(c)give the Secretary of State the name of each such other person and his address for service of a notice under subsection (2)(a) below.
(2)If the water undertaker states that it so appears in relation to any such information, the Secretary of State shall—
(a)if the person to whom or to whose business the information relates is not the water undertaker, give that person notice that the information is included in a draft water resources management plan and, unless subsection (10) below applies, is required to be published under this section; and
(b)give each person (including the water undertaker) to whom any such information relates a reasonable opportunity—
(i)of objecting to the publication of the information relating to him on the ground that it is commercially confidential; and
(ii)of making representations to the Secretary of State for the purpose of justifying any such objection,
and shall determine, taking any objections and representations under paragraph (b) into account, whether the information is or is not commercially confidential.
(3)A water undertaker shall—
(a)(subject to subsection (10) below) publish the draft water resources management plan in the prescribed way or, if no way is prescribed, in a way calculated to bring it to the attention of persons likely to be affected by it;
(b)publish with it a statement—
(i)whether any information has been excluded from the published draft plan by virtue of subsection (10) below and, if it has, the general nature of that information; and
(ii)that any person may make representations in writing about the plan to the Secretary of State before the end of a period specified in the statement; and
(c)send a copy of the published draft plan and accompanying statement to such persons (if any) as may be prescribed.
(4)The Secretary of State shall send to the water undertaker a copy of any representations he receives following publication of the draft plan under subsection (3) above and shall give it a reasonable period of time within which to comment on the representations.
(5)The Secretary of State may in regulations prescribe how such representations and any comments by the water undertaker on them are to be dealt with.
(6)Regulations under subsection (5) above—
(a)may provide for the Secretary of State to cause an inquiry or other hearing to be held in connection with the draft water resources management plan; and
(b)if they do so provide, may provide for subsections (2) to (5) of section 250 of the Local Government Act 1972 (local inquiries: evidence and costs) to apply with prescribed modifications to such an inquiry or hearing as they apply to inquiries under that section.
(7)The Secretary of State may direct a water undertaker that its water resources management plan must differ from the draft sent to him under subsection (1) above in ways specified in his direction, and (subject to subsection (9) below) it shall be the duty of the water undertaker to comply with the direction.
(8)The water undertaker shall—
(a)(subject to subsection (10) below) publish the water resources management plan in the prescribed way or, if no way is prescribed, in a way calculated to bring it to the attention of persons likely to be affected by it; and
(b)publish with it a statement whether any information has been excluded from the published plan by virtue of subsection (10) below and, if it has, the general nature of that information.
(9)If the water undertaker considers that publishing a water resources management plan complying with a direction under subsection (7) above would mean including in the published plan any information (other than any information in relation to which the Secretary of State has already made a determination under subsection (2) above) which might be commercially confidential (as regards itself or another person)—
(a)the water undertaker shall send the Secretary of State a notice saying so, and giving the Secretary of State the name of any such other person and his address for service of a notice under subsection (2)(a) above as applied by paragraph (b) below; and
(b)subsection (2) above shall apply in relation to that information as it applies in relation to the information referred to there;
and the Secretary of State may either confirm his direction under subsection (7) above (which is to be treated as a new direction under subsection (7)) or revoke the previous such direction (or the previous one so treated) and give a new one.
(10)The published version of a draft water resources management plan published under subsection (3)(a) above, and a water resources management plan published under subsection (8)(a) above, shall exclude any information which the Secretary of State—
(a)has determined under subsection (2) above (or that subsection as applied by subsection (9) above) is commercially confidential; or
(b)directs the water undertaker to exclude on the ground that it appears to him that its publication would be contrary to the interests of national security.
(11)Any steps to be taken by a water undertaker under this section shall be completed by such time or within such period as the Secretary of State may direct.
Textual Amendments
F3Ss. 37A-37D inserted (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2006 for specified provisions and further purposes and 1.4.2007 otherwise) by Water Act 2003 (c. 37), ss. 62, 105(3); S.I. 2004/2528, art. 2(j) (with art. 4); S.I. 2005/2714, art. 2(i) (with Sch. paras. 6, 8); S.I. 2006/984, art. 2(q) (with art. 3, Sch.); S.I. 2007/1021, art. 2(a)
Modifications etc. (not altering text)
C9Ss. 37A-37D modified (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2007 otherwise) by S.I. 1999/672, Sch. 2 (as amended by Water Act 2003 (c. 37), ss. 100(3)(7), 105(3); S.I. 2004/2528, art. 2(s) (with savings in art. 4); S.I. 2005/2714, art. 2(k) (with Sch. 2 para. 8); S.I. 2007/1021, art. 2(c)
(1)It shall be the duty of each [F14water supply licensee] to provide the water undertaker with such information as the water undertaker may reasonably request for the purposes of preparing or revising its water resources management plan.
(2)In the event of any dispute between a water undertaker and a [F14water supply licensee] as to the reasonableness of the water undertaker’s request under subsection (1) above, either party may refer the matter for determination by the Secretary of State, and any such determination shall be final.
(3)For the purposes of paragraph (b) of section 37B(1) above, the water undertaker shall identify in its statement under that paragraph any information—
(a)provided by a [F14water supply licensee] pursuant to subsection (1) above; and
(b)contained in the water undertaker’s draft water resources management plan,
which the [F14water supply licensee] has (at the time of providing it to the water undertaker) specifically identified as being, in the [F15water supply licensee's] opinion, commercially confidential.
(4)The water undertaker shall not use any unpublished information save for the purpose of facilitating the performance by it of any of the duties imposed on it by or under this Act, any of the other consolidation Acts or the Water Act 1989.
(5)In subsection (4) above—
(a)“unpublished information” means confidential information which—
(i)is provided to the water undertaker by a [F14water supply licensee] under this section;
(ii)relates to the affairs of any individual or to any particular business; and
(iii)by virtue of section 37B above, is not published;
(b)“the other consolidation Acts” has the same meaning as in section 206 below.
Textual Amendments
F3Ss. 37A-37D inserted (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2006 for specified provisions and further purposes and 1.4.2007 otherwise) by Water Act 2003 (c. 37), ss. 62, 105(3); S.I. 2004/2528, art. 2(j) (with art. 4); S.I. 2005/2714, art. 2(i) (with Sch. paras. 6, 8); S.I. 2006/984, art. 2(q) (with art. 3, Sch.); S.I. 2007/1021, art. 2(a)
F14Words in s. 37C substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 48(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F15Words in s. 37C(3) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 48(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
Modifications etc. (not altering text)
C10Ss. 37A-37D modified (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2007 otherwise) by S.I. 1999/672, Sch. 2 (as amended by Water Act 2003 (c. 37), ss. 100(3)(7), 105(3); S.I. 2004/2528, art. 2(s) (with savings in art. 4); S.I. 2005/2714, art. 2(k) (with Sch. 2 para. 8); S.I. 2007/1021, art. 2(c)
(1)Directions given under section 37A [F16, 37AA] or 37B above may be—
(a)general directions applying to all water undertakers; or
(b)directions applying only to one or more water undertakers specified in the directions,
and shall be given by an instrument in writing.
(2)It shall be the duty of each water undertaker to whom directions apply to comply with the directions.
(3)The duties of—
(a)a water undertaker under sections 37A to 37C above and under this section; and
(b)a [F17water supply licensee] under section 37C above,
shall be enforceable by the Secretary of State under section 18 above.
[F18(4)The Minister may by order made by statutory instrument amend the period for the time being specified in section 37A(6)(c).
(5)In subsection (4), “the Minister” means—
(a)the Secretary of State, in relation to an order applying to water undertakers whose areas are wholly or mainly in England, and
(b)the Welsh Ministers, in relation to an order applying to water undertakers whose areas are wholly or mainly in Wales.
(6)A statutory instrument containing an order made by the Secretary of State under subsection (4) is subject to annulment in pursuance of a resolution of either House of Parliament.
(7)A statutory instrument containing an order made by the Welsh Ministers under subsection (4) is subject to annulment in pursuance of a resolution of the Assembly.
(8)Subsection (9) applies in relation to a statutory instrument containing both—
(a)an order made by the Secretary of State under subsection (4), and
(b)an order made by the Welsh Ministers under subsection (4).
(9)If in accordance with subsection (6) or (7) (negative resolution procedure)—
(a)either House of Parliament resolves that an address be presented to Her Majesty praying that an instrument containing an order made by the Secretary of State be annulled, or
(b)the Assembly resolves that an instrument containing an order made by the Welsh Ministers be annulled,
the instrument is to have no further effect and Her Majesty may by Order in Council revoke the instrument.]]
Textual Amendments
F3Ss. 37A-37D inserted (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2006 for specified provisions and further purposes and 1.4.2007 otherwise) by Water Act 2003 (c. 37), ss. 62, 105(3); S.I. 2004/2528, art. 2(j) (with art. 4); S.I. 2005/2714, art. 2(i) (with Sch. paras. 6, 8); S.I. 2006/984, art. 2(q) (with art. 3, Sch.); S.I. 2007/1021, art. 2(a)
F16Word in s. 37D(1) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 27(4), 94(2)(g)
F17Words in s. 37D(3)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 49; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F18S. 37D(4)-(9) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(3), 94(2)(g)
Modifications etc. (not altering text)
C11Ss. 37A-37D modified (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2007 otherwise) by S.I. 1999/672, Sch. 2 (as amended by Water Act 2003 (c. 37), ss. 100(3)(7), 105(3); S.I. 2004/2528, art. 2(s) (with savings in art. 4); S.I. 2005/2714, art. 2(k) (with Sch. 2 para. 8); S.I. 2007/1021, art. 2(c)
(1)For the purpose-
(a)of facilitating the determination of the extent to which breaches of the obligations imposed by the following provisions of this Part are to amount to breaches of the duty imposed by section 37 above; or
(b)of supplementing that duty by establishing overall standards of performance in relation to that duty,
the Secretary of State may, in accordance with section 39 below, by regulations provide for contraventions of such requirements as may be prescribed to be treated for the purposes of this Act as breaches of that duty.
(2)The Secretary of State may, in accordance with section 39 below, by regulations prescribe such standards of performance in connection with the provision of supplies of water as, in his opinion, ought to be achieved in individual cases.
(3)Regulations under subsection (2) above may provide that if a water undertaker fails to meet a prescribed standard it shall pay such amount as may be prescribed to any person who is affected by the failure and is of a prescribed description.
(4)Without prejudice to the generality of the power conferred by subsection (2) above, regulations under that subsection may—
(a)include in a standard of performance a requirement for a water undertaker, in prescribed circumstances, to inform a person of his rights by virtue of any such regulations;
(b)provide for any dispute under the regulations to be referred by either party to the dispute to the Authority;
(c)make provision for the procedure to be followed in connection with any such reference and for [F2the Authority's] determination on such a reference to be enforceable in such manner as may be prescribed;
(d)prescribe circumstances in which a water undertaker is to be exempted from requirements of the regulations.
F19[(5)Where [F2the Authority] determines any dispute in accordance with regulations under this section [F2it] shall, in such manner as may be specified in the regulations, give [F2its] reasons for reaching [F2its] decision with respect to the dispute.]
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F19S. 38(5) added (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1 para. 18; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992 , art. 3, Sch. Pt.I
(1)For the purpose of establishing overall standards of performance in connection with the supply of water by water supply licensees in accordance with their retail authorisations or restricted retail authorisations, the Minister may, in accordance with section 39ZA, by regulations—
(a)impose requirements in connection with such supplies of water;
(b)provide for a requirement so imposed to be enforceable under section 18 by—
(i)the Minister, or
(ii)the Authority, with the consent of or in accordance with a general authorisation given by the Secretary of State.
(2)The Minister may, in accordance with section 39ZA, by regulations prescribe such standards of performance in connection with the provision of supplies of water as, in the Minister's opinion, ought to be achieved in individual cases.
(3)Regulations under subsection (2) may provide that if a water supply licensee fails to meet a prescribed standard the licensee must pay such amount as may be prescribed to any person who—
(a)is affected by the failure, and
(b)is of a prescribed description.
(4)Without prejudice to the generality of the power conferred by subsection (2), regulations under subsection (2) may—
(a)include in a standard of performance a requirement for a water supply licensee, in prescribed circumstances, to inform a person of that person's rights by virtue of any such regulations;
(b)provide for a dispute under the regulations to be referred by either party to the dispute to the Authority;
(c)make provision for the procedure to be followed in connection with any such reference and for the Authority's determination on such a reference to be enforceable in such manner as may be prescribed;
(d)prescribe circumstances in which a water supply licensee is to be exempted from requirements of the regulations.
(5)Where the Authority determines any dispute in accordance with regulations under this section it must, in such manner as may be specified in the regulations, give its reasons for reaching its decision with respect to the dispute.
(6)In this section—
“the Minister” means—
the Secretary of State, in relation to supplies of water made in accordance with a retail authorisation;
the Welsh Ministers, in relation to supplies of water made in accordance with a restricted retail authorisation;
“prescribed” means prescribed by regulations made by the Minister.]
Textual Amendments
F20S. 38ZA inserted (1.11.2016) by Water Act 2014 (c. 21), ss. 29(1), 94(3); S.I. 2016/1007, art. 2(d)
(1)the Authority shall from time to time collect information with respect to—
(a)the compensation paid by water undertakers under regulations under section 38(2) above; F22...
[F23(aa)the compensation paid by water supply licensees under regulations under section 38ZA(2); and]
(b)the levels of overall performance achieved by water undertakers [F24or water supply licensees] in connection with the provision of water supplies.
(2)At such times as [F2the Authority] may direct, each water undertaker shall give the following information to [F2the Authority]—
(a)as respects each standard prescribed by regulations under section 38(2) above, the number of cases in which compensation was paid and the aggregate amount or value of that compensation; and
(b)as respects each standard established by regulations under section 38(1)(b) above, such information with respect to the level of performance achieved by the undertaker as may be so specified.
[F25(2A)At such times as the Authority may direct, each water supply licensee is to give the following information to the Authority—
(a)as respects each standard established by regulations under section 38ZA(1), such information with respect to the level of performance achieved by the licensee as may be specified in the direction;
(b)as respects each standard prescribed by regulations under section 38ZA(2), the number of cases in which compensation was paid and the aggregate amount or value of that compensation.]
[F26(3)The requirements in subsections (2) and (2A) are enforceable by the Authority under section 18.]
(4)[F2The Authority] shall, at least once in every year, arrange for the publication, in such form and in such manner as [F2it] considers appropriate, of such of the information collected by or given to [F2it] under this section as it may appear to [F2it] expedient to give to customers or potential customers of water undertakers [F27or water supply licensees].
(5)In arranging for the publication of any such information [F2the Authority] shall have regard to the need for excluding, so far as practicable—
(a)any matter which relates to the affairs of an individual, where publication of that matter would or might, in the opinion of [F2the Authority], seriously and prejudicially affect the interests of that individual; and
(b)any matter which relates specifically to the affairs of a particular body of persons, whether corporate or unincorporate, where publication of that matter would or might, in the opinion of [F2the Authority], seriously and prejudicially affect the interests of that body.]
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F21S. 38A inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s.27; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F22Word in s. 38A(1) repealed (1.11.2016) by Water Act 2014 (c. 21), ss. 29(3)(a), 94(3); S.I. 2016/1007, art. 2(d)
F23S. 38A(aa) inserted (1.11.2016) by Water Act 2014 (c. 21), ss. 29(3)(b), 94(3); S.I. 2016/1007, art. 2(d)
F24Words in s. 38A(b) inserted (1.11.2016) by Water Act 2014 (c. 21), ss. 29(3)(c), 94(3); S.I. 2016/1007, art. 2(d)
F25S. 38A(2A) inserted (1.11.2016) by Water Act 2014 (c. 21), ss. 29(4), 94(3); S.I. 2016/1007, art. 2(d)
F26S. 38A(3) substituted (1.1.2015 for specified purposes, 1.11.2016 in so far as not already in force) by Water Act 2014 (c. 21), ss. 29(5), 94(3); S.I. 2014/3320, art. 2(2)(a); S.I. 2016/1007, art. 2(d)
F27Words in s. 38A(4) inserted (1.11.2016) by Water Act 2014 (c. 21), ss. 29(6), 94(3); S.I. 2016/1007, art. 2(d)
(1)It shall be the duty of the Council to publish, in such form and manner and with such frequency as it thinks appropriate, such statistical information as it considers appropriate relating to complaints made by consumers about any matter relating to the activities of water undertakers or [F29water supply licensees] and the handling of such complaints.
(2)In subsection (1) above, “complaints” includes complaints made directly to water undertakers or [F30water supply licensees] (or anyone carrying on activities on their behalf) and complaints to the Authority, the Council, the Assembly or the Secretary of State.]
Textual Amendments
F28S. 38B inserted (1.10.2005) by Water Act 2003 (c. 37), ss. 45(1), 105(3); S.I. 2005/2714, art. 2(e) (with Sch. para. 8)
F29Words in s. 38B(1) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 50(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F30Words in s. 38B(2) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 50(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
[F31(A1)The Secretary of State may make regulations under section 38 above—
(a)on an application by the Authority, in accordance with subsections (1) to (3) below; or
(b)otherwise than on such an application, in accordance with subsections (4) to (8) below.]
(1)[F32Where the Authority has made to the Secretary of State a written application complying with subsection (2) below, the Secretary of State may make regulations under section 38 above if—]
F33[(b) the Secretary of State is satisfied that a copy of the application has been served by the Authority—
(i)on every water undertaker specified in the application;F34. . .
(ii)on persons or bodies appearing to the Secretary of State to be representative of persons likely to be affected by the regulations;]
[F35(iii)on the Council; and
(iv)on such other persons or bodies as the Secretary of State may consider appropriate;]
(c)such period as the Secretary of State considers appropriate has been allowed for the making—
(i)by [F2the Authority]; and
(ii)by any affected water undertaker [F36or person or body on whom a copy of the application has been served under paragraph [F37(b)] above],
of representations or objections with respect to [F2the Authority's] proposals and any modifications proposed by the Secretary of State; and
(d)the Secretary of State has considered [F38the summary mentioned in subsection (2)(bb) below,] [F2the Authority's] reasons for [F2its] proposals and every representation or objection which has been duly made with respect to those proposals, or any proposed modifications of those proposals, and has not been withdrawn.
F39[(1A)Before making an application to the Secretary of State under this section [F2the Authority] shall arrange for such research as [F2it] considers appropriate with a view to discovering the views of a representative sample of persons likely to be affected and consider the results.]
(2)An application made by [F2the Authority] to the Secretary of State complies with this subsection if it—
(a)sets out [F40the Authority’s proposals for the making of] regulations under section 38 above;
(b)specifies the water undertaker or undertakers in relation to which it is proposed [F41the regulations] should apply
F42[(bb) is accompanied by a written summary of the results of the research carried out in accordance with subsection (1A) above;] ; and
(c)summarises [F2the Authority's] reasons for [F2its] proposals.
(3)The Secretary of State shall not make any regulations [F43on an application by the Authority under this section] except where—
(a)the only provisions of the regulations are [F44those which in the opinion of the Secretary of State give effect to the proposals set out in the Authority’s application or to those proposals] with such modifications as the Secretary of State considers appropriate; and
(b)each of the modifications (if any) of [F2the Authority's] proposals to which effect is given by the regulations is a modification the proposal to make which has been notified—
(i)to [F2the Authority];F45. . .
(ii)to any water undertaker appearing to the Secretary of State to be likely to be affected by the modifications [F46and
(iii)to any person or body on whom a copy of the Authority’s application was served under subsection (1)(b) above.]
[F47(4)Where no such application as is mentioned in subsection (1) above has been made, the Secretary of State may make regulations under section 38 above only if he considers—
(a)that the regulations will contribute towards the attainment of policies relating to public health or the environment; or
(b)(if he does not consider that they will so contribute) that there are exceptional reasons why it is otherwise in the public interest that the regulations should be made.
(5)Before making regulations under section 38 above by virtue of subsection (4) above, the Secretary of State shall—
(a)give notice of his proposals;
(b)consider the results of the research carried out in accordance with subsection (7) below; and
(c)consider every representation or objection with respect to the proposals which has been duly made and not withdrawn.
(6)A notice under subsection (5)(a) above must—
(a)summarise the Secretary of State’s reasons for his proposals;
(b)specify the water undertaker or undertakers in relation to which it is proposed the regulations should apply; and
(c)specify the period within which objections or representations with respect to the proposals may be made.
(7)Before giving notice under subsection (5)(a) above the Secretary of State shall arrange for such research as he considers appropriate with a view to discovering the views of a representative sample of persons likely to be affected.
(8)A notice under subsection (5)(a) above shall be given by serving a copy on—
(a)the Authority;
(b)the Council;
(c)every water undertaker to which the regulations will apply;
(d)persons or bodies appearing to the Secretary of State to be representative of persons likely to be affected by the regulations; and
(e)such other persons or bodies as the Secretary of State may consider appropriate.]
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F31S. 39(A1) inserted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(2), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F32S. 39(1): words substituted (1.4.2005) for para. (a) and preceding words by virtue of Water Act 2003 (c. 37), ss. 41(3)(a), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F33S. 39(1)(b) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1 para. 19(2); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992 , art. 3, Sch. Pt.I
F34Word in s. 39(1)(b)(i) repealed (1.4.2005) by Water Act 2003 (c. 37), ss. 41(3)(b), 101(2), 105(3), Sch. 9 Pt. 2; S.I. 2005/968, art. 2(h)(n)(i) (with savings in art. 4, Sch. 1, 2)
F35S. 39(1)(b)(iii)(iv) inserted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(3)(b), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F36Words in s. 39(1)(c)(ii) inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1 para. 19(3); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992 , art. 3, Sch. Pt. I
F37Words in s. 39(1)(c)(ii) substituted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(3)(c), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F38Words in s. 39(1)(d) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 26(2); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992 , art. 3, Sch. Pt.I
F39S. 39(1A) inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 26(3); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992 , art. 3, Sch. Pt. I
F40Words in s. 39(2)(a) substituted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(4)(a), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F41Words in s. 39(2)(b) substituted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(4)(b), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F42S. 39(2)(bb) inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 26(4); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992 , art. 3, Sch. Pt.I
F43Words in s. 39(3) substituted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(5)(a), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F44Words in s. 39(3)(a) substituted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(5)(b), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F45Word in s. 39(3)(b)(i) repealed (1.4.2005) by Water Act 2003 (c. 37), ss. 41(5)(c), 105(3), 101(2), Sch. 9 Pt. 2; S.I. 2005/968, art. 2(h)(n)(i) (with savings in art. 4, Sch. 1, 2)
F46S. 39(3)(b)(iii) and preceding word inserted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(5)(c), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
F47S. 39(4)-(8) inserted (1.4.2005) by Water Act 2003 (c. 37), ss. 41(6), 105(3); S.I. 2005/968, art. 2(h) (with savings in art. 4, Sch. 1, 2)
(1)Section 39 applies for the purposes of making regulations under section 38ZA as it applies for the purposes of making regulations under section 38.
(2)In the application of section 39 by virtue of subsection (1)—
(a)a reference to a water undertaker is to be treated as a reference to a water supply licensee, and
(b)a reference to the Secretary of State is to be treated as a reference to the Minister (as defined in section 38ZA(6)).
(3)Regulations under section 38ZA are to be made by statutory instrument.
(4)A statutory instrument containing regulations under section 38ZA is subject to annulment in pursuance of a resolution of—
(a)either House of Parliament, in the case of regulations made by the Secretary of State;
(b)the Assembly, in the case of regulations made by the Welsh Ministers.
(5)Section 213(2) to (2B) applies to regulations made by the Welsh Ministers under section 38ZA as it applies to regulations made by the Secretary of State.]
Textual Amendments
F48S. 39ZA inserted (15.7.2015) by Water Act 2014 (c. 21), ss. 29(7), 94(3); S.I. 2015/1469, art. 2(c) (with art. 5(1)(5))
Modifications etc. (not altering text)
C12S. 39ZA(2)(a) modified (temp.) (1.7.2015) by The Water Act 2014 (Commencement No. 4 and Transitional Provisions) Order 2015 (S.I. 2015/1469), art. 5(1)(5)
(1)Each water undertaker shall, in such form and manner and with such frequency as the Authority may direct, take steps to inform its customers [F50, and, if the direction so specifies, [F51water supply licensees] using the undertaker’s supply system for the purpose of supplying water to the premises of customers or those customers,] of—
(a)the standards of overall performance established under section 38(1)(b) above which are applicable to that undertaker; and
(b)that undertaker’s level of performance as respects each of those standards.
[F52(1A)Each water supply licensee must, in such form and manner and with such frequency as the Authority may direct, take steps to inform the licensee's customers of—
(a)the standards of overall performance established under section 38ZA(1) which are applicable to that licensee;
(b)that licensee's level of performance as regards those standards.
(1B)The Authority may direct that the requirement in subsection (1A) is not to apply to such water supply licensees as may be specified in the direction.]
(2)In giving [F53a direction under subsection (1) or (1A)], [F2the Authority] shall not specify a frequency of less than once in every period of twelve months.
[F54(2A)The [F55water supply licensees] referred to in subsection (1) above shall, if the Authority so directs, pass on the information about the matters mentioned in that subsection to their customers.
(2B)In subsection (1) above, the reference to the water undertaker’s supply system shall be construed in accordance with [F56section 17B] above.]
(3)The duty of a water undertaker [F57or [F58water supply licensee]] to comply with this section shall be enforceable by [F2the Authority] under section 18 above.]
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F49S. 39A inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 28; Competition and Service (Utilities) Act. 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt.I
F50Words in s. 39A(1) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 13(2); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F51Words in s. 39A(1) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 51(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F52S. 39A(1A)(1B) inserted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 51(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F53Words in s. 39A(2) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 51(4); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F54S. 39A(2A)(2B) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 13(3); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F55Words in s. 39A(2A) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 51(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F56Words in s. 39A(2B) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 51(5); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F57Words in s. 39A(3) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 13(4); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F58Words in s. 39A(3) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 51(6); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)It shall be the duty of each water undertaker to prepare [F60, publish] and maintain a drought plan.
(2)A drought plan is a plan for how the water undertaker will continue, during a period of drought, to discharge its duties to supply adequate quantities of wholesome water, with as little recourse as reasonably possible to drought orders or drought permits under Chapter 3 of Part 2 of the Water Resources Act 1991.
(3)The duties referred to in subsection (2) above include in particular those imposed under or by virtue of—
(a)section 37 above;
(b)sections 67 to 69 below.
(4)A drought plan shall address, in particular, the following matters—
(a)what measures the water undertaker might need to take to restrain the demand for water within its area;
(b)what measures the water undertaker might need to take to obtain extra water from other sources (also taking into account for that purpose the introduction of water into the undertaker’s supply system by or on behalf of [F61water supply licensees]);
(c)how the water undertaker will monitor the effects of the drought and of the measures taken under the drought plan;
(d)such other matters as the Secretary of State may specify in directions.
(5)Section 37B above (water resources management plans: publication and representations), including any power in that section to make regulations or give directions, applies in relation to drought plans (including revised plans) as it applies in relation to water resources management plans.
(6)Each water undertaker shall review (or further review) its drought plan and prepare [F62and publish] a revised plan in each of the following cases—
(a)if there is a material change of circumstances;
(b)if directed to do so by the Secretary of State;
(c)in any event, not later than the end of the period of [F63five years] beginning with the date when the plan (or revised plan) was last published in accordance with section 37B(8)(a) above as applied by subsection (5) above,
and shall follow the procedure in section 37B above as applied by subsection (5) above (whether or not the revised plan prepared by the undertaker includes any proposed alterations to the previous plan).
(7)Before preparing its drought plan (including a revised plan), the water undertaker shall consult—
(a)the Environment Agency[F64, if the plan (or revised plan) would affect water resources in England;]
[F65(aa)the NRBW, if the plan (or revised plan) would affect water resources in Wales;]
(b)the Authority;
(c)the Secretary of State; and
(d)any [F66water supply licensee] which supplies water to premises in the undertaker’s area via the undertaker’s supply system.
(8)The Secretary of State may give directions specifying the form which a drought plan must take.
(9)Directions given under this section (including directions given under section 37B above as applied by subsection (5) above) may be—
(a)general directions applying to all water undertakers; or
(b)directions applying only to one or more water undertakers specified in the directions,
and shall be given by an instrument in writing.
(10)It shall be the duty of each water undertaker to whom directions apply to comply with the directions.
[F67(11)Before giving a direction under subsection (6)(b), the Secretary of State shall consult—
(a)the Environment Agency, if the revised plan would affect water resources in England, and
(b)the NRBW, if the revised plan would affect water resources in Wales.
(11A)Before giving a direction under subsection (6)(b), the Welsh Ministers shall consult—
(a)the NRBW, if the revised plan would affect water resources in Wales, and
(b)the Environment Agency, if the revised plan would affect water resources in England.]
(12)The duty of a water undertaker under this section shall be enforceable by the Secretary of State under section 18 above.
Textual Amendments
F59Ss. 39B, 39C inserted (1.10.2004 for specified purposes and otherwise 1.10.2005) by Water Act 2003 (c. 37), ss. 63, 105(3); S.I. 2004/2528, art. 2(j) (with savings in art. 4); S.I. 2005/2714, art. 2(j) (with Sch. 2 para. 8)
F60Word in s. 39B(1) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(4)(a), 94(2)(g)
F61Words in s. 39B(4)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 52(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F62Words in s. 39B(6) inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(4)(b)(i), 94(2)(g)
F63Words in s. 39B(6)(c) substituted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(4)(b)(ii), 94(2)(g)
F64Words in s. 39B(7)(a) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 230(2)(a) (with Sch. 7)
F65S. 39B(7)(aa) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 230(2)(b) (with Sch. 7)
F66Words in s. 39B(7)(d) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 52(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F67S. 39B(11)(11A) substituted for s. 39B(11) (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 230(3) (with Sch. 7)
Modifications etc. (not altering text)
C13S. 39B modified (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2007 otherwise) by S.I. 1999/672, Sch. 2 (as amended by Water Act 2003 (c. 37), ss. 100(3)(7), 105(3); S.I. 2004/2528, art. 2(s) (with savings in art. 4); S.I. 2005/2714, art. 2(k) (with Sch. 2 para. 8); S.I. 2007/1021, art. 2(c)
(1)It shall be the duty of each [F68water supply licensee] to provide the water undertaker with such information as the water undertaker may reasonably request for the purposes of preparing or revising its drought plan.
(2)In the event of any dispute between a water undertaker and a [F68water supply licensee] as to the reasonableness of the water undertaker’s request under subsection (1) above, either party may refer the matter for determination by the Secretary of State, and any such determination shall be final.
(3)For the purposes of paragraph (b) of section 37B(1) above as applied by section 39B(5) above, the water undertaker shall identify in its statement under that paragraph any information—
(a)provided by a [F68water supply licensee] pursuant to subsection (1) above; and
(b)contained in the water undertaker’s draft drought plan,
which the [F68water supply licensee] has (at the time of providing it to the water undertaker) specifically identified as being, in the [F69water supply licensee's] opinion, commercially confidential.
(4)The water undertaker shall not use any unpublished information save for the purpose of facilitating the performance by it of any of the duties imposed on it by or under this Act, any of the other consolidation Acts or the Water Act 1989.
(5)In subsection (4) above—
(a)“unpublished information” means confidential information which—
(i)is provided to the water undertaker by a [F68water supply licensee] under this section;
(ii)relates to the affairs of any individual or to any particular business; and
(iii)by virtue of section 37B above as applied by section 39B(5) above, is not published;
(b)“the other consolidation Acts” has the same meaning as in section 206 below.
(6)The duties of a [F68water supply licensee] and a water undertaker under this section shall be enforceable by the Secretary of State under section 18 above.]
Textual Amendments
F59Ss. 39B, 39C inserted (1.10.2004 for specified purposes and otherwise 1.10.2005) by Water Act 2003 (c. 37), ss. 63, 105(3); S.I. 2004/2528, art. 2(j) (with savings in art. 4); S.I. 2005/2714, art. 2(j) (with Sch. 2 para. 8)
F68Words in s. 39C substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 53(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F69Words in s. 39C(3) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 53(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
Modifications etc. (not altering text)
C14S. 39C modified (1.10.2004 for specified purposes and 1.10.2005 for further specified purposes and 1.4.2007 otherwise) by S.I. 1999/672, Sch. 2 (as amended by Water Act 2003 (c. 37), ss. 100(3)(7), 105(3); S.I. 2004/2528, art. 2(s) (with savings in art. 4); S.I. 2005/2714, art. 2(k) (with Sch. 2 para. 8); S.I. 2007/1021, art. 2(c)
(1)The Minister may by order made by statutory instrument amend the period for the time being specified in section 39B(6)(c).
(2)In subsection (1), “the Minister” means—
(a)the Secretary of State, in relation to an order applying to water undertakers whose areas are wholly or mainly in England, and
(b)the Welsh Ministers, in relation to an order applying to water undertakers whose areas are wholly or mainly in Wales.
(3)A statutory instrument containing an order made by the Secretary of State under subsection (1) is subject to annulment in pursuance of a resolution of either House of Parliament.
(4)A statutory instrument containing an order made by the Welsh Ministers under subsection (1) is subject to annulment in pursuance of a resolution of the Assembly.
(5)Subsection (6) applies in relation to a statutory instrument containing both—
(a)an order made by the Secretary of State under subsection (1), and
(b)an order made by the Welsh Ministers under subsection (1).
(6)If in accordance with subsection (3) or (4) (negative resolution procedure)—
(a)either House of Parliament resolves that an address be presented to Her Majesty praying that an instrument containing an order made by the Secretary of State be annulled, or
(b)the Assembly resolves that an instrument containing an order made by the Welsh Ministers be annulled,
the instrument is to have no further effect and Her Majesty may by Order in Council revoke the instrument.]
Textual Amendments
F70S. 39D inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 28(5), 94(2)(g)
(1)This section applies where—
(a)a qualifying person requests a water undertaker to provide a supply of water in bulk to the qualifying person, or
(b)a water undertaker proposes such an arrangement;
and references in this section to the supplier are references to the water undertaker who is to provide the supply of water.
(2)In this section “qualifying person” means—
(a)a water undertaker;
(b)a person who has made an application for an appointment or variation under section 8 which has not been determined.
(3)On the application of the qualifying person or the supplier, the Authority may—
(a)if it appears to the Authority that it is necessary or expedient for the purposes of securing the efficient use of water resources, or the efficient supply of water, that the supplier should give a supply of water in bulk to the qualifying person, and
(b)if the Authority is satisfied that the supplier and qualifying person cannot reach agreement within a reasonable time,
by order require the supplier to give and the qualifying person to take a supply of water in bulk for such period and on such terms and conditions as may be specified in the order.
(4)Before making an order under subsection (3), the Authority must consult the appropriate agency, in particular about whether the proposed supply of water would secure an efficient use of water resources, taking into account the effect on the environment of the proposed supply.
(5)Subject to subsection (6), an order under subsection (3) has effect as an agreement between the supplier and the qualifying person.
(6)If the Authority makes an order under subsection (3) that affects a person who is a qualifying person by virtue of subsection (2)(b), the Authority must frame the order so that it does not have effect until—
(a)the person becomes a water undertaker for the area specified in the order, or
(b)the person becomes a water undertaker for an area that includes the area specified in the order (in the case of a water undertaker applying for a variation).
