Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
(1)It shall be the duty of a sewerage undertaker (in accordance with section 101 below) to provide a public sewer to be used for the drainage for domestic purposes of premises in a particular locality in its area if-
(a)the undertaker is required to provide the sewer by a notice served on the undertaker by one or more of the persons who under subsection (2) below are entitled to require the provision of the sewer for that locality;
(b)the premises in that locality the drainage of which would be by means of that sewer are—
(i)premises on which there are buildings; or
(ii)premises on which there will be buildings when proposals made by any person for the erection of any buildings are carried out;
and
(c)the conditions specified in section 99 below are satisfied in relation to that requirement.
[F1(1A)It shall be the duty of a sewerage undertaker (in accordance with section 101 below) to provide a lateral drain to communicate with a public sewer and to be used for the drainage for domestic purposes of premises in its area if—
(a)the undertaker is required to provide the lateral drain by a notice served on the undertaker by one or more of the persons who under subsection (2A) below are entitled to require the provision of the lateral drain;
(b)the premises the drainage of which would be by means of that lateral drain are—
(i)premises on which there are buildings; or
(ii)premises on which there will be buildings when proposals made by any person for the erection of any buildings are carried out; and
(c)the conditions specified in section 99 below are satisfied in relation to that requirement.]
(2)Each of the following persons shall be entitled to require the provision of a public sewer for any locality, that is to say—
(a)the owner of any premises in that locality;
(b)the occupier of any premises in that locality;
(c)any local authority within whose area the whole or any part of that locality is situated;
[F2(ca)where the whole or any part of that locality is situated within a Mayoral development area, the Mayoral development corporation;]
(d)where the whole or any part of that locality is situated in a new town, within the meaning of the M1New Towns Act 1981—
(i)the [F3new towns residuary body]; and
(ii)F4. . . the development corporation for the new town F4. . .;
and
(e)where the whole or any part of that locality is situated within an area designated as an urban development area under Part XVI of the M2Local Government, Planning and Land Act 1980, the urban development corporation.
[F5(2A)Each of the following persons shall be entitled to require the provision of a lateral drain, that is to say—
(a)the owner of the premises the drainage of which would be by means of that lateral drain;
(b)the occupier of those premises;
(c)any local authority within whose area those premises are situated;
(d)where those premises are situated in a new town, within the meaning of the New Towns Act 1981—
(i)the [F6new towns residuary body]; and
(ii)the development corporation for the new town; and
(e)where those premises are situated within an area designated as an urban development area under Part 16 of the Local Government, Planning and Land Act 1980, the urban development corporation.]
F7(2B). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(3)The duty of a sewerage undertaker under this section to provide a public sewer [F8or, as the case may be, a lateral drain] shall be owed to the person who requires the provision of the sewer [F9or lateral drain] or , as the case may be, to each of the persons who joins in doing so.
(4)Where a duty is owed by virtue of subsection (3) above to any person, any breach of that duty which causes that person to sustain loss or damage shall be actionable at the suit of that person; but, in any proceedings brought against a [F10sewerage] undertaker in pursuance of this subsection, it shall be a defence for the undertaker to show that it took all reasonable steps and exercised all due diligence to avoid the breach.
(5)In this section the reference to domestic purposes, in relation to the drainage of premises F11. . . to which a requirement under this section relates, is a reference—
(a)where there are buildings on [F12those premises] , to such domestic sewerage purposes as are specified in relation to those buildings in the requirement; and
(b)where any person is proposing to erect buildings on [F13those premises] , to such domestic sewerage purposes as are so specified in relation to the buildings and to times after the erection of the buildings.
Textual Amendments
F1S. 98(1A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(2), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F2S. 98(2)(ca) inserted (15.1.2012) by Localism Act 2011 (c. 20), s. 240(1)(l), Sch. 22 para. 42
F3Words in s. 98(2)(d)(i) substituted (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), ss. 56, 325, Sch. 8 para. 58(a); S.I. 2008/3068, art. 2(1)(w) (with savings and transitional provisions in arts. 6-13)
F4Words in s. 98(2)(d)(ii) repealed (1.10.1998) by 1998 c. 38, s. 152, Sch. 18 Pt. IV (with ss. 137(1), 139(2), 143(2)); S.I. 1998/2244, art. 4
F5S. 98(2A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F6Words in s. 98(2A)(d)(i) substituted (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), ss. 56, 325, Sch. 8 para. 58(b); S.I. 2008/3068, art. 2(1)(w) (with savings and transitional provisions in arts. 6-13)
F7S. 98(2B) omitted (E.) (31.10.2021) by virtue of The Water and Sewerage Undertakers (Exit from Non-household Retail Market) (Consequential Provision) Regulations 2021 (S.I. 2021/1208), regs. 1(2), 2(6)
F8Words in s. 98(3) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(4), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F9Words in s. 98(3) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(4), 105(3); S.I. 2004/641, art. 4 (with Sch. 3 para. 7)
F10Word in s. 98(4) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 56(6), Sch. 1 para. 26; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F11Words in s. 98(5) repealed (28.5.2004) by Water Act 2003 (c. 37), ss. 95(5)(a), 101(2), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 4(b)(d)(i) (with Sch. 3 para. 7)
F12Words in s. 98(5)(a) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(5)(b), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F13Words in s. 98(5)(b) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(5)(c), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
Marginal Citations
(1)The conditions mentioned in section 98(1)(c) [F14or 98(1A)(c)] above are satisfied in relation to a requirement for the provision of a public sewer [F15or (as the case may be) lateral drain] by a sewerage undertaker if—
(a)such undertakings as the undertaker may have reasonably required in accordance with subsection (2) [F16or, as the case may be, subsection (2A)] below have been given by the person or persons who have required the provision of the sewer [F15or (as the case may be) lateral drain] ; and
(b)[F17such security as charging rules allow and the undertaker may have required] has been provided for the discharge of any obligations imposed by those undertakings on any person who, under subsection (3) below, may be required to secure his undertakings.
(2)The undertakings which a sewerage undertaker may require for the purposes of subsection (1) above in respect of any public sewer are undertakings which—
[F18(a)bind the person or persons mentioned in that subsection to pay to the undertaker such charges as the undertaker may impose in accordance with charging rules, and]
(b)in the case of undertakings binding two or more persons, bind them either jointly and severally or with liability to pay apportioned in such manner as they may agree.
[F19(2A)The undertakings which a sewerage undertaker may require for the purposes of subsection (1) above in respect of any lateral drain are undertakings which—
F20(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(b)in the case of undertakings binding two or more persons, bind them either jointly and severally or with liability apportioned in such manner as they may agree.]
[F21(3)For the purposes of subsection (1)(b) above a person may be required to secure his undertakings in relation to the provision of a public sewer or, as the case may be, a lateral drain if—
(a)it was by virtue of section 98(2)(a) or (b) or (as the case may be) section 98(2A)(a) or (b) above that he required, or joined in requiring, the provision of the sewer or drain; and
(b)he is not a public authority.]
F22(4). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F23(5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(6)Any dispute between a sewerage undertaker and any other person as to—
(a)the undertakings or security required by the undertaker for the purposes of this section; or
(b)the amount [F24or amounts by way of charges] required to be paid in pursuance of any such undertaking,
[F25may be referred to the Authority for determination under section 30A above by either party to the dispute.]
[F26(7)[F27In this section “relevant deficit” and “discounted aggregate deficit” have the meanings given by sections 100 and 100A below, respectively.]]
Textual Amendments
F14Words in s. 99(1) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(6)(a)(i), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F15Words in s. 99(1) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(6)(a)(ii), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F16Words in s. 99(1)(a) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(6)(a)(iii), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F17Words in s. 99(1)(b) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(2)(a), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F18S. 99(2)(a) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(2)(b), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F19S. 99(2A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(6)(b), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F20S. 99(2A)(a) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(2)(c), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F21S. 99(3) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(6)(c), 105(3); S.I. 2004/641, art. 4(c) (with Sch. 3 para. 7)
F22S. 99(4) repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 19(2)(d), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F23S. 99(5) repealed (1.4.2018) by Water Act 2014 (c. 21), ss. 19(2)(d), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F24Words in s. 99(6)(b) inserted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(2)(e), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F25Words in s. 99(6) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 93(1)(b)(4), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F26S. 99(7) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 93(1)(c)(4), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F27S. 99(7) repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 87; S.I. 2017/462, art. 5(e)(iii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
[F28(1)For the purposes of section 99 above the relevant deficit for any year on a public sewer is the amount (if any) by which the drainage charges payable for the use during that year of that sewer are exceeded by the annual borrowing costs of a loan of the amount required for the provision of that sewer.
(2)The annual borrowing costs of a loan of the amount required for the provision of a public sewer is the aggregate amount which would fall to be paid in any year by way of payments of interest and repayments of capital if an amount equal to so much of the costs reasonably incurred in providing that sewer as were not incurred in the provision of additional capacity had been borrowed, by the sewerage undertaker providing the sewer, on terms—
(a)requiring interest to be paid and capital to be repaid in twelve equal annual instalments; and
(b)providing for the amount of the interest to be calculated at such rate, and in accordance with such other provision, as may have been determined for the purposes of this subsection.
(3)A determination for the purposes of subsection (2) above shall be made either—
(a)by the undertaker with the approval of [F29the Authority; or
(b)in default of such a determination, by [F29the Authority].
(4)For the purposes of this section the costs reasonably incurred in providing a public sewer (“the new sewer”) shall include—
(a)the costs reasonably incurred in providing such other public sewers and such pumping stations as it is necessary to provide in consequence of the provision of the new sewer; and
(b)such proportion (if any) as is reasonable of the costs reasonably incurred in providing any such additional capacity in an earlier public sewer as falls to be used in consequence of the provision of the new sewer.
(5)In subsection (4) above the reference to an earlier public sewer, in relation to the new sewer, is a reference to any public sewer which—
(a)has been provided in the period of twelve years immediately before the provision of the new sewer; and
(b)was so provided in pursuance of a public sewer requisition.