(7)Neither the CMA nor the Authority may exercise, in respect of an agreement for the supply of water in bulk by a water undertaker to a qualifying person, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(8)Subsection (7)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement for the supply of water in bulk by a water undertaker to a qualifying person, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(9)In exercising its functions under this section, the Authority must have regard to the desirability of—
(a)facilitating effective competition within the water supply industry;
(b)the supplier's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the supplier's being able to meet its existing obligations, and likely future obligations, to supply water without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the supplier to meet its existing obligations, or likely future obligations, to supply water.
(10)In this section and section 40A “the appropriate agency”, in relation to a determination whether to make an order under subsection (3) or section 40A(1) which would result in, or which would vary or terminate, a bulk supply agreement, means—
(a)the Environment Agency, in a case where all parties to the bulk supply agreement are or would be—
(i)a water undertaker whose area is wholly in England, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(b)the NRBW, in a case where all parties to the bulk supply agreement are or would be—
(i)a water undertaker whose area is wholly in Wales, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(c)both the Environment Agency and the NRBW, in any other case.
(11)In this section and sections 40A to 40J “bulk supply agreement” means an agreement with one or more water undertakers for the supply of water in bulk and includes—
(a)an order under subsection (3) which is deemed to be an agreement by virtue of subsection (5), and
(b)any agreement which has been varied by order under section 40A(1).]
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)On the application of any party to a bulk supply agreement, the Authority may—
(a)if it appears to the Authority that it is necessary or expedient for the purpose of securing the efficient use of water resources, or the efficient supply of water, that the bulk supply agreement should be varied or terminated, and
(b)if the Authority is satisfied that variation or termination cannot be achieved by agreement within a reasonable time,
by order vary or terminate the bulk supply agreement.
(2)Before making an order under subsection (1), the Authority must consult the appropriate agency, in particular about whether the proposed variation or termination of the bulk supply agreement would secure an efficient use of water resources, taking into account the effect on the environment of what is proposed.
(3)If an order under subsection (1) is made in relation to a bulk supply agreement, the agreement—
(a)has effect subject to the provision made by the order, or
(b)ceases to have effect (as the case may be).
(4)An order under subsection (1) may require any party to the agreement to pay compensation to any other party.
(5)Neither the CMA nor the Authority may exercise, in respect of an agreement to vary or terminate a bulk supply agreement, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(6)Subsection (5)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement to vary or terminate a bulk supply agreement, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(7)In exercising its functions under this section, the Authority must have regard to the expenses incurred by the supplier in complying with its obligations under the bulk supply agreement in question and to the desirability of—
(a)facilitating effective competition within the water supply industry;
(b)the supplier's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the supplier's being able to meet its existing obligations, and likely future obligations, to supply water without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the supplier to meet its existing obligations, or likely future obligations, to supply water.
(8)In this section and sections 40B to 40J—
“qualifying person” has the meaning given by section 40;
“supplier”, in relation to a bulk supply agreement, means any water undertaker which is required by the agreement to provide a bulk supply of water.]
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)The Authority may issue one or more codes in respect of bulk supply agreements.
(2)A code may make provision about—
(a)procedures in connection with making a bulk supply agreement;
(b)procedures in connection with varying or terminating a bulk supply agreement;
(c)procedures to be followed by the Authority in determining whether to make an order under section 40(3) or 40A(1);
(d)the terms and conditions of a bulk supply agreement, including terms as to the duration of such an agreement;
(e)principles for determining the terms and conditions that should or should not be incorporated into a bulk supply agreement;
(f)the steps to be taken by the Authority in determining whether a person is complying with a code.
(3)A code must include provision requiring persons proposing to make, vary or terminate a bulk supply agreement to consult the appropriate agency.
(4)If the Authority considers that a water undertaker is not acting as required by a code, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(5)The Authority may not give a direction under subsection (4) requiring a person to enter into, vary or terminate an agreement.
(6)It is the duty of a water undertaker to comply with a direction under subsection (4), and this duty is enforceable by the Authority under section 18.
(7)A code may make different provision for different persons or different descriptions of person.
(8)The Authority may from time to time revise a code issued under this section and issue a revised code.
(9)A revised code may include provision for applying any of its revisions to bulk supply agreements made before the revised code comes into force.
(10)In this section “the appropriate agency”, in relation to a bulk supply agreement or proposed bulk supply agreement, means the body that would be consulted by the Authority under section 40(4) or 40A(2) if an order under section 40(3) or 40A(1) were being considered in relation to the agreement or proposed agreement.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)Before issuing a code under section 40B, the Authority must—
(a)prepare a draft of the proposed code under section 40B;
(b)consult the appropriate agency;
(c)consult such other persons about the proposed code as it considers appropriate.
(2)The Authority must specify the period (“the consultation period”) within which persons may make representations about the proposed code.
(3)Before a code under section 40B prepared by the Authority is issued, the Minister may direct the Authority—
(a)not to issue the code, or
(b)to issue the code with specified modifications.
(4)Subsection (3) is subject to subsections (6) and (7).
(5)In subsection (3) “the Minister” means—
(a)the Secretary of State, so far as a code prepared by the Authority relates to bulk supply agreements to which all parties are—
(i)a water undertaker whose area is wholly or mainly in England, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(b)the Welsh Ministers, so far as a code prepared by the Authority relates to bulk supply agreements to which all parties are—
(i)a water undertaker whose area is wholly or mainly in Wales, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(c)the Secretary of State and the Welsh Ministers acting jointly, so far as a code prepared by the Authority relates to bulk supply agreements to which—
(i)a person falling within paragraph (a)(i) or (ii) is party, and
(ii)a person falling within paragraph (b)(i) or (ii) is party.
(6)If the power under subsection (3) is exercised to give a direction in respect of such bulk supply agreements as are referred to in paragraph (a), (b) or (c) of subsection (5), it may not be exercised again in respect of such bulk supply agreements as are referred to in that paragraph.
(7)If the power under subsection (3) to give a direction in respect of such bulk supply agreements as are referred to in paragraph (a), (b) or (c) of subsection (5) is not exercised on the first occasion on which it may be so exercised, it may not be exercised in respect of such bulk supply agreements as are referred to in that paragraph on a later occasion.
(8)A direction under subsection (3) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code prepared by the Authority in relation to which a direction may be given may not be issued before that period of 28 days has expired.
(9)In this section “the appropriate agency” means—
(a)the Environment Agency, so far as a proposed code relates to bulk supply agreements to which all parties are persons mentioned in section 40(10)(a)(i) or (ii);
(b)the NRBW, so far as a proposed code relates to bulk supply agreements to which all parties are persons mentioned in section 40(10)(b)(i) or (ii);
(c)both the Environment Agency and the NRBW, in any other case.
(10)This section is subject to section 40D.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)This section applies if the Authority proposes to issue a revised code under section 40B and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 40C does not apply to the proposed revised code.
(3)Once the Authority has issued the revised code, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised code, and
(b)as regards each revision contained in it, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(4)Notice under subsection (3) is to be given to such persons as the Authority considers appropriate.
(5)Unless the Authority gives notice that a revision in a revised code is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised code is issued.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)The Authority may issue rules about charges that may be imposed by a water undertaker under a bulk supply agreement.
(2)The rules may in particular make provision about—
(a)what types of charge may be imposed;
(b)the amount or the maximum amount, or a method for determining the amount or maximum amount, of any type of charge;
(c)principles for determining what types of charge may or may not be imposed;
(d)principles for determining the amount of any charge that may be imposed;
(e)publication of the charges that may be imposed.
(3)If the Authority considers that a water undertaker is not acting as required by rules under this section, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(4)It is the duty of a water undertaker to comply with a direction under subsection (3), and this duty is enforceable by the Authority under section 18.
(5)The rules may—
(a)make different provision for different water undertakers or different descriptions of water undertaker;
(b)make different provision for different purposes;
(c)make provision subject to exceptions.
(6)The Authority may from time to time revise rules issued under this section and issue revised rules.
(7)The Authority must issue revised rules if—
(a)guidance is issued under section 40I, and
(b)the Authority, having regard to that guidance, considers that it is appropriate to revise the rules.
(8)Revised rules may include provision for applying any of their revisions to bulk supply agreements made before the revised rules come into effect.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)Rules under section 40E may provide for the reduction of charges payable for a supply of water under a bulk supply agreement where conditions specified by the rules are satisfied.
(2)Rules made by virtue of subsection (1) may in particular—
(a)specify conditions that affect any party to a bulk supply agreement;
(b)require that steps be taken for the purpose of reducing or managing water consumption;
(c)specify conditions about reducing charges payable by a person who—
(i)is not party to the agreement, and
(ii)takes or proposes to take such steps as satisfy or would satisfy a condition falling within paragraph (b).
(3)The rules may provide that, where a charge falls to be reduced in accordance with rules made by virtue of subsection (1), the water undertaker to which the charges are payable must give notice of that reduction to the Authority.
(4)Rules made by virtue of subsection (3) may—
(a)make provision as to the content of the notice;
(b)specify the period within which an undertaker is to give notice to the Authority.
(5)Provision under subsection (4)(a) may in particular require the notice to specify—
(a)the provision of the rules that brings about the reduction in the charge;
(b)the amount of the charge, with and without the reduction;
(c)the period for which the reduction has effect.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)Before issuing rules under section 40E, the Authority must—
(a)prepare a draft of the proposed rules, and
(b)consult such persons about the proposed rules as it thinks appropriate.
(2)The Authority must specify the period (“the consultation period”) within which persons may make representations about the proposed rules.
(3)The Authority must have regard to guidance issued under section 40I in making rules under section 40E.
(4)Before rules under section 40E prepared by the Authority are issued, the Minister may direct the Authority not to issue the rules.
(5)In subsection (4) “the Minister” means—
(a)the Secretary of State, so far as rules prepared by the Authority relate to bulk supply agreements to which all parties are—
(i)a water undertaker whose area is wholly or mainly in England, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(b)the Welsh Ministers, so far as rules prepared by the Authority relate to bulk supply agreements to which all parties are—
(i)a water undertaker whose area is wholly or mainly in Wales, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(c)the Secretary of State and the Welsh Ministers acting jointly, so far as rules prepared by the Authority relate to bulk supply agreements to which—
(i)a person falling within paragraph (a)(i) or (ii) is party, and
(ii)a person falling within paragraph (b)(i) or (ii) is party.
(6)A direction under subsection (4) must be given within the period of 28 days beginning with the day after the end of the consultation period, and rules may not be issued before that period of 28 days has expired.
(7)This section is subject to section 40H.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)This section applies if the Authority proposes to issue revised rules under section 40E and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 40G does not apply to the proposed revised rules.
(3)Before issuing the revised rules, the Authority must give notice to the Minister of its intention to issue revised rules.
(4)Before the revised rules are issued, the Minister may direct the Authority not to issue the revised rules.
(5)A direction under subsection (4) must be given within the period of 14 days beginning with the day after the day on which notice is given under subsection (3), and the Authority may not issue the revised rules in question before—
(a)that period of 14 days expires, or
(b)the Minister notifies the Authority that no direction under subsection (4) will be given in relation to the revised rules,
whichever is the sooner.
(6)Once the Authority has issued the revised rules, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised rules, and
(b)as regards each revision contained in them, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(7)Notice under subsection (6) is to be given to such persons as the Authority considers appropriate.
(8)Unless the Authority gives notice that a revision in revised rules is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised rules are issued.
(9)In this section “the Minister” has the meaning given by section 40G.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)The Minister may issue guidance as to the content of rules under section 40E.
(2)Before issuing the guidance, the Minister must—
(a)prepare a draft of the proposed guidance;
(b)consult the relevant persons about the draft.
(3)The relevant persons are—
(a)the Secretary of State;
(b)the Welsh Ministers;
(c)such other persons as the Minister thinks appropriate.
(4)The Minister may from time to time revise the guidance and issue revised guidance.
(5)Subsections (2) and (3) apply to revised guidance as they apply to the original guidance.
(6)The Minister must arrange for the publication of guidance issued under this section.
(7)In this section “the Minister” means—
(a)the Secretary of State, in relation to bulk supply agreements to which all parties are—
(i)a water undertaker whose area is wholly or mainly in England, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(b)the Welsh Ministers, in relation to bulk supply agreements to which all parties are—
(i)a water undertaker whose area is wholly or mainly in Wales, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;
(c)the Secretary of State and the Welsh Ministers acting jointly, in relation to bulk supply agreements to which—
(i)a person falling within paragraph (a)(i) or (ii) is party, and
(ii)a person falling within paragraph (b)(i) or (ii) is party.
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)A supplier under a bulk supply agreement must provide such information as the appropriate agency may request in relation to water supplied under the agreement.
(2)The requirement in subsection (1) is enforceable by the Authority under section 18.
(3)In subsection (1) “the appropriate agency” means the body that would be consulted by the Authority under section 40A(2) if the agreement were to be varied or terminated by an order under section 40A(1).]
Textual Amendments
F71Ss. 40-40J substituted for ss. 40, 40A (6.4.2015 for the insertion of s. 40J, 1.11.2016 for the insertion of s. 40E for specified purposes and s. 40I, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 8(1), 94(3) (with s. 8(2)); S.I. 2015/773, art. 2(1)(a)(i) (with art. 4); S.I. 2016/1007, art. 2(b); S.I. 2017/1288, art. 3(a); S.I. 2018/397, art. 2(a)
(1)It shall be the duty of a water undertaker (in accordance with section 44 below) to provide a water main to be used for providing such supplies of water to premises in a particular locality in its area as (so far as those premises are concerned) are sufficient for domestic purposes, if-
(a)the undertaker is required to provide the main by a notice served on the undertaker by one or more of the persons who under subsection (2) below are entitled to require the provision of the main for that locality;
(b)the premises in that locality to which those supplies would be provided by means of that main are—
(i)premises consisting in buildings or parts of buildings; or
(ii)premises which will so consist when proposals made by any person for the erection of buildings or parts of buildings are carried out;
and
(c)the conditions specified in section 42 below are satisfied in relation to that requirement.
(2)Each of the following persons shall be entitled to require the provision of a water main for any locality, that is to say—
(a)the owner of any premises in that locality;
(b)the occupier of any premises in that locality;
(c)any local authority within whose area the whole or any part of that locality is situated;
[F72(ca)where the whole or any part of that locality is situated within a Mayoral development area, the Mayoral development corporation;]
(d)where the whole or any part of that locality is situated in a new town, within the meaning of the M1New Towns Act 1981—
(i)the [F73new towns residuary body]; and
(ii)F74. . . the development corporation for the new town, F74. . .;
and
(e)where the whole or any part of that locality is situated within an area designated as an urban development area under Part XVI of the M2Local Government, Planning and Land Act 1980, the urban development corporation.
F75(2A). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(3)The duty of a water undertaker under this section to provide a water main shall be owed to the person who requires the provision of the main or, as the case may be, to each of the persons who joins in doing so.
(4)Where a duty is owed by virtue of subsection (3) above to any person, any breach of that duty which causes that person to sustain loss or damage shall be actionable at the suit of that person; but, in any proceedings brought against a water undertaker in pursuance of this subsection, it shall be a defence for the undertaker to show that it took all reasonable steps and exercised all due diligence to avoid the breach.
(5)In this section “local authority”, in relation to the Inner Temple and the Middle Temple, includes, respectively, the Sub-Treasurer of the Inner Temple and the Under-Treasurer of the Middle Temple.
Textual Amendments
F72S. 41(2)(ca) inserted (15.1.2012) by Localism Act 2011 (c. 20), s. 240(1)(l), Sch. 22 para. 40
F73Words in s. 41(2)(d)(i) substituted (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), ss. 56, 325, Sch. 8 para. 56; S.I. 2008/3068, art. 2(1)(w) (with savings and transitional provisions in arts. 6-13)
F74Words in s. 41(2)(d)(ii) repealed (1.10.1998) by 1998 c. 38, s. 152, Sch. 18 Pt.IV (with ss. 137(1), 139(2), 143(2)); S.I. 1998/2244, art. 4
F75S. 41(2A) omitted (E.) (31.10.2021) by virtue of The Water and Sewerage Undertakers (Exit from Non-household Retail Market) (Consequential Provision) Regulations 2021 (S.I. 2021/1208), regs. 1(2), 2(2)
Marginal Citations
(1)The conditions mentioned in section 41(1)(c) above are satisfied in relation to a requirement for the provision of a water main by a water undertaker if—
(a)such undertakings as the undertaker may have reasonably required in accordance with subsection (2) below have been given by the person or persons who have required the provision of the main; and
(b)[F76such security as charging rules allow and the undertaker may have required] has been provided for the discharge of any obligations imposed by those undertakings on any person who, under subsection (3) below, may be required to secure his undertakings.
(2)The undertakings which a water undertaker may require for the purposes of subsection (1) above in respect of any water main are undertakings which—
[F77(a)bind the person or persons mentioned in that subsection to pay to the undertaker such charges as the undertaker may impose in accordance with charging rules, and]
(b)in the case of undertakings binding two or more persons, bind them either jointly and severally or with liability to pay apportioned in such manner as they may agree.
(3)For the purposes of subsection (1)(b) above a person may be required to secure his undertakings in relation to the provision of a water main if—
(a)it was by virtue of section 41(2)(a) or (b) above that he required, or joined in requiring, the provision of the main; and
(b)he is not a public authority.
F78(4). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F79(5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(6)Any dispute between a water undertaker and any other person as to—
(a)the undertakings or security required by the undertaker for the purposes of this section; or
(b)the amount [F80or amounts by way of charges] required to be paid in pursuance of any such undertaking,
[F81may be referred to the Authority for determination under section 30A above by either party to the dispute.]
[F82(7)[F83In this section “relevant deficit” and “discounted aggregate deficit” have the meanings given by sections 43 and 43A below, respectively.]]
Textual Amendments
F76Words in s. 42(1)(b) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(2)(a), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F77S. 42(2)(a) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(2)(b), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F78S. 42(4) repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 18(2)(c), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F79S. 42(5) repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 18(2)(c), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F80Words in s. 42(6)(b) inserted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(2)(d), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F81Words in s. 42(6) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 90(3)(5), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F82S. 42(7) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 90(4)(5), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F83S. 42(7) repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 54; S.I. 2017/462, art. 5(e)(ii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
[F84(1)For the purposes of section 42 above the relevant deficit for any year on a water main is the amount (if any) by which the [F85relevant revenue in respect of that main for that year is] exceeded by the annual borrowing costs of a loan of the amount required for the provision of that main.
(2)The annual borrowing costs of a loan of the amount required for the provision of a water main is the aggregate amount which would fall to be paid in any year by way of payments of interest and repayments of capital if an amount equal to so much of the costs reasonably incurred in providing that main as were not incurred in the provision of additional capacity had been borrowed, by the water undertaker providing the main, on terms—
(a)requiring interest to be paid and capital to be repaid in twelve equal annual instalments; and
(b)providing for the amount of the interest to be calculated at such rate, and in accordance with such other provision, as may have been determined for the purposes of this subsection.
(3)A determination for the purposes of subsection (2) above shall be made either—
(a)by the undertaker with the approval of the Authority; or
(b)in default of such a determination, by [F2the Authority].
(4)For the purposes of this section the costs reasonably incurred in providing a water main (“the new main”) shall include—
(a)the costs reasonably incurred in providing such other water mains and such tanks, service reservoirs and pumping stations as it is necessary to provide in consequence of the provision of the new main; and
(b)such proportion (if any) as is reasonable of the costs reasonably incurred in providing [F86or procuring the provision of] any such additional capacity in an earlier main as falls to be used in consequence of the provision of the new main.
[F87(5)In subsection (4) above the reference to an earlier main, in relation to the new main, is a reference to any water main which—
(a)has been provided in pursuance of a water main requisition; or
(b)has been vested (by virtue of a declaration made under this Chapter) in the water undertaker,
in the period of twelve years immediately before the provision of the new main.]
(6)Any reference in this section to the provision of additional capacity in a water main provided in pursuance of a requirement under any enactment is a reference to such works carried out or other things done in connection with the provision of that main as are carried out or done for the purpose of enabling that main to be used for purposes in addition to those for which it is necessary to provide the main in order to comply with the requirement.
[F88(7)Any reference in this section to the relevant revenue in respect of a main provided by a water undertaker for any year is—
(a)in relation to premises connected with the main which are supplied with water by the undertaker, is a reference to so much of the aggregate of any charges payable to the undertaker in respect of services provided in the course of that year as represents charges which—
(i)have been imposed by the undertaker in relation to those premises; and
(ii)are reasonably attributable to the provision of a supply of water (whether or not for domestic purposes) to those premises by means of that main;
(b)in relation to premises connected with the main which are supplied with water by a licensed water supplier, is a reference to so much of the aggregate of any charges made during the course of that year which—
(i)are payable by the supplier to the undertaker in respect of the duty under section 66A(2)(b), 66B(3)(b) or 66C(2)(b)(ii) below; and
(ii)are reasonably attributable to the use of that main for the purpose of the supplier supplying water to those premises.]
(8)An approval or determination given or made by [F2the Authority] for the purposes of subsection (2) above—
(a)may be given or made in relation to the provision of a particular water main, in relation to the provision of mains of a particular description or in relation to the provision of water mains generally; and
(b)may be revoked at any time except in relation to a water main [F89in respect of which the conditions referred to in section 42(1) above have already been satisfied.] .
(9)In this section “water main requisition” means—
(a)a requirement under section 41 above (including, by virtue of paragraph 1 of Schedule 2 to the M3Water Consolidation (Consequential Provisions) Act 1991, a requirement under section 40 of the M4Water Act 1989);
(b)a requirement under the provisions of section 36 or 37 of the M5Water Act 1945 or of section 29 of Schedule 3 to that Act (water main requisitions); or
(c)a requirement under any local statutory provision corresponding to section 41 above or to any of those provisions of that Act of 1945.]
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F84S. 43 repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 55; S.I. 2017/462, art. 5(e)(ii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
F85Words in s. 43(1) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 14(2); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F86Words in s. 43(4)(b) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(1)(a)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F87S. 43(5) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(1)(b)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F88S. 43(7) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 14(3); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F89Words in s. 43(8)(b) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(1)(c)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
Marginal Citations
[F91(1)For the purposes of section 42 above the discounted aggregate deficit on a water main is the amount equal to the sum of the estimated relevant deficits for each of the twelve years following the provision of the main, in each case discounted in accordance with subsection (6) below.
(2)The estimated relevant deficit for any year is the amount (if any) by which the estimated revenue in respect of the water main for that year would be exceeded by the annual borrowing costs of a loan of the amount required for the provision of that main.
(3)Subsections (2) to (6), (8) and (9) of section 43 above (which relate to the annual borrowing costs of a loan of the amount required for the provision of a water main) shall apply for the purposes of this section as they apply for the purposes of that.
(4)Any reference in this section to the estimated revenue in respect of a water main for any year—
(a)in relation to premises expected to be connected with the main and supplied with water by a water undertaker, is a reference to so much of the aggregate of any charges expected to be payable to the undertaker for the provision of services in the course of that year as would represent charges—
(i)imposed by the undertaker in relation to those premises, and
(ii)reasonably attributable to the provision of a supply of water (whether or not for domestic purposes) to those premises by means of that main; and
(b)in relation to premises expected to be connected with the main and supplied with water by a licensed water supplier, is a reference to so much of the aggregate of any charges expected to be made during the course of that year as would be—
(i)payable by the supplier to the undertaker in respect of the duty under section 66A(2)(b), 66B(3)(b) or 66C(2)(b)(ii) below; and
(ii)reasonably attributable to the use of that main for the purpose of the supplier’s supplying water to those premises.
(5)For the purpose of calculating estimated revenue under subsection (4) above, a thing is expected to be the case if, at the time the calculation is made, it is reasonably likely to occur.
(6)The estimated relevant deficit for a year mentioned in subsection (1) above shall be discounted in order to determine its net present value by applying such factor, and in accordance with such other provision, as may be determined by the Authority.
(7)A determination made by the Authority for the purposes of subsection (6) above—
(a)may be made in relation to the provision of a particular water main or in relation to the provision of water mains generally; and
(b)may be revoked at any time except in relation to a water main in respect of which the conditions referred to in section 42(1) above have already been satisfied.]]
Textual Amendments
F90S. 43A inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(2)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F91S. 43A repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 55; S.I. 2017/462, art. 5(e)(ii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
(1)A water undertaker shall not be in breach of a duty imposed by section 41 above in relation to any locality unless-
(a)the period of three months beginning with the relevant day has expired; and
[F92(b)the water undertaker has not, before the end of that period, so laid the water main to be provided as to enable (as the case may be)—
(i)service pipes to premises in that locality; or
(ii)a water main which is the subject of an agreement under section 51A below (“the self-laid main”),
to connect with the main at the place or places determined under subsection (3) below.]
(2)The period mentioned in subsection (1)(a) above may be extended in any case—
(a)by agreement between the water undertaker and the person or persons who required the provision of the main; or
(b)where there is a dispute as to whether the period should be extended, by [F93the Authority] on a reference under subsection (4) below.
(3)The places mentioned in subsection (1)(b) above shall be—
(a)such places as are determined by agreement between the water undertaker and the person or persons who required the provision of the water main; or
(b)in default of agreement, such places as are determined by [F94the Authority] , on a reference under subsection (4) below, to be the places at which it is reasonable, in all the circumstances, for service pipes to premises in the locality in question [F95, or (as the case may be) the self-laid main,] to connect with the water main.
[F96(4)A reference for the purposes of subsection (2) or (3) above may be made to the Authority for determination under section 30A above by either party to the dispute.]
(5)In this section “relevant day”, in relation to a requirement to provide a water main F97. . . , means the day after whichever is the later of the following, that is to say—
(a)the day on which the conditions specified in section 42 above are satisfied in relation to the requirement; and
[F98(b)the day on which the place or places where (as the case may be)—
(i)service pipes to premises in the locality in question; or
(ii)the self-laid main,
will connect with the main are determined under subsection (3) above.]
Textual Amendments
F92S. 44(1)(b) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(3)(a)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F93Words in s. 44(2)(b) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(3)(b)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F94Words in s. 44(3)(b) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(3)(c)(i)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F95Words in s. 44(3)(b) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(3)(c)(ii)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F96S. 44(4) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(3)(d)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F97Words in s. 44(5) omitted (28.5.2004) and repealed (1.4.2005) by virtue of Water Act 2003 (c. 37), ss. 91(3)(e)(4), 101(2), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3); S.I. 2005/968, art. 2(n) (with savings in art. 4, Schs. 1, 2)
F98S. 44(5)(b) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 91(3)(e)(ii)(4), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
(1)Subject to the following provisions of this section and to sections 46 and 47 below, it shall be the duty of a water undertaker (in accordance with section 51 below) to make a connection under this section where the owner or occupier of any premises F99. . .which—
(a)consist in the whole or any part of a building; or
(b)are premises on which any person is proposing to erect any building or part of a building,
serves a notice on the undertaker requiring it, for the purpose of providing a supply of water for domestic purposes to that building or part of a building, to connect a service pipe to those premises with one of the undertaker’s water mains.
F100(1ZA). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
[F101(1A)In relation to service pipes which do not belong to or fall to be laid by the undertaker—
(a)subsection (1) above is subject to section 51D(1) below; and
(b)any such service pipe which is to vest in the undertaker by virtue of an agreement under section 51A below shall be connected to one of the undertaker’s water mains subject to and in accordance with the terms of that agreement.]
(2)Where a notice has been served for the purposes of this section, the duty imposed by subsection (1) above shall be a dutyF102... to make the connection required by the notice if—
(a)the main with which the service pipe is required to be connected is neither a trunk main nor a water main which is or is to be used solely for the purpose of supplying water otherwise than for domestic purposes; and
(b)such conditions as the undertaker may have imposed under sections 47 to 50 below have been satisfied;
and, subject to section 51 below, that duty shall arise whether or not the service pipe to which the notice relates has been laid when the notice is served.
(3)A notice for the purposes of this section—
(a)shall be accompanied or supplemented by all such information as the undertaker may reasonably require; and
(b)if the notice has effect so that a requirement is imposed on the undertaker by virtue of section 46(4) below, shall set out the matters that have given rise to the imposition of that requirement;
but, subject to section 51(5) below and without prejudice to the effect (if any) of any other contravention of this subsection, a failure to provide information in pursuance of the obligation to supplement such a notice shall not invalidate that notice.
(4)The duty imposed on a water undertaker by this section shall be owed to the person who served the notice by virtue of which the duty arises.
(5)Where a duty is owed by virtue of subsection (4) above to any person, any breach of that duty which causes that person to sustain loss or damage shall be actionable at the suit of that person; but, in any proceedings brought against a water undertaker in pursuance of this subsection, it shall be a defence for the undertaker to show that it took all reasonable steps and exercised all due diligence to avoid the breach.
[F103(6)Where a water undertaker carries out any works which it is its duty under this section to carry out, the person serving the notice is liable to pay to the undertaker such charges as the undertaker may impose in accordance with charging rules.]
F104[(6A)Any dispute between a water undertaker and any other person [F105as to the payments required to be made] may be referred to the Authority for determination under section 30A above by either party to the dispute.]
(7)Nothing in this section or in sections 46 to 51 below shall impose any duty on a water undertaker to connect a service pipe to any premises with a service pipe to any other premises.
(8)In the following provisions of this Chapter a notice served for the purposes of this section is referred to as a connection notice.
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F99Words in s. 45(1) repealed (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), ss. 43(1), 56(7), Sch. 2; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F100S. 45(1ZA) omitted (E.) (31.10.2021) by virtue of The Water and Sewerage Undertakers (Exit from Non-household Retail Market) (Consequential Provision) Regulations 2021 (S.I. 2021/1208), regs. 1(2), 2(3)
F101S. 45(1A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 92(2)(7), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F102Words in s. 45(2) repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 18(3)(a), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F103S. 45(6) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(3)(b), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F104S. 45(6A) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(2); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F105Words in s. 45(6A) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(3)(c), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
(1)Where a water undertaker is required to make a connection in pursuance of any connection notice, it shall also be the duty of the undertakerF106... to carry out such of the works to which this section applies as need to be carried out before the connection can be made.
(2)This section applies to the laying of so much of the service pipe to be connected with the water main as it is necessary, for the purpose of making that connection, to lay in a street.
(3)In a case where—
(a)the water main with which the service pipe is to be connected is situated in a street;
(b)the premises consisting in the building or part of a building in question together with any land occupied with it abut on the part of the street where the main is situated; and
(c)the service pipe to those premises will—
(i)enter the premises otherwise than through an outer wall of a building abutting on the street; and
(ii)have a stopcock fitted to it by the undertaker in the premises,
this section applies to the laying of so much of the service pipe as it is necessary, for the purpose of making the required connection, to lay in land between the boundary of the street and that stopcock.
(4)In a case where the connection notice is served in compliance with a requirement imposed by a notice by a local authority under section 80 below, this section applies to the laying of so much of the service pipe to be connected with a water main in pursuance of the connection notice as it is necessary, for the purpose of making the connection, to lay in land owned or occupied by a person who is certified by that authority—
(a)to have unreasonably refused his consent to the laying of the service pipe; or
(b)to have sought to make the giving of his consent subject to unreasonable conditions.
(5)Where a water main is alongside a street and within eighteen metres of the middle of that street, subsections (2) to (4) above shall have effect in relation to the laying, for the purpose of making a connection with that main, of a service pipe to any premises as if the street included so much of the land between the main and the boundary of the street as is not comprised in those premises or in any land occupied with those premises.
(6)It shall be the duty of any water undertaker making a connection in pursuance of a connection notice to ensure that a stopcock belonging to the undertaker is fitted to the service pipe which is connected.
(7)Subsections (4) to [F107(6A)] of section 45 above shall have effect-
(a)in relation to any duties which, by virtue of a connection notice, are imposed on a water undertaker by this section; and
(b)in relation to any works which, by virtue of the service of such a notice, such an undertaker carries out [F108as its duty under this section],
as they have effect by virtue of that notice in relation to the duty which arises under that section or, as the case may be, to works which the undertaker carries out [F109as its duty under that section].
(8)Subject to subsection (9) below, a water undertaker may comply with any duty under this section to lay a service pipe by laying a water main instead; but nothing in section 45 above or this section shall impose any duty on a water undertaker to lay a water main where it has no power to lay a service pipe.
(9)Where a water undertaker exercises its power under subsection (8) above to lay a water main instead of a service pipe—
(a)paragraph (a) of section 51(1) below shall have effect as if any additional time reasonably required by reason of the laying of the main instead of the service pipe were included in the time allowed by that paragraph for the laying of the service pipe; F110...
F110(b). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F106Words in s. 46(1) repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 18(4)(a), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F107Words in s. 46(7) substituted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(3); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt. II
F108Words in s. 46(7)(b) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(4)(b), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F109Words in s. 46(7) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(4)(c), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F110S. 46(9)(b) and word repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 18(4)(d), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
(1)Subject to subsection (3) and [F111sections 48 to] [F111sections 49 and] 50 below, where the owner or occupier of any premises (“the relevant premises”) serves a connection notice on a water undertaker, the undertaker may make compliance with one or more of the requirements specified in subsection (2) below a condition of its complying with the duties to which it is subject by virtue of that notice.
(2)The requirements mentioned in subsection (1) above are—
(a)a requirement that [F112such security as charging rules allow and the undertaker requires] has been provided for the discharge of any obligations imposed by virtue of section 45(6) or 46(7)(b) above on the person who served the connection notice;
(b)a requirement, in a case where the connection required by the connection notice is necessary as a consequence of a disconnection made by reason of any person’s failure to pay any charges, that the person serving the connection notice has paid any amount owed by him to the undertaker—
(i)in respect of a supply of water to the relevant premises; or
(ii)in respect of expenses [F113reasonably]incurred in the making of the disconnection;
(c)a requirement that a meter for use in determining the amount of any charges which have been or may be fixed in relation to the relevant premises by reference to volume has been installed and connected either—
(i)by the undertaker; or
(ii)in accordance with specifications approved by the undertaker;
(d)a requirement that—
[F114(i)subject to section 51D(1) below, so much of the service pipe to the relevant premises as does not belong to, vest in or fall to be laid by the undertaker; and]
(ii)the plumbing of the premises,
comply with specifications approved by the undertaker for the purpose of ensuring that it will be reasonably practicable for such a meter as is mentioned in paragraph (c) above to be installed and connected as so mentioned;
(e)a requirement that a separate service pipe has been provided—
(i)to each house or building on the relevant premises; or
(ii)where different parts of a building on the relevant premises are separately occupied, to each of those parts or to any of them;
(f)a requirement, in relation to the relevant premises—
(i)that such a requirement as may be imposed under section 66 below has been complied with; or
(ii)in a case where such a requirement could be imposed but for there already being such a cistern as is mentioned in that section, that the cistern and its float-operated valve are in good repair;
(g)a requirement that there is no contravention in relation to the water fittings used or to be used in connection with—
(i)the supply of water to the relevant premises; or
(ii)the use of water in those premises,
of such of the requirements of regulations under section 74 below as are prescribed for the purposes of this paragraph; and
(h)a requirement that every such step has been taken as has been specified in any notice served on any person under section 75 below in relation to the relevant premises.
F115[(2A)No condition shall be imposed by a water undertaker under subsection (2)(e) above unless it is reasonable to do so in order to ensure that the undertaker will be able to perform its functions, in relation to the supply of water to the relevant premises or any part of those premises, efficiently.]
(3)A condition shall not be imposed by a water undertaker under this section on a person who has served a connection notice except by a counter-notice served on that person before the end of the period of fourteen days beginning with the day after the service of the connection notice.
F116[(3A)Any dispute as to whether any requirement of a kind mentioned in subsection (2)(a), (b), (e) or (f) above has been complied with may be referred to the Authority for determination under section 30A above by either party to the dispute.
(3B)Any dispute between a water undertaker and any other person as to F117...—
[F118(a)the security required to be provided by a condition imposed under subsection (2)(a),]
(b)[F119whether] the expenses referred to in subsection (2)(b)(ii) above were incurred reasonably, or
(c)in a particular case, [F120whether] subsection (2A) above prevents a water undertaker from imposing a condition under subsection (2)(e) above,
may be referred to [F2the Authority] for determination under section 30A above by either party to the dispute.]
(4)This section shall be without prejudice to the provisions of sections 233 and 372 of the M6Insolvency Act 1986 (conditions of supply after insolvency).
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F111Words in s. 47(1) substituted (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 56; S.I. 2017/462, art. 5(e)(ii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
F112Words in s. 47(2)(a) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(5)(a), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F113Word in s. 47(2)(b)(ii) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 51(2); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F114S. 47(2)(d)(i) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 92(3)(7), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F115S. 47(2A) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 51(3); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F116S. 47(3A)(3B) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 51(4); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F117Word in s. 47(3B) repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 18(5)(b), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F118S. 47(3B)(a) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(5)(c), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F119Word in s. 47(3B)(b) inserted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(5)(d), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
F120Word in s. 47(3B)(c) inserted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(5)(e), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
Marginal Citations
[F121(1)Where for the purposes of subsection (2)(a) of section 47 above any sums have been deposited with a water undertaker by way of security for the discharge of any obligation, the undertaker shall pay interest at such rate as may be determined either—
(a)by the undertaker with the approval of the Authority; or
(b)in default of a determination under paragraph (a) above, by [F2the Authority],
on every sum of 50p so deposited for every three months during which it remains in the hands of the undertaker.
(2)An approval or determination by [F2the Authority] for the purposes of this section—
(a)may be given or made in relation to a particular case or description of cases or generally; and
(b)may be revoked at any time.]
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F121S. 48 repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 57; S.I. 2017/462, art. 5(e)(ii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
(1)The power conferred on a water undertaker to impose conditions under section 47 above for the purposes of metering—
(a)shall be exercisable in relation to any premises even if the undertaker has no immediate intention, when the power is exercised, of fixing charges in relation to those premises by reference to volume; but
(b)shall not be exercisable so as to require the alteration or removal of any pipe laid or plumbing installed before 1st April 1989.
(2)Specifications approved by any water undertaker for the purposes of subsection (2)(c) or (d) of section 47 above may be approved—
(a)in relation to particular premises; or
(b)by being published in such manner as the undertaker considers appropriate, in relation to premises generally or to any description of premises.
F122[(3)Any dispute between a water undertaker and any other person as to the terms of any condition imposed under section 47 above for the purposes of metering shall be referred—
(a)to the arbitration of a single arbitrator appointed by agreement between the undertaker and that person; or
(b)if no agreement is reached, for determination by the Authority under section 30A above.]
(4)References in this section to the imposition of a condition under section 47 above for the purposes of metering are references to the imposition of conditions by virtue of subsection (2)(c) or (d) of that section.
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F122S. 49(3) substituted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(4); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt. II
(1)This section applies where the effect of a connection notice served in respect of any house is to require a service pipe to that house to be connected with a water main with which it has previously been connected.
(2)Where this section applies, the water undertaker on which the connection notice is served shall not be entitled to make the reconnection subject to any such condition as, apart from this section, may be imposed by virtue of section 47(2)(e) above unless the undertaker would have been entitled under section 64 below to require the provision of a separate service pipe if the reconnection had already been made.
(1)A water undertaker shall not be in breach of a duty imposed by virtue of the service of a connection notice unless—
(a)in the case of a duty to lay any service pipe or to connect any service pipe to which such a duty relates, it has failed to lay that pipe or to make that connection as soon as reasonably practicable after the relevant day;
(b)in the case of a duty to connect a service pipe the whole of which has already been laid when the notice is served on the undertaker, it has failed to make the connection before the end of the period of fourteen days beginning with the relevant day.
(2)In any case in which a water undertaker is subject to any such duty as is mentioned in subsection (1)(a) above, it shall be presumed, unless the contrary is shown in relation to that case, that the period of twenty-one days beginning with the relevant day is the period within which it is reasonably practicable for a water undertaker—
(a)to lay so much of any service pipe; and
(b)to fit such stopcock,
as it is necessary to lay or fit in that case for connecting a water main in a street with a service pipe at the boundary of any premises which abut on the part of the street where the main is situated.
(3)Where—
(a)a connection notice is served in respect of any premises; and
(b)at the time when the notice is served, the customer’s part of the service pipe to those premises has not been laid,
the duties of the undertaker under sections 45 and 46 above shall not arise by virtue of that notice until the person serving the notice, having obtained the necessary consents from the owners and occupiers of any affected land, has, at his own expense, laid so much of the service pipe as it is necessary, for the purpose of making the connection, to lay otherwise than in a street or in land mentioned in subsections (3) to (5) of section 46 above.
(4)In subsection (3) above the reference to the customer’s part of the service pipe to any premises is a reference to so much of the service pipe to those premises as falls to be laid otherwise than by the water undertaker in pursuance of section 46 above.
(5)Where—
(a)a person who has served a connection notice on a water undertaker has failed to comply with his obligation under section 45(3)(a) above to supplement that notice with information required by the undertaker; and
(b)that requirement was made by the undertaker at such a time before the end of the period within which the undertaker is required to comply with the duties imposed by virtue of the notice as gave that person a reasonable opportunity to provide the required information within that period,
the undertaker may delay its compliance with those duties until a reasonable time after the required information is provided.
(6)In this section “the relevant day”, in relation to a duty imposed on a water undertaker by virtue of a connection notice, means the day after whichever is the latest of the following days, that is to say-
(a)the day on which the notice was served on the undertaker;
(b)in a case where it is necessary for the person serving the notice to lay any service pipe after serving the notice, the day on which a notice stating that the pipe has been laid is served on the undertaker;
(c)the day on which all such conditions are satisfied as the undertaker has, under sections 47 to 50 above, made conditions of its compliance with that duty.
Textual Amendments
F123Ss. 51A-51E and preceding cross-heading inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 92(1), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
(1)Subject to subsections (2) and (10) below, a water undertaker may agree with any person constructing or proposing to construct—
(a)any water main; or
(b)any service pipe,
that, if the water main or service pipe is constructed in accordance with the terms of the agreement, the undertaker will, upon completion of the work, at some specified date or on the happening of some future event, declare the water main or (as the case may be) so much of the service pipe as the undertaker could otherwise, by virtue of sections 45 to 51 above, be required to lay, to be vested in that undertaker.
(2)Subsection (1) above shall not apply in the case of water mains or service pipes which are to be used (in whole or in part) for the purpose of supplying water other than for domestic purposes, but—
(a)nothing in this section shall prevent a water undertaker from agreeing apart from this section to declare any such water main or service pipe (or a part of it, as specified in the agreement) to be vested in the undertaker; and
(b)such a declaration shall take effect as a declaration made under this Chapter.
(3)A person constructing or proposing to construct a water main or a service pipe to which subsection (1) above applies may [F124request a water undertaker to make an agreement under this section.]
F125(4). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F125(5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F125(6). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F125(7). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F125(8). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(9)An agreement made under this section by a water undertaker shall be enforceable against the undertaker by the owner or occupier for the time being of any premises connected or to be connected with the water main or service pipe to which it relates.
[F126(9A)The reference in subsection (9) to an agreement made under this section includes a reference to—
(a)an order under section 51B which is deemed to be an agreement by virtue of section 51B(5), and
(b)an agreement which has been varied by order under section 51C(1).]
(10)A water undertaker shall not make an agreement under this section with respect to a water main or a service pipe situated within the area of another water undertaker, until either—
(a)that other undertaker has consented in writing to the making of the agreement; or
(b)the Secretary of State, on an application made to him, has dispensed with the necessity for such consent, either unconditionally or subject to such conditions as he may think fit to impose.
Textual Amendments
F124Words in s. 51A(3) substituted (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 10(2)(a), 94(3); S.I. 2017/462, art. 4(a); S.I. 2017/1288, art. 3(c)
F125S. 51A(4)-(8) repealed (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 10(2)(b), 94(3); S.I. 2017/462, art. 4(a); S.I. 2017/1288, art. 3(c)
F126S. 51A(9A) inserted (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 10(2)(c), 94(3); S.I. 2017/462, art. 4(a); S.I. 2017/1288, art. 3(c)
(1)This section applies where a person constructing or proposing to construct a water main or service pipe makes a request to a water undertaker under section 51A(3).
(2)The person or the water undertaker may apply to the Authority for an order under subsection (4) if the person and the water undertaker have not made such agreement as was requested by the person.
(3)The Authority may, on the application of the person or the water undertaker, make an order under subsection (4) if the Authority is satisfied that—
(a)it is appropriate for work proposed to be done by a person other than the water undertaker to be so done, and
(b)the person and the water undertaker cannot reach agreement within a reasonable time.
(4)The Authority may by order—
(a)require the water undertaker to give such undertakings as to the vesting of the water main or service pipe in the undertaker as the Authority may specify, and
(b)impose such terms and conditions as regards taking the benefit of the undertakings as the Authority may specify.
(5)An order under subsection (4) has effect as an agreement under section 51A between the person and the water undertaker.
(6)The Authority may not, by order under subsection (4), require a water undertaker to vest in itself a water main or service pipe as regards which there is a contravention of any of the requirements of section 74 that are prescribed for the purposes of this subsection.
(7)The Authority may not make an order under subsection (4) with respect to a water main or service pipe that is situated within the area of another water undertaker, until either—
(a)that other undertaker has consented in writing to the making of the order, or
(b)the Minister, on an application made to the Minister, has disapplied paragraph (a), either unconditionally or subject to such conditions as the Minister thinks fit.
(8)“The Minister” means—
(a)the Secretary of State, as regards the consent of a water undertaker whose area is wholly or mainly in England;
(b)the Welsh Ministers, as regards the consent of a water undertaker whose area is wholly or mainly in Wales.
(9)Neither the CMA nor the Authority may exercise, in respect of an agreement for the vesting of a water main or service pipe in a water undertaker at a future date, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(10)Subsection (9)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement for the vesting of a water main or service pipe at a future date, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(11)In exercising its functions under this section, the Authority must have regard to the desirability of—
(a)facilitating effective competition within the water supply industry;
(b)the recovery by the water undertaker of the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the ability of the water undertaker to meet its existing obligations, and likely future obligations, to supply water without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the water undertaker to meet its existing obligations, or likely future obligations, to supply water.]
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)On the application of a party to a section 51A agreement to vary (or terminate) the agreement, the Authority may—
(a)if it appears to the Authority that it is necessary or expedient that the section 51A agreement should be varied (or terminated),
(b)if the Authority is satisfied, in the case of an application to vary the agreement, that it is appropriate for work proposed to be done by a person other than the water undertaker to be so done, and
(c)if the Authority is satisfied that variation (or termination) cannot be achieved by agreement within a reasonable time,
by order vary (or terminate) the section 51A agreement.
(2)If an order under subsection (1) is made in relation to a section 51A agreement, the agreement—
(a)has effect subject to the provision made by the order, or
(b)ceases to have effect, as the case may be.
(3)An order under subsection (1) may require any party to the agreement to pay compensation to any other party.
(4)Neither the CMA nor the Authority may exercise, in respect of an agreement to vary or terminate a section 51A agreement, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(5)Subsection (4)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement to vary or terminate a section 51A agreement, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(6)In exercising its functions under this section, the Authority must have regard to the expenses incurred by the water undertaker in complying with its obligations under the section 51A agreement in question and to the desirability of—
(a)facilitating effective competition within the water supply industry;
(b)the recovery by the water undertaker of the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the ability of the water undertaker to meet its existing obligations, and likely future obligations, to supply water without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the water undertaker to meet its existing obligations, or likely future obligations, to supply water.
(7)In this section and sections 51CA to 51CG “section 51A agreement” means an agreement with a water undertaker for the vesting of a water main or service pipe in a water undertaker at a future date and includes—
(a)an order under section 51B which is deemed to be an agreement by virtue of section 51B(5), and
(b)any agreement which has been varied by order under subsection (1).]
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)The Authority must issue a code in respect of section 51A agreements.
(2)The code may make provision about—
(a)procedures in connection with making an agreement under section 51A;
(b)procedures in connection with varying or terminating a section 51A agreement;
(c)procedures to be followed by the Authority in determining whether to make an order under section 51B(4) or 51C(1);
(d)the circumstances in which it is, or is not, appropriate for work to be done by a person other than a water undertaker;
(e)the terms and conditions of a section 51A agreement;
(f)principles for determining the terms and conditions that should or should not be incorporated into a section 51A agreement;
(g)the steps to be taken by the Authority in determining whether a person is complying with the code.
(3)Provision under subsection (2)(c) may in particular require the Authority to consult—
(a)the Chief Inspector of Drinking Water;
(b)the Chief Inspector of Drinking Water for Wales if there is one.
(4)Provision under subsection (2)(d) may include in particular provision about circumstances relating to—
(a)the nature of the work;
(b)the kind of premises supplied or to be supplied.
(5)Provision under subsection (2)(e) may include in particular provision about terms and conditions as regards—
(a)constructing associated infrastructure;
(b)vesting associated infrastructure in a water undertaker;
(c)constructing water mains so as to meet additional supply requirements;
(d)connecting new water mains or service pipes to the existing supply system of a water undertaker;
(e)complying with requirements of the kind referred to in section 47(2);
(f)the duration of a section 51A agreement.
(6)If the Authority considers that a water undertaker is not acting as required by the code, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(7)The Authority may not give a direction under subsection (6) requiring a person to enter into, vary or terminate an agreement.
(8)It is the duty of a water undertaker to comply with a direction under subsection (6), and this duty is enforceable by the Authority under section 18.
(9)The code may make different provision for different persons or descriptions of person.
(10)The Authority must from time to time review the code and, if appropriate, issue a revised code.
(11)A revised code may include provision for applying any of its revisions to section 51A agreements made before the revised code comes into force.
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)Before issuing a code under section 51CA, the Authority must—
(a)prepare a draft of the proposed code under section 51CA, and
(b)consult the relevant persons about the proposed code.
(2)The relevant persons are—
(a)the Chief Inspector of Drinking Water;
(b)the Chief Inspector of Drinking Water for Wales if there is one;
(c)such other persons as the Authority considers appropriate.
(3)The Authority must specify the period (“the consultation period”) within which a person may make representations about the proposed code.
(4)Before a code under section 51CA prepared by the Authority is issued, the Minister may direct the Authority—
(a)not to issue the code, or
(b)to issue the code with specified modifications.
(5)Subsection (4) is subject to subsections (7) and (8).
(6)In subsection (4) “the Minister” means—
(a)the Secretary of State, so far as the code relates to section 51A agreements for the vesting of water mains or service pipes in water undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as the code relates to section 51A agreements for the vesting of water mains or service pipes in water undertakers whose areas are wholly or mainly in Wales.
(7)The power under subsection (4) may not be exercised more than once by the Secretary of State or the Welsh Ministers.
(8)If the power under subsection (4) is not exercised by the Secretary of State or the Welsh Ministers on the first occasion on which it may be exercised by the Secretary of State or (as the case may be) the Welsh Ministers, it may not be exercised by the Secretary of State or (as the case may be) the Welsh Ministers on a later occasion.
(9)A direction under subsection (4) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code in relation to which a direction may be given may not be issued before that period of 28 days has expired.
(10)This section is subject to section 51CC.
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)This section applies if the Authority proposes to issue a revised code under section 51CA and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 51CB does not apply to the proposed revised code.
(3)Once the Authority has issued the revised code, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised code, and
(b)as regards each revision contained in it, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(4)Notice under subsection (3) is to be given to such persons as the Authority considers appropriate.
(5)Unless the Authority gives notice that a revision in a revised code is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised code is issued.
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)The Authority may issue rules about charges that may be imposed by a water undertaker under a section 51A agreement.
(2)The rules may in particular make provision about—
(a)what types of charge may be imposed;
(b)the amount or the maximum amount, or a method for determining the amount or maximum amount, of any type of charge;
(c)principles for determining what types of charge may or may not be imposed;
(d)principles for determining the amount of any charge that may be imposed;
(e)publication of the charges that may be imposed.
(3)The rules may require a water undertaker, upon declaring a water main or service pipe to be vested in the undertaker in accordance with a section 51A agreement, to pay to the other party to the agreement an amount (which may be nil) determined in accordance with the rules.
(4)Rules made by virtue of subsection (3) may, in particular, provide for the determination to take into account—
(a)revenue that might be derived from the water main or service pipe in question;
(b)costs that might have been incurred in providing such a water main or service pipe.
(5)The rules may also make provision as to—
(a)the amount of security that may be required by a water undertaker for the purposes of any charges imposed by the water undertaker under a section 51A agreement;
(b)the type of security that may be required;
(c)the payment of interest on a sum deposited with a water undertaker by way of security.
(6)If the Authority considers that a water undertaker is not acting as required by rules under this section, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(7)It is the duty of a water undertaker to comply with a direction under subsection (6), and this duty is enforceable by the Authority under section 18.
(8)The rules may make different provision for different water undertakers or descriptions of undertaker.
(9)The Authority may from time to time revise rules issued under this section and issue revised rules.
(10)The Authority must issue revised rules if—
(a)guidance is issued under section 51CG, and
(b)the Authority, having regard to that guidance, considers that it is appropriate to revise the rules.
(11)Revised rules may include provision for applying any of their revisions to section 51A agreements made before the revised rules come into effect.
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)Before issuing rules under section 51CD, the Authority must—
(a)prepare a draft of the proposed rules, and
(b)consult the relevant persons about the draft.
(2)The relevant persons are—
(a)the Secretary of State;
(b)the Welsh Ministers;
(c)the Council;
(d)any water undertakers or other persons likely to be affected by the rules;
(e)such other persons as the Authority thinks appropriate.
(3)The Authority must specify the period (“the consultation period”) within which the relevant persons may make representations about the proposed rules.
(4)The Authority must have regard to guidance issued under section 51CG in making rules under section 51CD.
(5)Before rules under section 51CD prepared by the Authority are issued, the Minister may direct the Authority not to issue the rules.
(6)In subsection (5) “the Minister” means—
(a)the Secretary of State, so far as the rules relate to section 51A agreements for the vesting of water mains or service pipes in water undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as the rules relate to section 51A agreements for the vesting of water mains or service pipes in water undertakers whose areas are wholly or mainly in Wales.
(7)A direction under subsection (5) must be given within the period of 28 days beginning with the day after the end of the consultation period, and rules may not be issued before that period of 28 days has expired.
(8)This section is subject to section 51CF.
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)This section applies if the Authority proposes to issue revised rules under section 51CD and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 51CE does not apply to the proposed revised rules.
(3)Before issuing the revised rules, the Authority must give notice to the Minister of its intention to issue revised rules.
(4)Before the revised rules are issued, the Minister may direct the Authority not to issue the revised rules.
(5)A direction under subsection (4) must be given within the period of 14 days beginning with the day after the day on which notice is given under subsection (3), and the Authority may not issue the revised rules in question before—
(a)that period of 14 days expires, or
(b)the Minister notifies the Authority that no direction under subsection (4) will be given in relation to the revised rules,
whichever is the sooner.
(6)Once the Authority has issued the revised rules, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised rules, and
(b)as regards each revision contained in them, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(7)Notice under subsection (6) is to be given to such persons as the Authority considers appropriate.
(8)Unless the Authority gives notice that a revision in revised rules is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised rules are issued.
(9)In this section “the Minister” has the meaning given by section 51CE.
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)The Minister may issue guidance as to the content of rules under section 51CD.
(2)Before issuing the guidance, the Minister must—
(a)prepare a draft of the proposed guidance;
(b)consult the relevant persons about the draft.
(3)The relevant persons are—
(a)the Secretary of State;
(b)the Welsh Ministers;
(c)such other persons as the Minister thinks appropriate.
(4)The Minister may from time to time revise the guidance and issue revised guidance.
(5)Subsections (2) and (3) apply to revised guidance as they apply to the original guidance.
(6)The Minister must arrange for the publication of guidance issued under this section.
(7)In this section “the Minister” means—
(a)the Secretary of State, so far as the guidance is as to the content of rules relating to section 51A agreements for the vesting of water mains or service pipes in water undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as the guidance is as to the content of rules relating to section 51A agreements for the vesting of water mains or service pipes in water undertakers whose areas are wholly or mainly in Wales.]
Textual Amendments
F127Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15); S.I. 2017/1288, art. 3(c)
(1)Where a person (other than a water undertaker) constructs a water main or service pipe which is to be used, in whole or in part, for supplying water for domestic or food production purposes, no water undertaker may permit that water main or service pipe to become connected with its supply system unless it vests (to the relevant extent) in a water undertaker.
(2)In subsection (1) above, “the relevant extent” means the extent specified in the agreement for the vesting in the undertaker of the water main or service pipe in question.
(3)The prohibition imposed on a water undertaker by subsection (1) above shall be enforceable under section 18 above by the Authority.
(1)For the purposes of sections 51A to 51D above, the definition of “water main” in section 219(1) below shall be treated as if the words “not being a pipe for the time being vested in a person other than the undertaker” were omitted.
(2)[F128In section 51A], references to so much of the service pipe as the undertaker could otherwise, by virtue of sections 45 to 51 above, be required to lay shall be construed disregarding section 46(8) above.
(3)In this Act, references to vesting or the making of a declaration of vesting with respect to a service pipe refer to so much of the service pipe as is specified for those purposes in the relevant vesting agreement.]
Textual Amendments
F128Words in s. 51E(2) substituted (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 10(4), 94(3); S.I. 2017/462, art. 4(a); S.I. 2017/1288, art. 3(c)
(1)The domestic supply duty of a water undertaker in relation to any premises is a duty, until there is an interruption of that duty—
(a)to provide to those premises such a supply of water as (so far as those premises are concerned) is sufficient for domestic purposes; and
(b)to maintain the connection between the undertaker’s water main and the service pipe by which that supply is provided to those premises.
(2)Subject to the following provisions of this section and to section 53 below, a water undertaker shall owe a domestic supply duty in relation to any premises to which this section applies F129. . . if—
(a)a demand for a supply of water for domestic purposes has been made, in accordance with subsection (5) below, to the undertaker in respect of those premises; or
(b)those premises are premises to which this section applies by reason of a supply of water provided before 1st September 1989,
and there has been no interruption of the domestic supply duty in relation to those premises since that demand was made or, as the case may be, since the beginning of 1st September 1989.
(3)[F130Subject to subsection (4A) below,]this section applies to any premises if—
(a)they consist in the whole or any part of a building and are connected by means of a service pipe to [F131one of the water undertaker’s water mains]; and
(b)the requirements of subsection (4) below are satisfied in relation to those premises.
(4)The requirements of this subsection are satisfied in relation to any premises if—
(a)the pipe by means of which the premises are connected to the water main in question was first connected with that main in pursuance of a connection notice served in respect of those premises;
(b)that pipe was the means by which a supply of water from that main was being supplied to those premises for domestic purposes immediately before 1st September 1989;
(c)the condition specified in paragraph (b) above would be satisfied in relation to the premises if any service pipe to those premises had not been temporarily disconnected for the purposes of any necessary works which were being carried out immediately before 1st September 1989;
[F132(ca)the premises are in a retail exit area and the pipe by means of which the premises are connected to the water main in question was first connected with that main in pursuance of section 66A(3);] or,
(d)the condition specified in any of the preceding paragraphs—
(i)has been satisfied in relation to the premises at any time on or after 1st September 1989; and
(ii)would continue to be satisfied in relation to the premises had not the whole or any part of a service pipe to those premises, or the main with which such a pipe had been connected, been renewed (on one or more previous occasions).
[F133(4A)This section does not apply to any premises if—
(a)they are not in the area of the water undertaker [F134or they are in a retail exit area] ;
(b)they are not household premises (as defined in section 17C above); and
(c)[F135in the case of premises to be supplied using the supply system of a water undertaker whose area is wholly or mainly in Wales,] the total quantity of water estimated to be supplied to them annually for the purposes of subsection (2) of section 17D above is not less than the quantity specified in that subsection.]
(5)For the purposes of this section a demand in respect of any premises is made in accordance with this subsection if it is made—
(a)by the person who is the occupier of the premises at the time when the demand is made; or
(b)by a person who is the owner of the premises at that time and agrees with the undertaker to pay all the undertaker’s charges in respect of the supply demanded.
(6)For the purposes of this section—
(a)there is an interruption of the domestic supply duty owed by a water undertaker in relation to any premises if that supply is cut off by anything done by the undertaker in exercise of any of its disconnection powers, other than a disconnection or cutting off for the purposes of the carrying out of any necessary works; and
(b)a domestic supply duty owed in relation to any premises shall not be treated as interrupted by reason only of a change of the occupier or owner of the premises.
[F136(6A)For the purposes of this section, there is also an interruption of the domestic supply duty owed by a water undertaker in relation to any premises where—
(a)a notice is served in respect of those premises under section 63AA below; and
(b)the time specified in that notice has passed.]
(7)Nothing in this section shall impose any duty on a water undertaker—
(a)to provide a supply of water directly from, or maintain any connection with, a water main which is a trunk main or is or is to be used solely for the purpose of supplying water otherwise than for domestic purposes; or
(b)to provide a supply of water to any premises, or maintain the connection between a water main and a service pipe to any premises, during any period during which it is reasonable—
(i)for the supply of water to those premises to be cut off or reduced; or
(ii)for the pipe to be disconnected,
for the purposes of the carrying out of any necessary works.
(8)In this section references to the disconnection powers of a water undertaker are references to the powers conferred on the undertaker by any of sections 60 to 62 and 75 below.
Textual Amendments
F129Words in s. 52(2) repealed (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), ss. 41, 56(7), Sch. 2; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt.I
F130Words in s. 52(3) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 15(2); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F131WOrds in s. 52(3)(a) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1 para. 20; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt.I
F132S. 52(4)(ca) inserted (E.) (31.10.2021) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) (Consequential Provision) Regulations 2021 (S.I. 2021/1208), regs. 1(2), 2(4)
F133S. 52(4A) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 15(3); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F134Words in s. 52(4A)(a) inserted (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), reg. 1(2), Sch. 2 para. 4
F135Words in s. 52(4A)(c) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 58(2); S.I. 2017/462, art. 3(k)(vii)
F136S. 52(6A) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 15(4); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
(1)Where a demand for the purposes of section 52(2) above has been made to a water undertaker in respect of any premises (“the relevant premises”), the undertaker may make compliance with one or more of the requirements specified in subsection (2) below a condition of providing his first supply of water in compliance with that demand.
(2)The requirements mentioned in subsection (1) above are—
(a)a requirement, in a case where the demand is made as a consequence of a supply having been cut off by reason of any person’s failure to pay any charges, that the person making the demand has paid any amount owed by him to the undertaker—
(i)in respect of a supply of water to the relevant premises; or
(ii)in respect of expenses [F137reasonably] incurred in cutting off any such supply;
(b)a requirement, in relation to the relevant premises
(i)that such a requirement as may be imposed under section 66 below has been complied with; or
(ii)in a case where such a requirement could be imposed but for there already being such a cistern as is mentioned in that section, that the cistern and its float-operated valve are in good repair;
(c)a requirement that there is no contravention in relation to the water fittings used or to be used in connection with—
(i)the supply of water to the relevant premises; or
(ii)the use of water in those premises,
of such of the requirements of regulations under section 74 below as are prescribed for the purposes of this subsection; and
(d)a requirement that every such step has been taken as has been specified in any notice served on any person under section 75 below in relation to the relevant premises.
F138[(2A)Any dispute between a water undertaker and any other person as to whether the expenses referred to in subsection (2)(a)(ii) above were incurred reasonably may be referred to the Authority for determination under section 30A above by either party to the dispute.]
F139[(2A)Any dispute between a water undertaker and any other person as to whether any requirement of a kind mentioned in subsection (2)(a) or (b) above has been complied with may be referred to [F2the Authority] for determination under section 30A above by either party to the dispute.]
(3)This section shall be without prejudice to the provisions of sections 233 and 372 of the M7Insolvency Act 1986 (conditions of supply after insolvency).
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F137Word in s. 53(2)(a)(ii) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 51(5); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F138S. 53(2A) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 51(5); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt. II
F139S. 53(2A) inserted (1.9.1992) by Competition and Service (Utilitites) Act 1992 (c. 43), s. 35(5); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
Marginal Citations
(1)A duty imposed on a water undertaker under section 52 above—
(a)to provide a supply of water to any premises; or
(b)to maintain a connection between a water main and a service pipe by which such a supply is provided,
shall be owed to the consumer.
(2)Where a duty is owed by virtue of this section to any person, any breach of that duty which causes that person to sustain loss or damage shall be actionable at the suit of that person; but, in any proceedings brought against a water undertaker in pursuance of this subsection, it shall be a defence for the undertaker to show that it took all reasonable steps and exercised all due diligence to avoid the breach.
(1)This section applies where the owner or occupier of any premises in the area of a water undertaker requests the undertaker to provide a supply of water to those premises and—
(a)the premises are premises which do not consist in the whole or any part of a building; or
(b)the requested supply is for purposes other than domestic purposes.
[F140(1A)This section also applies where—
(a)a water undertaker is requested to provide a supply of water to premises which are not in the undertaker’s area by the owner or occupier of the premises;
(b)the premises are household premises (as defined in section 17C above) [F141, in the case of premises to be supplied using the supply system of a water undertaker whose area is wholly or mainly in Wales,] or the total quantity of water estimated to be supplied to the premises annually for the purposes of subsection (2) of section 17D above is less than the quantity specified in that subsection; and
(c)paragraph (a) or (b) of subsection (1) above applies.]
[F142(1B)But this section does not apply to any premises if—
(a)they are in a retail exit area, and
(b)they are not household premises (as defined in section 17C above).]
(2)Where this section applies, it shall be the duty of the water undertaker, in accordance with such terms and conditions as may be determined under section 56 below—
(a)to take any such steps as may be so determined in order to enable the undertaker to provide the requested supply; and
(b)having taken any such steps, to provide that supply.
(3)A water undertaker shall not be required by virtue of this section to provide a new supply to any premises, or to take any steps to enable it to provide such a supply, if the provision of that supply or the taking of those steps would—
(a)require the undertaker, in order to meet all its existing obligations to supply water for domestic or other purposes, together with its probable future obligations to supply buildings and parts of buildings with water for domestic purposes, to incur unreasonable expenditure in carrying out works; or
(b)otherwise put at risk the ability of the undertaker to meet any of the existing or probable future obligations mentioned in paragraph (a) above.
(4)A water undertaker shall not be required by virtue of this section to provide a new supply to any premises, or to take any steps to enable it to provide such a supply, if there is a contravention in relation to the water fittings used or to be used in connection with—
(a)the supply of water to those premises; or
(b)the use of water in those premises,
of such of the requirements of regulations under section 74 below as are prescribed for the purposes of this subsection.
(5)Where—
(a)a request has been made by any person to a water undertaker for the purposes of subsection (2) above; and
(b)the steps which the undertaker is required to take by virtue of that request include steps for the purpose of obtaining any necessary authority for, or agreement to, any exercise by the undertaker of any of its powers or the carrying out by the undertaker of any works,
the failure of the undertaker to acquire the necessary authority or agreement shall not affect any liability of that person, under any term or condition in accordance with which those steps are taken, to re-imburse the undertaker in respect of some or all of the expenses incurred by the undertaker in taking those steps.
(6)Nothing in this section shall impose any duty on a water undertaker to provide a supply of water to any premises during any period during which it is reasonable for the supply of water to those premises to be cut off or reduced for the purposes of the carrying out of any necessary works.
(7)The duty of a water undertaker to supply water under this section at the request of any person, and any terms and conditions determined under section 56 below in default of agreement between the undertaker and that person, shall have effect as if contained in such an agreement.
(8)Except so far as otherwise provided by the terms and conditions determined under section 56 below in relation to any supply, the duties of a water undertaker under this section shall have effect subject to the provisions of sections 60 to 63 [F143and 63AB] and 75 below.
Textual Amendments
F140S. 55(1A) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 16(2); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F141Words in s. 55(1A)(b) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 59; S.I. 2017/462, art. 3(k)(vii)
F142S. 55(1B) inserted (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), reg. 1(2), Sch. 2 para. 5
F143Words in s. 55(8) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 16(3); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
Modifications etc. (not altering text)
C15S. 55 extended (01.12.1991) By Water Consolidation (Consequential Provisions) Act 1991 (c. 60, SIF 130), ss. 2(2), 4(2), Sch. 2 Pt. I para.8.
(1)Subject to subsection (3) below, any terms or conditions or other matter which falls to be determined for the purposes of a request made by any person to a water undertaker for the purposes of section 55 above shall be determined—
(a)by agreement between that person and the water undertaker; or
(b)in default of agreement, by the Authority according to what appears to [F2it] to be reasonable.
(2)Subject to subsection (3) below, [F2the Authority] shall also determine any dispute arising between any person and a water undertaker by virtue of subsection (3) or (4) of section 55 above.
(3)[F2The Authority] may, instead of [F2itself] making a determination under subsection (1) or (2) above, refer any matter submitted to [F2it] for determination under that subsection to the arbitration of such person as [F2it] may appoint.
(4)For the purposes of any determination under this section by [F2the Authority] or any person appointed by [F2it] it shall be for a water undertaker to show that it should not be required to comply with a request made for the purposes of section 55 above.
(5)The charges in respect of a supply provided in compliance with any request made for the purposes of section 55 above—
(a)shall not be determined by [F2the Authority] or a person appointed by [F2it], except in so far as, at the time of the request, no provision is in force by virtue of a charges scheme under section 143 below in respect of supplies of the applicable description; and
(b)in so far they do fall to be determined, shall be so determined having regard to the desirability of the undertaker’s—
(i)recovering the expenses of complying with its obligations under section 55 above; and
(ii)securing a reasonable return on its capital.
(6)To the extent that subsection (5)(a) above excludes any charges from a determination under this section, those charges shall be fixed from time to time by a charges scheme under section 143 below, but not otherwise.
(7)The determination of any matter under this section shall be without prejudice to the provisions of sections 233 and 372 of the M8Insolvency Act 1986 (conditions of supply after insolvency).
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
Marginal Citations
(1)It shall be the duty of a water undertaker to allow any person to take water for extinguishing fires from any of its water mains or other pipes on which a fire-hydrant is fixed.
(2)Every water undertaker shall, at the request of the [F144fire and rescue authority] concerned, fix fire-hydrants on its water mains (other than its trunk mains) at such places as may be most convenient for affording a supply of water for extinguishing any fire which may break out within the area of the undertaker.
(3)It shall be the duty of every water undertaker to keep every fire-hydrant fixed on any of its water mains or other pipes in good working order and, for that purpose, to replace any such hydrant when necessary.
(4)It shall be the duty of a water undertaker to ensure that a [F144fire and rescue authority] has been supplied by the undertaker with all such keys as the authority may require for the fire-hydrants fixed on the water mains or other pipes of the undertaker.