(6)Any reference in this section to the provision of additional capacity in a public sewer provided in pursuance of a requirement under any enactment is a reference to such works carried out or other things done in connection with the provision of that sewer as are carried out or done for the purpose of enabling that sewer to be used for purposes in addition to those for which it is necessary to provide the sewer in order to comply with the requirement.
(7)Any reference in this section to the drainage charges payable for the use during any year of any sewer provided by a sewerage undertaker is a reference to so much of the aggregate of any charges payable to the sewerage undertaker in respect of services provided in the course of that year as represents charges which—
(a)have been imposed by the undertaker in relation to such of the premises connected with that sewer as are premises where there are buildings; and
(b)are reasonably attributable to the use of that sewer for the drainage for domestic sewerage purposes of those premises or to the disposal of effluent drained for any such purpose from those premises.
(8)An approval or determination given or made by [F29the Authority] for the purposes of subsection (2) above—
(a)may be given or made in relation to the provision of a particular public sewer, in relation to the provision of sewers of a particular description or in relation to the provision of public sewers generally; and
(b)may be revoked at any time except in relation to a public sewer [F30in respect of which the conditions referred to in section 99(1) above have already been satisfied.]
(9)In this section “public sewer requisition” means—
(a)a requirement under section 98 above (including, by virtue of paragraph 1 of Schedule 2 to the M3Water Consolidation (Consequential Provisions) Act 1991, a requirement under section 71 of the M4Water Act 1989);
(b)a requirement under the provisions of section 16 of the M5Water Act 1973 (sewer requisitions); or
(c)a requirement under any local statutory provision corresponding to section 98 above or to any of the provisions of that section 16.]
Textual Amendments
F28S. 100 repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 88; S.I. 2017/462, art. 5(e)(iii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F30Words in s. 100(8)(b) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 93(2), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
Marginal Citations
[F32(1)For the purposes of section 99 above the discounted aggregate deficit on a public sewer is the amount equal to the sum of the estimated relevant deficits for each of the twelve years following the provision of the sewer, in each case discounted in accordance with subsection (6) below.
(2)The estimated relevant deficit for any year is the amount (if any) by which the estimated drainage charges payable for the use during that year of that sewer would be exceeded by the annual borrowing costs of a loan of the amount required for the provision of that sewer.
(3)Subsections (2) to (6), (8) and (9) of section 100 above (which relate to the annual borrowing costs of a loan of the amount required for the provision of a public sewer) shall apply for the purposes of this section as they apply for the purposes of that section.
(4)Any reference in this section to the estimated drainage charges payable for the use during any year of any sewer is a reference to so much of the aggregate of any charges expected to be payable to the sewerage undertaker for the provision of services in the course of that year as would represent charges—
(a)imposed by the undertaker in relation to such of the premises with which the sewer is expected to be connected as are premises where there are buildings; and
(b)reasonably attributable to the use of that sewer for the drainage for domestic sewerage purposes of those premises or to the disposal of effluent drained for any such purposes from those premises.
(5)For the purposes of subsection (4) above, a thing is expected to be the case if, at the time the relevant calculation is made, it is reasonably likely to occur.
(6)The estimated relevant deficit for a year mentioned in subsection (1) above shall be discounted in order to determine its net present value by applying such factor, and in accordance with such other provision, as may be determined by the Authority.
(7)A determination made by the Authority for the purposes of subsection (6) above—
(a)may be made in relation to the provision of a particular public sewer or in relation to the provision of public sewers generally; and
(b)may be revoked at any time except in relation to a public sewer in respect of which the conditions referred to in section 99(1) above have already been satisfied.]]
Textual Amendments
F31S. 100A inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 93(3)(4), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F32S. 100A repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 88; S.I. 2017/462, art. 5(e)(iii) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
(1)A sewerage undertaker shall not be in breach of a duty imposed by section 98 above in relation to any locality or (in the case of a lateral drain) in relation to any premises unless—
(a)the period of six months beginning with the relevant day has expired; and
(b)the sewerage undertaker has not, before the end of that period, so laid (as the case may be)—
(i)the public sewer to be provided as to enable drains and private sewers to be used for the drainage of premises in the locality to communicate with the public sewer; or
(ii)the lateral drain to be provided as to enable the drain to be used for the drainage of premises to communicate with a public sewer vested in that undertaker,
at the place or places determined under subsection (3) below.
(2)The period mentioned in subsection (1)(a) above may be extended—
(a)by agreement between the undertaker and the person or persons who required the provision of the public sewer or, as the case may be, lateral drain; or
(b)where there is a dispute as to whether the period should be extended, by the Authority on a reference under subsection (4) below.
(3)The places mentioned in subsection (1)(b) above shall be—
(a)such place or places as are determined by agreement between the sewerage undertaker and the person or persons who required the provision of the public sewer or, as the case may be, lateral drain; or
(b)in default of agreement, such place or places as are determined by the Authority on a reference under subsection (4) below to be the place or places at which it is reasonable, in all the circumstances—
(i)in relation to the provision of a public sewer, for drains or private sewers to be used for the drainage of premises in the locality in question to communicate with the public sewer; or
(ii)in relation to the provision of a lateral drain—
(a)for the lateral drain to communicate with a public sewer vested in the undertaker; and
(b)for the remainder of the drain of which the lateral drain forms part to connect with the lateral drain.
(4)A reference for the purposes of subsection (2) or (3) above may be made to the Authority for determination under section 30A above by either party to the dispute.
(5)In this section “relevant day”, in relation to a requirement to provide a public sewer for any locality or, as the case may be, a lateral drain, means the day after whichever is the later of the following—
(a)the day on which the conditions specified in section 99 above are satisfied in relation to the requirement; and
(b)the day on which the place or places where (as the case may be)—
(i)drains or private sewers to be used for the drainage of premises in that locality will communicate with the public sewer; or
(ii)the lateral drain will communicate with a public sewer and the remainder of the drain will connect with the lateral drain,
are determined under subsection (3) above.]
Textual Amendments
F33S. 101 substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(7)(8), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
Textual Amendments
F34Cross heading and s. 101A inserted (1.2.1996 for specified purposes and otherwise 1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 103 (with ss. 7(6), 115, 117); S.I. 1996/186, arts. 2, 3
(1)Without prejudice to section 98 above, it shall be the duty of a sewerage undertaker to provide a public sewer to be used for the drainage for domestic sewerage purposes of premises in a particular locality in its area if the conditions specified in subsection (2) below are satisfied.
(2)The conditions mentioned in subsection (1) above are—
(a)that the premises in question, or any of those premises, are premises on which there are buildings F36. . . ;
(b)that the drains or sewers used for the drainage for domestic sewerage purposes of the premises in question do not, either directly or through an intermediate drain or sewer, connect with a public sewer; and
(c)that the drainage of any of the premises in question F37. . . is giving, or is likely to give, rise to such adverse effects to the environment or amenity that it is appropriate, having regard to any guidance issued under this section by the Secretary of State and all other relevant considerations, to provide a public sewer for the drainage for domestic sewerage purposes of the premises in question.
(3)Without prejudice to the generality of subsection (2)(c) above, regard shall be had to the following considerations, so far as relevant, in determining whether it is appropriate for any sewer to be provided by virtue of this section—
(a)the geology of the locality in question or of any other locality;
(b)the number of premises, being premises on which there are buildings, which might reasonably be expected to be drained by means of that sewer;
(c)the costs of providing that sewer;
(d)the nature and extent of any adverse effects to the environment or amenity arising, or likely to arise, as a result of the premises or, as the case may be, the locality in question not being drained by means of a public sewer; and
(e)the extent to which it is practicable for those effects to be overcome otherwise than by the provision (whether by virtue of this section or otherwise) of public sewers, and the costs of so overcoming those effects.
(4)Guidance issued by the Secretary of State under this section may—
(a)relate to how regard is to be had to the considerations mentioned in paragraphs (a) to (e) of subsection (3) above;
(b)relate to any other matter which the Secretary of State considers may be a relevant consideration in any case and to how regard is to be had to any such matter;
(c)set out considerations, other than those mentioned in paragraphs (a) to (e) of subsection (3) above, to which (so far as relevant) regard shall be had in determining whether it is appropriate for any sewer to be provided by virtue of this section;
(d)relate to how regard is to be had to any such consideration as is mentioned in paragraph (c) above;
(e)without prejudice to paragraphs (a) to (d) above, relate to how a sewerage undertaker is to discharge its functions under this section.
(5)F38... the Secretary of State shall arrange for any guidance issued by him under this section to be published in such manner as he considers appropriate.
(6)Subject to the following provisions of this section, the duty of a sewerage undertaker by virtue of subsection (1) above shall be enforceable under section 18 above—
(a)by the Secretary of State; or
(b)with the consent of or in accordance with a general authorisation given by the Secretary of State, by the Authority.
(7)[F39Subsections (7A) and (7B) apply where there is a dispute] between a sewerage undertaker and an owner or occupier of any premises in its area as to—
(a)whether the undertaker is under a duty by virtue of subsection (1) above to provide a public sewer to be used for any such drainage of those premises as is mentioned in that subsection;
(b)the domestic sewerage purposes for which any such sewer should be provided; or
(c)the time by which any such duty of the undertaker should be performed,
F40...
[F41(7A)The dispute is to be determined by the appropriate person and may be referred to the appropriate person for determination by either of the parties to the dispute.
(7B)If the dispute is between a sewerage undertaker and an owner or occupier of premises in Wales, the NRBW must provide advice in relation to any of the matters mentioned in subsection (7)(a) to (c) if so requested by—
(a)either of the parties to the dispute, or
(b)the appropriate person.
(7C)Any advice provided by the NRBW under subsection (7B) must be provided to both parties to the dispute and to the appropriate person.]
(8)The [F42appropriate person] —
(a)shall notify the parties of the reasons for its decision on any dispute referred to it under [F43subsection (7A)] above; and
(b)may make any such recommendations, or give any such guidance, relating to or in connection with the drainage of the premises or locality in question as it considers appropriate.