[F145(4A)Where a fire-hydrant is removed (other than at the request of the fire authority concerned) by a water undertaker in the course of carrying out works in relation to any of its water mains or other pipes, the cost of replacing the fire-hydrant shall be borne by the undertaker.]
(5)Subject to [F146subsection (5A) and] section 58(3) below, the expenses incurred by a water undertaker in complying with its obligations under subsections (2) to (4) above shall be borne by the [F147fire and rescue authority] concerned.
[F148(5A)Where a fire-hydrant is damaged as the result of any use made of it with the authority of a water undertaker, other than use for the purposes of fire-fighting or for any other purposes of a fire and rescue authority, the fire and rescue authority is not liable for the cost of repairing or replacing the hydrant.]
(6)Nothing in this section shall require a water undertaker to do anything which it is unable to do by reason of the carrying out of any necessary works.
(7)The obligations of a water undertaker under this section shall be enforceable under section 18 above by the Secretary of State.
(8)In addition, where a water undertaker is in breach of its obligations under this section, the undertaker shall be guilty of an offence and liable—
(a)on summary conviction, to a fine not exceeding the statutory maximum;
(b)on conviction on indictment, to a fine.
(9)In any proceedings against any water undertaker for an offence under subsection (8) above it shall be a defence for that undertaker to show that it took all reasonable steps and exercised all due diligence to avoid the commission of the offence.
(10)F149. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F144Words in s. 57(2)(4) substituted (1.10.2004 for E. and 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), ss. 53, 61,{Sch. 1 para. 76(2)}; S.I. 2004/2304, art. 2(2) (subject to savings in art. 3); S.I. 2004/2917, art. 2
F145S. 57(4A) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 84(1), 105(3); S.I. 2004/641, art. 3(v) (with art. 6, Sch. 3)
F146Words in s. 57(5) inserted (1.10.2004 for E. and 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), ss. 53, 61,{Sch. 1 para. 76(3)(a)}; S.I. 2004/2304, art. 2(2) (subject to savings in art. 3); S.I. 2004/2917, art. 2
F147Words in s. 57(5) substituted (1.10.2004 for E. and 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), ss. 53, 61,{Sch. 1 para. 76(3)(b)}; S.I. 2004/2304, art. 2(2) (subject to art. 2); S.I. 2004/2917, art. 2
F148S. 57(5A) inserted (1.10.2004 for E. and 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), ss. 53, 61,{Sch. 1 para. 76(4)}; S.I. 2004/2304, art. 2(2) (subject to savings in art. 3); S.I. 2004/2917, art. 2
F149S. 57(10) repealed (1.10.2004 for E. and 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), ss. 54, 61,{Sch. 2}; S.I. 2004/2304, art. 2(2) (subject to savings in art. 3); S.I. 2004/2917, art. 2
(1)A water undertaker shall, at the request of the owner or occupier of any factory or place of business, fix a fire-hydrant, to be used for extinguishing fires and not other purposes, at such place on any suitable water main or other pipe of the undertaker as is as near as conveniently possible to that factory or place of business.
(2)For the purposes of subsection (1) above a water main or other pipe is suitable, in relation to a factory or place of business, if—
(a)it is situated in a street which is in or near to that factory or place of business; and
(b)it is of sufficient dimensions to carry a hydrant and is not a trunk main.
(3)Subsection (5) of section 57 above shall not apply in relation to expenses incurred in compliance, in relation to a specially requested fire-hydrant, with the obligations under subsections (3) and (4) of that section.
(4)Any expenses incurred by a water undertaker—
(a)in complying with its obligations under subsection (1) above; or
(b)in complying, in relation to a specially requested fire-hydrant, with its obligations under section 57(3) or (4) above,
shall be borne by the owner or occupier of the factory or place of business in question, according to whether the person who made the original request for the hydrant did so in his capacity as owner or occupier.
[F150(4A)Where a specially requested fire-hydrant is removed (other than at the request of the owner or occupier of the factory or place of business in question) by a water undertaker in the course of carrying out works in relation to any of its water mains or other pipes, the cost of replacing the fire-hydrant shall be borne by the undertaker.]
(5)Subsections (6) to (9) of section 57 above shall apply in relation to the obligations of a water undertaker under this section as they apply to the obligations of a water undertaker under that section.
(6)In this section—
“factory” has the same meaning as in the M9Factories Act 1961; and
“specially requested fire-hydrant” means a fire-hydrant which—
(a)is fixed on a water main or other pipe of a water undertaker; and
(b)was fixed on that main or pipe (whether before or after it became such a main or pipe under the M10Water Act 1989) in pursuance of a request made by the owner or occupier of a factory or place of business.
Textual Amendments
F150S. 58(4A) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 84(2), 105(3); S.I. 2004/641, art. 3(v) (art. 6, Sch. 3)
Marginal Citations
(1)A water undertaker shall, at the request of a sewerage undertaker, highway authority or local authority, provide, from such of its pipes as are of an appropriate capacity, a supply of water for cleansing sewers and drains, for cleansing and watering highways or, as the case may be, for supplying any public pumps, baths or wash-houses.
(2)A supply of water provided by a water undertaker under this section shall be provided upon such terms and conditions as may be reasonable.
(3)A water main or other pipe of a water undertaker shall be treated as of an appropriate capacity for the purposes of this section if and only if it has a fire-hydrant fixed on it.
(4)Nothing in this section shall require a water undertaker to do anything which it is unable to do by reason of the carrying out of any necessary works.
(5)The obligations of a water undertaker under this section shall be enforceable under section 18 above by the Authority.
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
(1)Subject to the following provisions of this section, a water undertaker may—
(a)disconnect a service pipe which, for the purposes of providing a supply of water to any premises, is connected with any water main of that undertaker; or
(b)otherwise cut off a supply of water to any premises,
if it is reasonable for the disconnection to be made, or the supply to be cut off, for the purposes of the carrying out of any necessary works.
(2)The power of a water undertaker under this section to cut off a supply of water shall include power to reduce a supply of water.
(3)Except in an emergency or in the case of a reduction which is immaterial, the power of a water undertaker under this section to cut off or reduce a supply shall be exercisable in relation to any premises only after the undertaker has served reasonable notice on the consumer of the proposal for the carrying out of the necessary works.
(4)Where a water undertaker exercises its power under this section to make any disconnection or to cut off or reduce a supply of water to any premises for the purposes of the carrying out of any necessary works, it shall owe a duty to the consumer to secure—
(a)that those works are carried out with reasonable dispatch; and
(b)that any supply of water to those premises for domestic purposes is interrupted for more than twenty-four hours for the purposes of the carrying out of those works only if an emergency supply has been made available (whether or not in pipes) within a reasonable distance of the premises.
(5)Any breach by a water undertaker of the duty owed by virtue of subsection (4) above which causes any person to whom it is owed to sustain loss or damage shall be actionable at the suit of that person.
(1)Subject to [F151subsections (1A) to (6)], a water undertaker may disconnect a service pipe which for the purposes of providing a supply of water to any premises is connected with any water main of that undertaker, or may otherwise cut off a supply of water to any premises, [F152if subsection (1ZA) or (1ZB) applies
(1ZA) This subsection applies] if the occupier of the premises—
(a)is liable (whether in his capacity as occupier or under any agreement with the undertaker) to pay charges due to the undertaker in respect of the supply of water to those premises; and
(b)has failed to do so before the end of the period of seven days beginning with the day after he is served with notice requiring him to do so.
[F153(1ZB)This subsection applies if a water supply licensee requests the undertaker to disconnect the service pipe or otherwise cut off the supply of water to the premises.
(1ZC)A water supply licensee may make a request under subsection (1ZB) only if—
(a)the occupier of the premises is liable under an agreement with the licensee to pay charges to the licensee in respect of the supply of water to the premises,
(b)the licensee has served notice on the occupier requiring payment of charges due,
(c)the occupier has failed to pay the charges before the end of the period of seven days beginning with the day after the notice was served, and
(d)that period has expired.]
[F154(1A)The power conferred by subsection (1) above is not exercisable in relation to any premises specified in Schedule 4A to this Act.]
(2)Where—
(a)a water undertaker has served a notice for the purposes of paragraph (b) of [F155subsection (1ZA)] above on a person; and
(b)within the period of seven days mentioned in that paragraph, that person serves a counter-notice on the undertaker stating that he disputes his liability to pay the charges in question,
the undertaker shall not in respect of that notice exercise his power by virtue of [F156subsection (1)] in relation to any premises except at a time when that person is the occupier of the premises and those charges are enforceable against that person in a manner specified in subsection (3) below.
[F157(2A)Where—
(a)a water supply licensee has served a notice for the purposes of subsection (1ZC)(b) on a person, and
(b)within the period of seven days mentioned in subsection (1ZC)(c), the person serves a counter-notice on the licensee stating that he disputes his liability to pay the charges in question,
the licensee may not make a request under subsection (1ZB) in relation to the premises except at a time when that person is the occupier of the premises and those charges are enforceable against that person in a manner specified in subsection (3).]
(3)For the purposes of subsection (2) [F158or (2A)] above charges are enforceable in a manner specified in this subsection against a person if-
(a)the undertaker [F159or, as the case may be, the licensee] is able to enforce a judgment against that person for the payment of the charges; or
(b)that person is in breach of an agreement entered into, since the service of his counter-notice, for the purpose of avoiding or settling proceedings by the undertaker [F160or, as the case may be, the licensee] for the recovery of the charges.
(4)A water undertaker which exercises its power under this section to disconnect any pipe or otherwise to cut off any supply of water may recoverF161... any expenses reasonably incurred by the undertaker in making the disconnection or in otherwise cutting off the supply [F162—
(a)from the person in respect of whose liability the power is exercised, in a case where the power is exercised in the circumstances mentioned in subsection (1ZA);
(b)from the water supply licensee who made the request, in a case where the power is exercised in the circumstances mentioned in subsection (1ZB).]
(5)Where—
(a)a water undertaker has power under this section to disconnect any pipe to any premises, or otherwise to cut off any supply to any premises; and
(b)a supply of water is provided to those premises [F163(“the primary premises”)] and to other premises [F164(“the secondary premises”)] wholly or partly by the same service pipe,
the undertaker may exercise that power so as to cut off the supply to [F165the secondary premises] if and only if the same person is the occupier of [F166the primary premises] and of [F167the secondary premises].
[F168(6)The undertaker may not cut off the supply to the secondary premises in reliance on subsection (5) if—
(a)in a case where the undertaker is exercising the power in subsection (1) because charges are due to it, the secondary premises are supplied by a person other than the undertaker;
(b)in a case where the undertaker is exercising the power in subsection (1) because of a request for disconnection under subsection (1ZB), the secondary premises are supplied by a person other than the licensee which made that request.]
Textual Amendments
F151Words in s. 61(1) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(2)(a); S.I. 2017/462, art. 3(k)(vii)
F152 S. 61(1ZA) and words inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(2)(b); S.I. 2017/462, art. 3(k)(vii)
F153S. 61(1ZB)(1ZC) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(3); S.I. 2017/462, art. 3(k)(vii)
F155Words in s. 61(2)(a) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(4)(a); S.I. 2017/462, art. 3(k)(vii)
F156Words in s. 61(2) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(4)(b); S.I. 2017/462, art. 3(k)(vii)
F157S. 61(2A) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(5); S.I. 2017/462, art. 3(k)(vii)
F158Words in s. 61(3) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(6)(a); S.I. 2017/462, art. 3(k)(vii)
F159Words in s. 61(3)(a) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(6)(b); S.I. 2017/462, art. 3(k)(vii)
F160Words in s. 61(3)(b) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(6)(c); S.I. 2017/462, art. 3(k)(vii)
F161Words in s. 61(4) repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(7)(a); S.I. 2017/462, art. 3(k)(vii)
F162S. 61(4)(a)(b) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(7)(b); S.I. 2017/462, art. 3(k)(vii)
F163Words in s. 61(5)(b) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(8)(a)(i); S.I. 2017/462, art. 3(k)(vii)
F164Words in s. 61(5)(b) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(8)(a)(ii); S.I. 2017/462, art. 3(k)(vii)
F165Words in s. 61(5) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(8)(b)(i); S.I. 2017/462, art. 3(k)(vii)
F166Words in s. 61(5) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(8)(b)(ii); S.I. 2017/462, art. 3(k)(vii)
F167Words in s. 61(5) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(8)(b)(iii); S.I. 2017/462, art. 3(k)(vii)
F168S. 61(6) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(9); S.I. 2017/462, art. 3(k)(vii)
(1)Subject to the following provisions of this section, a water undertaker may—
(a)disconnect a service pipe which for the purposes of providing a supply of water to any premises is connected with any water main of that undertaker; or
(b)otherwise cut off a supply of water to any premises,
if notice specifying the time after which a supply of water to those premises will no longer be required has been served on the undertaker by a consumer and that time has passed.
(2)No person shall be liable to a water undertaker for any expenses incurred by the undertaker in exercising the power conferred on the undertaker by this section.
(1)Where a water undertaker—
(a)disconnects a service pipe to any inhabited house, or otherwise cuts off a supply of water to such a house; and
(b)does so without restoring the supply to that house before the end of the period of twenty-four hours beginning with the time when it is cut off,
the undertaker shall, no later than forty-eight hours after that time, serve notice that it has cut off that supply on the local authority in whose area the house is situated.
(2)A water undertaker which fails, without reasonable excuse, to serve a notice on a local authority as required by subsection (1) above shall be guilty of an offence under this section.
(3)A water undertaker shall be guilty of an offence under this section if—
(a)it disconnects a service pipe to any premises, or otherwise cuts off a supply of water to any premises, in a case in which it has no power to do so under sections 60 to 62 above, section 75 below or any other enactment; or
(b)in disconnecting any such pipe or cutting off any such supply it fails, without reasonable excuse, to comply with any requirement of the provisions in pursuance of which it disconnects the pipe or cuts off the supply.
[F169(3A)A water undertaker is not guilty of an offence under subsection (3) where it disconnects a service pipe or otherwise cuts off a supply of water under section 61 in the circumstances mentioned in section 61(1ZB) (request from water supply licensee).]
(4)A water undertaker which is guilty of an offence under this section shall be liable, on summary conviction, to a fine not exceeding level 3 on the standard scale.
Textual Amendments
F169S. 63(3A) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 61; S.I. 2017/462, art. 3(k)(vii)
Textual Amendments
F170Ss. 63AA-63AC and preceding cross-heading inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 17; S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F171Words in s. 63AA cross-heading substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 62; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(l) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)The owner or occupier of any premises may serve a notice on a water undertaker—
(a)informing the undertaker that the premises are to be supplied by a [F173water supply licensee]; and
(b)specifying the time after which a supply of water to the premises by the undertaker will no longer be required.
(2)Where the charges for the water supplied by the undertaker are, under Chapter 1 of Part 5 of this Act, fixed in relation to the premises by reference to volume, the time specified in the notice shall fall at least two working days after the notice is served.
(3)In this section and section 63AB below, any reference to two working days is a reference to a period of forty-eight hours calculated after disregarding any time falling on—
(a)a Saturday or Sunday; or
(b)Christmas Day, Good Friday or any day which is a bank holiday in England and Wales under the Banking and Financial Dealings Act 1971.
Textual Amendments
F172Words in s. 63AA title substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 63(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(l) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F173Words in s. 63AA(1)(a) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 63(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(l) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)The duty of a water undertaker under section 55 above [F175or section 63AC(2)] to provide a supply of water to any premises shall cease to apply if—
(a)a notice specifying the time after which a supply of water to the premises by the undertaker will no longer be required in consequence of the premises being supplied by a [F176water supply licensee] has been served on the undertaker by the owner or occupier of the premises; and
(b)that time has passed.
(2)Where the charges for the water supplied by the undertaker are, under Chapter 1 of Part 5 of this Act, fixed in relation to the premises by reference to volume, the time specified in the notice shall fall at least two working days after the notice is served.
Textual Amendments
F174Words in s. 63AB title substituted (6.3.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 64(2); S.I. 2017/58, art. 2(c) (with art. 3(1))
F175Words in s. 63AB(1) inserted (6.3.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 64(3); S.I. 2017/58, art. 2(c) (with art. 3(1))
F176Words in s. 63AB(1)(a) substituted (6.3.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 64(4); S.I. 2017/58, art. 2(c) (with art. 3(1))
(1)This section applies where—
(a)a water supply licensee (“the previous licensee”) ceases to supply any premises with water, and
(b)the owner or occupier of the premises has not notified the water undertaker in whose area the premises are that—
(i)he has made arrangements for the continuation of the supply of water to the premises, or
(ii)he intends any supply of water to the premises to cease.
(2)It is to be the duty of the water undertaker to continue the supply of water to the premises which was made by the previous licensee.
(3)But the Authority may give a direction to an eligible water supply licensee (an “interim licensee”) providing that it is to be the duty of that licensee to continue the supply instead.
(4)An “eligible water supply licensee” is a water supply licensee with a retail authorisation or a restricted retail authorisation who has elected to be an eligible water supply licensee for the purposes of this section in accordance with the code issued under section 63AF.
(5)If the Authority proposes to give a direction under subsection (3) to an eligible water supply licensee—
(a)the Authority must give notice of the proposed direction to the licensee, and
(b)the licensee may, in accordance with the code issued under section 63AF, temporarily suspend the election made by the licensee as mentioned in subsection (4), so that the proposed direction cannot be given to the licensee.
(6)Where a supply is made by an undertaker under subsection (2)—
(a)the charges payable in respect of the supply are to be fixed from time to time by a charges scheme under section 143, and
(b)subject to subsection (12), the supply is to be made until—
(i)a supply is made by an interim licensee by virtue of a direction under subsection (3),
(ii)a supply is made by a water supply licensee following the service of a notice under section 63AA or 63AB;
(iii)a supply is made under section 52 or 55, or
(iv)a notice is served by the undertaker on the owner or occupier of the premises stating that the supply is to be discontinued (subject to subsection (8)),
whichever is the earlier.
(7)Where a supply is made by an interim licensee by virtue of a direction given under subsection (3)—
(a)the supply by the interim licensee is to be treated as having begun on the date on which the previous licensee ceased to supply the premises,
(b)the terms and conditions in accordance with which the supply is to be made are to be—
(i)those provided for by a scheme made under section 63AE, or
(ii)such other terms and conditions as may be agreed between the interim licensee and the owner or occupier of the premises, and
(c)subject to subsection (12), the supply is to be made until it is discontinued in accordance with the terms and conditions mentioned in paragraph (b).
(8)A notice under subsection (6)(b)(iv) may not be served before the end of the period of three months beginning with the day on which the supply by the previous licensee ceased.
(9)Subsections (10) and (11) apply if, within a period of three months beginning with the date on which the previous licensee ceased to supply the premises with water, the owner or occupier of the premises serves notice—
(a)under section 63AA or 63AB, on the water undertaker continuing the supply under subsection (2), or
(b)in accordance with the terms and conditions mentioned in subsection (7)(b), on the interim licensee continuing the supply by virtue of a direction given under subsection (3),
that instead another water supply licensee (“the new licensee”) is to continue the supply of water to the premises which was made by the previous licensee.
(10)The notice must—
(a)specify the time from which the new licensee is to continue the supply in question, and
(b)be served in accordance with the code issued under section 63AF.
(11)In the case of a notice served as mentioned in subsection (9)(a), the supply by the new licensee is to be treated as having begun on the date on which the previous licensee ceased to supply the premises.
(12)Supplies of water under this section are subject to sections 60 to 63.]]
Textual Amendments
F177Ss. 63AC-63AF substituted for s. 63AC (1.4.2017) by Water Act 2014 (c. 21), ss. 31, 94(3); S.I. 2017/462, art. 3(f)
(1)A water undertaker is not required by virtue of section 63AC to provide a supply of water to any premises if the provision of the supply would—
(a)require the undertaker, in order to meet all its existing obligations to supply water for domestic or other purposes, together with its probable future obligations to supply buildings and parts of buildings with water for domestic purposes, to incur unreasonable expenditure in carrying out works, or
(b)otherwise put at risk its ability to meet any of the existing or probable future obligations mentioned in paragraph (a).
(2)The Authority may determine, in a case referred to it by the owner or occupier of the premises in question, whether the condition in subsection (1) is satisfied in relation to a water undertaker.
(3)Before the Authority determines whether that condition is satisfied, it must consult—
(a)the Secretary of State, in the case of a water undertaker whose area is wholly or mainly in England;
(b)the Welsh Ministers, in the case of a water undertaker whose area is wholly or mainly in Wales.
(4)The supply of water to any premises by a water undertaker under section 63AC does not prevent a proposed supply to those premises by that undertaker under section 55 from being regarded as a new supply for the purposes of that section.
(5)Where a duty is imposed by section 63AC(2), or by virtue of a direction given under section 63AC(3), in respect of any premises, any breach of the duty which causes the owner or occupier of the premises to sustain loss or damage is actionable at the suit of that owner or occupier.
(6)But in any proceedings brought against a water undertaker or water supply licensee in pursuance of subsection (5), it is a defence for the undertaker or licensee to show that the undertaker or, as the case may be, the licensee took all reasonable steps and exercised all due diligence to avoid the breach.
(7)For the purposes of section 63AC, premises which are outside a water undertaker's area are to be treated as being within that area if they are supplied with water using the undertaker's supply system.
(8)In subsection (7), the reference to the undertaker's supply system is to be construed in accordance with section 17B.
Textual Amendments
F177Ss. 63AC-63AF substituted for s. 63AC (1.4.2017) by Water Act 2014 (c. 21), ss. 31, 94(3); S.I. 2017/462, art. 3(f)
(1)A person who is an eligible water supply licensee for the purposes of section 63AC must make, and from time to time revise, a scheme containing the terms and conditions which, in the absence of agreed terms and conditions, are to apply to a supply of water made by the licensee by virtue of a direction given under section 63AC(3).
(2)A scheme under this section may make different provision for different purposes, or for different areas.
(3)As soon as practicable after a water supply licensee makes or revises a scheme under this section the licensee is to—
(a)publish the scheme, or revised scheme, on the licensee's website, and
(b)send a copy of the scheme, or revised scheme, to the Authority.
(4)The Authority may give a direction that terms and conditions applying to a supply of water in accordance with a scheme under this section must be modified as specified in the direction.
(5)A direction under subsection (4) may apply—
(a)generally to terms and conditions applying in accordance with a scheme under this section, or
(b)to terms and conditions so applying in any particular case.
(6)It is the duty of a water supply licensee to comply with a direction under subsection (4), and this duty is enforceable under section 18.
Textual Amendments
F177Ss. 63AC-63AF substituted for s. 63AC (1.4.2017) by Water Act 2014 (c. 21), ss. 31, 94(3); S.I. 2017/462, art. 3(f)
(1)The Authority must issue a code in relation to—
(a)supplies of water under section 63AC, and
(b)its power of direction under section 63AC(3) (power to direct that eligible water supply licensee makes interim supply).
(2)The code may, in particular, make provision about—
(a)the procedure for electing to be an eligible water supply licensee for the purposes of section 63AC;
(b)the procedure for temporarily suspending such an election under section 63AC(5)(b);
(c)the circumstances in which the Authority's power of direction under section 63AC(3) or 63AE(4) may or may not be exercised;
(d)how the Authority will determine the date on which a water supply licensee ceased to supply premises with water for the purposes of section 63AC;
(e)terms and conditions contained in schemes made under section 63AE;
(f)eligible water supply licensees informing owners or occupiers of premises of their schemes for terms and conditions made under section 63AE, before agreeing any terms and conditions as mentioned in section 63AC(7)(b)(ii);
(g)the giving of notices as mentioned in section 63AC(9) (that a new licensee is to continue the supply of water made by the previous licensee) including, in particular, provision about—
(i)the earliest time that a notice may specify as the time from which a new licensee is to continue the supply of water made by a previous licensee;
(ii)the procedure for serving a notice.
(3)If the Authority considers that a water supply licensee is not acting as required by provision contained in the code as mentioned in subsection (2)(e) or (f), the Authority may give the licensee a direction to do, or not to do, a particular thing specified in the direction.
(4)It is the duty of a water supply licensee to comply with a direction under subsection (3), and this duty is enforceable under section 18.
(5)The Authority must from time to time review the code and, if appropriate, issue a revised code.
(6)References in section 63AC to the code issued under this section are to the code issued under this section that has effect at the time in question.]
Textual Amendments
F177Ss. 63AC-63AF substituted for s. 63AC (1.4.2017) by Water Act 2014 (c. 21), ss. 31, 94(3); S.I. 2017/462, art. 3(f)
(1)A water undertaker shall be guilty of an offence under this section if it uses a limiting device in relation to any premises specified in Schedule 4A to this Act, with the intention of enforcing payment of charges which are or may become due to the undertaker in respect of the supply of water to the premises.
(2)For the purposes of this section “a limiting device”, in relation to any premises, means any device or apparatus which—
(a)is fitted to any pipe by which water is supplied to the premises or a part of the premises, whether that pipe belongs to the undertaker or to any other person, and
(b)is designed to restrict the use which may be made of water supplied to the premises by the undertaker.
(3)An undertaker does not commit an offence under this section by disconnecting a service pipe to any premises or otherwise cutting off a supply of water to the premises.
(4)An undertaker guilty of an offence under this section shall be liable on summary conviction to a fine not exceeding level 3 on the standard scale.]
(1)Subject to the following provisions of this section, a water undertaker may require the provision of a separate service pipe to any premises F179. . . which—
(a)consist in a house or any other building or part of a building, being, in the case of a part of a building, a part which is separately occupied; and
(b)are already supplied with water by the undertaker but do not have a separate service pipe.
(2)Where the supply of water to two or more houses [F180is provided wholly or partly by the same service pipe], the water undertaker shall not require the provision of separate service pipes to those houses until—
(a)the service pipe, in so far as it belongs to a person other than the undertaker, becomes so defective as to require renewal or is no longer sufficient to meet the requirements of those houses;
(b)a payment in respect of the supply of water to any of those houses remains unpaid after the end of the period for which it is due;
(c)the houses are, by structural alterations to one or more of them, converted into a larger number of houses;
(d)the owner or occupier of any of those houses has interfered with, or allowed another person to interfere with, the existing service pipe and thereby caused the supply of water to any house to be interfered with; or
(e)the undertaker has reasonable grounds for believing that such interference as is mentioned in paragraph (d) above is likely to take place.
F181[(2A)Any dispute between a water undertaker and any other person as to whether any condition of a kind mentioned in subsection (2) above has been complied with may be referred to the Authority for determination under section 30A above by either party to the dispute.]
(3)If, in the case of any such premises as are described in subsection (1) above, the water undertaker which provides a supply of water to those premises serves notice on the consumer requiring the provision of a separate service pipe and setting out the power of the undertaker under subsection (4) below—
(a)that consumer shall, within three months after the service of the notice, lay so much of the required pipe as the undertaker is not under a duty to lay by virtue of paragraph (b) below;
(b)sections 45 to 51 above shall apply as if that consumer had by a connection notice required the undertaker to connect the separate service pipe to those premises with the undertaker’s water main;
(c)that consumer shall be presumed, without prejudice to his power to make further demands and requests—
(i)in so far as those premises were provided before the service of the notice with a supply of water for domestic purposes, to have made a demand for the purposes of section 52 above that such a supply is provided by means of the separate service pipe; and
(ii)in so far as those premises were provided before the service of the notice with a supply of water for other purposes, to have requested the undertaker to provide the same supply by means of that pipe as was provided before the service of the notice;
and
(d)on providing a supply of water to those premises by means of the separate service pipe, the undertaker may cut off any supply replaced by that supply and may make such disconnections of pipes by which the replaced supply was provided as it thinks fit.
(4)If a person upon whom a notice has been served for the purposes of subsection (3) above fails to comply with the notice, the water undertaker may—
(a)itself carry out the works which that person was required to carry out; and
(b)recover the expenses reasonably incurred by the undertaker in doing so from that person.
(5)Without prejudice—
(a)to the power of a water undertaker by virtue of paragraph (b) of subsection (3) above to impose conditions under section 47 above; or
(b)to the power conferred by virtue of paragraph (d) of that subsection,
any works carried out by a water undertaker by virtue of the provisions of the said paragraph (b) or of subsection (4) above shall be necessary works for the purposes of this Chapter.
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F179Words in s. 64(1) repealed (1.7.1992 ) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1, para. 21(a), Sch. 2; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F180Words in s. 64(2) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1 para. 21(b); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F181S. 64(2A) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(6); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
(1)Subject to the following provisions of this section, it shall be the duty of a water undertaker to cause the water in such of its water mains and other pipes as—
(a)are used for providing supplies of water for domestic purposes; or
(b)have fire-hydrants fixed on them,
to be laid on constantly and at such a pressure as will cause the water to reach to the top of the top-most storey of every building within the undertaker’s area.
(2)Nothing in subsection (1) above shall require a water undertaker to provide a supply of water at a height greater than that to which it will flow by gravitation through its water mains from the service reservoir or tank from which that supply is taken.
(3)For the purposes of this section a water undertaker shall be entitled to choose the service reservoir or tank from which any supply is to be taken.
(4)Nothing in subsection (1) above shall impose any duty on a water undertaker to maintain the constancy or pressure of any supply of water during any period during which it is reasonable for that supply to be cut off or reduced for the purposes of the carrying out of any necessary works.
(5)The Secretary of State may by order modify the application of the preceding provisions of this section in relation to any water undertaker.
(6)The Secretary of State shall not make an order under subsection (5) above except—
(a)in accordance with Schedule 5 to this Act; and
(b)on an application made in accordance with that Schedule by the Authority or by the water undertaker in relation to which the order is made.
(7)Subject to subsection (6) above, the power of the Secretary of State to make an order under subsection (5) above shall be exercisable by statutory instrument subject to annulment in pursuance of a resolution of either House of Parliament
(8)An order under subsection (5) above may—
(a)require the payment of compensation by a water undertaker to persons affected by the order;
(b)make different provision for different cases, including different provision in relation to different persons, circumstances or localities; and
(c)contain such supplemental, consequential and transitional provision as the Secretary of State considers appropriate.
(9)The obligations of a water undertaker under this section shall be enforceable under section 18 above by the [F182[F2Authority]].
(10)In addition, where a water undertaker is in breach of a duty under this section, the undertaker shall be guilty of an offence and liable—
(a)on summary conviction, to a fine not exceeding the statutory maximum;
(b)on conviction on indictment, to a fine.
(11)In any proceedings against any water undertaker for an offence under subsection (10) above it shall be a defence for that undertaker to show that it took all reasonable steps and exercised all due diligence to avoid the commission of the offence.
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F182Word in s. 65(9) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1 para.22; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt.I
(1)A water undertaker may require that any premises consisting in—
(a)any building or part of a building the supply of water to which need not, in accordance with provision contained in or made under this Act, be constantly laid on under pressure; or
(b)any relevant house to which water is required to be delivered at a height greater than a point 10.5 metres below the draw-off level of the service reservoir or tank from which a supply of water is being provided by the undertaker to those premises,
shall be provided with a cistern which has a float-operated valve and is fitted on the pipe by means of which water is supplied to those premises.
(2)A water undertaker may, in the case of such a house as is mentioned in paragraph (b) of subsection (1) above, require that a cistern the provision of which is required under that subsection shall be capable of holding sufficient water to provide an adequate supply to the house for a period of twenty-four hours.
(3)If, where a water undertaker provides a supply of water to any premises, the consumer, after having been required to do so by notice served on him by the undertaker, fails before the end of the period specified in the notice—
(a)to provide a cistern in accordance with a requirement under this section; or
(b)to put any such cistern and its float-operated valve into good repair,
the water undertaker may itself provide a cistern, or carry out any repairs necessary to prevent waste of water.
(4)The period specified for the purposes of subsection (3) above in a notice under this section shall be a period of not less than twenty-eight days beginning with the day after the service of the notice.
(5)Where a water undertaker provides a cistern or carries out any repairs under subsection (3) above, it may recover the expenses reasonably incurred by it in doing so from the owner of the premises in question.
(6)In this section—
“pre-transfer supplier”, in relation to a house, means the person who was supplying water to that house immediately before 1st September 1989; and
“relevant house” means any house other than a house in relation to which the following two conditions are satisfied, that is to say—
the erection of the house was commenced before 1st September 1989; and
no such requirement as is mentioned in subsection (1) or (2) above could have been imposed in relation to the house under any enactment having effect immediately before that date in relation to the pre-transfer supplier.
Textual Amendments
F183Pt. 3 Ch. 2A inserted (1.4.2004 for specified provisions and purposes and 1.12.2005 otherwise) by Water Act 2003 (c. 37), ss. 56, 105(3), Sch. 4 para. 3; S.I. 2004/641, art. 3(l), Sch. 1 (with art. 6, Sch. 3); S.I. 2005/2714, art. 3(a) (with Sch. 2 para. 8)
F184S. 66A-66C and cross-heading substituted (1.4.2017 for the substitution of ss. 66A, 66AA, 66C) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 1; S.I. 2017/462, art. 3(i)(i) (with arts. 6-9, 12)
Modifications etc. (not altering text)
C16Pt. 3 Ch. 2A applied (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), regs. 1(2), 38
(1)This section applies where a water supply licensee with a retail authorisation (“L”) requests a water undertaker to permit the use of the undertaker's supply system for the purpose of supplying water to premises that—
(a)L is to supply in accordance with L's retail authorisation, and
(b)are in the area of the undertaker.
(2)This section also applies where a water supply licensee with a restricted retail authorisation (“R”) requests a water undertaker to permit the use of the undertaker's supply system for the purpose of supplying water to premises that—
(a)R is to supply in accordance with R's restricted retail authorisation, and
(b)are in the area of the undertaker.
(3)Where this section applies, the undertaker must in accordance with a section 66D agreement take such steps—
(a)for the purpose of connecting the premises in question with the undertaker's supply system, or
(b)in respect of that system,
as may be provided for in that agreement in order to enable the requested use of the undertaker's supply system.
[F185(3A)A water undertaker is not required by this section to take any steps to enable the use of its supply system at a time when it is required to take those steps by virtue of a notice under section 41 or a connection notice.]
(4)A water undertaker is not required by this section to permit the use of its supply system, or to take any steps to enable its use, if the first or second ground applies.
(5)The first ground is that—
(a)in the case of a request under subsection (1), the water supply licensee has not secured by means of—
(i)a request under section 66AA(1) made by the licensee,
(ii)a request under section 66B(1) or 66C(1), (2) or (3) made by the licensee or another water supply licensee, or
(iii)a combination of such requests,
a supply of water, or the introduction of a supply of water, in connection with which the premises in question are to be supplied;
(b)in the case of a request under subsection (2), the water supply licensee has not secured by means of—
(i)a request under section 66AA(2), 66B(2) or (3) or 66C(4), or
(ii)a combination of such requests,
a supply of water, or the introduction of a supply of water, in connection with which the premises in question are to be supplied.
(6)The second ground is that there is, in relation to the water fittings used or to be used in connection with—
(a)the supply of water to the premises in question, or
(b)the use of water in those premises,
a contravention of such of the requirements of regulations under section 74 as are prescribed for the purposes of this subsection.
(7)Where—
(a)a request has been made by a water supply licensee for the purposes of subsection (1) or (2), and
(b)the steps which the undertaker is required to take by virtue of that request include steps for the purpose of obtaining any necessary authority for, or agreement to, any exercise by it of any of its powers or the carrying out by it of any works,
the failure of the undertaker to acquire the necessary authority or agreement does not affect the liability of the licensee to reimburse the undertaker in respect of some or all of the expenses incurred by it in taking those steps, if the section 66D agreement provides for such liability as regards those steps.
(8)For the purposes of this section and sections 66AA to 66C—
(a)premises which are outside a water undertaker's area are to be treated as being within that area if they are supplied with water using the undertaker's supply system, and
(b)any pipes of the water undertaker which are used for the purpose of supplying premises as mentioned in paragraph (a) are to be treated as being part of the undertaker's supply system (if they would not otherwise be part of it).
(9)In this section and sections 66AA to 66C—
(a)“prescribed” means, in relation to a water undertaker whose area is wholly or mainly in Wales, prescribed by regulations made by the Welsh Ministers by statutory instrument, which is subject to annulment in pursuance of a resolution of the Assembly;
(b)a reference to the supply system of a water undertaker is to be construed in accordance with section 17B;
(c)references to a retail authorisation or a restricted retail authorisation are to be construed in accordance with Schedule 2A.]
Textual Amendments
(1)This section applies where a water supply licensee with a retail authorisation (“L”) requests a water undertaker to provide L with a supply of water for the purpose of supplying water to premises that—
(a)L is to supply in accordance with L's retail authorisation, and
(b)are in the area of the undertaker.
(2)This section also applies where a water supply licensee with a restricted retail authorisation (“R”) requests a water undertaker to provide R with a supply of water for the purpose of supplying water to premises that—
(a)R is to supply in accordance with R's restricted retail authorisation, and
(b)are in the area of the undertaker.
(3)Where this section applies, the undertaker must in accordance with a section 66D agreement—
(a)take such steps in respect of the undertaker's supply system as may be provided for in that agreement in order to enable the use of the undertaker's supply system for the purpose in subsection (1) or, as the case may be, subsection (2), and
(b)having taken such steps, provide the requested supply of water.
(4)A water undertaker is not required by this section to provide a supply of water if both of the first and second grounds apply.
(5)The first ground is that—
(a)the premises to be supplied by L or, as the case may be, R do not consist in the whole or any part of a building, or
(b)the supply to be made by L or, as the case may be, R to those premises is for purposes other than domestic purposes.
(6)The second ground is that provision of a supply of water by the water undertaker would—
(a)require the undertaker, in order to meet all its existing obligations to supply water for domestic or other purposes, together with its probable future obligations to supply buildings and parts of buildings with water for domestic purposes, to incur unreasonable expenditure in carrying out works, or
(b)otherwise put at risk its ability to meet any of the existing or probable future obligations mentioned in paragraph (a).
(7)Where—
(a)a request has been made by a water supply licensee for the purposes of subsection (1) or (2), and
(b)the steps which the undertaker is required to take by virtue of that request include steps for the purpose of obtaining any necessary authority for, or agreement to, any exercise by it of any of its powers or the carrying out by it of any works,
the failure of the undertaker to acquire the necessary authority or agreement does not affect the liability of the licensee to reimburse the undertaker in respect of some or all of the expenses incurred by it in taking those steps, if the section 66D agreement provides for such liability as regards those steps.
(1)This section applies where—
(a)a water supply licensee with a wholesale authorisation (“L”) requests a water undertaker to permit L to introduce water into the undertaker's supply system, with a view to the use of that system, in connection with that introduction of water, to supply water to particular premises in accordance with a retail authorisation (whether L's or another's), and
(b)the premises in issue are in the area of the undertaker.
(2)This section also applies where—
(a)a water supply licensee with a supplementary authorisation (“R1”) requests a water undertaker to permit R1 to introduce water into the undertaker's supply system, with a view to the use of that system, in connection with that introduction of water, to supply water to particular premises in accordance with R1's restricted retail authorisation, and
(b)the premises in issue are in the area of the undertaker.
(3)This section also applies where—
(a)a water undertaker agrees to permit a water supply licensee with a supplementary authorisation (“R2”) to introduce water into the undertaker's treatment works,
(b)in connection with that introduction, R2 requests the undertaker to permit R2 to introduce water into the undertaker's supply system, with a view to the use of that system to supply water to particular premises in accordance with R2's restricted retail authorisation, and
(c)the premises in issue are in the area of the undertaker.
(4)Where this section applies, the undertaker must in accordance with a section 66D agreement—
(a)in a case falling within subsection (1), take such steps—
(i)for the purpose of connecting L's source of water with the undertaker's supply system, or
(ii)in respect of the undertaker's supply system,
as may be provided for in that agreement in order to enable L to make the requested introduction of water into the supply system;
(b)in a case falling within subsection (2), take such steps—
(i)for the purpose of connecting R1's treatment works with the undertaker's supply system,
(ii)for the purpose of connecting with the undertaker's supply system any source used by R1 for the purpose of supplying water other than for domestic or food purposes, or
(iii)in respect of the undertaker's supply system,
as may be provided for in that agreement in order to enable R1 to make the requested introduction of water into the supply system;
(c)in a case falling within subsection (3), take such steps in respect of the undertaker's supply system as may be provided for in that agreement in order to enable R2 to make the requested introduction of water into the supply system;
(d)having taken steps under paragraph (a), (b) or (c) (as the case may be), permit the requested introduction of water into that supply system.
(5)A water undertaker is not required by this section to permit the introduction of water into its supply system, or to take any steps to enable such an introduction of water, if permitting the introduction of water into the undertaker's supply system would—
(a)require the undertaker, in order to meet all its existing obligations to supply water for domestic or other purposes, together with its probable future obligations to supply buildings and parts of buildings with water for domestic purposes, to incur unreasonable expenditure in carrying out works, or
(b)otherwise put at risk its ability to meet any of the existing or probable future obligations mentioned in paragraph (a).
(6)Where—
(a)a request has been made by a water supply licensee for the purposes of subsection (1), (2) or (3), and
(b)the steps which the undertaker is required to take by virtue of that request include steps for the purpose of obtaining any necessary authority for, or agreement to, any exercise by it of any of its powers or the carrying out by it of any works,
the failure of the undertaker to acquire the necessary authority or agreement does not affect the liability of the licensee to reimburse the undertaker in respect of some or all of the expenses incurred by it in taking those steps, if the section 66D agreement provides for such liability as regards those steps.
(7)In this section “treatment works” means—
(a)in relation to a water undertaker whose area is wholly or mainly in Wales, the works designated as treatment works by the Secretary of State for the purposes of section 17B(6);
(b)in relation to a water supply licensee, the works designated from time to time by the Welsh Ministers as treatment works for the purposes of this paragraph.
(8)A list of any works designated for the purposes of subsection (7)(b) must be published from time to time by the Welsh Ministers in such manner as the Welsh Ministers consider appropriate for the purpose of bringing the designations to the attention of persons likely to be affected by them.
(9)A pipe laid because of subsection (4)(a)(i) or (b)(i) or (ii) is to be regarded as a water main for the purposes of this Act, subject to any provision to the contrary.
(10)In this section and section 66C—
(a)a reference to a wholesale authorisation is to be construed in accordance with Schedule 2A;
(b)a reference to a supplementary authorisation is to be construed in accordance with Schedule 2A.
(1)This section applies where a water supply licensee with a wholesale authorisation (“L1”)—
(a)requests a water undertaker other than L1's primary water undertaker (the “secondary water undertaker”) to provide a supply of water so that water may be supplied to particular premises, using the primary water undertaker's supply system and in accordance with a retail authorisation (whether L1's or another's), and
(b)requests L1's primary water undertaker to permit L1 to introduce that water into the primary water undertaker's supply system,
and the premises in issue are in the area of the primary water undertaker.
A request under paragraph (a) may only be made to a water undertaker whose area is wholly or mainly in England.
(2)This section also applies where a water supply licensee with a wholesale authorisation (“L2”)—
(a)requests a water undertaker whose area is wholly or mainly in Wales and which is not L2's primary water undertaker (the “secondary water undertaker”) to provide a supply of water so that L2 may supply water to particular premises, using the primary water undertaker's supply system and in accordance with L2's retail authorisation so far as that authorisation relates to L2's customers, and
(b)requests L2's primary water undertaker to permit L2 to introduce that water into the primary water undertaker's supply system,
and the premises in issue are in the area of the primary water undertaker.
(3)This section also applies where a water supply licensee with a wholesale authorisation (“L3”)—
(a)agrees with a water undertaker whose area is wholly or mainly in Wales and which is not L3's primary undertaker (the “secondary water undertaker”) for the secondary water undertaker to provide a supply of water so that water may be supplied to particular premises, using the primary water undertaker's supply system and in accordance with—
(i)L3's retail authorisation except so far as that authorisation relates to L3's customers, or
(ii)a retail authorisation other than L3's, and
(b)requests L3's primary water undertaker to permit L3 to introduce that water into the primary water undertaker's supply system,
and the premises in issue are in the area of the primary water undertaker.
(4)This section also applies where a water supply licensee with a supplementary authorisation (“R”)—
(a)requests a water undertaker other than R's primary water undertaker (the “secondary water undertaker”) to provide a supply of water so that R may supply water to particular premises, using the primary water undertaker's supply system and in accordance with R's restricted retail authorisation, and
(b)requests R's primary water undertaker to permit R to introduce that water into the primary water undertaker's supply system,
and the premises in issue are in the area of the primary water undertaker.
A request under paragraph (a) may be made to a water undertaker whose area is wholly or mainly in England or Wales.
(5)Where this section applies by virtue of subsection (1), (2) or (4), the secondary water undertaker must in accordance with a section 66D agreement—
(a)take such steps in respect of its supply system as may be provided for in that agreement in order to enable it to provide the requested supply, and
(b)having taken such steps, provide that supply.
(6)Where this section applies, the primary water undertaker must in accordance with a section 66D agreement—
(a)take such steps—
(i)for the purpose of connecting the secondary water undertaker's supply system with the primary water undertaker's supply system, or
(ii)in respect of its supply system,
as may be provided for in that agreement in order to enable L1, L2, L3 or R to make the requested introduction of water into the primary undertaker's supply system, and
(b)having taken such steps, permit the requested introduction.
(7)A secondary water undertaker is not required by this section to provide a supply of water to L1, L2 or R if providing the supply of water would—
(a)require the secondary undertaker, in order to meet all its existing obligations to supply water for domestic or other purposes, together with its probable future obligations to supply buildings and parts of buildings with water for domestic purposes, to incur unreasonable expenditure in carrying out works, or
(b)otherwise put at risk its ability to meet any of the existing or probable future obligations mentioned in paragraph (a).
(8)A primary water undertaker is not required by this section to permit the introduction of water into its supply system, or to take any steps to enable such an introduction of water, if permitting the introduction of a supply of water would—
(a)require the primary undertaker, in order to meet all its existing obligations to supply water for domestic or other purposes, together with its probable future obligations to supply buildings and parts of buildings with water for domestic purposes, to incur unreasonable expenditure in carrying out works, or
(b)otherwise put at risk its ability to meet any of the existing or probable future obligations mentioned in paragraph (a).
(9)Where—
(a)a request has been made by a water supply licensee to a water undertaker for the purposes of subsection (1), (2), (3) or (4), and
(b)the steps which the undertaker is required to take by virtue of that request include steps for the purpose of obtaining any necessary authority for, or agreement to, any exercise by it of any of its powers or the carrying out by it of any works,
the failure of the undertaker to acquire the necessary authority or agreement does not affect the liability of the licensee to reimburse the undertaker in respect of some or all of the expenses incurred by it in taking those steps, if the section 66D agreement provides for such liability as regards those steps.
(10)A pipe laid because of subsection (6)(a)(i) is to be regarded as a water main for the purposes of this Act, subject to any provision to the contrary.
(11)For the purposes of this section, a water undertaker is the primary water undertaker of a water supply licensee if the undertaker's supply system is to be used for the purpose of making the supply to the premises mentioned in subsection (1), (2), (3) or (4).]
(1)The Authority may determine, in a case referred to it by a water supply licensee, whether any condition specified in the following provisions is satisfied—
(a)section 66A(5) and (6);
(b)section 66AA(5) and (6);
(c)section 66B(5);
(d)section 66C(7) and (8).
(2)Before the Authority determines whether a condition specified in section 66B(5) is satisfied, it must consult the Secretary of State.
(3)If a determination as to a condition specified in section 66B(5) relates to the introduction of water into the supply system of a water undertaker whose area is wholly or mainly in Wales, the Authority must consult the Welsh Ministers, not the Secretary of State.
(4)Before the Authority determines whether a condition specified in section 66C(7) or (8) is satisfied, it must consult the Secretary of State and the appropriate agency.
(5)If the case in which a determination as to a condition specified in section 66C(7) or (8) is made relates to—
(a)the supply of water by a water undertaker whose area is wholly or mainly in Wales, and
(b)the introduction of water into the supply system of a water undertaker whose area is wholly or mainly in Wales,
the Authority must consult the Welsh Ministers, not the Secretary of State.
(6)If the case in which a determination as to a condition specified in section 66C(7) or (8) is made relates to the supply of water by one water undertaker, and the introduction of water into the supply system of another water undertaker, and only one of those undertakers has an area wholly or mainly in Wales, the Authority must consult the Welsh Ministers as well as the Secretary of State.
(7)In subsection (4), “the appropriate agency”, in relation to a determination as to a condition specified in section 66C(7) or (8) relating to the supply of water by one water undertaker, and the introduction of water into the supply system of another water undertaker means—
(a)the Environment Agency, in a case where the areas of both undertakers are wholly in England;
(b)the NRBW, in a case where the areas of both undertakers are wholly in Wales;
(c)both the Environment Agency and the NRBW, in any other case.]
Textual Amendments
F186S. 66CA inserted (1.4.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 2; S.I. 2017/462, art. 3(i)(ii)
(1)On the application of—
(a)a water supply licensee that has made a request under sections 66A to 66C, or
(b)a water undertaker to which such a request has been made,
the Authority may by order require a water undertaker to perform the duty in question under sections 66A to 66C, for such period and on such terms and conditions as may be specified in the order.
(2)The Authority may make an order under subsection (1) only if—
(a)in the case of an application relating to a duty under section 66A, 66AA, 66B or 66C, it appears to the Authority that the water undertaker is required to perform that duty under that section, or
(b)in the case of an application relating to duties under section 66C, it appears to the Authority that both water undertakers in question are required to perform duties under that section,
and it is satisfied that the parties cannot reach agreement within a reasonable time.
(3)An order under subsection (1) has effect as an agreement between—
(a)the water supply licensee, and
(b)the water undertaker required to perform the duty in question.
(4)On the application of a party to a section 66D agreement, and if the Authority is satisfied that the parties cannot reach agreement on the variation or termination of the agreement within a reasonable time, the Authority may by order vary or terminate the agreement.
(5)If an order under subsection (4) is made in relation to a section 66D agreement, the agreement—
(a)has effect subject to the provision made by the order, or
(b)ceases to have effect, as the case may be.
(6)An order under subsection (4) may require one party to the agreement to pay compensation to the other.
(7)Neither the CMA nor the Authority may exercise, in respect of an agreement for the performance of a duty under sections 66A to 66C by a water undertaker, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(8)Subsection (7)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement for the performance of a duty under sections 66A to 66C by a water undertaker, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(9)In this Chapter a reference to a section 66D agreement is a reference to—
(a)an agreement for the performance of a duty under sections 66A to 66C by a water undertaker, or
(b)an order deemed to be such an agreement under subsection (3), or
(c)an agreement varied by order under subsection (4).]
Textual Amendments
F187S. 66D substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 3; S.I. 2017/462, art. 3(i)(iii) (with arts. 6-9)
(1)The Authority may issue one or more codes in respect of section 66D agreements.
(2)A code may make provision about—
(a)procedures in connection with making a section 66D agreement;
(b)procedures in connection with varying or terminating a section 66D agreement;
(c)the terms and conditions of a section 66D agreement, including terms as to the duration of such an agreement;
(d)principles for determining the terms and conditions that should or should not be incorporated into a section 66D agreement.
(3)A code may make provision about the steps to be taken by the Authority in determining for the purposes of section 66D(2) whether a water undertaker is, in the particular case, required to perform a duty under sections 66A to 66C.
(4)If the Authority considers that a water undertaker or a water supply licensee is not acting as required by a code, the Authority may give the undertaker or the licensee a direction to do, or not to do, a thing specified in the direction.
(5)The Authority may not give a direction under subsection (4) requiring a person to enter into, vary or terminate an agreement.
(6)It is the duty of a water undertaker or a water supply licensee to comply with a direction under subsection (4), and this duty is enforceable by the Authority under section 18.
(7)A code may make—
(a)different provision for different persons or descriptions of person;
(b)different provision for different duties under sections 66A to 66C.
(8)The Authority may from time to time revise a code issued under this section and issue a revised code.
(9)A revised code may include provision for applying any of its revisions to section 66D agreements made before the revised code comes into effect.
Textual Amendments
F188Ss. 66DA-66DC inserted (1.9.2015 for the insertion of s. 66DB in part, 1.9.2015 for the insertion of s. 66DB(3), 1.4.2016 for the insertion of s. 66DB(1)(b) so far as not already in force, 30.3.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 4; S.I. 2015/773, art. 3(c) (with art. 5); S.I. 2015/1469, art. 3(d)(i); S.I. 2016/465, art. 2(j)(i) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 2(c) (with art. 10)
(1)Before issuing a code under section 66DA, the Authority must—
(a)prepare a draft of the proposed code under section 66DA;
(b)consult persons in accordance with subsections (2) to (4).
(2)If the proposed code relates to section 66D agreements made with water undertakers whose areas are wholly or mainly in England, the Authority must consult the following about the proposed code—
(a)the Secretary of State;
(b)the Chief Inspector of Drinking Water;
(c)the appropriate agency;
(d)the Council;
(e)any relevant undertakers likely to be affected by the proposed code;
(f)any water supply licensees likely to be affected by the proposed code;
(g)such other persons as the Authority thinks appropriate.
(3)If the proposed code relates to section 66D agreements made with water undertakers whose areas are wholly or mainly in Wales, the Authority must consult the following about the proposed code—
(a)the Welsh Ministers;
(b)the Chief Inspector of Drinking Water for Wales if there is one, or the Chief Inspector of Drinking Water if section 86(1B)(b) applies;
(c)the appropriate agency;
(d)the Council;
(e)any relevant undertakers likely to be affected by the proposed code;
(f)any water supply licensees likely to be affected by the proposed code;
(g)such other persons as the Authority thinks appropriate.
(4)The Authority must specify the period (“the consultation period”) within which a person may make representations about the proposed code.
(5)Before a code under section 66DA prepared by the Authority is issued, the Minister may direct the Authority—
(a)not to issue the code, or
(b)to issue the code with specified modifications.
(6)Subsection (5) is subject to subsections (8) and (9).
(7)In subsection (5) “the Minister” means—
(a)the Secretary of State, so far as a code prepared by the Authority relates to section 66D agreements affecting only the supply systems of water undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as a code prepared by the Authority relates to section 66D agreements affecting only the supply systems of water undertakers whose areas are wholly or mainly in Wales;
(c)the Secretary of State and the Welsh Ministers acting jointly, so far as a code prepared by the Authority relates to section 66D agreements not falling within paragraph (a) or (b).
(8)If the power under subsection (5) is exercised to give a direction in respect of such section 66D agreements as are referred to in paragraph (a), (b) or (c) of subsection (7), it may not be exercised again in respect of such section 66D agreements as are referred to in that paragraph.
(9)If the power under subsection (5) to give a direction in respect of such section 66D agreements as are referred to in paragraph (a), (b) or (c) of subsection (7) is not exercised on the first occasion on which it may be so exercised, it may not be exercised in respect of such section 66D agreements as are referred to in that paragraph on a later occasion.
(10)A direction under subsection (5) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code prepared by the Authority in relation to which a direction may be given may not be issued before that period of 28 days has expired.
(11)In this section “the appropriate agency” means—
(a)the Environment Agency, in relation to section 66D agreements made with water undertakers whose areas are wholly in England;
(b)the NRBW, in relation to section 66D agreements made with water undertakers whose areas are wholly in Wales;
(c)both the Environment Agency and the NRBW, in relation to section 66D agreements made with water undertakers whose areas are partly in England and partly in Wales.
(12)This section is subject to section 66DC.
Textual Amendments
F188Ss. 66DA-66DC inserted (1.9.2015 for the insertion of s. 66DB in part, 1.9.2015 for the insertion of s. 66DB(3), 1.4.2016 for the insertion of s. 66DB(1)(b) so far as not already in force, 30.3.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 4; S.I. 2015/773, art. 3(c) (with art. 5); S.I. 2015/1469, art. 3(d)(i); S.I. 2016/465, art. 2(j)(i) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 2(c) (with art. 10)
(1)This section applies if the Authority proposes to issue a revised code and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 66DB does not apply to the proposed revised code.
(3)Once the Authority has issued the revised code, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised code, and
(b)as regards each revision contained in it, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(4)Notice under subsection (3) is to be given to such persons as the Authority considers appropriate.
(5)Unless the Authority gives notice that a revision in a revised code is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised code is issued.]
Textual Amendments
F188Ss. 66DA-66DC inserted (1.9.2015 for the insertion of s. 66DB in part, 1.9.2015 for the insertion of s. 66DB(3), 1.4.2016 for the insertion of s. 66DB(1)(b) so far as not already in force, 30.3.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 4; S.I. 2015/773, art. 3(c) (with art. 5); S.I. 2015/1469, art. 3(d)(i); S.I. 2016/465, art. 2(j)(i) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 2(c) (with art. 10)
(1)The Authority must issue rules about charges that may be imposed by a water undertaker under a section 66D agreement.
(2)The rules may in particular make provision about—
(a)the types of charges that may be imposed;
(b)the amount or the maximum amount, or methods for determining the amount or maximum amount, of any type of charge;
(c)principles for determining what types of charges may or may not be imposed;
(d)principles for determining the amount of any charge that may be imposed;
(e)publication of the charges that may be imposed.
(3)The rules must include provision for and in connection with requiring a water undertaker to impose on a water supply licensee only such charges as would enable the licensee, where the services it provides to a person under its retail authorisation or restricted retail authorisation are services to which a section 142(2)(b) agreement would apply if the undertaker had continued to provide the services, to charge for those services at the same rate or rates as would have applied if the section 142(2)(b) agreement had applied.
(4)In subsection (3) “section 142(2)(b) agreement” means an agreement to which section 142(2)(b) applies.
(5)If the Authority considers that a water undertaker is not acting as required by rules under this section, the Authority may—
(a)give the undertaker a direction to do, or not to do, a thing specified in the direction, or
(b)in a case where a section 66D agreement to which the undertaker is party requires modification in order to conform to the rules, give a direction to the undertaker and the water supply licensee in question to modify the agreement.
(6)It is the duty of a water undertaker or a water supply licensee to comply with a direction under subsection (5), and this duty is enforceable by the Authority under section 18.
(7)The rules may—
(a)make different provision for different persons or descriptions of person;
(b)make different provision for different purposes;
(c)make provision subject to exceptions.
(8)The Authority may from time to time revise rules issued under this section and issue revised rules.
(9)The Authority must issue revised rules if—
(a)guidance is issued under section 66ED, and
(b)the Authority, having regard to that guidance, considers that it is appropriate to revise the rules.
(10)Revised rules may include provision for applying any of their revisions to section 66D agreements made before the revised rules come into effect.]
Textual Amendments
F189Ss. 66E-66ED substituted (1.9.2015 for the substitution of s. 66EB(1)-(7), 1.9.2016 for the substitution of ss. 66E for specified purposes, 66EA, 66EB(8), 66EC, 66ED, 1.4.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 5; S.I. 2015/1469, art. 3(d)(ii); S.I. 2016/465, art. 3(e) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 3(i)(iv) (with arts. 6-9)
(1)Rules under section 66E may make provision about the reduction of charges payable under a section 66D agreement where—
(a)a water supply licensee that has a retail authorisation or a restricted retail authorisation is party to the section 66D agreement, and
(b)other conditions specified by the rules are satisfied.
(2)Rules made by virtue of subsection (1) may in particular—
(a)specify conditions relating to any party to the section 66D agreement;
(b)specify conditions about persons taking steps for the purpose of reducing or managing water consumption;
(c)specify conditions about the premises by reference to which such steps are to be taken;
(d)specify conditions about reducing charges payable by a person who—
(i)is not party to the section 66D agreement, and
(ii)takes or proposes to take such steps as satisfy or would satisfy a condition specified under paragraph (b).
(3)The rules may provide that, where a charge falls to be reduced in accordance with rules made by virtue of subsection (1), the water undertaker to which the charges are payable must give notice of that reduction to the Authority.
(4)Rules made by virtue of subsection (3) may—
(a)make provision as to the content of the notice;
(b)specify the period within which an undertaker is to give notice to the Authority.
(5)Provision under subsection (4)(a) may in particular require the notice to specify—
(a)the amount of the charge, with and without the reduction;
(b)the period for which the reduction has effect.
Textual Amendments
F189Ss. 66E-66ED substituted (1.9.2015 for the substitution of s. 66EB(1)-(7), 1.9.2016 for the substitution of ss. 66E for specified purposes, 66EA, 66EB(8), 66EC, 66ED, 1.4.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 5; S.I. 2015/1469, art. 3(d)(ii); S.I. 2016/465, art. 3(e) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 3(i)(iv) (with arts. 6-9)
(1)Before issuing rules under section 66E, the Authority must—
(a)prepare a draft of the proposed rules, and
(b)consult the relevant persons about the draft.
(2)The relevant persons are—
(a)the Secretary of State;
(b)the Welsh Ministers;
(c)the Council;
(d)any water undertakers likely to be affected by the rules;
(e)any water supply licensees likely to be affected by the rules;
(f)such other persons as the Authority thinks appropriate.
(3)The Authority must specify the period (“the consultation period”) within which persons may make representations about the proposed rules.
(4)The Authority must have regard to guidance issued under section 66ED in preparing rules under section 66E.
(5)Before rules under section 66E prepared by the Authority are issued, the Minister may direct the Authority not to issue the rules.
(6)In subsection (5) “the Minister” means—
(a)the Secretary of State, so far as rules prepared by the Authority relate to section 66D agreements affecting only the supply systems of water undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as rules prepared by the Authority relate to section 66D agreements affecting only the supply systems of water undertakers whose areas are wholly or mainly in Wales;
(c)the Secretary of State and the Welsh Ministers acting jointly, so far as rules prepared by the Authority relate to section 66D agreements not falling within paragraph (a) or (b).
(7)A direction under subsection (5) must be given within the period of 28 days beginning with the day after the end of the consultation period, and rules may not be issued before that period of 28 days has expired.
(8)This section is subject to section 66EC.
Textual Amendments
F189Ss. 66E-66ED substituted (1.9.2015 for the substitution of s. 66EB(1)-(7), 1.9.2016 for the substitution of ss. 66E for specified purposes, 66EA, 66EB(8), 66EC, 66ED, 1.4.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 5; S.I. 2015/1469, art. 3(d)(ii); S.I. 2016/465, art. 3(e) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 3(i)(iv) (with arts. 6-9)
(1)This section applies if the Authority proposes to issue revised rules under section 66E and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 66EB does not apply to the proposed revised rules.
(3)Before issuing the revised rules, the Authority must give notice to the Minister of its intention to issue revised rules.
(4)Before the revised rules are issued, the Minister may direct the Authority not to issue the revised rules.
(5)A direction under subsection (4) must be given within the period of 14 days beginning with the day after the day on which notice is given under subsection (3), and the Authority may not issue the revised rules in question before—
(a)that period of 14 days expires, or
(b)the Minister notifies the Authority that no direction under subsection (4) will be given in relation to the revised rules,
whichever is the sooner.
(6)Once the Authority has issued the revised rules, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised rules, and
(b)as regards each revision contained in them, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(7)Notice under subsection (6) is to be given to such persons as the Authority considers appropriate.
(8)Unless the Authority gives notice that a revision in revised rules is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised rules are issued.
(9)In this section “the Minister” has the meaning given by section 66EB.
Textual Amendments
F189Ss. 66E-66ED substituted (1.9.2015 for the substitution of s. 66EB(1)-(7), 1.9.2016 for the substitution of ss. 66E for specified purposes, 66EA, 66EB(8), 66EC, 66ED, 1.4.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 5; S.I. 2015/1469, art. 3(d)(ii); S.I. 2016/465, art. 3(e) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 3(i)(iv) (with arts. 6-9)
(1)The Minister may issue guidance as to the content of rules under section 66E.
(2)Before issuing the guidance, the Minister must—
(a)prepare a draft of any proposed guidance;
(b)consult the relevant persons about the draft.
(3)The relevant persons are—
(a)the Secretary of State;
(b)the Welsh Ministers;
(c)such other persons as the Minister thinks appropriate.
(4)The Minister may from time to time revise guidance issued under this section and issue revised guidance.
(5)Subsections (2) and (3) apply to revised guidance as they apply to the original guidance.
(6)The Minister must arrange for the publication of guidance issued under this section.
(7)In this section “the Minister” means—
(a)the Secretary of State, in relation to section 66D agreements affecting only the supply systems of water undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, in relation to section 66D agreements affecting only the supply systems of water undertakers whose areas are wholly or mainly in Wales;
(c)the Secretary of State and the Welsh Ministers acting jointly, in relation to section 66D agreements not falling within paragraph (a) or (b).]
Textual Amendments
F189Ss. 66E-66ED substituted (1.9.2015 for the substitution of s. 66EB(1)-(7), 1.9.2016 for the substitution of ss. 66E for specified purposes, 66EA, 66EB(8), 66EC, 66ED, 1.4.2017 in so far as not already in force) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 5; S.I. 2015/1469, art. 3(d)(ii); S.I. 2016/465, art. 3(e) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16); S.I. 2017/462, art. 3(i)(iv) (with arts. 6-9)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F190S. 66F repealed (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 6; S.I. 2017/462, art. 3(i)(v) (with arts. 6-9)
(1)Subsection (2) below applies if at any time the Authority determines that an introduction of water which a water undertaker is required to permit under section 66B or 66C above in accordance with [F191a section 66D agreement] constitutes a strategic supply of water.
(2)The Authority shall designate the introduction as a strategic supply.
(3)Subsection (4) below applies if—
(a)a water undertaker requests the Authority to make a determination that an introduction of water constitutes a strategic supply for the purposes of subsection (1) above, or
(b)the Authority otherwise proposes to make a determination that an introduction of water constitutes a strategic supply for the purposes of that subsection.
(4)The Authority shall give notice of the request or proposed determination to—
(a)the Secretary of State;
(b)the Assembly;
(c)the Environment Agency[F192, if the request or proposed determination relates to an introduction of water to the supply system of a water undertaker for the purpose of supplying water to premises in England];
[F193(ca)the NRBW, if the request or proposed determination relates to an introduction of water to the supply system of a water undertaker for the purpose of supplying water to premises in Wales;]
(d)the other party or parties, or the parties, to [F194the section 66D agreement]; and
(e)such other persons (if any) as the Authority thinks it appropriate to notify.
(5)Any such notice shall specify the time (not being less than twenty-eight days from the date on which the notice was given) within which representations or objections with respect to the request or proposed determination may be made.
(6)The Authority shall consider any representations or objections which are duly made and not withdrawn.
(7)If the Authority determines that an introduction designated under this section as a strategic supply no longer constitutes such a supply, it shall cancel its designation.
(8)If the Authority proposes to make a determination under subsection (7) above that an introduction no longer constitutes a strategic supply, it shall give notice of the proposed determination to the persons specified in paragraphs (a) to (d) of subsection (4) above.
(9)Subsection (5) above applies to a notice under subsection (8) above as it applies to a notice under subsection (4) above (and subsection (6) above applies accordingly).
(10)For the purposes of this section, an introduction of water is a strategic supply if, without that introduction being made, there is a substantial risk that the water undertaker would be unable to maintain supplies to its own customers[F195, and supplies which it is obliged to make under [F196section 66AA] or 66C,] as well as supplying [F197relevant customers of a water supply licensee] with water for domestic purposes.
[F198(11)A person is a relevant customer of a water supply licensee if the introduction of water in question is made by reference to the supply of water to that person's premises in accordance with—
(a)a retail authorisation (whether that retail authorisation is an authorisation of the licensee requesting the introduction of water or another water supply licensee's authorisation), or
(b)a restricted retail authorisation of the licensee requesting the introduction of water.]
Textual Amendments
F191Words in s. 66G(1) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 7(2); S.I. 2017/462, art. 3(i)(v)
F192Words in s. 66G(4)(c) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 234(2) (with Sch. 7)
F193S. 66G(4)(ca) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 234(3) (with Sch. 7)
F194Words in s. 66G(4)(d) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 7(3); S.I. 2017/462, art. 3(i)(v)
F195Words in s. 66G(10) inserted (1.4.2011) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 5 para. 7(1) (with s. 49(1)(6)); S.I. 2011/694, art. 3(j)
F196Words in s. 66G(10) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 7(4)(a); S.I. 2017/462, art. 3(i)(v)
F197Words in s. 66G(10) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 7(4)(b); S.I. 2017/462, art. 3(i)(v)
F198S. 66G(11) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 7(5); S.I. 2017/462, art. 3(i)(v)
(1)Subsection (2) below applies if at any time the Authority determines that two or more introductions of water—
(a)which are made by a licensed water supplier; and
(b)which a water undertaker is required to permit under section 66B or 66C above in accordance with [F199section 66D agreements],
constitute a collective strategic supply of water.
(2)The Authority shall designate the introductions as a collective strategic supply.
(3)Subsection (4) below applies if—
(a)a water undertaker requests the Authority to make a determination that two or more introductions of water constitute a collective strategic supply for the purposes of subsection (1) above, or
(b)the Authority otherwise proposes to make a determination that two or more introductions of water constitute a collective strategic supply for the purposes of that subsection.
(4)The Authority shall give notice of the request or proposed determination to—
(a)the Secretary of State;
(b)the Assembly;
(c)the Environment Agency[F200, if the request or proposed determination relates to an introduction of water to the supply system of a water undertaker for the purpose of supplying water to premises in England];
[F201(ca)the NRBW, if the request or proposed determination relates to an introduction of water to the supply system of a water undertaker for the purpose of supplying water to premises in Wales;]
(d)the other party or parties, or the parties, to [F202the section 66D agreements]; and
(e)such other persons (if any) as the Authority thinks it appropriate to notify.
(5)Any such notice shall specify the time (not being less than twenty-eight days from the date on which the notice was given) within which representations or objections with respect to the request or proposed determination may be made.
(6)The Authority shall consider any representations or objections which are duly made and not withdrawn.
(7)If the Authority determines that introductions designated under this section as a collective strategic supply no longer constitute such a supply, it shall cancel their designation.
(8)If the Authority proposes to make a determination under subsection (7) above that introductions no longer constitute a collective strategic supply, it shall give notice of the proposed determination to the persons specified in paragraphs (a) to (d) of subsection (4) above.
(9)Subsection (5) above applies to a notice under subsection (8) above as it applies to a notice under subsection (4) above (and subsection (6) above applies accordingly).
(10)For the purposes of this section, introductions of water are a collective strategic supply if, without those introductions being made, there is a substantial risk that the water undertaker would be unable to maintain supplies to its own customers[F203, and supplies which it is obliged to make under [F204section 66AA] or 66C,] as well as supplying the [F205relevant customers of a water supply licensee] with water for domestic purposes.