(9)The decision of the [F44appropriate person] on any dispute referred to it under [F45subsection (7A)] above shall be final.
(10)A sewerage undertaker shall only be taken to be in breach of its duty under subsection (1) above where, and to the extent that, it has accepted, or the [F46appropriate person] has determined under this section, that it is under such a duty and where any time accepted by it, or determined by the [F46appropriate person] under this section, as the time by which the duty is to that extent to be performed has passed.
[F47(11)In this section “the [F48appropriate person] ” means—
(a)the Environment Agency, in relation to disputes between sewerage undertakers and owners or occupiers of premises in England;
(b)[F49the Welsh Ministers] , in relation to disputes between sewerage undertakers and owners or occupiers of premises in Wales[F50, or such person as the Welsh Ministers may from time to time appoint as the appropriate person in relation to such disputes.]]
[F51(12)A person may be appointed as the appropriate person under subsection (11)(b) only if the person is independent of the NRBW.
(13)A person is independent of the NRBW for the purposes of subsection (12) if the person is—
(a)an individual who is not a member of the NRBW or the NRBW's staff, or
(b)a body none of whose members is a member of the NRBW or the NRBW's staff.]]
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F35S. 101A inserted (1.2.1996 for specified purposes and otherwise 1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 103 (with ss. 7(6), 115, 117); S.I. 1996/186, arts. 2, 3
F36Words in s. 101A(2)(a) repealed (28.5.2004) by Water Act 2003 (c. 37), ss. 94(a), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 4 (with Sch. 3 para. 7)
F37Words in s. 101A(2)(c) repealed (28.5.2004) by Water Act 2003 (c. 37), ss. 94(b), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 4 (with Sch. 3 para. 7)
F38Words in s. 101A(5) omitted (26.5.2015) by virtue of Deregulation Act 2015 (c. 20), s. 115(3)(l), Sch. 22 para. 17
F39Words in s. 101A(7) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(2)(a), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F40Words in s. 101A(7) repealed (1.11.2015) by Water Act 2014 (c. 21), ss. 41(2)(b), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F41Ss. 101A(7A)-(7C) inserted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(3), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F42Words in s. 101A(8) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(5), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F43Words in s. 101A(8)(a) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(4), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F44Words in s. 101A(9) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(5), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F45Words in s. 101A(9) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(4), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F46Words in s. 101A(10) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(5), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F47S. 101A(11) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 237(4) (with Sch. 7)
F48Words in s. 101A(11) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(5), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F49Words in s. 101A(11)(b) substituted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(6)(a), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F50Words in s. 101A(11)(b) inserted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(6)(b), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
F51S. 101A(12)(13) inserted (1.11.2015) by Water Act 2014 (c. 21), ss. 41(7), 94(3); S.I. 2015/1786, art. 2 (with art. 3)
(1)Where a sewerage undertaker provides a public sewer pursuant to a duty to do so imposed on it by section 98 or section 101A above, the undertaker may, at the request of the person mentioned in subsection (2) below, also provide at the same time one or more lateral drains to be used for the drainage for domestic purposes of premises in its area and to communicate with that sewer.
(2)A request under subsection (1) above may be made—
(a)in the case of a public sewer to be provided under section 98 above, by the person who requires the provision of the sewer under that section; and
(b)in the case of a public sewer to be provided under section 101A above, by the owner or occupier of any premises in respect of which the duty to provide the sewer arises under that section (but any request may only be for the provision of a lateral drain to his premises).
(3)The person making a request under this section shall pay to the [F53sewerage] undertaker, following provision of the lateral drain, [F54such charges as the undertaker may impose in accordance with charging rules].
[F55(3A)The sewerage undertaker may require the person making a request under this section to provide such security for the payment of the charges as charging rules allow.]
(4)Any dispute between the sewerage undertaker and the person making a request under this section as to—
(a)whether a lateral drain should be provided pursuant to the request; F56...
[F57(b)the amount of any charge imposed,][F58or
(c)the security required to be provided,]
may be referred to the Authority for determination under section 30A above by either party to the dispute.
(5)Any lateral drain provided pursuant to a request made to a sewerage undertaker under this section shall belong to the undertaker.]
Textual Amendments
F52S. 101B inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 95(9)(10), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F53Word in s. 101B(3) substituted (1.4.2018) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 89(a); S.I. 2017/462, art. 5(e)(aa)(iv) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
F54Words in s. 101B(3) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(3)(a), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F55S. 101B(3A) inserted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(3)(b), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F56Word in s. 101B(4)(a) repealed (1.4.2018 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 89(b); S.I. 2017/462, art. 5(e)(bb)(iv) (with art. 14) (as amended by S.I. 2017/926, art. 2(3))
F57S. 101B(4)(b) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(3)(c), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F58S. 101B(4)(c) and word inserted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(3)(d), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
(1)Subject to the following provisions of this section and to sections 103, 105 and 146(3) below, a sewerage undertaker may at any time declare that—
(a)any sewer which is situated within its area or which serves the whole or any part of that area;F59. . .
[F60(aa)any lateral drain which communicates or is to communicate with a public sewer which—
(i)is so situated or serves the whole or any part of that area; and
(ii)is vested in that undertaker; or]
(b)any sewage disposal works which are so situated or which serve the whole or any part of that area,
shall, as from such date as may be specified in the declaration, become vested in the undertaker.
(2)The owner, or any of the owners, of any sewer [F61, lateral drain] or sewage disposal works with respect to which a sewerage undertaker might make a declaration under this section may make an application to that undertaker requesting it to make a declaration under this section with respect to the sewer [F61, lateral drain] or works.
(3)A declaration or application under this section may be made with respect to a part only of a sewer.
(4)A sewerage undertaker which proposes to make a declaration under this section—
[F62(za)shall give notice of its proposal to any sewerage licensee which uses, or removes matter from, the undertaker's sewerage system in accordance with a retail, wholesale or disposal authorisation;]
(a)shall give notice of its proposal to the owner or owners of the sewer [F63, lateral drain] or works in question; and
(b)shall take no further action in the matter until two months have elapsed without an appeal against the proposal being lodged under section 105 below or, as the case may be, until any appeal so lodged has been determined.
(5)A sewerage undertaker, in deciding whether a declaration should be made under this section, shall have regard to all the circumstances of the case and, in particular, to the following considerations, that is to say—
(a)whether the sewer or works in question is or are adapted to, or required for, any general system of sewerage or sewage disposal which the undertaker has provided, or proposes to provide, for the whole or any part of its area;
(b)whether the sewer [F64or lateral drain] is constructed under a highway or under land reserved by a planning scheme for a street;
(c)the number of buildings which the sewer [F65or lateral drain] is intended to serve, and whether, regard being had to the proximity of other buildings or the prospect of future development, it is likely to be required to serve additional buildings;
(d)the method of construction and state of repair of the sewer [F66, lateral drain] or works; and
(e)in a case where an owner objects, whether the making of the proposed declaration would be seriously detrimental to him.
(6)Any person who immediately before the making of a declaration under this section was entitled to use the sewer [F67or lateral drain] in question shall be entitled to use it, or any sewer [F67or lateral drain] substituted for it, to the same extent as if the declaration had not been made.
(7)No declaration may be made under this section in respect of any sewer or works the construction of which was completed before 1st October 1937.
Textual Amendments
F59Word in s. 102(1)(a) repealed (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(a)(3), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 4(b)(d)(i) (with Sch. 3 para. 7)
F60S. 102(1)(aa) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(a)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F61Words in s. 102(2) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(b)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F62S. 102(4)(za) inserted (1.4.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 90; S.I. 2017/462, art. 3(k)(xi)
F63Words in s. 102(4)(a) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(c)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F64Words in s. 102(5)(b) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(d)(i)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F65Words in s. 102(5)(c) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(d)(ii)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F66Words in s. 102(5)(d) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(d)(iii)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F67Words in s. 102(6) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(1)(e)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
Modifications etc. (not altering text)
C1S. 102 excluded (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), regs. 1(1)(b), 5(2) (with reg. 1(1)(c))
(1)Where a sewerage undertaker is about to take into consideration the question of making a declaration under section 102 above with respect to—
(a)any sewer which is situated within the area of another sewerage undertaker or which, though situated within its own area, serves the whole or any part of the area of another sewerage undertaker; F68. . .
[F69(aa)any lateral drain which is situated within the area of another sewerage undertaker or which, though situated within its own area, communicates or is to communicate with a public sewer which is situated within or serves the whole or any part of the area of another sewerage undertaker; or]
(b)any sewage disposal works which are situated within the area of another sewerage undertaker or which, though situated within its own area, serve the whole or any part of the area of another sewerage undertaker,
it shall give notice to the other undertaker.
(2)Where a sewerage undertaker is required to give notice under subsection (1) above to another undertaker, no declaration under section 102 above shall be made by the former undertaker until either—
(a)the other undertaker has consented to the declaration; or
(b)the Secretary of State, on an application made to him, has dispensed with the necessity for such consent, either unconditionally or subject to such conditions as he may think fit to impose.
[F70(3)Where—
(a)a sewer (or part of a sewer) or a lateral drain is vested, or any sewage disposal works are vested, in a relevant body; and
(b)in the case of a sewer, part of a sewer, lateral drain or works vested in railway undertakers or dock undertakers, the sewer, part or lateral drain in question is, or the works are, situated in or on land belonging to those undertakers and held or used by them for the purposes of their undertaking,
a sewerage undertaker shall not make a declaration under section 102 above with respect to (as the case may be) the sewer, or part of it, or the lateral drain or the works, except on the application of the relevant body concerned.]
(4)Where a sewerage undertaker makes a declaration under section 102 above with respect to—
(a)a sewer [F71or lateral drain] which is situated within the area of another sewerage undertaker; or
(b)any sewage disposal works which are so situated,
it shall forthwith give notice of the fact to that other undertaker.