[F206(11)A person is a relevant customer of a water supply licensee if an introduction of water is made by reference to the supply of water to that person's premises in accordance with—
(a)a retail authorisation (whether that retail authorisation is an authorisation of the licensee requesting the introduction of water or another water supply licensee's authorisation), or
(b)a restricted retail authorisation of the licensee requesting the introduction of water.]
Textual Amendments
F199Words in s. 66H(1)(b) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 8(2); S.I. 2017/462, art. 3(i)(v)
F200Words in s. 66H(4)(c) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 235(2) (with Sch. 7)
F201S. 66H(4)(ca) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 235(3) (with Sch. 7)
F202Words in s. 66H(4)(d) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 8(3); S.I. 2017/462, art. 3(i)(v)
F203Words in s. 66H(10) inserted (1.4.2011) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 5 para. 7(2) (with s. 49(1)(6)); S.I. 2011/694, art. 3(j)
F204Words in s. 66H(10) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 8(4)(a); S.I. 2017/462, art. 3(i)(v)
F205Words in s. 66H(10) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 8(4)(b); S.I. 2017/462, art. 3(i)(v)
F206S. 66H(11) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 8(5); S.I. 2017/462, art. 3(i)(v)
(1)Subject to subsections (2) and (3) and section 66K below, no person shall use a water undertaker’s supply system for the purpose of supplying water to any premises [F207of—
(a)a customer,
(b)the person so using that system, or
(c)a person associated with that person].
(2)Subsection (1) above shall not apply where the supply is made—
(a)by the water undertaker, or
(b)by a [F208water supply licensee] in pursuance of [F209the licensee's licence].
(3)The Secretary of State may by regulations specify further circumstances in which subsection (1) above shall not apply.
(4)A person who contravenes subsection (1) above shall be guilty of an offence.
(5)Any undertaking entered into which involves a contravention of subsection (1) above shall be unenforceable.
(6)A person guilty of an offence under this section shall be liable—
(a)on summary conviction, to a fine not exceeding the statutory maximum, and
(b)on conviction on indictment, to a fine.
(7)No proceedings for an offence under this section shall be instituted except by—
(a)the Secretary of State, or
(b)the Authority.
(8)The functions of—
(a)making regulations under subsection (3) above; and
(b)instituting proceedings under subsection (7)(a) above,
are exercisable by the Assembly (and not by the Secretary of State) in relation to any supply system of a water undertaker whose area is wholly or mainly in Wales.
[F210(8A)For the purposes of this section, a person (A) is associated with another person (B) if they would be associated with each other for the purposes of Schedule 2A if A were a water supply licensee.]
(9)In this section and sections 66J and 66L below, references to the supply system of a water undertaker shall be construed in accordance with [F211section 17B].
Textual Amendments
F207Words in s. 66I(1) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 9(2); S.I. 2016/465, art. 2(j)(ii) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F208Words in s. 66I(2)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 9(3)(a); S.I. 2016/465, art. 2(j)(ii) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F209Words in s. 66I(2)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 9(3)(b); S.I. 2016/465, art. 2(j)(ii) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F210S. 66I(8A) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 9(4); S.I. 2017/462, art. 3(i)(vi)
F211Words in s. 66I(9) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 9(5); S.I. 2017/462, art. 3(i)(vi)
Modifications etc. (not altering text)
C17S. 66I(1) restricted (1.12.2005) by The Water Supply (Exceptions from Supply System Prohibitions) Regulations 2005 (S.I. 2005/3075), reg. 3
(1)Subject to subsections (2) and (3) and section 66K below, no person shall introduce water into a water undertaker’s supply system (other than the undertaker itself).
(2)Subsection (1) above shall not apply where the water is introduced—
(a)by a [F212water supply licensee] in pursuance of its licence, or
(b)by another water undertaker under an agreement for a supply of water in bulk.
(3)The Secretary of State may by regulations specify further circumstances in which subsection (1) above shall not apply.
(4)A person who contravenes subsection (1) above shall be guilty of an offence.
(5)Any undertaking entered into which involves a contravention of subsection (1) above shall be unenforceable.
(6)A person guilty of an offence under this section shall be liable [F213on summary conviction, or on conviction on indictment, to a fine].
(7)For the purposes of section 210 below, the penalty on conviction on indictment of an offence under this section shall be deemed to include imprisonment (in addition to or instead of a fine) for a term not exceeding two years.
(8)No proceedings for an offence under this section shall be instituted except by—
(a)the Secretary of State; or
(b)the Authority.
(9)The functions of—
(a)making regulations under subsection (3) above; and
(b)instituting proceedings under subsection (8)(a) above,
are exercisable by the Assembly (and not by the Secretary of State) in relation to any supply system of a water undertaker whose area is wholly or mainly in Wales.
Textual Amendments
F212Words in s. 66J(2)(a) substituted (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 6(4)
F213Words in s. 66J(6) substituted (12.3.2015) by The Legal Aid, Sentencing and Punishment of Offenders Act 2012 (Fines on Summary Conviction) Regulations 2015 (S.I. 2015/664), reg. 1(1), Sch. 4 para. 23(2) (with reg. 5(1))
Modifications etc. (not altering text)
C18S. 66J modified (temp.) (22.3.2017) by The Water Act 2014 (Commencement No. 9 and Transitional Provisions) Order 2017 (S.I. 2017/462), art. 11(5)
C19S. 66J(1) restricted (1.12.2005) by The Water Supply (Exceptions from Supply System Prohibitions) Regulations 2005 (S.I. 2005/3075), reg. 4
(1)The Secretary of State may by order made by statutory instrument grant exemption from section 66I(1) or 66J(1) above to—
(a)a person or persons of a class;
(b)generally or to such extent as may be specified in the order; and
(c)unconditionally or subject to such conditions as may be so specified.
(2)Before making an order under subsection (1) above the Secretary of State shall give notice—
(a)stating that he proposes to make such an order and setting out the terms of the proposed order;
(b)stating the reasons why he proposes to make the order in the terms proposed; and
(c)specifying the time (not being less than twenty-eight days from the date of publication of the notice) within which representations or objections with respect to the proposals may be made,
and shall consider any representations or objections which are duly made and not withdrawn.
(3)The notice required by subsection (2) above shall be given—
(a)by serving a copy of it on the Authority; and
(b)by publishing it in such manner as the Secretary of State considers appropriate for bringing it to the attention of those likely to be affected by the proposed order.
(4)Notice of an exemption granted to a person shall be given—
(a)by serving a copy of the exemption on him; and
(b)by publishing the exemption in such manner as the Secretary of State considers appropriate for bringing it to the attention of other persons who may be affected by it.
(5)Notice of an exemption granted to persons of a class shall be given by publishing the exemption in such manner as the Secretary of State considers appropriate for bringing it to the attention of—
(a)persons of that class; and
(b)other persons who may be affected by it.
(6)An exemption may be granted—
(a)indefinitely; or
(b)for a period specified in, or determined by or under, the exemption.
(7)Conditions included in an exemption by virtue of subsection (1)(c) above may, in particular, require any person carrying on any activity in pursuance of the exemption—
(a)to comply with any direction given by the Secretary of State or the Authority as to such matters as are specified in the exemption or are of a description so specified;
(b)except in so far as the Secretary of State or the Authority consents to his doing or not doing them, not to do or to do such things as are specified in the exemption or are of a description so specified; and
(c)to refer for determination by the Secretary of State or the Authority such questions arising under the exemption as are specified in the exemption or are of a description so specified.
(1)The Secretary of State may by order made by statutory instrument revoke an order by which an exemption was granted to a person under section 66K(1) above or vary an order by which more than one exemption was so granted so as to terminate any of the exemptions—
(a)at the person’s request;
(b)in accordance with any provision of the order by which the exemption was granted; or
(c)if it appears to the Secretary of State inappropriate that the exemption should continue to have effect.
(2)The Secretary of State may by order made by statutory instrument revoke an order by which an exemption was granted to persons of a class under section 66K(1) above or vary an order by which more than one exemption was so granted so as to terminate any of the exemptions—
(a)in accordance with any provision of the order by which the exemption was granted; or
(b)if it appears to the Secretary of State inappropriate that the exemption should continue to have effect.
(3)The Secretary of State may by direction withdraw an exemption granted to persons of a class under section 66K(1) above from any person of that class—
(a)at the person’s request;
(b)in accordance with any provision of the order by which the exemption was granted; or
(c)if it appears to the Secretary of State inappropriate that the exemption should continue to have effect in the case of the person.
(4)Before making an order under subsection (1)(b) or (c) or (2) above or giving a direction under subsection (3)(b) or (c) above, the Secretary of State shall—
(a)consult the Authority; and
(b)give notice—
(i)stating that he proposes to make such an order or give such a direction;
(ii)stating the reasons why he proposes to make such an order or give such a direction; and
(iii)specifying the time (not being less than twenty-eight days from the date of publication of the notice) within which representations or objections with respect to the proposals may be made,
and shall consider any representations or objections which are duly made and not withdrawn.
(5)The notice under subsection (4) above shall be given—
(a)where the Secretary of State is proposing to make an order under subsection (1)(b) or (c) above, by serving a copy of it on the person to whom the exemption was granted;
(b)where he is proposing to make an order under subsection (2) above, by publishing it in such manner as the Secretary of State considers appropriate for bringing it to the attention of persons of the class of persons to whom the exemption was granted; and
(c)where he is proposing to give a direction under subsection (3)(b) or (c) above, by serving a copy of it on the person from whom he proposes to withdraw the exemption.
(6)A statutory instrument containing an order under subsection (1) or (2) above or subsection (1) of section 66K above shall be subject to annulment in pursuance of a resolution of either House of Parliament.
(7)The power to—
(a)make an order under subsection (1) or (2) above or subsection (1) of section 66K above; or
(b)give a direction under subsection (3) above,
is exercisable by the Assembly (and not by the Secretary of State) in relation to any supply system of a water undertaker whose area is wholly or mainly in Wales.
(8)Accordingly, subsections (1) to (5) above and section 66K above apply in relation to an order made or a direction given by the Assembly by virtue of subsection (7) above as they apply in relation to an order made or direction given by the Secretary of State.]
(1)The Secretary of State may by regulations make provision that water that is supplied to any premises is or is not to be regarded as wholesome for the purposes of this Chapter if it satisfies or, as the case may be, fails to satisfy such requirements as may be prescribed.
(2)Without prejudice to the generality of subsection (1) above, regulations under this section may, for the purpose of determining the wholesomeness of any water—
(a)prescribe general requirements as to the purposes for which the water is to be suitable;
(b)prescribe specific requirements as to the substances that are to be present in or absent from the water and as to the concentrations of substances which are or are required to be present in the water;
(c)prescribe specific requirements as to other characteristics of the water;
(d)provide that the question whether prescribed requirements are satisfied may be determined by reference to such samples as may be prescribed;
(e)enable the Secretary of State to authorise such relaxations of and departures from the prescribed requirements (or from any of them) as may be prescribed, to make any such authorisation subject to such conditions as may be prescribed and to modify or revoke any such authorisation or condition; and
(f)enable the Secretary of State to authorise a local authority (either instead of the Secretary of State or concurrently with him) to exercise in relation to a private supply any power conferred on the Secretary of State by regulations made by virtue of paragraph (e) above.
Subordinate Legislation Made
P1S. 67: ss. 67 and 77(3) (with ss. 77(4) and 213(2)) power exercised by S.I.1991/2790
Modifications etc. (not altering text)
C20S. 67 applied by S.I. 2000/2531, reg. 2(2)(c) (as inserted (1.10.2009) by The Building and Approved Inspectors (Amendment) Regulations 2009 (S.I. 2009/1219), reg. 2(2)(b))
C21S. 67 applied (1.10.2010) by The Building Regulations 2010 (S.I. 2010/2214), regs. 1, 2(5) (with reg. 9)
Textual Amendments
F214Words in s. 68 cross-heading inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(8); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F215Words in s. 68 cross-heading substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 66; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)It shall be the duty of a water undertaker [F218where its supply system is used for the purpose of supplying water to any premises for domestic or food production purposes]—
(a)[F219to ensure that any water so supplied] is wholesome at the time of supply; and
(b)so far as reasonably practicable, to ensure, in relation to each source or combination of sources from which [F220water is so supplied], that there is, in general, no deterioration in the quality of the water which is supplied from time to time from that source or combination of sources.
[F221and this section and section 69 below apply, in relation to the duty of an undertaker, whether or not the water supplied using the undertaker’s supply system is supplied by the undertaker.]
[F222(1A)It shall be the duty of a [F223water supply licensee]—
(a)when supplying water to any premises for domestic or food production purposes, in accordance with [F224the licensee's retail authorisation or restricted retail authorisation], to ensure that the water is wholesome at the time of supply; and
(b)so far as reasonably practicable, to ensure, in relation to each source or combination of sources from which [F225that licensee] supplies water to premises for domestic or food production purposes, in accordance with [F226the licensee's retail authorisation or restricted retail authorisation], that there is, in general, no deterioration in the quality of the water which is supplied from time to time from that source or combination of sources,
F227...]
(2)For the purposes of this section and section 69 below and subject to subsection (3) below, [F228where a water undertaker’s supply system is used for the purpose of supplying water to any premises, any water so supplied] to any premises shall not be regarded as unwholesome at the time of supply where it has ceased to be wholesome only after leaving the undertaker’s pipes.
(3)For the purposes of [F229subsection (1) above where a water undertaker’s supply system is used for the purpose of supplying water to any premises, and the water so supplied] would not otherwise be regarded as unwholesome at the time of supply, that water shall be regarded as unwholesome at that time if—
(a)it has ceased to be wholesome after leaving the undertaker’s pipes but while in a pipe which is subject to water pressure from a water main or which would be so subject but for the closing of some valve; and
(b)it has so ceased in consequence of the failure of the undertaker, before [F230the water is supplied, to ensure that such steps are taken] as may be prescribed for the purpose of securing the elimination, or reduction to a minimum, of any prescribed risk that the water would cease to be wholesome after leaving the undertaker’s pipes.
[F231(3A)For the purposes of subsection (1A) above where water supplied by a [F232water supply licensee] to any premises would not otherwise be regarded as unwholesome at the time of supply, that water shall be regarded as unwholesome at that time if—
(a)it has ceased to be wholesome after leaving the relevant pipes but while in a pipe which is subject to water pressure from a water main or which would be so subject but for the closing of some valve; and
(b)it has so ceased in consequence of the failure of [F233the licensee], before supplying the water, to ensure that such steps are taken as may be prescribed for the purpose of securing the elimination, or reduction to a minimum, of any prescribed risk that the water would cease to be wholesome after leaving the relevant pipes.
(3B)In subsection (3A) above “relevant pipes” means the pipes of the water undertaker whose supply system is used for the purpose of the supply made by the [F234water supply licensee].]
(4)The provisions of this section shall apply in relation to water which is supplied by a water undertaker whether or not the water is water which the undertaker is required to supply by virtue of any provision of this Act.
(5)The duties of a water undertaker [F235and [F236water supply licensee]] under this section shall be enforceable under section 18 above by the Secretary of State.
[F237(6)References in this section to a retail authorisation or a restricted retail authorisation are to be construed in accordance with Schedule 2A.
(7)In this section “prescribed” means—
(a)in relation to a water undertaker whose area is wholly or mainly in Wales, and
(b)in relation to a water supply licensee so far as relating to licensed activities using the supply system of such a water undertaker,
prescribed by regulations made by the Welsh Ministers by statutory instrument, which is subject to annulment in pursuance of a resolution of the Assembly.]
Textual Amendments
F216 S. 68: words in sidenote inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(8); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F217Words in s. 68 title substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F218Words in s. 68(1) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(2)(a); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F219Words in s. 68(1)(a) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(2)(b); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F220Words in s. 68(1)(b) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(2)(c); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F221Words in s. 68(1) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(2)(d); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F222S. 68(1A) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(3); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F223Words in s. 68(1A) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(3)(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F224Words in s. 68(1A)(a) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(3)(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F225Words in s. 68(1A)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(3)(c); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F226Words in s. 68(1A)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(3)(d); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F227Words in s. 68(1A) repealed (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(3)(e); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F228Words in s. 68(2) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(4); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F229Words in s. 68(3) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(5)(a); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F230Words in s. 68(3)(b) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(5)(b); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F231S. 68(3A)(3B) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(6); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F232Words in s. 68(3A) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(4)(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F233Words in s. 68(3A)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(4)(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F234Words in s. 68(3B) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(5); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F235Words in s. 68(5) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 18(7); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F236Words in s. 68(5) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(6); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F237S. 68(6)(7) inserted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(7); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)The Secretary of State may by regulations require a water undertaker [F238or a [F239water supply licensee] to ensure that such steps are taken] as may be prescribed for the purpose of securing compliance with section 68 above.
(2)Without prejudice to the generality of the power conferred by subsection (1) above, regulations under that subsection may impose an obligation on a water undertaker [F240or [F241water supply licensee]]—
(a)to [F242ensure that all such steps are taken] as may be prescribed for monitoring and recording whether the water [F243used for relevant supplies] to premises for domestic or food production purposes is wholesome at the time of supply;
(b)to [F244ensure that all such steps are taken] as may be prescribed for monitoring and recording the quality of the water from any source, or combination of sources, which [F245is used or is proposed to be used for making relevant supplies] to any premises for domestic or food production purposes;
(c)to ensure that a source which [F246is used or proposed to be used for making relevant supplies] for domestic or food production purposes is not so used until prescribed requirements for establishing the quality of water which may be supplied from that source have been complied with;
(d)to [F247ensure that records are kept] of the localities within which all the premises [F248receiving relevant supplies] for domestic or food production purposes F249. . . are normally supplied from the same source or combination of sources;
(e)to [F250ensure that prescribed requirements are complied with] with respect to the analysis of water samples or with respect to internal reporting or organisational arrangements.
(3)Without prejudice to subsections (1) and (2) above, the Secretary of State may by regulations make provision [F251imposing obligations on water undertakers or [F252water supply licensees] with respect to the use for the purposes of or in connection with making relevant supplies]—
(a)of such processes and substances; and
(b)of products that contain or are made with such substances or materials,
as he considers might affect the quality of any water.
(4)Without prejudice to the generality of the power conferrred by subsection (3) above, regulations under that subsection may—
(a)[F253require water undertakers or [F254water supply licensees] to ensure that] processes, substances and products which have not been approved under the regulations or which contravene the regulations [F255are not used for the purposes of or in connection with relevant supplies];
(b)for the purposes of provision made by virtue of paragraph (a) above, require [F256water undertakers and [F257water supply licensees] to ensure that] processes, substances and products used [F258for the purposes of or in connection with relevant supplies] conform to such standards as may be prescribed by or approved under the regulations;
(c)impose such other requirements as may be prescribed with respect to the use [F259for the purposes of or in connection with relevant supplies] of prescribed processes, substances and products;
(d)provide for the giving, refusal and revocation, by prescribed persons, of approvals required for the purposes of the regulations, for such approvals to be capable of being made subject to such conditions as may be prescribed and for the modification and revocation of any such condition;
(e)impose obligations to furnish prescribed persons with information reasonably required by those persons for the purpose of carrying out functions under the regulations;
(f)provide for a contravention of the regulations to constitute—
(i)a summary offence punishable, on summary conviction, by a fine not exceeding level 5 on the standard scale or such smaller sum as may be prescribed; or
(ii)an offence triable either way and punishable, on summary conviction, by a fine not exceeding the statutory maximum and, on conviction on indictment, by a fine;
and
(g)require prescribed charges to be paid to persons carrying out functions under the regulations.
(5)The Secretary of State may by regulations F260. . . —
(a)[F261require a water undertaker]to publish information about the quality of water supplied for domestic or food production purposes to any premises [F262using that undertaker’s supply system]; F263. . .
[F264(aa)require a [F265water supply licensee] to publish information about the quality of water supplied for domestic or food production purposes to any premises by [F266that licensee].]
(b)[F267require any such undertaker [F268or licensee]] to provide information to prescribed persons about the quality of water [F269supplied as referred to in paragraph (a) or (aa) above (as the case may be)].
(6)Regulations under subsection (5) above—
(a)shall prescribe both the information which is to be published or provided in pursuance of the regulations and the manner and circumstances in which it is to be published or provided;
(b)may require the provision of information by a water undertaker [F270or [F271water supply licensee]] to any person to be free of charge or may authorise it to be subject to the payment by that person to the undertaker [F272or licensee] of a prescribed charge; and
(c)may impose such other conditions on the provision of information by a water undertaker [F273or [F274water supply licensee]] to any person as may be prescribed.
[F275(7)In this section, “relevant supplies” means—
(a)in the case of an obligation imposed on a water undertaker, supplies of water—
(i)made by the undertaker in carrying out its functions; or
(ii)made by a [F276water supply licensee] using the undertaker’s supply system; and
(b)in the case of an obligation imposed on a [F277water supply licensee], supplies of water made by that supplier using a water undertaker’s supply system.]
Textual Amendments
F238Words in s. 69(1) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(2); S.I. 2004/641, art. 3(y), Sch. 2
F239Words in s. 69(1) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F240Words in s. 69(2) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(a); S.I. 2004/641, art. 3(y), Sch. 2
F241Words in s. 69(2) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F242Words in s. 69(2)(a) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(b)(i); S.I. 2004/641, art. 3(y), Sch. 2
F243Words in s. 69(2)(a) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(b)(ii); S.I. 2004/641, art. 3(y), Sch. 2
F244Words in s. 69(2)(b) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(c)(i); S.I. 2004/641, art. 3(y), Sch. 2
F245Words in s. 69(2)(b) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(c)(ii); S.I. 2004/641, art. 3(y), Sch. 2
F246Words in s. 69(2)(c) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(d); S.I. 2004/641, art. 3(y), Sch. 2
F247Words in s. 69(2)(d) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(e)(i); S.I. 2004/641, art. 3(y), Sch. 2
F248Words in s. 69(2)(d) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(e)(ii); S.I. 2004/641, art. 3(y), Sch. 2
F249Words in s. 69(2)(d) omitted (1.4.2004) by virtue of and repealed (prosp.) by Water Act 2003 (c. 37), ss. 101(1)(2), 105(3), Sch. 8 para. 19(3)(e)(iii), Sch. 9 Pt. 3; S.I. 2004/641, art. 3(y), Sch. 2
F250Words in s. 69(2)(e) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(3)(f); S.I. 2004/641, art. 3(y), Sch. 2
F251Words in s. 69(3) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(4); S.I. 2004/641, art. 3(y), Sch. 2
F252Words in s. 69(3) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F253Words in s. 69(4)(a) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(5)(a)(i); S.I. 2004/641, art. 3(y), Sch. 2
F254Words in s. 69(4)(a) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F255Words in s. 69(4)(a) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(5)(a)(ii); S.I. 2004/641, art. 3(y), Sch. 2
F256Words in s. 69(4)(b) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(5)(b)(i); S.I. 2004/641, art. 3(y), Sch. 2
F257Words in s. 69(4)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F258Words in s. 69(4)(b) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(5)(b)(ii); S.I. 2004/641, art. 3(y), Sch. 2
F259Words in s. 69(4)(c) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(5)(c); S.I. 2004/641, art. 3(y), Sch. 2
F260Words in s. 69(5) omitted (1.4.2004) by virtue of and repealed (prosp.) by Water Act 2003 (c. 37), ss. 101(1)(2), 105(3), Sch. 8 para. 19(6)(a), Sch. 9 Pt. 3; S.I. 2004/641, art. 3(y), Sch. 2
F261Words in s. 69(5)(a) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), {Sch. 8 para. 19(6)(b)(i))}; S.I. 2004/641, art. 3(y), Sch. 2
F262Words in s. 69(5)(a) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(6)(b)(ii); S.I. 2004/641, art. 3(y), Sch. 2
F263Words in s. 69(5)(a) omitted (1.4.2004) by virtue of and repealed (prosp.) by Water Act 2003 (c. 37), ss. 101(1)(2), 105(3), Sch. 8 para. 19(6)(c), Sch. 9 Pt. 3; S.I. 2004/641, art. 3(y), Sch. 2
F264S. 69(5)(aa) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(6)(d); S.I. 2004/641, art. 3(y), Sch. 2
F265Words in s. 69(5)(aa) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F266Words in s. 69(5)(aa) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(4); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F267Words in s. 69(5)(b) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(6)(e)(i); S.I. 2004/641, art. 3(y), Sch. 2
F268Words in s. 69(5)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(5); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F269Words in s. 69(5)(b) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(6)(e)(ii); S.I. 2004/641, art. 3(y), Sch. 2
F270Words in s. 69(6)(b) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(7)(a)(i); S.I. 2004/641, art. 3(y), Sch. 2
F271Words in s. 69(6)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F272Words in s. 69(6)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(5); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F273Words in s. 69(6)(c) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(7)(b); S.I. 2004/641, art. 3(y), Sch. 2
F274Words in s. 69(6)(c) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F275S. 69(7) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 19(8); S.I. 2004/641, art. 3(y), Sch. 2
F276Words in s. 69(7)(a)(ii) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F277Words in s. 69(7)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 68(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)Subject to subsection (3) below, where a [F278water undertaker’s supply system is used for the purposes of supplying water] to any premises and that water is unfit for human consumption, [F279the relevant persons] shall be guilty of an offence and liable [F280on summary conviction, or on conviction on indictment, to a fine].
[F281(1A)For the purposes of subsection (1) above, the relevant persons are—
(a)the water undertaker whose supply system is used for the purposes of supplying the water (in this section referred to as the “primary water undertaker”); and
(b)any employer of persons, or any self-employed person, who is concerned in the supply of the water.]
(2)For the purposes of section 210 below and any other enactment under which an individual is guilty of an offence by virtue of subsection (1) above the penalty on conviction on indictment of an offence under this section shall be deemed to include imprisonment (in addition to or instead of a fine) for a term not exceeding two years.
(3)In any proceedings against any [F282relevant person] for an offence under this section it shall be a defence for [F283that person] to show that it—
(a)had no reasonable grounds for suspecting that the water would be used for human consumption; or
(b)took all reasonable steps and exercised all due diligence for securing that the water was fit for human consumption on leaving [F284the primary water undertaker's] pipes or was not used for human consumption.
[F285(3A)For the purposes of paragraph (b) of subsection (3) above—
(a)in the case of proceedings against a primary water undertaker, showing that the undertaker took all reasonable steps and exercised all due diligence as mentioned in that paragraph includes (among other things) showing that the relevant arrangements were reasonable in all the circumstances; and
(b)in the case of proceedings against any other relevant person, showing that the person took all reasonable steps and exercised all due diligence as mentioned in that paragraph includes (among other things) showing that it took all reasonable steps and exercised all due diligence for securing that all aspects of the relevant arrangements for which it was responsible were properly carried out.
(3B)In subsection (3A) above, “relevant arrangements” means arrangements made by the primary water undertaker to ensure that all other relevant persons were required to take all reasonable steps and exercise all due diligence for securing that the water was fit for human consumption on leaving the undertaker’s pipes or was not used for human consumption.]
(4)Proceedings for an offence under this section shall not be instituted except by the Secretary of State or the Director of Public Prosecutions.
Textual Amendments
F278Words in s. 70(1) substituted (1.10.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 20(2)(a); S.I. 2004/2528, art. 2(t)(iv) (with art. 4, Sch.)
F279Words in s. 70(1) substituted (1.10.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 20(2)(b); S.I. 2004/2528, art. 2(t)(iv) (with art. 4, Sch.)
F280Words in s. 70(1) substituted (12.3.2015) by The Legal Aid, Sentencing and Punishment of Offenders Act 2012 (Fines on Summary Conviction) Regulations 2015 (S.I. 2015/664), reg. 1(1), Sch. 4 para. 23(3) (with reg. 5(1))
F281S. 70(1A) inserted (1.10.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 20(3); S.I. 2004/2528, art. 2(t)(iv) (with art. 4, Sch.)
F282Words in s. 70(3) substituted (1.10.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 20(4)(a); S.I. 2004/2528, art. 2(t)(iv) (with art. 4, Sch.)
F283Words in s. 70(3) substituted (1.10.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 20(4)(b); S.I. 2004/2528, art. 2(t)(iv) (with art. 4, Sch. )
F284Word in s. 70(3)(b) substituted (1.10.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 20(4)(c); S.I. 2004/2528, art. 2(t)(iv) (with art. 4)
F285S. 70(3A)(3B) inserted (1.10.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 20(5); S.I. 2004/2528, art. 2(t)(iv) (with art. 4, Sch.)
(1)Subject to subsections (2) and (3) below, a person shall be guilty of an offence under this section if—
(a)he causes or allows any underground water to run to waste from any well, borehole or other work; or
(b)he abstracts from any well, borehole or other work water in excess of his reasonable requirements.
(2)A person shall not be guilty of an offence by virtue of subsection (1)(a) above in respect of anything done for the purpose—
(a)of testing the extent or quality of the supply; or
(b)of cleaning, sterilising, examining or repairing the well, borehole or other work in question.
(3)Where underground water interferes or threatens to interfere with the carrying out or operation of any underground works (whether waterworks or not), it shall not be an offence under this section, if no other method of disposing of the water is reasonably practicable, to cause or allow the water to run to waste so far as may be necessary for enabling the works to be carried out or operated.
(4)A person who is guilty of an offence under this section shall be liable, on summary conviction, to a fine not exceeding level 3 on the standard scale.
(5)On the conviction of a person under this section, the court may—
(a)order that the well, borehole or other work to which the offence relates shall be effectively sealed; or
(b)make such other order as appears to the court to be necessary to prevent waste of water.
(6)If any person fails to comply with an order under subsection (5) above, then, without prejudice to any penalty for contempt of court, the court may, on the application of [F286the [F287appropriate agency]], authorise [F288the appropriate agency] to take such steps as may be necessary to execute the order; and any expenses incurred in taking any such steps shall be recoverable summarily as a civil debt from the person convicted.
(7)Any person designated for the purpose by [F289the [F287appropriate agency]] shall, on producing some duly authenticated document showing his authority, have a right at all reasonable times—
(a)to enter any premises for the purpose of ascertaining whether there is, or has been, any contravention of the provisions of this section on or in connection with the premises;
(b)to enter any premises for the purpose of executing any order of the court under this section which [F289the [F287appropriate agency]] has been authorised to execute in those premises.
(8)Part I of Schedule 6 to this Act shall apply to the rights of entry conferred by subsection (7) above.
[F290(9)In this section “the appropriate agency” means—
(a)the Environment Agency, in relation to a well, borehole or other work in England;
(b)the NRBW, in relation to a well, borehole or other work in Wales.]
Textual Amendments
F286Words in s. 71(6) substituted (1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 101(1)(a) (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
F287Words in s. 71 substituted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 236(2) (with Sch. 7)
F288Words in s. 71(6) substituted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 236(3) (with Sch. 7)
F289Words in s. 71(7) substituted (1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 101(2) (with ss. 7(6), 115, 117): S.I. 1996/186, art. 3
F290S. 71(9) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 236(4) (with Sch. 7)
(1)Subject to subsections (2) and (3) below, a person is guilty of an offence under this section if he is guilty of any act or neglect whereby the water in any waterworks which is used or likely to be used—
(a)for human consumption or domestic purposes; or
(b)for manufacturing food or drink for human consumption,
is polluted or likely to be polluted.
(2)Nothing in this section shall be construed as restricting or prohibiting any method of cultivation of land which is in accordance with the principles of good husbandry.
(3)Nothing in this section shall be construed as restricting or prohibiting the reasonable use of oil or tar on any highway maintainable at public expense so long as the highway authority take all reasonable steps for preventing—
(a)the oil or tar; and
(b)any liquid or matter resulting from the use of the oil or tar,
from polluting the water in any waterworks.
(4)A person who is guilty of an offence under this section shall be liable—
(a)on summary conviction, to a fine not exceeding the statutory maximum and, in the case of a continuing offence, to a further fine not exceeding £50 for every day during which the offence is continued after conviction;
(b)on conviction on indictment, to imprisonment for a term not exceeding two years or to a fine or to both.
(5)In this section “waterworks” includes—
(a)any spring, well, adit, borehole, service reservoir or tank; and
(b)any main or other pipe or conduit of a water undertaker; and
(c)any pipe or conduit of a [F291water supply licensee].
Textual Amendments
F291Words in s. 72(5)(c) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 69; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
Modifications etc. (not altering text)
C22S. 72 amended (27.8.1993) by 1993 c. 12, ss. 40, 51(2), Sch. 3 Pt. I para. 8 (with ss. 42, 46).
C23S. 72 modified by S.I. 2010/675, Sch. 23 Pt. 8 para. 3 Table 9 (as substituted (1.10.2011) by The Environmental Permitting (England and Wales) (Amendment) Regulations 2011 (S.I. 2011/2043), reg. 1(b), Sch. 1)
C24S. 72 modified (1.1.2017) by The Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154), reg. 1(1), Sch. 23 paras. 1(3), 2 Table 9 (with regs. 1(3), 77-79, Sch. 4)
(1)If any person who is the owner or occupier of any premises to which a supply of water is provided by a water undertaker [F292or [F293water supply licensee]] intentionally or negligently causes or suffers any water fitting for which he is responsible to be or remain so out of order, so in need of repair or so constructed or adapted, or to be so used—
(a)that water in a water main or other pipe of a water undertaker, or in a pipe connected with such a water main or pipe, is or is likely to be contaminated by the return of any substance from those premises to that main or pipe;
(b)that water that has been supplied by the undertaker [F294or [F295licensee]] to those premises is or is likely to be contaminated before it is used; or
(c)that water so supplied is or is likely to be wasted or, having regard to the purposes for which it is supplied, misused or unduly consumed,
that person shall be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 3 on the standard scale.
[F296(1A)In any proceedings under subsection (1) above it shall be a defence to prove–
(a)that the contamination or likely contamination, or the wastage, misuse or undue consumption, was caused (wholly or mainly) by the installation, alteration, repair or connection of the water fitting on or after 1st July 1999;
(b)that the works were carried out by or under the direction of an approved contractor within the meaning of the Water Supply (Water Fittings) Regulations 1999; and
(c)that the contractor certified to the person who commissioned those works that the water fitting complied with the requirements of those regulations.]
(2)Any person who uses any water supplied to any premises by a water undertaker for a purpose other than one for which it is supplied to those premises shall, unless the other purpose is the extinguishment of a fire, be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 3 on the standard scale.
(3)Where a person has committed an offence under subsection (2) above, the water undertaker in question shall be entitled to recover from that person such amount as may be reasonable in respect of any water wasted, misused or improperly consumed in consequence of the commission of the offence.
(4)For the purposes of this section the owner or occupier of any premises shall be regarded as responsible for every water fitting on the premises which is not a water fitting which a person other than the owner or, as the case may be, occupier is liable to maintain.
Textual Amendments
F292Words in s. 73(1) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 22(a); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F293Words in s. 73(1) substituted (1.4.2016) by Explanatory Note 2014 (c. 21), s. 94(3), Sch. 7 para. 70(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F294Words in s. 73(1)(b) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 22(b); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F295Word in s. 73(1)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 70(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F296S. 73(1A) inserted (1.7.1999) by S.I. 1999/1148, reg. 8
(1)The Secretary of State may by regulations make such provision as he considers appropriate for any of the following purposes, that is to say—
(a)for securing—
(i)that water in a water main or other pipe of a water undertaker is not contaminated; and
(ii)that its quality and suitability for particular purposes is not prejudiced,
by the return of any substance from any premises to that main or pipe;
(b)for securing that water which is in any pipe connected with any such main or other pipe or which has been supplied to any premises by a water undertaker [F297or [F298water supply licensee]] is not contaminated, and that its quality and suitability for particular purposes is not prejudiced, before it is used;
(c)for preventing the waste, undue consumption and misuse of any water at any time after it has left the pipes of a water undertaker for the purpose of being supplied by that undertaker [F299or [F300that or another water supply licensee]] to any premises; and
(d)for securing that water fittings installed and used by persons to whom water is or is to be supplied by a water undertaker [F301or [F302water supply licensee]] are safe and do not cause or contribute to the erroneous measurement of any water or the reverberation of any pipes.