(5)In this section “relevant body” means any sewerage undertaker, any local authority or county council or any railway undertakers or dock undertakers.
Textual Amendments
F68Word in s. 103(1)(a) repealed (28.5.2004) by Water Act 2003 (c. 37), ss. 96(2)(a)(3), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 4(b)(d)(i) (with Sch. 3 para. 7)
F69S. 103(1)(aa) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(2)(a)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F70S. 103(3) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(2)(b)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F71Words in s. 103(4)(a) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(2)(c)(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
[F72(1)Subject to subsection (7) and section 146(3) below, a sewerage undertaker may agree with—
(a)any person constructing or proposing to construct—
(i)any sewer;
(ii)any drain which is intended to communicate with a public sewer vested in that undertaker; or
(iii)any sewage disposal works; or
(b)any person at whose expense the undertaker is, by virtue of an agreement under section 160 below, to carry out work in connection with the construction of such a drain or sewer,
that, if the sewer, drain or sewage disposal works is or are constructed in accordance with the terms of the agreement, the undertaker will, upon completion of the work, at some specified date or on the happening of some future event, declare the sewer or such part of the drain as constitutes the lateral drain or the works (as the case may be) to be vested in that undertaker.]
(2)A person [F73mentioned in paragraph (a) or (b) of subsection (1) above] may [F74request a sewerage undertaker to make an agreement under this section.]
F75(3). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F76(4). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(5)Any agreement made under this section by a sewerage undertaker shall be enforceable against the undertaker by the owner or occupier for the time being of any premises served by the sewer [F77, lateral drain] or works to which it relates.
[F78(5A)The reference in subsection (5) to an agreement made under this section includes a reference to—
(a)an order under section 105ZA which is deemed to be an agreement by virtue of section 105ZA(5), and
(b)any agreement which has been varied by order under section 105ZB(1).]
(6)F79. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F80(6A). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
[F81(7)A sewerage undertaker shall not make an agreement under this section with respect to—
(a)a sewer, drain or sewage disposal works situated within the area of another sewerage undertaker; or
(b)a drain which is intended to communicate with a sewer which—
(i)is so situated; or
(ii)is vested in another sewerage undertaker,
until one of the conditions mentioned in subsection (8) below is satisfied.
(8)The conditions are—
(a)that other undertaker has consented to the making of the agreement; or
(b)the Secretary of State, on an application made to him, has dispensed with the necessity for such consent, either unconditionally or subject to such conditions as he may think fit to impose.]
[F82(9)Undertakers shall have regard to any guidance about agreements under this section issued by—
(a)the Secretary of State, in relation to undertakers whose areas are wholly or mainly in England, or
(b)the Welsh Ministers, in relation to undertakers whose areas are wholly or mainly in Wales.]
Textual Amendments
F72S. 104(1) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(4)(a), 105(3); S.I. 2004/641,{art. 4(b)} (with Sch. 3 para. 7)
F73Words in s. 104(2) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(4)(b), 105(3); S.I. 2004/641,{art. 4(b)} (with Sch. 3 para. 7)
F74Words in s. 104(2) substituted (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 11(2)(a), 94(3); S.I. 2017/462, art. 4(b); S.I. 2017/1288, art. 3(d)
F75S. 104(3) repealed (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 11(2)(b), 94(3); S.I. 2017/462, art. 4(b); S.I. 2017/1288, art. 3(d)
F76S. 104(4) repealed (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 11(2)(b), 94(3); S.I. 2017/462, art. 4(b); S.I. 2017/1288, art. 3(d)
F77Words in s. 104(5) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(4)(c), 105(3); S.I. 2004/641,{art. 4(b)} (with Sch. 3 para. 7)
F78S. 104(5A) inserted (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 11(2)(c), 94(3); S.I. 2017/462, art. 4(b); S.I. 2017/1288, art. 3(d)
F79S. 104(6) repealed (28.5.2004) by Water Act 2003 (c. 37), ss. 96(4)(d), 105(3), Sch. 9 Pt. 3; S.I. 2004/641, art. 4(b)(d)(ii) (with Sch. 3 para. 7)
F80S. 104(6A) repealed (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 11(2)(b), 94(3); S.I. 2017/462, art. 4(b); S.I. 2017/1288, art. 3(d)
F81S. 104(7)(8) substituted (28.5.2004) for s. 104(7) by Water Act 2003 (c. 37), ss. 96(4)(f), 105(3); S.I. 2004/641,{art. 4(b)} (with Sch. 3 para. 7)
F82S. 104(9) added (1.10.2010 for specified purposes, 1.10.2012 for specified purposes) by Flood and Water Management Act 2010 (c. 29), ss. 42(3), 49(3) (with s. 49(1)(6)); S.I. 2010/2169, art. 4; S.I. 2012/2048, art. 2 (with art. 3)
(1)An owner of any sewer [F83, lateral drain] or sewage disposal works may appeal to the Authority if—
(a)he is aggrieved by the proposal of a sewerage undertaker to make a declaration under section 102 above; or
(b)he is aggrieved by the refusal of a sewerage undertaker to make such a declaration.
[F84(2)[F85A person who has entered or wants to enter an agreement under section 104 may appeal to the Authority about any matter concerning the agreement (including whether it is concluded, its terms and its operation).]]
(3)The time for the making of an appeal under subsection (1) above by the owner of any sewer [F86, lateral drain] or sewage disposal works shall be-
(a)in the case of an appeal by virtue of paragraph (a) of that subsection, any time within two months after notice of the proposal is served on that owner; and
(b)in the case of an appeal by virtue of paragraph (b) of that subsection, any time after receipt of notice of the undertaker’s refusal or, if no such notice is given, at any time after the end of two months from the making of the application for the declaration.
(4)On the hearing of an appeal under this section, [F29the Authority] may—
(a)in the case of an appeal under subsection (1) above, allow or disallow the proposal of the sewerage undertaker or, as the case may be, make any declaration which the sewerage undertaker might have made; or
(b)[F87in the case of an appeal under subsection (2) above—
(i)uphold the refusal of the undertaker to grant the application or to modify the terms offered; or
(ii)on behalf of the undertaker, refuse the application or enter into any agreement into which the undertaker might have entered on the application;]
and any declaration made under paragraph (a) above shall have the same effect as if it had been made by the undertaker in question.
(5)Where [F29the Authority] makes a declaration under subsection (4)(a) above, [F29it] may, if [F29it] thinks fit—
(a)specify conditions, including conditions as to the payment of compensation by the sewerage undertaker; and
(b)direct that [F29its] declaration shall not take effect unless any conditions so specified are accepted.
(6)[F88Where [F29the Authority] makes an agreement under subsection (4)(b) above on behalf of a sewerage undertaker, [F29it] may do so on such terms as he considers reasonable or, as the case may be, on the terms offered by the undertaker subject to such modifications as [F29it] considers appropriate for ensuring that the terms of the agreement are reasonable.]
(7)[F29The Authority], in deciding, on an appeal under this section, whether any declaration or agreement should be made, shall have regard to all the circumstances of the case and, in particular, to the considerations specified in section 102(5) above; [F89and for the purposes of this subsection, in its application in relation to an appeal under subsection (2) above, paragraphs (a) to (e) of section 102(5) above shall have effect with the necessary modifications.]
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F83Words in s. 105(1) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(5)(a), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F84S. 105(2) substituted (1.10.2010 for specified purposes, 1.10.2012 for specified purposes) by Flood and Water Management Act 2010 (c. 29), ss. 42(2), 49(3) (with s. 49(1)(6)); S.I. 2010/2169, art. 4; S.I. 2012/2048, art. 2 (with art. 3)
F85S. 105(2) repealed (1.10.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 92(a); S.I. 2017/462, art. 4(d)(ii) (as substituted by S.I. 2017/926, art. 2(2))
F86Words in s. 105(3) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 96(5)(b), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F87S. 105(4)(b) and word repealed (1.10.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 92(b); S.I. 2017/462, art. 4(d)(ii) (as substituted by S.I. 2017/926, art. 2(2))
F88S. 105(6) repealed (1.10.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 92(c); S.I. 2017/462, art. 4(d)(ii) (as substituted by S.I. 2017/926, art. 2(2))
F89Words in s. 105(7) repealed (1.10.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 92(d); S.I. 2017/462, art. 4(d)(ii) (as substituted by S.I. 2017/926, art. 2(2))
(1)This section applies where a person mentioned in section 104(1)(a) or (b) makes a request to a sewerage undertaker under section 104(2).
(2)The person or the sewerage undertaker may apply to the Authority for an order under subsection (4) if the person and the sewerage undertaker have not made such agreement as was requested by the person.
(3)The Authority may, on the application of the person or the sewerage undertaker, make an order under subsection (4) if the Authority is satisfied that—
(a)where the person is such person as is mentioned in section 104(1)(a), it is appropriate for work proposed to be done by a person other than the sewerage undertaker to be so done, and
(b)the person and the sewerage undertaker cannot reach agreement within a reasonable time.
(4)The Authority may by order—
(a)require the sewerage undertaker to give such undertakings as to the vesting of the sewer, such part of the drain as constitutes the lateral drain or the works in the undertaker as the Authority may specify, and
(b)impose such terms and conditions as regards taking the benefit of the undertakings as the Authority may specify.
(5)An order under subsection (4) has effect as an agreement under section 104 between the person and the sewerage undertaker.
(6)The Authority may not make an order under subsection (4) with respect to—
(a)a sewer, drain or sewage disposal works situated in the area of another undertaker, or
(b)a drain which is intended to communicate with a sewer which—
(i)is so situated, or
(ii)is vested in another sewerage undertaker,
until one of the conditions mentioned in subsection (7) is satisfied.
(7)The conditions are that—
(a)the other sewerage undertaker has consented in writing to the making of the order, or
(b)the Minister, on an application made to the Minister, has disapplied paragraph (a), either unconditionally or subject to such conditions as the Minister thinks fit.