(2)Without prejudice to the generality of subsection (1) above, regulations under this section may, for any of the purposes specified in that subsection, make provision in relation to such water fittings as may be prescribed—
(a)for forbidding the installation, connection or use of the fittings if they have not been approved under the regulations or if they contravene the regulations;
(b)for requiring the fittings, for the purposes of provision made by virtue of paragraph (a) above, to be of such a size, nature, strength or workmanship, to be made of such materials or in such a manner or to conform to such standards as may be prescribed by or approved under the regulations;
(c)for imposing such other requirements as may be prescribed with respect to the installation, arrangement, connection, testing, disconnection, alteration and repair of the fittings and with respect to the materials used in their manufacture;
(d)for the giving, refusal and revocation, by prescribed persons, of approvals required for the purposes of the regulations; and
(e)for such approvals to be capable of being made subject to such conditions as may be prescribed and for the modification and revocation of any such condition.
(3)Without prejudice as aforesaid, regulations under this section may—
(a)impose separate or concurrent duties with respect to the enforcement of the regulations on water undertakers, local authorities and such other persons as may be prescribed;
(b)confer powers on a water undertaker or local authority to carry out works and take other steps, in prescribed circumstances, for remedying any contravention of the regulations;
(c)provide for the recovery by a water undertaker or local authority of expenses reasonably incurred by the undertaker or authority in the exercise of any power conferred by virtue of paragraph (b) above;
(d)repeal or modify the provisions of section 73 above or section 75 below;
(e)provide for a contravention of the regulations to constitute a summary offence punishable, on summary conviction, by a fine not exceeding level 5 on the standard scale or such smaller sum as may be prescribed;
(f)require prescribed charges to be paid to persons carrying out functions under the regulations;
(g)enable the Secretary of State to authorise such relaxations of and departures from such of the requirements of the regulations as may be prescribed, to make any such authorisation subject to such conditions as may be prescribed and to modify or revoke any such authorisation or condition;
(h)enable the Secretary of State to authorise a water undertaker or local authority (either instead of the Secretary of State or concurrently with him) to exercise any power conferred on the Secretary of State by regulations made by virtue of paragraph (g) above; and
(i)require disputes arising under the regulations to be referred to arbitration and for determinations under the regulations to be subject to such rights of appeal as may be prescribed.
(4)Without prejudice to sections 84 and 170 below, any person designated in writing for the purposes of this subsection in such manner as may be prescribed may—
(a)enter any premises for the purpose of—
(i)ascertaining whether any provision contained in or made or having effect under this Act with respect to any water fittings or with respect to the waste or misuse of water is being or has been contravened;
(ii)determining whether, and if so in what manner, any power or duty conferred or imposed on any person by regulations under this section should be exercised or performed; or
(iii)exercising any such power or performing any such duty;
or
(b)carry out such inspections, measurements and tests on premises entered by that person or on water fittings or other articles found on any such premises, and take away such samples of water or of any land and such water fittings and other articles, as that person has been authorised to carry out or take away in accordance with regulations under this section.
(5)Part II of Schedule 6 to this Act shall apply to the rights and powers conferred by subsection (4) above.
(6)The power of the Secretary of State under this section to make regulations with respect to the matters specified in the preceding provisions of this section shall include power, by regulations under this section—
(a)to modify the operation of Schedule 2 to the M11Water Consolidation (Consequential Provisions) Act 1991 in relation to any byelaws made under section 17 of the M12Water Act 1945 which have effect by virtue of paragraph 19 of Schedule 26 to the M13Water Act 1989 and that Schedule 2; and
(b)to revoke or amend any such byelaws;
but, so long as any such byelaws so have effect, the references in sections 47(2)(g), 53(2)(c) and 55(4) above to such regulations under this section as are prescribed shall have effect as including references to those byelaws.
(7)Any sums received by the Secretary of State in consequence of the provisions of any regulations under this section shall be paid into the Consolidated Fund.
(8)In this section “safe” has the same meaning as in Part II of the M14Consumer Protection Act 1987.
Textual Amendments
F297Words in s. 74(1)(b) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 23(a); S.I. 2004/641, art. 3(y), Sch. 2 (with art. 6, Sch. 3)
F298Words in s. 74(1)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 71(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F299Words in s. 74(1)(c) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 23(b); S.I. 2004/641, art. 3(y), Sch. 2 (with art. 6, Sch. 3)
F300Words in s. 74(1)(c) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 71(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F301Words in s. 74(1)(d) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 23(c); S.I. 2004/641, art. 3(y), Sch. 2 (with art. 6, Sch. 3)
F302Words in s. 74(1)(d) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 71(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
Marginal Citations
(1)Without prejudice to any power conferred on water undertakers by regulations under section 74 above, where a water undertaker which provides a supply of water to any premises has reason for believing—
(a)that damage to persons or property is being or is likely to be caused by any damage to, or defect in, any water fitting used in connection with the supply of water to those premises which is not a service pipe belonging to the undertaker;
(b)that water in a water main or other pipe of the undertaker is being or is likely to be contaminated by the return of any substance from those premises to that main or pipe;
(c)that water which is in any pipe connected with any such main or other pipe or which has been supplied by the undertaker to those premises is being or is likely to be contaminated before it is used; or
(d)that water which has been or is to be so supplied is being or is likely to be wasted or, having regard to the purposes for which it is supplied, misused or unduly consumed,
the undertaker may exercise the power conferred by subsection (2) below in relation to those premises.
[F303(1A)Without prejudice to any power conferred on water undertakers by regulations under section 74 above, where a water undertaker whose supply system is used for the purpose of a [F304water supply licensee] making a supply of water to any premises has reason for believing—
(a)that damage to persons or property is being or is likely to be caused by any damage to, or defect in, any water fitting used in connection with the supply of water to those premises which is not a service pipe belonging to the water undertaker;
(b)that water in a water main or other pipe of the undertaker is being or is likely to be contaminated by the return of any substance from those premises to that pipe or main;
(c)that water which is in any pipe connected with any such main or other pipe or which has been supplied by the supplier to those premises is being or is likely to be contaminated before it is used; or
(d)that water which has been or is to be so supplied is being or is likely to be wasted or, having regard to the purposes for which it is supplied, misused or unduly consumed,
the undertaker may exercise the power conferred by subsection (2) below in relation to those premises.]
(2)The power conferred by this subsection in relation to any premises is—
(a)where the case constitutes an emergency, power to disconnect the service pipe or otherwise to cut off the supply of water to those premises; and
(b)in any other case, power to serve notice on the consumer requiring him to take such steps as may be specified in the notice as necessary to secure that the damage, contamination, waste, misuse or undue consumption ceases or, as the case may be, does not occur.
(3)Where a water undertaker, in exercise of the power conferred by virtue of subsection (2)(a) above, disconnects a service pipe to any premises or otherwise cuts off any supply of water to any premises, the undertaker shall, as soon as reasonably practicable after the supply is disconnected or cut off, serve a notice on the consumer specifying the steps which that person is required to take before the undertaker will restore the supply.
(4)The steps specified in a notice under subsection (3) above shall be the steps necessary to secure that, as the case may be—
(a)the damage, contamination, waste, misuse or undue consumption; or
(b)the likelihood of damage, contamination, waste, misuse or undue consumption,
would not recur if the supply were restored.
(5)A water undertaker which fails, without reasonable excuse, to serve a notice in accordance with subsection (3) above shall be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 3 on the standard scale.
(6)A notice served for the purposes of subsection (2)(b) above shall—
(a)specify the period, not being less than the period of seven days beginning with the day after the service of the notice, within which the steps specified in the notice are to be taken; and
(b)set out the powers of the undertaker under subsections (7) to (9) below.
(7)Where a water undertaker has served a notice for the purposes of subsection (2)(b) above in relation to any premises and—
(a)the case becomes an emergency; or
(b)the premises appear to be unoccupied and the steps specified in the notice are not taken before the end of the period so specified,
the undertaker may disconnect the service pipe to those premises or otherwise cut off the supply of water to those premises.
(8)Subsections (3) to (5) above shall apply where a water undertaker exercises its power under subsection (7) above as they apply where such an undertaker exercises its power by virtue of subsection (2)(a) above.
(9)Where, in a case not falling within subsection (7)(a) or (b) above, any steps specified in a notice served by a water undertaker for the purposes of subsection (2)(b) above have not been taken by the end of the period so specified, the water undertaker shall have power—
(a)to take those steps itself; and
(b)subject to subsection (10) below, to recover any expenses reasonably incurred by the undertaker in taking those steps from the person on whom the notice was served;
and any steps taken by a water undertaker by virtue of paragraph (a) above shall be necessary works for the purposes of Chapter II of this Part.
(10)Where any steps are taken by virtue of this section and it is shown that, in the circumstances of the case, those steps were not necessary as mentioned in subsection (2) or, as the case may be, (4) above, the water undertaker in question-
(a)shall not be entitled to recover any expenses incurred by it in taking those steps; and
(b)shall be liable to pay to any other person who took any of those steps an amount equal to any expenses reasonably incurred by that person in taking any of those steps.
[F305(11)Where the power conferred by subsection (2) above on a water undertaker is exercisable by virtue of subsection (1A) above—
(a)the references to the consumer in subsections (2) and (3), in relation to a supply of water to any premises, shall be taken to be references to the person in respect of whom the supply is made; and
(b)the undertaker shall serve on the [F306water supply licensee] providing the supply a copy of any notice under this section which is served on the person mentioned in paragraph (a) above.
(12)In subsection (1A) above, the reference to the supply system of a water undertaker shall be construed in accordance with [F307section 17B] above.]
Textual Amendments
F303S. 75(1A) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 24(2); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F304Words in s. 75(1A) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 72(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F305S. 75(11)(12) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 24(3); S.I 2005/2714, {art. 3(c)} (with Sch. para. 8)
F306Words in s. 75(11)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 72(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F307Words in s. 75(12) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 72(4); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
Modifications etc. (not altering text)
C25S. 75(2)-(12) applied (with modifications) (20.4.2010) by The Water Supply (Water Quality) Regulations 2010 (S.I. 2010/994), regs. 1(1), 21(4)(5) (with reg. 1(2)(3))
C26S. 75(2)-(12) applied (with modifications) (27.6.2016) by The Water Supply (Water Quality) Regulations 2016 (S.I. 2016/614), regs. 1(1), 21(4)(5) (with reg. 1(2)(3))
C27S. 75(2)-(12) applied with modifications (15.6.2018) by The Water Supply (Water Quality) Regulations 2018 (S.I. 2018/647), regs. 1(1), 21(4)(5) (with reg. 1(2))
(1)A water undertaker may prohibit one or more specified uses of water supplied [F309by means of its supply system] if it thinks that it is experiencing, or may experience, a serious shortage of water for distribution.
(2)Only the following uses of water may be prohibited—
(a)watering a garden using a hosepipe;
(b)cleaning a private motor-vehicle using a hosepipe;
(c)watering plants on domestic or other non-commercial premises using a hosepipe;
(d)cleaning a private leisure boat using a hosepipe;
(e)filling or maintaining a domestic swimming or paddling pool;
(f)drawing water, using a hosepipe, for domestic recreational use;
(g)filling or maintaining a domestic pond using a hosepipe;
(h)filling or maintaining an ornamental fountain;
(i)cleaning walls, or windows, of domestic premises using a hosepipe;
(j)cleaning paths or patios using a hosepipe;
(k)cleaning other artificial outdoor surfaces using a hosepipe.
(3)The Minister may by order—
(a)add a non-domestic purpose to the list in subsection (2);
(b)remove a purpose from the list in subsection (2).
(4)A prohibition must specify—
(a)the date from which it applies, and
(b)the area to which it applies (which may be all or part of the undertaker's area).
(5)A person who contravenes a prohibition—
(a)is guilty of an offence, and
(b)is liable on summary conviction to a fine not exceeding level 3 on the standard scale.
(6)A water undertaker which issues a prohibition must make arrangements for a reasonable reduction of charges which are made in respect of prohibited uses (including arrangements for repayment or credit where charges are paid in advance).
(7)A water undertaker may vary or revoke a prohibition.
[F310(8)The reference in subsection (1) to the supply system of a water undertaker is to be construed in accordance with section 17B.]]
Textual Amendments
F308Ss. 76-76C substituted for s. 76 (1.9.2010 for specified purposes, 1.10.2010 in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), ss. 36, 49(3) (with s. 49(1)(6)); S.I. 2010/2169, arts. 3(3), 4, Sch. (with art. 5)
F309Words in s. 76(1) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 73(a); S.I. 2017/462, art. 3(k)(viii)
F310S. 76(8) inserted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 73(b); S.I. 2017/462, art. 3(k)(viii)
(1)A prohibition may—
(a)apply to one or more specified uses of water generally or only in specified cases or circumstances (which may be specified by reference to classes of user, timing or in any other way);
(b)be subject to exceptions (which may be absolute or conditional, and may be specified by reference to classes of user, timing or in any other way).
(2)The Minister may by order—
(a)provide for exceptions to a category of use in section 76(2) (whether or not added under section 76(3));
(b)provide that a specified activity, or an activity undertaken in specified circumstances, is to be or not to be treated as falling within a category of use in section 76(2) (whether or not added under section 76(3));
(c)define a word or phrase used in section 76(2) (whether or not added under section 76(3)).
(3)In particular, an order may—
(a)restrict a category of use by reference to how water is drawn;
(b)frame an exception by reference to ownership of land by a specified person or class of person;
(c)provide for a process that involves the use of a hosepipe at any point to be included in the meaning of “using a hosepipe”;
(d)provide for a reference to a thing to include a reference to something that is or may be used in connection with it (such as, for example, for a reference to a vehicle to include a reference to a trailer).
(4)In this section and section 76 “the Minister” means—
(a)the Secretary of State in relation to prohibitions which may be issued by water undertakers whose areas are wholly or mainly in England, and
(b)the Welsh Ministers in relation to prohibitions which may be issued by water undertakers whose areas are wholly or mainly in Wales.
(5)Subject to provision under subsection (2), a reference to a hosepipe in section 76 includes a reference to anything designed, adapted or used to serve the same purpose as a hosepipe.]
Textual Amendments
F308Ss. 76-76C substituted for s. 76 (1.9.2010 for specified purposes, 1.10.2010 in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), ss. 36, 49(3) (with s. 49(1)(6)); S.I. 2010/2169, arts. 3(3), 4, Sch. (with art. 5)
(1)A prohibition takes effect only if this section is complied with.
(2)Before the period for which a prohibition is to apply the water undertaker must give notice of the prohibition and its terms—
(a)in at least two newspapers circulating in the area to which it is to apply, and
(b)on the water undertaker's internet website.
(3)The notice must give details of how to make representations about the proposed prohibition.
(4)The variation of a prohibition is to be treated as a prohibition for the purposes of this section.
(5)A water undertaker must give notice of a revocation of a prohibition—
(a)in at least two newspapers circulating in the area to which it is to apply, and
(b)on the water undertaker's internet website.
(6)The revocation may not take effect until at least one notice under subsection (5) has been given.]
Textual Amendments
F308Ss. 76-76C substituted for s. 76 (1.9.2010 for specified purposes, 1.10.2010 in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), ss. 36, 49(3) (with s. 49(1)(6)); S.I. 2010/2169, arts. 3(3), 4, Sch. (with art. 5)
(1)Section 213 applies to orders under section 76(3) or 76A(2) as it applies to regulations.
(2)But—
(a)an order made by the Secretary of State under section 76(3) may not be made unless a draft has been laid before and approved by resolution of each House of Parliament,
(b)an order made by the Welsh Ministers under section 76(3) may not be made unless a draft has been laid before and approved by resolution of the National Assembly for Wales, and
(c)an order made by the Welsh Ministers under section 76A(2) shall be subject to annulment in pursuance of a resolution of the National Assembly for Wales.]
Textual Amendments
F308Ss. 76-76C substituted for s. 76 (1.9.2010 for specified purposes, 1.10.2010 in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), ss. 36, 49(3) (with s. 49(1)(6)); S.I. 2010/2169, arts. 3(3), 4, Sch. (with art. 5)
(1)It shall be the duty of every local authority to take all such steps as they consider appropriate for keeping themselves informed about the wholesomeness and sufficiency of water supplies provided to premises in their area, including every private supply to any such premises.
(2)It shall be the duty of a local authority to comply with any direction given by the Secretary of State to that authority, to authorities of a description applicable to that authority or to local authorities generally as to—
(a)the cases and circumstances in which they are or are not to exercise any of the powers conferred on them by this Chapter in relation to private supplies; and
(b)the manner in which those powers are to be exercised.
(3)The Secretary of State may by regulations make such provision, supplementing the provisions of this section and of sections 78 and 79(2) below, as he considers appropriate for—
(a)imposing duties and conferring powers on local authorities with respect to the acquisition of information about the quality and sufficiency of water supplies provided to premises in their areas; and
(b)regulating the performance of any duty imposed by or under any of those provisions.
(4)Without prejudice to the generality of subsection (3) above, regulations under that subsection may—
(a)prescribe the matters to be taken into account by a local authority in determining, for the purposes of subsection (1) above, what is appropriate;
(b)provide, for the purposes of the exercise or performance of any power or duty conferred or imposed on a local authority by or under any of the provisions mentioned in subsection (3) above, for such samples of water to be taken and analysed at such times and in such manner as may be prescribed;
(c)authorise local authorities to exercise or perform any such power or duty through prescribed persons;
(d)provide for the recovery by a local authority from prescribed persons of such amounts as may be prescribed in respect of expenses reasonably incurred by the authority in the exercise of any such power or the performance of any such duty.
Subordinate Legislation Made
P2S. 77(3)(4): ss. 67 and 77(3) (with ss. 77(4) and 213(2)) power exercised by S.I.1991/2790
Modifications etc. (not altering text)
C28Ss. 77-79 modified (6.4.2010) by The Cowes Port Health Authority Order 2010 (S.I. 2010/1216), arts. 1(1), 4, Sch.
C29Ss. 77-79 modified (6.4.2010) by The Portsmouth Port Health Authority Order 2010 (S.I. 2010/1217), arts. 1(1), 4, Sch.
(1)It shall be the duty of a local authority to notify any water undertaker of anything appearing to the authority to suggest—
(a)that any supply by that undertaker [F311, or by a [F312water supply licensee] using that undertaker’s supply system,] of water for domestic or food production purposes to any premises in the area of that authority is, has been or is likely to become unwholesome or (so far as any such premises are concerned) insufficient for domestic purposes;
(b)that the unwholesomeness or insufficiency of any such supply is, was or is likely to be such as to cause a danger to life or health; or
(c)that the duty imposed on that undertaker by virtue of section 68(1)(b) above is being, has been or is likely to be so contravened as to affect any supply of water to premises in that area.
(2)Where a local authority have notified a water undertaker of any such matter as is mentioned in subsection (1) above, it shall be the duty of that authority, if they are not satisfied that all such remedial action as is appropriate will be taken by the undertaker, to inform the Secretary of State about the contents of the notification.
[F313(3)In subsection (1)(a) above, the reference to the water undertaker’s supply system shall be construed in accordance with [F314section 17B] above.]
Textual Amendments
F311Words in s. 78(1)(a) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 26(2); S.I 2005/2714, {art. 3(c)} (with Sch. para. 8)
F312Words in s. 78(1)(a) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 74(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(n) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F313S. 78(3) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 26(3); S.I 2005/2714, {art. 3(c)} (with Sch. para. 8)
F314Words in s. 78(3) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 74(3); S.I. 2017/462, art. 3(k)(ix)
Modifications etc. (not altering text)
C28Ss. 77-79 modified (6.4.2010) by The Cowes Port Health Authority Order 2010 (S.I. 2010/1216), arts. 1(1), 4, Sch.
C29Ss. 77-79 modified (6.4.2010) by The Portsmouth Port Health Authority Order 2010 (S.I. 2010/1217), arts. 1(1), 4, Sch.
(1)This section applies to a case in which it is not practicable at reasonable cost for a water undertaker, by supplying water in pipes, to provide or maintain such a supply of wholesome water to any particular premises in its area as (so far as those premises are concerned) is sufficient for domestic purposes.
(2)In any case to which this section applies, it shall be the duty of the local authority in whose area the premises in question are situated, if they are satisfied—
(a)that the insufficiency or unwholesomeness of the supply of water for domestic purposes to those premises is such as to cause a danger to life or health; and
(b)that it is practicable at reasonable cost for the water undertaker, by providing it otherwise than in pipes, to provide to those premises such a supply of wholesome water as is sufficient for those purposes,
to require the undertaker, under subsection (3) below, to provide a supply of water to those premises otherwise than in pipes.
(3)Where, in a case to which this section applies—
(a)the insufficiency or unwholesomeness of the supply of water for domestic purposes to the premises in question is such as to cause a danger to life or health;
(b)it is practicable at reasonable cost for the water undertaker, by providing it otherwise than in pipes, to provide to those premises such a supply of wholesome water as (so far as those premises are concerned) is sufficient for domestic purposes; and
(c)the local authority in whose area those premises are situated notify the undertaker of the danger to life or health and require the undertaker to provide a supply otherwise than in pipes,
it shall be the duty of the undertaker, for such period as may be required by that local authority, to provide any supply to those premises which it is practicable at reasonable cost to provide otherwise than in pipes and which it is required to provide by that authority.
(4)Where under this section a local authority require the provision by a water undertaker of a supply of water to any premises, that authority—
(a)shall be liable to the undertaker for any charges payable by virtue of Chapter I of Part V of this Act in respect of the provision of that supply; but
(b)shall have power to recover the whole or any part of any charges paid by virtue of this subsection from the owner or occupier of the premises to which the supply is provided.
(5)In this section references to the provision of a supply of water to any premises otherwise than in pipes shall have effect, in a case in which it is practicable at reasonable cost to provide a supply (whether or not in pipes) to a place within a reasonable distance of those premises, as including references to the provision of a supply to that place.
(6)The duty of a water undertaker under subsection (3) above shall be enforceable under section 18 above by the Authority.
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
Modifications etc. (not altering text)
C28Ss. 77-79 modified (6.4.2010) by The Cowes Port Health Authority Order 2010 (S.I. 2010/1216), arts. 1(1), 4, Sch.
C29Ss. 77-79 modified (6.4.2010) by The Portsmouth Port Health Authority Order 2010 (S.I. 2010/1217), arts. 1(1), 4, Sch.
(1)Subject to the following provisions of this section, where a local authority are satisfied in relation to any premises in their area which are supplied with water for domestic or food production purposes by means of a private supply—
(a)that any water which is being, has been or is likely to be supplied for those purposes to those premises by means of that private supply is not, was not or, as the case may be, is likely not to be wholesome; or
(b)that that private supply is failing, has failed or is likely to fail to provide to any house on those premises such a supply of wholesome water as (so far as that house is concerned) is sufficient for domestic purposes,
the authority may serve a notice in relation to that private supply on one or more of the relevant persons.
(2)A notice under this section in relation to a private supply of water to any premises shall-
(a)give particulars of the matters mentioned in subsection (1) above in respect of which the notice is served;
(b)specify the steps which, in the opinion of the authority serving the notice, are required to be taken for ensuring that there is a supply of water to those premises which is both wholesome and (so far as any house on those premises is concerned) sufficient for domestic purposes;
(c)specify a period, ending not less than twenty-eight days after the day on which the notice is served, within which any representations or objections with respect to the notice must be received by that authority; and
(d)state the effect in relation to that notice of section 81(2) and (3) below.
(3)Subject to sections 81 and 82 below, where a local authority serve a notice under this section on any relevant person they may do one or more of the following, that is to say—
(a)by that notice designate as steps to be taken by the authority themselves such of the steps specified in the notice as they consider it appropriate so to designate;
(b)by that notice require that person, within such reasonable period as may be specified in the notice, to take one or more of the steps so specified;
(c)by that notice require that person, at such times as may be determined in accordance with provision contained in the notice, to make to another relevant person or to that authority such payments as may be so determined in respect of expenses reasonably incurred by that other person or that authority in taking any step specified in the notice;
(d)by that notice undertake from time to time to make such payments to that person as may be so determined in respect of expenses reasonably incurred by that person in taking any step specified in the notice.
(4)The power of a local authority to serve a notice under this section specifying the steps which are required to be taken in relation to any source from which a private supply is provided both to premises in the area of that authority and to premises in the area of another local authority shall be exercisable only where—
(a)the other authority consent to the service of the notice; or
(b)the authorities act jointly in exercising their respective powers under this section in relation to that source.
(5)The powers conferred by this section and sections 81 and 82 below shall be so exercised in relation to a private supply of water to any premises where there is no house as to secure that no local authority are required to bear any of the expenses incurred (whether by the authority or by any other person) in taking any of the steps for ensuring that the supply is wholesome which are specified in a notice under this section.
(6)The steps that a relevant person may be required by a notice under this section to take in relation to any premises shall include—
(a)requiring a supply of water to be provided to those premises by a water undertaker or by any other person; and
(b)taking such steps for the purpose of securing that such a requirement is complied with, and of enabling such a supply to be so provided, as may be specified in the notice.
(7)For the purposes of this section and sections 81 to 83 below the relevant persons, in relation to a private supply of water to any premises in the area of a local authority, are—
(a)the owners and occupiers of those premises; and
(b)whether or not the source of the private supply is in that authority’s area, the owners and occupiers of the premises where that source is situated and any other person who exercises powers of management or control in relation to that source;
and in sections 81 to 83 below a notice under this section is referred to as a private supply notice.
(1)Subject to subsection (2) below, a private supply notice served by a local authority shall not take effect until the end of the period specified in the notice as the period within which representations or objections with respect to the notice must be received by that authority.
(2)Where any written representation or objection with respect to a private supply notice served by a local authority is received by the authority, before the end of the period specified in the notice, from a person on whom the notice was served, that notice shall not take effect unless—
(a)the notice is submitted by the authority to the Secretary of State and is confirmed by him either with or without modifications; or
(b)the representation or objection is withdrawn.
(3)If a local authority submit a private supply notice to the Secretary of State for confirmation, the Secretary of State—
(a)shall consider whether the notice should be confirmed and whether, if it is confirmed, it should be confirmed with or without modifications;
(b)may, with respect to the matters specified in the notice or any proposed modification of it, direct the local authority to serve a private supply notice, in such terms as may be specified in the direction, on any relevant person who has not previously been served with such a notice;
(c)may, for the purposes of paragraph (a) or (b) above cause a local inquiry to be held or afford—
(i)to the local authority; and
(ii)to every person who has made representations or objections with respect to the notice or any proposed direction under paragraph (b) above,
an opportunity of appearing before and being heard by a person appointed by the Secretary of State for the purpose; and
(d)if he is satisfied that the person on whom any notice to be served in pursuance of a direction under paragraph (b) above has had a proper opportunity of having his representations or objections with respect to the proposal for the direction considered, may dispense, in relation to the notice so served, with the provisions of subsections (1) and (2) above and of section 80(2)(c) and (d) above.
(4)Where the Secretary of State confirms a private supply notice (whether with or without modifications)—
(a)he, or if he so directs, the local authority concerned shall serve notice of that confirmation on every person originally served with the notice under section 80 above; and
(b)that notice shall take effect, with any modifications made by the Secretary of State, at such time as may be specified in the notice served under this subsection.
(1)Where any relevant person who is required by virtue of a private supply notice to take any step in relation to any premises fails to take that step within the period specified in the notice, the authority which served the notice may, in accordance with any applicable provision having effect by virtue of section 83 or 84 below, take that step themselves.
(2)Where any step is taken by a local authority in relation to any premises by virtue of subsection (1) above—
(a)the authority may recover from the person who failed to take that step within the specified period any expenses reasonably incurred by the authority in taking that step; and
(b)for the purposes of any requirement under which payments are required to be made to that person by any person other than the authority, sums paid by virtue of paragraph (a) above in respect of the taking of any step shall be deemed to be expenses incurred in the taking of that step by the person who failed to take it.
(3)Nothing in this Act shall confer any right of action on any person in respect of any loss or damage sustained by that person in consequence of the failure by any other person to take any step specified in a private supply notice.
(4)Any sum required to be paid to any person by virtue of any requirement or undertaking contained in a private supply notice shall be recoverable by that person from the person who is required to pay it.
(5)Any requirement which—
(a)is imposed by virtue of a private supply notice on the owner or occupier of any premises; and
(b)is expressed to bind those premises in relation to the owners or occupiers from time to time,
shall bind successive owners or, as the case may be, occupiers of those premises and shall be a local land charge.
(6)Subject to subsection (7) below, a local authority may by notice served on any person modify or revoke the effect in relation to that person of any private supply notice or notice under this subsection (including a notice which has been confirmed, with or without modifications, by the Secretary of State).
(7)Sections 80(2)(c) and (d) and 81 above shall apply, as they apply in relation to a private supply notice, in relation to any notice served by a local authority on any person under subsection (6) above except where the notice—
(a)extends the period within which any step is required to be taken by that person; or
(b)discharges, postpones or abates any obligation of that person to make a payment to the local authority.
(1)For the purposes of the taking of any steps falling to be taken by a local authority by virtue of a designation under subsection (3)(a) of section 80 above the provisions of Part VI of this Act shall have effect—
(a)as if the relevant works powers, so far as conferred on a water undertaker for the purpose of carrying out its functions, were also conferred on a local authority for the purpose of ensuring that a supply of water provided by means of a private supply to any premises in the authority’s area is both wholesome and (so far as any house on those premises is concerned) sufficient for domestic purposes;
(b)as if any such power, so far as it is conferred on a water undertaker in relation to things belonging to or operated or used by the undertaker for the purposes of its functions, were conferred by virtue of paragraph (a) above on a local authority in relation to things belonging to or operated or used by that authority, or a relevant person, in connection with the provision of water by means of a private supply;
(c)as if references to a water undertaker in any provision of Part VI of this Act relating to a relevant works power, except the references in sections 181 and 182 below, included references to a local authority; and
(d)as if the making by any person in pursuance of a private supply notice of any payment in respect of sums incurred in the laying of any pipe entitled that person, for the purposes of section 179(1) below, to an interest in the pipe.
(2)Where by virtue of this Act a local authority have power under Part VII of the M15Local Government Act 1972 (miscellaneous powers of a local authority) to acquire (whether compulsorily or otherwise) any land or right over land for the purpose of ensuring that private supplies of water to premises in their area are both wholesome and (so far as houses on those premises are concerned) sufficient for domestic purposes, that power shall include power to acquire land or any interest or right in or over land in order, for that purpose, to dispose of the land or the interest or right to a person who is a relevant person in relation to such a private supply.
(3)In this section “relevant works powers” means the powers conferred on water undertakers by sections 158, 159, 161, 163 and 165 below.
Marginal Citations
(1)Any person designated for the purpose by a local authority within whose area any waterworks are situated shall, on producing some duly authenticated document showing his authority, have a right at all reasonable hours to enter any premises for the purpose of ascertaining whether there is or has been any contravention of section 72 above in relation to those waterworks.
(2)Any person designated in writing for the purpose by a local authority may—
(a)enter any premises for the purpose of—
(i)ascertaining whether any provision contained in or made or having effect under this Act with respect to any water fittings, or with respect to the waste or misuse of water, is being or has been contravened;
(ii)determining whether, and if so in what manner, any power or duty conferred or imposed on any person by regulations under section 74 above should be exercised or performed; or
(iii)exercising any such power or performing any such duty;
or
(b)carry out such inspections, measurements and tests on premises entered by that person or on water fittings or other articles found on any such premises, and take away such samples of water or of any land and such water fittings and other articles, as that person has been authorised to carry out or take away in accordance with regulations under that section.
(3)Any person designated in writing for the purpose by any local authority may—
(a)enter any premises for the purpose, in relation to any private supply, of—
(i)determining whether, and if so in what manner, any power or duty conferred or imposed on that authority by or under any of sections 77 to 82 above should be exercised or performed; or
(ii)exercising any such power or performing any such duty;
(b)enter any premises to which a supply of water is provided by a water undertaker for the purpose, in relation to a supply so provided of—
(i)determining whether, and if so in what manner, any such power should be exercised or any such duty performed; or
(ii)exercising any such power or performing any such duty;
or
(c)carry out such inspections, measurements and tests on premises entered by that person or of articles found on any such premises, and take away such samples of water or of any land or articles, as the local authority—
(i)consider appropriate for the purposes of any such power or duty; and
(ii)have authorised that person to carry out or take away.
(4)Part I of Schedule 6 to this Act shall apply to the right of entry conferred by subsection (1) above; but nothing in that subsection or in that Part of that Schedule shall entitle any person designated for the purposes of that subsection by a local authority to have access to any waterworks belonging to a water undertaker.
(5)Part II of Schedule 6 to this Act shall apply to the rights and powers conferred by subsections (2) and (3) above.
(6)In subsection (1) above the reference to a local authority includes a reference to a county council and to the Sub-Treasurer of the Inner Temple and the Under-Treasurer of the Middle Temple; and any expenses incurred by the Common Council of the City of London in the exercise of their functions under that subsection shall be defrayed as part of their general expenses.
(7)In this section “waterworks” has the same meaning as in section 72 above.
(1)Subject to subsection (2) below, a local authority may serve on any person a notice requiring him to furnish that authority, within a period or at times specified in the notice and in a form and manner so specified, with such information as is reasonably required by that authority for the purpose of exercising or performing any power or duty conferred or imposed on that authority by or under any of sections 77 to 82 above.
(2)The Secretary of State may by regulations make provision for restricting the information which may be required under subsection (1) above and for determining the form in which the information is to be so required.
(3)A person who fails without reasonable excuse to comply with the requirements of a notice served on him under subsection (1) above shall be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 5 on the standard scale.
(1)The Secretary of State may for the purposes of this section appoint persons to act on his behalf F315. . . in relation to some or all of—
(a)the powers and duties conferred or imposed on him by or under sections 67 to 70 and 77 to 82 above; and
(b)such other powers and duties in relation to the quality and sufficiency of water supplied [F316using a water undertaker’s supply system] as are conferred or imposed on him by or under any other enactments.
[F317(1A)Subject to subsection (1B) below, the Secretary of State shall designate one such person as the Chief Inspector of Drinking Water.
(1B)If the function of the Secretary of State under subsection (1) above is transferred to any extent to the Assembly—
(a)subject to paragraph (b) below, the Assembly may designate one such person appointed by it as the Chief Inspector of Drinking Water for Wales; but
(b)if the person designated by the Assembly is the same as the person designated by the Secretary of State as the Chief Inspector of Drinking Water, he shall be known as such in both capacities.]
(2)[F318An inspector] appointed under this section shall—
(a)carry out such investigations as the Secretary of State may require him to carry out for the purpose of—
(i)ascertaining whether any duty or other requirement imposed on that undertaker [F319or a [F320water supply licensee] by or under any of sections 68, 69 and 79 above or imposed on a relevant person (as defined in subsection (1A) of section 70 above) by or under that section] is being, has been or is likely to be contravened; or
(ii)advising the Secretary of State as to whether, and if so in what manner, any of the powers of the Secretary of State in relation to such a contravention, or any of the powers (including the powers to make regulations) which are conferred on him by or under any of sections 67 to 70 and 77 to 82 above should be exercised;
and
(b)make such reports to the Secretary of State with respect to any such investigation as the Secretary of State may require.
(3)Without prejudice to the powers conferred by subsection (4) below, it shall be the duty of a water undertaker [F321, [F322water supply licensee] or other relevant person (as defined in section 70(1A) above)]—
(a)to give [F323an inspector] appointed under this section all such assistance; and
(b)to provide [F323an inspector] so appointed with all such information,
as that person may reasonably require for the purpose of carrying out any such investigation as is mentioned in subsection (2) above.
(4)Any [F324inspector] appointed under this section who is designated in writing for the purpose by the Secretary of State may—
(a)enter any premises for the purpose of carrying out any such investigation as is mentioned in subsection (2) above;
(b)carry out such inspections, measurements and tests on premises entered by that [F324inspector] or of articles or records found on any such premises, and take away such samples of water or of any land or articles, as that [F324inspector] considers appropriate for the purpose of enabling him to carry out any such investigation; or
[F325(c)at any reasonable time require—
(i)any water undertaker or [F326water supply licensee] to supply him with copies of, or extracts from, the contents of any records kept for the purpose of complying with any duty or other requirement imposed on that undertaker [F327or licensee] by or under any of sections 68, 69 and 79 above; or
(ii)any relevant person (as defined in subsection (1A) of section 70 above) to supply him with copies of, or extracts from, the contents of any records kept for the purpose of complying with any duty or other requirement imposed on that person by or under that section.]
(5)Part II of Schedule 6 to this Act shall apply to the rights and powers conferred by subsection (4) above.
(6)Any water undertaker [F328, [F329water supply licensee] or other relevant person] which fails to comply with the duty imposed on [F330that person] by virtue of subsection (3) above shall be guilty of an offence and liable [F331on summary conviction, or on conviction on indictment, to a fine].
[F332(7)Proceedings by the Secretary of State for an offence under this section or in relation to the quality and sufficiency of water supplied using a water undertaker’s supply system may be instituted and carried on in the name of the Chief Inspector of Drinking Water.
(8)Any such proceedings by the Assembly may be instituted and carried on in the name of the Chief Inspector of Drinking Water for Wales, if there is one (or, if subsection (1B)(b) above applies, in the name of the Chief Inspector of Drinking Water).
(9)In this section “inspector” means the Chief Inspector of Drinking Water or any other person appointed under subsection (1) above.]
Textual Amendments
F315Words in s. 86(1) repealed (1.4.2004) by Water Act 2003 (c. 37), ss. 57(2), 101(2), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 3(z)(i) (with art. 6, Sch. 3)
F316Words in s. 86(1)(b) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 26(2); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F317S. 86(1A)(1B) inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 57(3), 105(3); S.I. 2004/641, art. 3(m) (with art. 6, Sch. 3)
F318Words in s. 86(2) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 57(4), 105(3); S.I. 2004/641, art. 3(m) (with art. 6, Sch. 3)
F319Words in s. 86(2)(a)(i) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 26(3); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F320Words in s. 86(2)(a)(i) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 75(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F321Words in s. 86(3) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 26(4); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F322Words in s. 86(3) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 75(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F323Words in s. 86(3)(a)(b) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 57(5), 105(3); S.I. 2004/641, art. 3(m) (with art. 6, Sch. 3)
F324Word in s. 86(4) substituted (1.4.2004) by Water Act 2003 (c. 37), ss. 57(6), 105(3); S.I. 2004/641, art. 3(m) (with art. 6, Sch. 3)
F325S. 86(4)(c) substituted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 26(5); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F326Words in s. 86(4)(c)(i) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 75(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F327Words in s. 86(4)(c)(i) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 75(3); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F328Words in s. 86(6) inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 26(6); S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F329Words in s. 86(6) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 75(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F330Words in s. 86(6) substituted (1.4.2016) by water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 75(4); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F331Words in s. 86(6) substituted (12.3.2015) by The Legal Aid, Sentencing and Punishment of Offenders Act 2012 (Fines on Summary Conviction) Regulations 2015 (S.I. 2015/664), reg. 1(1), Sch. 4 para. 23(4) (with reg. 5(1))
F332S. 86(7)-(9) added (1.4.2004) by Water Act 2003 (c. 37), ss. 57(8), 105(3); S.I. 2004/641, art. 3(m) (with art. 6, Sch. 3)
(1)The Secretary of State may by order made by statutory instrument confer power on the Chief Inspector of Drinking Water to charge fees for the exercise of a function by an inspector appointed by the Secretary of State under section 86 (and to determine their amount).
(2)The Welsh Ministers may by order made by statutory instrument confer power on the designated person to charge fees for the exercise of a function by an inspector appointed by the Welsh Ministers under section 86 (and to determine their amount).
(3)In subsection (2) “the designated person” means—
(a)the Chief Inspector of Drinking Water for Wales, or
(b)if the same person is designated under section 86(1A) and (1B), the Chief Inspector of Drinking Water in that person's capacity as a person designated by the Welsh Ministers under section 86(1B).
(4)An order under this section may include consequential, supplementary, incidental or transitional provision, or savings.
(5)A statutory instrument containing an order made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.
(6)A statutory instrument containing an order made by the Welsh Ministers under this section is subject to annulment in pursuance of a resolution of the Assembly.
(7)Subsection (8) applies in relation to a statutory instrument containing both—
(a)an order under this section made by the Secretary of State, and
(b)an order under this section made by the Welsh Ministers.
(8)If in accordance with subsection (5) or (6)—
(a)either House of Parliament resolves that an address be presented to Her Majesty praying that an instrument containing an order made by the Secretary of State be annulled, or
(b)the Assembly resolves that an instrument containing an order made by the Welsh Ministers be annulled,
nothing further is to be done under the instrument after the date of the resolution and Her Majesty may by Order in Council revoke the instrument.]
Textual Amendments
F333S. 86ZA inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 40(1), 94(3); S.I. 2014/1823, art. 2(a)
Textual Amendments
F334S. 86A inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 29; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
(1)Each water undertaker shall establish a procedure for dealing with complaints made by its customers or potential customers in connection with the supply of water.
(2)No such procedure shall be established, and no modification of such a procedure shall be made, unless—
(a)the water undertaker has consulted the [F336regional committee] to which it has been allocated; and
(b)the proposed procedure or modification has been approved by the Authority].
(3)The water undertaker shall—
(a)publicise the procedure in such manner as may be approved by [F2the Authority]; and
(b)send a description of the procedure, free of charge, to any person who asks for one.
(4)[F2The Authority] may give a direction to a water undertaker requiring the undertaker to review its procedure or the manner in which the procedure operates.
(5)A direction under subsection (4) above—
(a)may specify the manner in which the review is to be conducted; and
(b)shall require a written report of the review to be made to [F2the Authority].
(6)Where [F2the Authority] receives a report under subsection (5)(b) above, [F2it] may, after consulting the water undertaker, direct the undertaker to make such modifications of—
(a)the procedure; or
(b)the manner in which the procedure operates,
as may be specified in the direction.
(7)Subsection (2) above does not apply to any modification made in compliance with a direction under subsection (6) above.
(8)The duty of a water undertaker to comply with subsection (1) above and with any direction given to it under subsection (4) or (6) above shall be enforceable by [F2the Authority] under section 18 above.
(9)Where [F2the Authority] is considering whether to exercise [F2its] powers under subsection (4) or (6) above in relation to a water undertaker, it shall be the duty of that undertaker to give [F2it] such information as [F2it] may reasonably require for the purpose of assisting [F2it] in coming to a decision.
(10)Section 202 below shall have effect, with the necessary modifications, in relation to information which [F2the Authority] requires for that purpose as it has effect in relation to information which the Secretary of State requires for purposes mentioned in subsection (1) of that section.]
Textual Amendments
F2Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F335S. 86A inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 29; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F336Words in s. 86A(2)(a) substituted (1.10.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 7 para. 27(3); S.I. 2005/2714, art. 2(l)(v)(aa) (with Sch. para. 8)
Modifications etc. (not altering text)
C30Pt. 3 Ch. 4 modified (1.4.2013 for E.) by Health and Social Care Act 2012 (c. 7), ss. 37(1), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
(1)If requested in writing to do so by a relevant authority, a water undertaker shall enter into arrangements with the relevant authority to increase the fluoride content of the water supplied by that undertaker to premises within the area specified in the arrangements.
(2)But a water undertaker shall not be required by subsection (1) above to enter into any such arrangements until an indemnity with respect to the arrangements has been given by virtue of section 90 below—
(a)to the water undertaker; and
(b)to any [F338water supply licensee] which is entitled to one.
(3)In this section and the following provisions of this Chapter—
(a)references to a relevant authority—
[F339(i)in relation to areas in England, are to the Secretary of State;]
(ii)in relation to areas in Wales, are to the Assembly; and
(b)references to water supplied by a water undertaker are to water supplied (whether by a water undertaker or a [F340water supply licensee]) to premises using the supply system of that undertaker.
F341(3A). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(4)The area specified in arrangements under this section may be—
[F342(a)in relation to England, such area [F343in England as the Secretary of State may determine];]
(b)in relation to Wales, such area comprising the whole or any part of Wales as the Assembly may determine.
(5)The arrangements shall be on such terms as may be agreed between the relevant authority and the water undertaker or, in the absence of agreement, determined in accordance with section 87B below.
(6)[F344Subject to subsection (6A)] those terms shall include provision—
(a)requiring the relevant authority to meet the reasonable capital and operating costs incurred by the water undertaker in giving effect to the arrangements;
(b)specifying circumstances in which the requirement to increase the fluoride content may be temporarily suspended; and
(c)for the variation of the arrangements at the request of the relevant authority.
[F345(6A)The Secretary of State may by regulations provide that, in circumstances specified in the regulations, subsection (6)(a) is not to apply in relation to arrangements entered into by the Secretary of State.
(6B)The Secretary of State may by regulations require a public body specified in the regulations to make payments to the Secretary of State to meet any costs incurred by the Secretary of State under the terms of the arrangements.]
(7)The relevant authority shall consult the Authority in relation to the terms to be included in any arrangements under this section (in particular, terms which affect the operation of the water undertaker’s supply system).
F346(7A). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F346(7B). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
[F347(7G)Before making regulations under subsection (6A) or (6B) the Secretary of State must consult such persons as the Secretary of State considers appropriate.]
F348(8). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F348(9). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F348(10). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(11)Before carrying out the consultation required by subsection (1) of section 89 below in relation to a step mentioned in paragraph (a), (b) or (c) of subsection (2) of that section, [F349a relevant authority] shall consult the water undertaker in question as to whether the arrangements which would result from taking that step would be operable and efficient (or, where it is proposed to terminate the arrangements, as to whether it would be reasonably practicable to do so).
[F350(12)A statutory instrument containing regulations under subsection (6A) is not to be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.]]
Textual Amendments
F337Ss. 87-87C substituted for s. 87 (1.8.2008 for E. for certain purposes as regards s. 87 and 25.2.2009 for E. for all other purposes) by Water Act 2003 (c. 37), ss. 58(2)(11)-(14), 105(3); S.I. 2008/1922, art. 2(a); S.I. 2009/359, art. 2, (with saving in art. 3, Sch. 3)
F338Words in s. 87(2)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 76; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F339S. 87(3)(a)(i) substituted (1.4.2013 for E.) by Health and Social Care Act 2012 (c. 7), ss. 35(2), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
F340Words in s. 87(3)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 76; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F341S. 87(3A) omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(2)(a), 186(6); S.I. 2022/1003, reg. 3(a)
F342S. 87(4)(a) substituted (1.4.2013 for E.) by Health and Social Care Act 2012 (c. 7), ss. 35(4), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
F343Words in s. 87(4)(a) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(2)(b), 186(6); S.I. 2022/1003, reg. 3(a)
F344Words in s. 87(6) inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(2)(c), 186(6); S.I. 2022/1003, reg. 3(a)
F345S. 87(6A)(6B) inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(2)(d), 186(6); S.I. 2022/1003, reg. 3(a)
F346S. 87(7A)(7B) omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(2)(e), 186(6); S.I. 2022/1003, reg. 3(a)
F347s. 87(7G) inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(2)(f), 186(6); S.I. 2022/1003, reg. 3(a)
F348S. 87(8)-(10) omitted (1.4.2013 for E.) by virtue of Health and Social Care Act 2012 (c. 7), ss. 35(7), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
F349Words in s. 87(11) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(2)(g), 186(6); S.I. 2022/1003, reg. 3(a)
F350S. 87(12) inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(2)(h), 186(6); S.I. 2022/1003, reg. 3(a)
Modifications etc. (not altering text)
C31S. 87: functions not to be exercised by a primary care trust (1.4.2000) by virtue of S.I. 2000/695, art. 4(1), Sch. 4
(1)Arrangements under section 87(1) above shall include provision for securing that, so far as reasonably practicable, the concentration of fluoride in the water supplied to premises in the specified area is maintained at the general target concentration of one milligram per litre.
(2)But the arrangements may provide for the concentration in the specified area (or any part of it) to be lower than that if the relevant authority considers that it is not reasonably practicable to achieve the general target concentration in the specified area (or that part of it).
(3)Any such lower concentration must still be as high as is reasonably practicable in the circumstances.
F352(3A). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(4)If, in relation to any area (“area A”), an order under section 88A(1) below specifies a general target concentration lower than that for which any arrangements effective there provide (or, by the previous operation of this subsection, are taken to provide), the arrangements shall have effect from the coming into force of the order as if they provided for the general target concentration specified in the order (subject to the operation again of subsections (2) and (3) above).
(5)If the result of the operation of subsection (4) above in relation to arrangements in area A is that in an area adjoining area A (“area B”) it is not reasonably practicable to maintain the concentration of fluoride in the water supplied by virtue of arrangements made in area B with the same water undertaker, the order shall be taken to extend also to area B so far as those arrangements are concerned, and subsection (4) above shall apply accordingly.
(6)An order under section 88A(1) below which in relation to any area specifies a general target concentration higher than that for which any arrangements effective there provide (or are taken to provide by virtue of subsection (4) or (5) above) does not have effect to increase the concentration for which the arrangements provide (or are taken to provide).
(7)In this section, “specified area” means the area specified in arrangements under section 87(1) above.]
Textual Amendments
F351Ss. 87-87C substituted for s. 87 (1.8.2008 for E. for certain purposes as regards s. 87 and 25.2.2009 for E. for all other purposes) by Water Act 2003 (c. 37), ss. 58(2)(11)-(14), 105(3); S.I. 2008/1922, art. 2(a); S.I. 2009/359, art. 2, (with saving in art. 3, Sch. 3)
F352S. 87A(3A) omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(3), 186(6); S.I. 2022/1003, reg. 3(a)
(1)This section applies if a relevant authority and a water undertaker fail to agree—
(a)the terms of arrangements requested by the relevant authority pursuant to subsection (1) of section 87 above; or
(b)a variation in the terms of those arrangements following a request by the relevant authority pursuant to subsection (6)(c) of that section.
(2)In relation to areas in England (except where subsection (4) below applies)—
[F354(a)the relevant authority may refer the matter to the Secretary of State for determination;]
[F354(a)the Secretary of State may—
(i)determine the terms of the arrangements as the Secretary of State sees fit; or
(ii)refer the matter for determination by such other person as the Secretary of State considers appropriate; and”, and]
(b)[F355following such a reference, the Secretary of State may—
(i)determine the terms of the arrangements as he sees fit; or
(ii)refer the matter for determination by such other person as he considers appropriate; and]
(c)the determination of the Secretary of State or, as the case may be, the other person shall be final.
(3)In relation to areas in Wales (except where subsection (4) below applies)—
(a)the Assembly may—
(i)determine the terms of the arrangements itself as it sees fit; or
(ii)refer the matter for determination by such other person as it considers appropriate; and
(b)the determination of the Assembly or, as the case may be, the other person shall be final.
(4)[F356Where the Assembly is one of the relevant authorities which has made a combined reference under section 87(8)(b) or (10)] [F356Where a combined reference is made under section 87(7C)(b) or 87(7F)] above—
(a)the terms of the arrangements shall be determined by a person appointed by the Secretary of State and the Assembly acting jointly; and
(b)the determination of that person shall be final.
(5)Following determination under this section of the terms to be included in any arrangements—
(a)the relevant authority shall give notice of the determination to the water undertaker in question; and
(b)the undertaker shall be deemed to have entered into the arrangements under section 87(1) above on the terms determined under this section with effect from the day after the date of the notice.
(6)References in this Chapter to arrangements entered into under section 87(1) above shall include arrangements deemed to have been entered into under that section by virtue of subsection (5)(b) above.]
Textual Amendments
F353Ss. 87-87C substituted for s. 87 (1.8.2008 for E. for certain purposes as regards s. 87 and 25.2.2009 for E. for all other purposes) by Water Act 2003 (c. 37), ss. 58(2)(11)-(14), 105(3); S.I. 2008/1922, art. 2(a); S.I. 2009/359, art. 2, (with saving in art. 3, Sch. 3)
F354S. 87B(2)(a) substituted (1.4.2013 for E.) by Health and Social Care Act 2012 (c. 7), ss. 35(10)(a), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
F355S. 87B(2)(b) omitted (1.4.2013 for E.) by virtue of Health and Social Care Act 2012 (c. 7), ss. 35(10)(b), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
F356Words in s. 87B(4) substituted (1.4.2013 for E.) by Health and Social Care Act 2012 (c. 7), ss. 35(11), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
(1)It shall be the duty of each water undertaker to comply with any arrangements entered into by it under section 87(1) above.
(2)Where, pursuant to any such arrangements, the fluoride content of any water is increased, the increase may be effected only by the addition of one or more of the following compounds of fluorine—
hexafluorosilicic acid (H2SiF6)
disodium hexafluorosilicate (Na2SiF6).
(3)Subject to subsection (4) below, water to which fluoride has been added pursuant to any such arrangements entered into by a water undertaker (with a view to its supply in an area) may be supplied by that or any other undertaker to premises in any other area (whether or not that other area is the subject of arrangements under section 87(1) above).
(4)Subsection (3) above applies if (and only if) the undertaker or undertakers concerned consider that it is necessary for the water to be supplied in the other area—
(a)for the purpose of dealing with any serious deficiency in supply; or
(b)in connection with the carrying out of any works (including cleaning and maintenance) by the undertaker concerned or, as the case may be, by the undertakers concerned, or by a [F358water supply licensee] supplying water using its or their supply system.
(5)In this section—
(a)the reference, in subsection (3) above, to water to which fluoride has been added pursuant to arrangements includes a reference to water to which fluoride has been added by Scottish Water in exercise of the power conferred by section 1 of the Water (Fluoridation) Act 1985; and
(b)in relation to a supply of such water by a water undertaker, the reference, in subsection (4) above, to the water undertakers concerned shall have effect as references to the water undertaker and Scottish Water.
(6)In subsection (4) above, “serious deficiency in supply” means any existing or threatened serious deficiency in the supply of water (whether in quantity or quality) caused by an exceptional lack of rain or by any accident or unforeseen circumstances.
(7)Arrangements entered into under section 87(1) above shall remain in force until the relevant authority, after giving reasonable notice to the water undertaker, terminates them.
(8)[F359But (except where it is reasonably practicable to terminate the arrangements separately), arrangements to which section 87(8)(a) or (b) applied may only be terminated by the relevant authorities acting jointly.]]
Textual Amendments
F357Ss. 87-87C substituted for s. 87 (1.8.2008 for E. for certain purposes as regards s. 87 and 25.2.2009 for E. for all other purposes) by Water Act 2003 (c. 37), ss. 58(2)(11)-(14), 105(3); S.I. 2008/1922, art. 2(a); S.I. 2009/359, art. 2, (with saving in art. 3, Sch. 3)
F358Words in s. 87C(4)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 77; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F359S. 87C(8) omitted (1.4.2013 for E.) by virtue of Health and Social Care Act 2012 (c. 7), ss. 35(12), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
(1)The Secretary of State may by order amend section [F36087C(2)] above by—
(a)adding a reference to another compound of fluorine; or
(b)removing any reference to a compound of fluorine.
(2)The power of the Secretary of State to make orders under this section shall be exercisable by statutory instrument subject to annulment in pursuance of a resolution of either House of Parliament.
Textual Amendments
F360Words in s. 88(1) substituted (25.2.2009 for E.) by Water Act 2003 (c. 37), ss. 58(3), 105(3); S.I. 2009/359, arts. 2, 3, Sch.
(1)The appropriate authority may by order made by statutory instrument provide that section 87A(1) above is to have effect as if for “one milligram per litre” there were substituted a lower concentration specified in the order.
(2)An order under subsection (1) above may make different provision for different geographical areas, or for some such areas and not others.
(3)A statutory instrument containing an order under subsection (1) above shall not be made by the Secretary of State (or by the Secretary of State and the Assembly acting jointly) unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.
(4)In subsection (1) above “appropriate authority”—
(a)in relation to an area which is partly in England and partly in Wales, means the Secretary of State and the Assembly acting jointly;
(b)in relation to an area which is wholly in England, means the Secretary of State; and
(c)in relation to an area which is wholly in Wales, means the Assembly.
(5)An order amending or revoking an order under subsection (1) above made by virtue of subsection (4)(a) above must also be made by the Secretary of State and the Assembly acting jointly.]
Textual Amendments
F361S. 88A inserted (25.2.2009 for E.) by Water Act 2003 (c. 37), ss. 58(4), 105(3); S.I. 2009/359, art. 2(b) (with saving in art. 3, Sch.)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F362Ss. 88B-88O omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(4), 186(6); S.I. 2022/1003, reg. 3(a)
(1)Before taking any step mentioned in subsection (2) below, [F365a relevant authority] shall—
(a)consult and ascertain opinion in accordance with regulations made by [F366that authority]; and
(b)comply with the requirements set out in regulations made by [F367that authority].
(2)The steps are—
(a)requesting a water undertaker to enter into arrangements under section 87(1) above;
(b)requesting a water undertaker to vary any such arrangements in, or except in, prescribed circumstances or cases;
(c)giving notice to a water undertaker under section 87C(7) above to terminate any such arrangements;
(d)maintaining any such arrangements in prescribed circumstances.
(3)Regulations—
(a)under paragraph (a) of subsection (1) above shall include provision about the process which [F368the relevant authority is] to follow for the purposes of that paragraph;
(b)under paragraph (b) of that subsection shall include provision about the requirements which must be satisfied (with respect to the outcome of that process or otherwise) before a step mentioned in subsection (2) above may be taken.
(4)Subsection (1) above shall not apply in relation to a proposal by [F369a relevant authority] to take the step mentioned in subsection (2)(c) above if [F370that authority so directs] by an instrument in writing (and such a direction may apply either generally or in relation to a particular proposal).
(5)[F371In this section “appropriate authority”—
(a)in a case where two or more relevant authorities (one of which is the Assembly) propose to request a particular water undertaker to take a step mentioned in subsection (2)(a), (b) or (c) in respect of arrangements in adjoining areas, means the Secretary of State and the Assembly acting jointly;
(b)in relation to England (except in a case to which paragraph (a) applies), means the Secretary of State; and
(c)in relation to Wales (except in a case to which paragraph (a) applies), means the Assembly.]]
Textual Amendments
F363Word in s. 89 heading omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(5)(a), 186(6); S.I. 2022/1003, reg. 3(a)
F364S. 89 substituted (18.2.2005 for E. for specified purposes, 1.8.2008 for E. for further specified purposes and 25.2.2009 for E. insofar as not already in force) by Water Act 2003 (c. 37), ss. 58(5), 105(3); S.I. 2005/344, art. 2; S.I. 2008/1922, art. 2(b)(c); S.I. 2009/359, arts. 2(c) (with saving in art. 3, Sch.)
F365Words in s. 89(1) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(5)(b)(i), 186(6); S.I. 2022/1003, reg. 3(a)
F366Words in s. 89(1)(a) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(5)(b)(ii), 186(6); S.I. 2022/1003, reg. 3(a)
F367Words in s. 89(1)(b) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(5)(b)(ii), 186(6); S.I. 2022/1003, reg. 3(a)
F368Words in s. 89(3)(a) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(5)(c), 186(6); S.I. 2022/1003, reg. 3(a)
F369Words in s. 89(4) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(5)(d)(i), 186(6); S.I. 2022/1003, reg. 3(a)
F370Words in s. 89(4) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(5)(d)(ii), 186(6); S.I. 2022/1003, reg. 3(a)
F371S. 89(5) omitted (1.4.2013 for E.) by virtue of Health and Social Care Act 2012 (c. 7), ss. 35(13)(f), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
(1)The Secretary of State may, with the consent of the Treasury, agree to indemnify any water undertaker in respect of liabilities which it may incur in complying with arrangements entered into by it pursuant to section 87(1) above.
(2)The Secretary of State may also, with the consent of the Treasury, agree to indemnify any [F373water supply licensee] in respect of liabilities which [F374the licensee] may incur—
(a)in supplying water to which fluoride has been added by a water undertaker by virtue of any such arrangements;
(b)(if the licensee is introducing water into the water undertaker’s supply system) in complying with any obligation imposed on [F374the licensee] by the undertaker in consequence of the arrangements.
(3)The Secretary of State may by regulations make provision with respect to—
(a)the matters in respect of which an indemnity may be given under subsection (1) or (2) above;
(b)the form and terms of any such indemnity; and
(c)such ancillary matters as he sees fit.]
Textual Amendments
F372Ss. 90, 90A substituted for s. 90 (18.2.2005 (E.) for specified purposes and 25.2.2009 (E.) insofar as not already in force) by Water Act 2003 (c. 37), ss. 58(6), 105(3); S.I. 2005/344, art. 2; S.I. 2009/359, art. 2(c) (subject to art. 3, Sch.)
F373Words in s. 90(2) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 78(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
F374Words in s. 90(2) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 78(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
(1)A relevant authority which has entered into arrangements under section 87(1) above shall—
(a)monitor the effects of the arrangements on the health of persons living in the area specified in the arrangements; and
(b)in accordance with subsections (3) to (5) below publish reports containing an analysis of those effects.
(2)The relevant authority shall make available—
(a)any information collected by it for the purposes of subsection (1) above; or
(b)summaries of that information.
(3)The relevant authority shall publish a report under subsection (1)(b) above within the period of four years beginning with the date on which the arrangements come into force (unless section 91(1) below applies in relation to the arrangements).
(4)Where section 91(1) below applies in relation to the arrangements, the relevant authority shall publish a report under subsection (1)(b) above within the period of four years beginning with the date on which section 58 of the Water Act 2003 came into force.
(5)The relevant authority shall publish a further report under subsection (1)(b) above within each period of four years beginning with the date on which their last such report was published.
F376(5A). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(6)This section ceases to apply in relation to any arrangements under section 87(1) above if those arrangements are terminated.]
Textual Amendments
F375Ss. 90, 90A substituted for s. 90 (18.2.2005 (E.) for specified purposes and 25.2.2009 (E.) insofar as not already in force) by Water Act 2003 (c. 37), ss. 58(6), 105(3); S.I. 2005/344, art. 2; S.I. 2009/359, art. 2(c) (subject to art. 3, Sch.)
F376S. 90A(5A) omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(6), 186(6); S.I. 2022/1003, reg. 3(a)
(1)With effect from the day on which section 176 of the Health and Care Act 2022 comes into force, old English fluoridation arrangements are to be treated for the purposes of this Chapter as if they were arrangements entered into by the water undertaker with the Secretary of State under section 87(1).
(2)The Secretary of State may request such modifications to the arrangements as the Secretary of State considers necessary in order to give effect to subsection (1) (for example to insert the terms mentioned in section 87(6)).
(3)If the Secretary of State and the water undertaker fail to agree the modifications requested by the Secretary of State—
(a)subsection (2) or, as the case may be, (4) of section 87B is to apply as if the parties had failed to agree the terms of the arrangements under section 87(1), and
(b)following determination of the modifications—
(i)the Secretary of State is to give notice of the determination to the water undertaker, and
(ii)the arrangements are deemed to have been modified as so determined with effect from the day after the date of notice.
(4)Sections 87(11) and 89(1) (which relate to consultation) do not apply to the deemed entry into, and modification of, arrangements by virtue of this section.
(5)References in this Chapter to arrangements entered into under section 87(1) include arrangements entered into by a water undertaker by virtue of subsection (1).
(6)In this section “old English fluoridation arrangements” means—
(a)any arrangements entered into by a water undertaker with a Strategic Health Authority under section 87(1) of the Water Industry Act 1991 (before section 87(3) was amended by section 35(2) of the Health and Social Care Act 2012 in relation to England), and
(b)any arrangements which were treated as arrangements falling within paragraph (a) by virtue of section 91 (as that section had effect immediately before the commencement of section 37(4) of the Health and Social Care Act 2012).]
Textual Amendments
F377S. 90B inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(2), 186(6); S.I. 2022/1003, reg. 3(b)
(1)With effect from the appointed day, [F380old Welsh fluoridation arrangements] shall be treated for the purposes of this Chapter as if they were arrangements entered into by the water undertaker in question with the [F381Welsh Ministers] under section 87(1) above.
(2)The [F382Welsh Ministers] may request such modifications to the arrangements as it considers necessary in order to give effect to subsection (1) above, for example to insert the terms mentioned in section 87(6) above.
(3)If the [F383Welsh Ministers] and the water undertaker fail to agree the modifications requested by [F384the Welsh Ministers]—
(a)subsection F385... (3) or, as the case may be, (4) of section 87B above shall apply as if the parties had failed to agree the terms of arrangements requested under section 87(1) above; and
(b)following determination of the modifications—
(i)the [F383Welsh Ministers] shall give notice of the determination to the water undertaker; and
(ii)the arrangements shall be deemed to have been modified as so determined with effect from the day after the date of the notice.
(4)Sections 87(11) and 89(1) above (which relate to consultation) shall not apply to the deemed entry into, and modification of, arrangements by virtue of this section.
(5)References in this Chapter to arrangements entered into under section 87(1) above shall include arrangements treated as entered into by a water undertaker by virtue of subsection (1) above.
(6)In this section—
“the appointed day” means the day on which section 58 of the Water Act 2003 comes into force [F386in relation to Wales]; and
[F387“old Welsh fluoridation arrangements” means arrangements, other than arrangements mentioned in section 90B(6), in pursuance of which a scheme for increasing the fluoride content of water was being operated by a water undertaker by virtue of paragraph 1 of Schedule 7 to this Act immediately before the appointed day.]]
Textual Amendments
F378S. 91 substituted (26.3.2010 for E.) by Water Act 2003 (c. 37), ss. 58(7), 105(3); S.I. 2010/975, art. 2(a)
F379S. 91 heading substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(a), 186(6); S.I. 2022/1003, reg. 3(b)
F380Words in s. 91(1) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(b)(i), 186(6); S.I. 2022/1003, reg. 3(b)
F381Words in s. 91(1) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(b)(ii), 186(6); S.I. 2022/1003, reg. 3(b)
F382Words in s. 91(2) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(c), 186(6); S.I. 2022/1003, reg. 3(b)
F383Words in s. 91(3) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(d)(i), 186(6); S.I. 2022/1003, reg. 3(b)
F384Words in s. 91(3) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(d)(ii), 186(6); S.I. 2022/1003, reg. 3(b)
F385Word in s. 91(3)(a) omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 176(3)(d)(iii), 186(6); S.I. 2022/1003, reg. 3(b)
F386Words in s. 91(6) inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(e)(i), 186(6); S.I. 2022/1003, reg. 3(b)
F387Words in s. 91(6) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(e)(ii), 186(6); S.I. 2022/1003, reg. 3(b)
Modifications etc. (not altering text)
C32S. 91 excluded (1.4.2013 for E.) by virtue of Health and Social Care Act 2012 (c. 7), ss. 37(4), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
(1)Subject to subsection (2) below, the Secretary of State may by regulations provide that the provisions of Chapters I to III of this Part shall have effect with such modifications as may be prescribed for the purpose of F389...—
[F390(a)giving effect to any retained EU obligations, or]
(b)[F391enabling Her Majesty's Government in the United Kingdom to give effect] to any international agreement to which the United Kingdom is for the time being a party.
(2)This section shall not authorise any modification of any of sections 71, 72 and 76 above or of any other provisions of this Part so far as they have effect for the purposes of or in relation to those sections.
Textual Amendments
F388Word in s. 92 heading inserted (31.12.2020) by The Floods and Water (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/558), regs. 1(1), 3(3)(a); 2020 c. 1, Sch. 5 para. 1(1)
F389Words in s. 92(1) omitted (31.12.2020) by virtue of The Floods and Water (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/558), regs. 1(1), 3(3)(b)(i); 2020 c. 1, Sch. 5 para. 1(1)
F390S. 92(1)(a) substituted (31.12.2020) by The Floods and Water (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/558), regs. 1(1), 3(3)(b)(ii); 2020 c. 1, Sch. 5 para. 1(1)
F391Words in s. 92(1)(b) inserted (31.12.2020) by The Floods and Water (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/558), regs. 1(1), 3(3)(b)(iii); 2020 c. 1, Sch. 5 para. 1(1)
(1)In this Part—
“connection notice” shall be construed in accordance with section 45(8) above;
“consumer”, in relation to a supply of water provided by a water undertaker to any premises, means (except in Chapter IV) a person who is for the time being the person on whom liability to pay charges to the undertaker in respect of that supply of water would fall;
“food production purposes” means the manufacturing, processing, preserving or marketing purposes with respect to food or drink for which water supplied to food production premises may be used, and for the purposes of this definition “food production premises” means premises used for the purposes of a business of preparing food or drink for consumption otherwise than on the premises;
“necessary works” includes works carried out, in exercise of any power conferred by or under any enactment, by a person other than a water undertaker;
“private supply” means, subject to subsection (2) below, a supply of water provided otherwise than by a water undertaker [F392or by a [F393water supply licensee] in accordance with Chapter 1A of Part 2 of this Act] (including a supply provided for the purposes of the bottling of water), and cognate expressions shall be construed accordingly;
“private supply notice” shall be construed in accordance with section 80(7) above;
“water fittings” includes pipes (other than water mains), taps, cocks, valves, ferrules, meters, cisterns, baths, water closets, soil pans and other similar apparatus used in connection with the supply and use of water;
“wholesome” and cognate expressions shall be construed subject to the provisions of any regulations made under section 67 above.
(2)For the purposes of any reference in this Part to a private supply, or to supplying water by means of a private supply, water shall be treated as supplied to any premises not only where it is supplied from outside those premises, but also where it is abstracted, for the purpose of being used or consumed on those premises, from a source which is situated on the premises themselves; and for the purposes of this subsection water shall be treated as used on any premises where it is bottled on those premises for use or consumption elsewhere.
(3)For the purposes of this Part a service pipe shall be treated as connected with a water main other than a trunk main even if the connection is an indirect connection made by virtue of a connection with another service pipe.
(4)The rights conferred by virtue of this Part as against the owner or occupier of any premises shall be without prejudice to any rights and obligations, as between themselves, of the owner and occupier of the premises.
Textual Amendments
F392S. 93(1): words in definition of "private supply" inserted (1.12.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 8 para. 28; S.I. 2005/2714, art. 3(c) (with Sch. para. 8)
F393Words in s. 93(1) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 79; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)