(8)“The Minister” means—
(a)the Secretary of State, as regards the consent of a sewerage undertaker whose area is wholly or mainly in England;
(b)the Welsh Ministers, as regards the consent of a sewerage undertaker whose area is wholly or mainly in Wales.
(9)Neither the CMA nor the Authority may exercise, in respect of an agreement for the vesting of a sewer, drain or sewage disposal works in a sewerage undertaker at a future date or on a future event, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(10)Subsection (9)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement for the vesting of a sewer, drain or sewage disposal works in a sewerage undertaker at a future date or on a future event, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(11)In exercising its functions under this section, the Authority must have regard to the desirability of—
(a)facilitating effective competition within the sewerage services industry;
(b)the recovery by the sewerage undertaker of the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the ability of the sewerage undertaker to meet its existing obligations, and likely future obligations, to provide sewerage services without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the sewerage undertaker to meet its existing obligations, or likely future obligations, to provide sewerage services.
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)On the application of a party to a section 104 agreement to vary (or terminate) the agreement, the Authority may—
(a)if it appears to the Authority that it is necessary or expedient that the section 104 agreement should be varied (or terminated),
(b)if the Authority is satisfied, in the case of an application to vary the agreement involving such person as is mentioned in section 104(1)(a), that it is appropriate for work proposed to be done by a person other than the sewerage undertaker to be so done, and
(c)if the Authority is satisfied that variation (or termination) cannot be achieved by agreement within a reasonable time,
by order vary (or terminate) the section 104 agreement.
(2)If an order under subsection (1) is made in relation to a section 104 agreement, the agreement—
(a)has effect subject to the provision made by the order, or
(b)ceases to have effect, as the case may be.
(3)An order under subsection (1) may require any party to the agreement to pay compensation to any other party.
(4)Neither the CMA nor the Authority may exercise, in respect of an agreement to vary or terminate a section 104 agreement, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(5)Subsection (4)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement to vary or terminate a section 104 agreement, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(6)In exercising its functions under this section, the Authority must have regard to the expenses incurred by the sewerage undertaker in complying with its obligations under the section 104 agreement in question and to the desirability of—
(a)facilitating effective competition within the sewerage services industry;
(b)the recovery by the sewerage undertaker of the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the ability of the sewerage undertaker to meet its existing obligations, and likely future obligations, to provide sewerage services without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the sewerage undertaker to meet its existing obligations, or likely future obligations, to provide sewerage services.
(7)In this section and sections 105ZC to 105ZI “section 104 agreement” means an agreement with a sewerage undertaker for the vesting of a sewer, drain or sewage disposal works in a sewerage undertaker at a future date or on a future event and includes—
(a)an order under section 105ZA which is deemed to be an agreement by virtue of section 105ZA(5), and
(b)any agreement which has been varied by order under subsection (1).
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)The Authority must issue a code in respect of section 104 agreements.
(2)The code may make provision about—
(a)procedures in connection with making an agreement under section 104;
(b)procedures in connection with varying or terminating a section 104 agreement;
(c)procedures to be followed by the Authority in determining whether to make an order under section 105ZA(4) or 105ZB(1);
(d)the circumstances in which it is, or is not, appropriate for work to be done by a person other than a sewerage undertaker;
(e)the terms and conditions of a section 104 agreement;
(f)principles for determining the terms and conditions that should or should not be incorporated into a section 104 agreement;
(g)the steps to be taken by the Authority in determining whether a person is complying with the code.
(3)Provision under subsection (2)(d) may include in particular provision about circumstances relating to—
(a)the nature of the work;
(b)the kind of premises supplied or to be supplied.
(4)Provision under subsection (2)(e) may include in particular provision about terms and conditions as regards—
(a)constructing associated infrastructure;
(b)vesting associated infrastructure in a sewerage undertaker;
(c)making a communication with public sewers.
(5)If the Authority considers that a sewerage undertaker is not acting as required by the code, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(6)The Authority may not give a direction under subsection (5) requiring a person to enter into, vary or terminate an agreement.
(7)It is the duty of a sewerage undertaker to comply with a direction under subsection (5), and this duty is enforceable by the Authority under section 18.
(8)The code may make different provision for different persons or descriptions of person.
(9)The Authority must from time to time review the code and, if appropriate, issue a revised code.
(10)A revised code may include provision for applying any of its revisions to section 104 agreements made before the revised code comes into force.
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)Before issuing a code under section 105ZC, the Authority must—
(a)prepare a draft of the proposed code under section 105ZC, and
(b)consult such persons about the proposed code as it considers appropriate.
(2)The Authority must specify the period (“the consultation period”) within which a person may make representations about the proposed code.
(3)Before a code under section 105ZC prepared by the Authority is issued, the Minister may direct the Authority—
(a)not to issue the code, or
(b)to issue the code with specified modifications.
(4)Subsection (3) is subject to subsections (6) and (7).
(5)In this section “the Minister” means—
(a)the Secretary of State, so far as the code relates to section 104 agreements for the vesting of sewers, drains or sewage disposal works in sewerage undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as the code relates to section 104 agreements for the vesting of sewers, drains or sewage disposal works in sewerage undertakers whose areas are wholly or mainly in Wales.
(6)The power under subsection (3) may not be exercised more than once by the Secretary of State or the Welsh Ministers.
(7)If the power under subsection (3) is not exercised by the Secretary of State or the Welsh Ministers on the first occasion on which it may be exercised by the Secretary of State or (as the case may be) the Welsh Ministers, it may not be exercised by the Secretary of State or (as the case may be) the Welsh Ministers on a later occasion.
(8)A direction under subsection (3) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code in relation to which a direction may be given may not be issued before that period of 28 days has expired.
(9)This section is subject to section 105ZE.
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)This section applies if the Authority proposes to issue a revised code under section 105ZC and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 105ZD does not apply to the proposed revised code.
(3)Once the Authority has issued the revised code, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised code, and
(b)as regards each revision contained in it, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(4)Notice under subsection (3) is to be given to such persons as the Authority considers appropriate.
(5)Unless the Authority gives notice that a revision in a revised code is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised code is issued.
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)The Authority may issue rules about charges that may be imposed by a sewerage undertaker under a section 104 agreement.
(2)The rules may in particular make provision about—
(a)what types of charge may be imposed;
(b)the amount or the maximum amount, or a method for determining the amount or maximum amount, of any type of charge;
(c)principles for determining what types of charge may or may not be imposed;
(d)principles for determining the amount of any charge that may be imposed;
(e)publication of the charges that may be imposed.
(3)The rules may require a sewerage undertaker, upon declaring a sewer, drain or sewage disposal works to be vested in the undertaker in accordance with a section 104 agreement, to pay to the other party to the agreement an amount (which may be nil) determined in accordance with the rules.
(4)Rules made by virtue of subsection (3) may, in particular, provide for the determination to take into account—
(a)revenue that might be derived from the sewer, drain or sewage disposal works in question;
(b)costs that might have been incurred in providing such a sewer, drain or sewage disposal works.
(5)The rules may also make provision as to—
(a)the amount of security that may be required by a sewerage undertaker for the purposes of any charges imposed by the sewerage undertaker under a section 104 agreement;
(b)the type of security that may be required;
(c)the payment of interest on a sum deposited with a sewerage undertaker by way of security.
(6)If the Authority considers that a sewerage undertaker is not acting as required by rules under this section, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(7)It is the duty of a sewerage undertaker to comply with a direction under subsection (6), and this duty is enforceable by the Authority under section 18.
(8)The rules may make different provision for different sewerage undertakers or descriptions of undertaker.
(9)The Authority may from time to time revise rules issued under this section and issue revised rules.
(10)The Authority must issue revised rules if—
(a)guidance is issued under section 105ZI, and
(b)the Authority, having regard to that guidance, considers that it is appropriate to revise the rules.
(11)Revised rules may include provision for applying any of their revisions to section 104 agreements made before the revised rules come into effect.
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)Before issuing rules under section 105ZF, the Authority must—
(a)prepare a draft of the proposed rules, and
(b)consult the relevant persons about the draft.
(2)The relevant persons are—
(a)the Secretary of State;
(b)the Welsh Ministers;
(c)the Council;
(d)any sewerage undertakers or other persons likely to be affected by the rules;
(e)such other persons as the Authority thinks appropriate.
(3)The Authority must specify the period (“the consultation period”) within which the relevant persons may make representations about the proposed rules.
(4)The Authority must have regard to guidance issued under section 105ZI in making rules under section 105ZF.
(5)Before rules under section 105ZF prepared by the Authority are issued, the Minister may direct the Authority not to issue the rules.
(6)In subsection (5) “the Minister” means—
(a)the Secretary of State, so far as the rules relate to section 104 agreements for the vesting of sewers, drains or sewage disposal works in sewerage undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as the rules relate to section 104 agreements for the vesting of sewers, drains or sewage disposal works in sewerage undertakers whose areas are wholly or mainly in Wales.
(7)A direction under subsection (5) must be given within the period of 28 days beginning with the day after the end of the consultation period, and rules may not be issued before that period of 28 days has expired.
(8)This section is subject to section 105ZH.
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)This section applies if the Authority proposes to issue revised rules under section 105ZF and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 105ZG does not apply to the proposed revised rules.
(3)Before issuing the revised rules, the Authority must give notice to the Minister of its intention to issue revised rules.
(4)Before the revised rules are issued, the Minister may direct the Authority not to issue the revised rules.
(5)A direction under subsection (4) must be given within the period of 14 days beginning with the day after the day on which notice is given under subsection (3), and the Authority may not issue the revised rules in question before—
(a)that period of 14 days expires, or
(b)the Minister notifies the Authority that no direction under subsection (4) will be given in relation to the revised rules,
whichever is the sooner.
(6)Once the Authority has issued the revised rules, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised rules, and
(b)as regards each revision contained in them, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(7)Notice under subsection (6) is to be given to such persons as the Authority considers appropriate.
(8)Unless the Authority gives notice that a revision in revised rules is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised rules are issued.
(9)In this section “the Minister” has the meaning given by section 105ZG.
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)The Minister may issue guidance as to the content of rules under section 105ZF.
(2)Before issuing the guidance, the Minister must—
(a)prepare a draft of the proposed guidance;
(b)consult the relevant persons about the draft.
(3)The relevant persons are—
(a)the Secretary of State;
(b)the Welsh Ministers;
(c)such other persons as the Minister thinks appropriate.
(4)The Minister may from time to time revise the guidance and issue revised guidance.
(5)Subsections (2) and (3) apply to revised guidance as they apply to the original guidance.
(6)The Minister must arrange for the publication of guidance issued under this section.
(7)In this section “the Minister” means—
(a)the Secretary of State, so far as the guidance is as to the content of rules relating to section 104 agreements for the vesting of sewers, drains or sewage disposal works in sewerage undertakers whose areas are wholly or mainly in England;
(b)the Welsh Ministers, so far as the guidance is as to the content of rules relating to section 104 agreements for the vesting of sewers, drains or sewage disposal works in sewerage undertakers whose areas are wholly or mainly in Wales.]
Textual Amendments
F90Ss. 105ZA-105ZI inserted (18.12.2015 for the insertion of ss. 105ZF-105ZI, 1.4.2017 for E. for the insertion of s. 105ZD, 1.10.2017 for E. in so far as not already in force, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 11(3), 94(3); S.I. 2015/1938, art. 2(c)(ii); S.I. 2017/462, arts. 3(e)(ii), 4(b); S.I. 2017/1288, art. 3(d)
(1)The Secretary of State may by regulations provide for him to make schemes for the adoption by sewerage undertakers of sewers, lateral drains and sewage disposal works of the descriptions set out in paragraphs (a), (aa) and (b) of section 102(1) above.
(2)The regulations may require sewerage undertakers to prepare draft schemes and to submit them to the Secretary of State.
(3)Each scheme shall relate to—
(a)the area of a sewerage undertaker, or part or parts of it; or
(b)the areas of more than one sewerage undertaker, or part or parts of them.
(4)It shall be the duty of a sewerage undertaker, in specified circumstances, to exercise its powers under section 102 above with a view to making the declaration referred to in subsection (1) of that section in relation to sewers, lateral drains or sewage disposal works which—
(a)fall within the area to which a scheme relates; and
(b)satisfy specified criteria.
(5)The circumstances and the criteria shall each be—
(a)specified in the regulations; or
(b)determined in accordance with the regulations and specified in the scheme.
(6)In relation to the exercise of those powers pursuant to that duty—
(a)section 102 above shall have effect—
(i)with the omission of subsections (2), (5) and (7);
(ii)as if in subsection (1) the words “sections 103, 105 and 146(3) below” read “section 105B below”;
(iii)with the omission of the words “or application” in subsection (3);
(iv)as if for subsection (4)(a) there were substituted—
“(a)shall give notice of its proposal to the owner or owners of the sewer, lateral drain or works in question unless, after diligent enquiry, he or they cannot be traced;
(aa)shall publish notice of its proposal in the prescribed manner; and”;
(v)as if in subsection (4)(b) “two months” read “two months or, if longer, the period specified by virtue of section 105B(5) below” and “section 105 below” read “section 105B(4) or (5) below, or”; and
(vi)as if section 96(3) of the Water Act 2003 did not apply;
(b)sections 103 and 105 above shall not apply; and
(c)if the regulations so provide, section 146(3) below shall not apply in circumstances or cases specified in the regulations.
(7)A duty imposed on a sewerage undertaker under subsection (4) above shall be enforceable by the Secretary of State under section 18 above.
(8)A statutory instrument containing regulations under subsection (1) above shall not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.]
Textual Amendments
F91Ss. 105A-105C inserted (1.4.2007) by Water Act 2003 (c. 37), ss. 98, 105(3); S.I. 2007/1021, art. 2(b)
(1)Any person falling within subsection (2) below may appeal to the Authority if he is aggrieved by—
(a)the proposal of a sewerage undertaker to make a declaration under section 102 above in relation to a sewer, lateral drain or sewage disposal works, pursuant to the undertaker’s duty to do so under section 105A(4) above (the “relevant duty”); or
(b)the failure of a sewerage undertaker to make such a proposal pursuant to that duty.
(2)The persons referred to are—
(a)an owner of a sewer, lateral drain or sewage disposal works;
(b)any other person affected by the proposal, or the failure, in question.
(3)The grounds upon which a person may appeal are—
(a)in a subsection (1)(a) case, that the relevant duty is not owed in relation to the sewer, lateral drain or sewage disposal works, or that the making of the proposed declaration would be seriously detrimental to him;
(b)in a subsection (1)(b) case, that the relevant duty is owed in relation to the sewer, lateral drain or sewage disposal works; or
(c)any other prescribed ground.
(4)An appeal under subsection (1)(a) above shall be made within two months after notice of the proposal is—
(a)served on the owner of the sewer, lateral drain or sewage disposal works; or
(b)published in accordance with section 102(4) above as modified by section 105A(6) above,
(or, if both occur, within two months after whichever is the later).
(5)An appeal under subsection (1)(b) above shall be made within such period as is specified in the scheme (not being less than two months).
(6)On the hearing of an appeal under subsection (1) above, the Authority may—
(a)in a subsection (1)(a) case, allow or disallow the proposal of the sewerage undertaker; or
(b)in a subsection (1)(b) case, determine that the undertaker was not under the relevant duty in relation to the sewer, lateral drain or sewage disposal works in question,
or, in either case, make any declaration that the sewerage undertaker might have made, unless the proposal is disallowed.
(7)If, in a subsection (1)(a) case, the Authority finds that the making of the proposed declaration would be seriously detrimental to the appellant, it shall disregard any duty on the part of the sewerage undertaker to make the proposal for the purpose of determining whether to allow or disallow the proposal.
(8)If, in a subsection (1)(a) case, the Authority disallows the proposal of the sewerage undertaker, the scheme pursuant to which it was made shall have effect as if there were no duty under section 105A(4) above on the sewerage undertaker in relation to the sewer, lateral drain or sewage disposal works in question.
(9)Where the Authority makes a declaration under subsection (6) above, it may, if it thinks fit—
(a)specify conditions, including conditions as to the payment of compensation by the sewerage undertaker; and
(b)direct that its declaration shall not take effect unless any conditions so specified are accepted.
(10)A declaration made under subsection (6) above shall have the same effect as if it had been made by the undertaker.
(11)The Secretary of State may by regulations make further provision in connection with appeals under this section.
(12)The regulations may, in particular, require the Authority to have regard to prescribed matters when determining an appeal under this section.]
Textual Amendments
F92Ss. 105A-105C inserted (1.4.2007) by Water Act 2003 (c. 37), ss. 98, 105(3); S.I. 2007/1021, art. 2(b)
(1)The Secretary of State may vary any scheme, or revoke it.
(2)Before making regulations or any scheme under section 105A above, and before amending or revoking the regulations or varying or revoking a scheme, the Secretary of State shall consult—
(a)each sewerage undertaker which would be affected;
[F94(aa)any sewerage licensee which uses, or removes matter from, the sewerage system of any such sewerage undertaker in accordance with a retail, wholesale or disposal authorisation;]
(b)the Authority;
(c)the Council;
(d)such other persons as the Secretary of State considers appropriate.
(3)The Secretary of State shall publish each scheme he makes, and any such scheme as varied, in the way he considers best for the purpose of bringing it to the attention of those likely to be affected by it.]
Textual Amendments
F93Ss. 105A-105C inserted (1.4.2007) by Water Act 2003 (c. 37), ss. 98, 105(3); S.I. 2007/1021, art. 2(b)
F94S. 105C(2)(aa) inserted (1.4.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 93; S.I. 2017/462, art. 3(k)(xii)
[F95(1)Subject to the provisions of this section—
(a)the owner or occupier of any premises, or
(b)the owner of any private sewer which drains premises,
shall be entitled to have his drains or sewer communicate with the public sewer of any sewerage undertaker and thereby to discharge foul water and surface water from those premises or that private sewer.]
[F96(1A)In this section, and in sections 107 to 109, 111, 113 to 116, 118, 119, 124, 127, 139 and 146 below—
(a)references (however expressed) to a public sewer include a public lateral drain which satisfies sewer standards; and
(b)for the purposes of paragraph (a) above—
(i)a “public lateral drain” is a lateral drain which either belongs to the sewerage undertaker or is vested in the sewerage undertaker by virtue of a declaration made under section 102 above or under an agreement made under section 104 above; and
(ii)“sewer standards” means such standards of construction and repair as the undertaker would require if the public lateral drain or part of it were to become a public sewer.]
[F97(1B)The right under subsection (1) is subject to section 106A.]
(2)Subject to the provisions of Chapter III of this Part, nothing in subsection (1) above shall entitle any person—
(a)to discharge directly or indirectly into any public sewer—
(i)any liquid from a factory, other than domestic sewage or surface or storm water, or any liquid from a manufacturing process; or
(ii)any liquid or other matter the discharge of which into public sewers is prohibited by or under any enactment; or
(b)where separate public sewers are provided for foul water and for surface water, to discharge directly or indirectly—
(i)foul water into a sewer provided for surface water; or
(ii)except with the approval of the undertaker, surface water into a sewer provided for foul water; or
(c)to have his drains or sewer made to communicate directly with a storm-water overflow sewer.
(3)A person desirous of availing himself of his entitlement under this section shall give notice of his proposals to the sewerage undertaker in question.
(4)At any time within twenty-one days after a sewerage undertaker receives a notice under subsection (3) above, the undertaker may by notice to the person who gave the notice refuse to permit the communication to be made, if it appears to the undertaker that the mode of construction or condition of the drain or sewer
[F98(a)does not satisfy the standards reasonably required by the undertaker; or
(b)is such that the making of the communication would be prejudicial to the undertaker’s sewerage system.]
(5)For the purpose of examining the mode of construction and condition of a drain or sewer to which a notice under subsection (3) above relates a sewerage undertaker may, if necessary, require it to be laid open for inspection.
[F99(5A)Where the sewer or drain satisfies the standards reasonably required by it, a sewerage undertaker may, as a condition of permitting the communication to be made, require that the sewer or that part of the drain forming the lateral drain be vested in it by virtue of a declaration under section 102 above.]
(6)Any question arising under subsections [F100(3) to (5A)] above between a sewerage undertaker and a person proposing to make a communication as to—
(a)the reasonableness of the undertaker’s refusal to permit a communication to be made; or
(b)as to the reasonableness of any requirement under subsection (5) [F101or (5A)] above,
may, on the application of that person, be determined by [F102the Director under section 30A above] [F103(and, accordingly, section 105 above shall not apply to any requirement under subsection (5A) above).]
F104(7). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(8)Where a person proposes under this section to make a communication between a drain or sewer and such a public sewer in Greater London as is used for the general reception of sewage from other public sewers and is not substantially used for the reception of sewage from private sewers and drains—
(a)the grounds on which a sewerage undertaker may refuse to permit the communication shall be such grounds as the undertaker thinks fit; and
(b)no application to [F105the Director] may be made under subsection (6) above in respect of any refusal under this subsection.
(9)In this section “factory” has the same meaning as in the M6Factories Act 1961.
Textual Amendments
F95S. 106(1) substituted (1.7.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 43(2); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F96S. 106(1A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(2), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F97S. 106(1B) inserted (2.5.2018 for W. for specified purposes, 7.1.2019 for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 3 para. 16(1) (with s. 49(1)(6)); S.I. 2018/557, arts. 2(b), 3(b)
F98S. 106(4): paras. (a)(b) substituted (28.5.2004) for words by Water Act 2003 (c. 37), ss. 99(3), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F99S. 106(5A) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(4), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F100Words in s. 106(6) substituted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(5)(a), 105(3); S.I. 2004/641, art. 4(b) (with Sch. 3 para. 7)
F101Words in s. 106(6)(b) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(5)(b), 105(3); S.I. 2004/641, art. 4 (with Sch. 3 para. 7)
F102Words in s. 106(6) substituted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(8)(a); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F103Words in s. 106(6) inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 99(5)(c), 105(3); S.I. 2004/641, art. 4 (with Sch. 3 para. 7)
F104S. 106(7) repealed (1.7.1992) and is expressed to cease to have effect (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), ss. 35(8)(b), 56(7), Sch. 2; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, arts. 3, 4, Sch. Pts. I, II
F105Words in s. 106(8)(b) substituted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(8)(c); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt. II
Modifications etc. (not altering text)
C2S. 106 applied (23.8.2007) by The Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), art. 15(2) (with savings in arts. 3(6), 12(3))
C3S. 106 applied (14.9.2006) by The Borough of Poole (Poole Harbour Opening Bridges) Order 2006 (S.I. 2006/2310), art. 14(2)(4)
C4S. 106 applied (3.7.2006) by The Port of Blyth (Battleship Wharf Railway) Order 2006 (S.I. 2006/1518), art. 10(2)
C5S. 106 applied (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 19(2)
C6S. 106 applied (7.8.2012) by The Ipswich Barrier Order 2012 (S.I. 2012/1867), arts. 1, 13(2) (with arts. 46-48, Sch. 8 para. 18)
C7S. 106 applied (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 13(2) (with art. 26(2))
C8S. 106 applied (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 20(2) (with art. 35(2))
C9S. 106 applied (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), arts. 1, 19(2) (with art. 42(2))
C10S. 106 modified (9.4.2013) by The Lancashire County Council (Torrisholme to the M6 Link (A683 Completion of Heysham to M6 Link Road)) Order 2013 (S.I. 2013/675), arts. 1, 16(2)
C11S. 106 applied (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), arts. 1, 21(2) (with arts. 48, 68, 79)
C12S. 106 applied (15.8.2013) by The North Blyth Biomass Power Station Order 2013 (S.I. 2013/1873), arts. 1, 11(2) (with art. 30)
C13S. 106 applied (22.8.2013) by The Leeds Railway Station (Southern Entrance) Order 2013 (S.I. 2013/1933), arts. 1, 13(2)
C14S. 106 applied (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), arts. 1, 20(2) (with arts. 20(7), 42, 43)
C15S. 106 applied (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), arts. 1, 14(2) (with art. 14(7))
C16S. 106 applied (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), arts. 1, 18(2) (with art. 34(2))
C17S. 106 applied (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), arts. 1, 17(2)
C18S. 106 applied (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), arts. 1, 13(2) (with arts. 37, 38, Sch. 9 para. 19)
C19S. 106 applied (24.7.2014) by The Daventry International Rail Freight Interchange Alteration Order 2014 (S.I. 2014/1796), arts. 1, 17(2) (with arts. 17(7), 24(2), Sch. 6 para. 3)
C20S. 106 applied (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), arts. 1, 20(2) (with arts. 12, 13, 20(7), Sch. 12 Pt. 1 para. 19, Sch. 12 Pt. 2 para. 6, Sch. 12 Pt. 3 para. 5, Sch. 12 Pt. 4 para. 4, Sch. 12 Pt. 5 para. 4)
C21S. 106 applied (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 15(2)
C22S. 106 applied (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 19(2)
C23S. 106 applied (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 18(2) (with art. 33)
C24S. 106 applied (2.10.2014) by The North Killingholme (Generating Station) Order 2014 (S.I. 2014/2434), arts. 1, 14(2) (with arts. 6, 13, 14(7), Sch. 8 Pt. 1 para. 6, Sch. 8 Pt. 3 paras. 4(3), 6, 17, Sch. 8 Pt. 5 para. 9)
C25S. 106 applied (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), arts. 1, 16(2)
C26S. 106 applied (23.10.2014) by The South Hook Combined Heat and Power Plant Order 2014 (S.I. 2014/2846), arts. 1, 10(2)
C27S. 106 modified (29.10.2014) by The Able Marine Energy Park Development Consent Order 2014 (S.I. 2014/2935), art. 20(2) (with arts. 30(4), 53)
C28S. 106 applied (28.11.2014) by The Walney Extension Offshore Wind Farm Order 2014 (S.I. 2014/2950), arts. 1, 15(2) (with arts. 38, 39)
C29S. 106 applied (15.12.2014) by The London Underground (Northern Line Extension) Order 2014 (S.I. 2014/3102), arts. 1, 16(2) (with Sch. 8 para. 45)
C30S. 106 applied (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), arts. 1, 12(2) (with arts. 37, 38)
C31S. 106 applied (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), arts. 1, 14(2)
C32S. 106 applied (2.2.2015) by The Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent Order 2015 (S.I. 2015/23), arts. 1, 18(2) (with art. 18(7))
C33S. 106 applied (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), arts. 1, 16(2)
C34S. 106 applied (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), arts. 1, 17(2) (with art. 17(7)(9), 40, 41, Sch. 12 Pt. 1 paras. 4, 9(2), 10, Sch. 12 Pt. 2 paras. 4(2)(3), 19, Sch. 12 Pt. 4 paras. 3, 4, 16
C35S. 106 applied (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), arts. 1, 15(2) (with art. 15(7), Sch. 8 para. 10)
C36S. 106 applied (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), arts. 1, 17(2) (with arts. 17(2), 36(2))
C37S. 106 applied (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), arts. 1, 9(2) (with art. 5)
C38S. 106 applied (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 17(2)
C39S. 106 applied (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 13(2) (with arts. 51, 53)
C40S. 106 applied (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 15(2) (with art. 44)
C41S. 106 applied (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 15(2)
C42S. 106 applied (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 14(2)
C43S. 106 applied (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), arts. 1, 18(2) (with arts. 40, 41)
C44S. 106 applied (19.11.2015) by The Ferrybridge Multifuel 2 Power Station Order 2015 (S.I. 2015/1832), arts. 1(2), 12(2)
C45S. 106 applied (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 8(2)
C46S. 106 modified (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), arts. 1, 10(2) (with art. 26)
C47S. 106 applied (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), arts. 1, 22(2)
C48S. 106 applied (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), arts. 1, 16(2) (with art. 16(7)(8), 32)
C49S. 106 applied (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), arts. 1, 15(2) (with art. 37)
C50S. 106 applied (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), arts. 1, 17(2) (with art. 39)
C51S. 106 applied (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 17(2) (with arts. 4, 5(3), 17(6))
C52S. 106 applied (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), arts. 1, 15(2) (with art. 39)
C53S. 106 applied (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 16(2)
C54S. 106 applied (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 20(2) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
C55S. 106 applied (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), arts. 1, 14(2) (with arts. 14(7), 35, 36)
C56S. 106 applied (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), arts. 1, 16(2) (with art. 35)
C57S. 106 applied (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), arts. 1(2), 15(2) (with arts. 37, 38)
C58S. 106 applied (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 18(2) (with art. 43)
C59S. 106 applied (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), arts. 1, 17(2)
C60S. 106 applied (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), arts. 1(2), 12(2) (with arts. 39, 40, Sch. 8 para. 19)
C61S. 106 applied (28.10.2016) by The Brechfa Forest Wind Farm Connection Order 2016 (S.I. 2016/987), arts. 1, 15(2) (with arts. 15(7), 37)
C62S. 106 applied (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 21(2) (with arts. 21(7), 43, 44)
C63S. 106 applied (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), arts. 1, 16(6)
C64S. 106 applied (29.3.2017) by The Glyn Rhonwy Pumped Storage Generating Station Order 2017 (S.I. 2017/330), arts. 1, 17(2) (with art. 31)
C65S. 106 applied (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), arts. 1, 16(2)
C66S. 106 applied (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 15(2)
C67S. 106 applied (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), arts. 1, 16(2) (with arts. 16(7), 22)
C68S. 106 applied (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), arts. 1, 13(2) (with arts. 5(9), 36, 37, Sch. 8 para. 34)
C69S. 106 applied (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 14(2) (with art. 14(7), Sch. 8 para. 20)
C70S. 106 applied (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 15(2) (with art. 32(2))
C71S. 106 applied (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 18(2) (with arts. 4, 37)
C72S. 106 applied (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 19(2) (with arts. 55-57, Sch. 8 para. 13)
C73S. 106 applied (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 19(2) (with arts. 19(7), 58, 59)
C74S. 106 applied (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 14(2) (with arts. 14(7), 24(8), 33(2))
C75S. 106 applied (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 14(2)
C76S. 106 applied (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 16(2) (with arts. 16(7), 31(2))
C77S. 106 applied (3.10.2018) by The A19/A184 Testo’s Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 17(2)(7) (with arts. 3(3), 5)
C78S. 106 applied (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 14(2) (with arts. 6, 42)
C79S. 106 applied (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 18(2) (with arts. 18(6), 55, 56)
C80S. 106 applied (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 16(2)
C81S. 106 applied (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 16(2)
C82S. 106 applied (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 16(2)
C83S. 106 applied (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 21(2) (with art. 21(8), Sch. 13 Pt. 1 para. 19)
C84S. 106 applied (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), arts. 1, 19(2) (with arts. 19(7), 37(2))
C85S. 106 applied (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 20(2) (with art. 3(1))
C86S. 106 applied (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 15(2) (with arts. 7, 15(7))
C87S. 106 applied (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 17(2) (with arts. 5, 17(7), 44)
C88S. 106 applied (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 18(2) (with arts. 7, 18(6))
C89S. 106 applied (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 15(2) (with arts. 15(6), 51, 56)
C90S. 106 applied (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 21(2) (with art. 21(7))
C91S. 106 applied (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 21(2) (with art. 37)
C92S. 106 applied (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 17(2) (with arts. 5, 44)
C93S. 106 applied (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 13(2) (with art. 37)
C94S. 106 applied (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 15(2) (with arts. 41, 42, Sch. 16 para. 66)
C95S. 106 applied (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 17(2) (with arts. 5, 17(7))
C96S. 106 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 15(2) (with Sch. 9 para. 144)
C97S. 106 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 20(2)
C98S. 106 applied (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 18(2) (with art. 32, Sch. 9 para. 36)
C99S. 106 applied (11.11.2020) by The West Burton C (Gas Fired Generating Station) Order 2020 (S.I. 2020/1148), arts. 1, 11(2) (with reg. 11(7))
C100S. 106 applied (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 17(2)
C101S. 106 applied (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), arts. 1, 17(2)
C102S. 106 applied (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 15(2) (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
C103S. 106 applied (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 20(2) (with arts. 5, 20(7), Sch. 27 para. 36)
C104S. 106 applied (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 20(2) (with arts. 4, 47)
C105S. 106 applied (15.3.2021) by The Wheelabrator Kemsley K3 Generating Station Order 2021 (S.I. 2021/173), arts. 1, 10(2)
C106S. 106 applied (2.12.2021) by The South Humber Bank Energy Centre Order 2021 (S.I. 2021/1259), arts. 1, 15(2) (with Sch. 8 para. 48)
C107S. 106 applied (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 12(2) (with arts. 15, 50, Sch. 11 para. 29)
C108S. 106 applied (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 15(2) (with arts. 15(6), 41, 42, Sch. 17 para. 66)
C109S. 106 applied (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 15(2) (with arts. 15(6), 41, 42, Sch. 16)
C110S. 106 applied (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 16(2) (with Sch. 8 Pt. 6 para. 19)
C111S. 106 applied (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 19(4) (with art. 55)
C112S. 106 applied (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 16(2) (with arts. 16(7), 40, 41)
S. 106 applied (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts 1(2), 16(2) (with arts. 16(7), 40, 41)
C113S. 106 applied (27.4.2022) by The Little Crow Solar Park Order 2022 (S.I. 2022/436), arts. 1, 9(2)
C114S. 106 applied (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 17(2)
C115S. 106 applied (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 19(2) (with arts. 6, 19(6), 34)
C116S. 106 applied (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 19(2) (with arts. 5, 19(7), 36)
C117S. 106 applied (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 16(2) (with art. 16(7))
C118S. 106 applied (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 21(2) (with arts. 4, 50)
C119S. 106 applied (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), arts. 1, 5(2) (with Sch. 10 paras. 21, 43)
C120S. 106 applied (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 25(7) (with arts. 25(9), 62, 76, 87)
C121S. 106 applied (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 20(2) (with arts. 4, 20(6), 53)
C122S. 106 applied (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 16(2) (with arts. 5, 40)
C123S. 106 applied (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 20(2) (with art. 53)
C124S. 106 applied (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 22(2) (with art. 22(7))
C125S. 106 applied (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 21(2) (with arts. 4, 52, Sch. 9 para. 82)
C126S. 106 applied (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 22(2) (with art. 51)
C127S. 106 applied (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 21(2) (with arts. 4, 21(6))
C128S. 106 applied (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 19(2) (with arts. 5, 19(7))
C129S. 106 applied (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 14(2) (with art. 32, Sch. 10 paras. 26(2), 68)
C130S. 106 applied (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 16(2) (with arts. 16(7), 34(2), Sch. 12 paras. 5, 47, 79)
C131S. 106 applied (13.2.2023) by The East Northamptonshire Resource Management Facility Order 2023 (S.I. 2023/110), arts. 1, 11(2) (with art. 9)
C132S. 106 applied (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 21(2) (with arts. 4, 21(6), 50)
C133S. 106 applied (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 15(2) (with art. 15(7))
C134S. 106 applied (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 20(2) (with arts. 5, 20(6), 53, Sch. 8 paras. 6, 64)
C135S. 106 applied (2.8.2023) by The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023 (S.I. 2023/815), arts. 1, 16(2) (with art. 42)
C136S. 106 applied (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 15(2) (with arts. 15(7), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
C137S. 106 applied (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 13(2) (with arts. 6(2), 13(6), 18, Sch. 11 paras. 5, 30)
C138S. 106 applied (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 20(2) (with arts. 4, 20(9), 45, Sch. 9 paras. 6, 46, 54(1))
C139S. 106 applied (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 14(2) (with arts. 36, 37, Sch. 9 paras. 14, 44(1), 76, 103)
C140S. 106 applied (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 15(2) (with art. 43, Sch. 12 paras. 5, 24)
C141S. 106 applied (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 24(2) (with arts. 4, 24(8), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
C142S. 106 applied (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 17(2) (with arts. 42, 43, Sch. 12 paras. 5, 51, 91, 129, 136, 234, 345, 356)
C143S. 106 applied (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 18(2) (with art. 18(6), Sch. 11 paras. 5, 22, 37, 47, 82, 110)
C144S. 106(8) restricted (18.12.1996) by 1996 c. 61, s. 38, Sch. 10 para. 13
C145S. 106(8) excluded (22.7.2008) by Crossrail Act 2008 (c. 18), s. 40, Sch. 14 para. 16
C146S. 106(8) excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 5
C147S. 106(8) excluded (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(1), Sch. 21 para. 7
Marginal Citations
(1)This section applies to a drainage system construction of which required approval under Schedule 3 to the Flood and Water Management Act 2010 (sustainable drainage).
(2)A person may exercise the right under section 106(1) in respect of surface water only if—
(a)the construction of the drainage system was approved under that Schedule, and
(b)the proposals for approval included a proposal for the communication with the public sewer.
(3)Where subsection (2) is satisfied, the connection may not be refused—
(a)under section 106(4), or
(b)on grounds that the drainage system absorbs water from more than one set of premises or sewer, or from land that is neither premises nor a sewer.]
Textual Amendments
F106S. 106A inserted (2.5.2018 for W. for specified purposes, 7.1.2019 for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 3 para. 16(2) (with s. 49(1)(6)); S.I. 2018/557, arts. 2(b), 3(b)
(1)A person may exercise the right under section 106(1) in respect of a lateral drain or sewer constructed after the commencement of this section only if Conditions 1 and 2 are satisfied.
(2)Condition 1 is that an agreement was entered into under section 104 in respect of the drain or sewer.
(3)Condition 2 is that the agreement included—
(a)provision about the standards according to which the drain or sewer was to be constructed, and
(b)provision about adoption of the drain or sewer by the sewerage undertaker.
(4)Provision for the purposes of Condition 2(a) must either—
(a)incorporate or accord with standards published by the Minister, or
(b)depart from those standards by express consent of the parties to the agreement.
(5)Provision for the purposes of Condition 2(b) must—
(a)include provision for adoption to occur automatically upon the occurence of specified events, and
(b)comply with any regulations made by the Minister (which may concern the provision required by paragraph (a) of this subsection).
(6)Subsection (1) does not apply—
(a)to drainage systems required to be approved in accordance with Schedule 3 to the Flood and Water Management Act 2010, or
(b)in other circumstances specified by the Minister in regulations.
(7)Where a person seeks to exercise the right under section 106(1) in reliance on satisfying Conditions 1 and 2, an undertaker may not refuse connection—
(a)whether or not in reliance on section 106(4), and
(b)whether or not the terms of the agreement under section 104 (including terms required by this section) have been complied with.
(8)In this section “the Minister” means—
(a)the Secretary of State, in relation to sewerage undertakers whose areas are wholly or mainly in England, and
(b)the Welsh Ministers, in relation to sewerage undertakers whose areas are wholly or mainly in Wales.]
Textual Amendments
F107S. 106B inserted (1.10.2010 for specified purposes, 1.10.2012 for specified purposes) by Flood and Water Management Act 2010 (c. 29), ss. 42(1), 49(3) (with s. 49(1)(6)); S.I. 2010/2169, art. 4; S.I. 2012/2048, art. 2 (with art. 3)
(1)Where a person gives to a sewerage undertaker notice under section 106 above of his proposal to have his drains or sewer made to communicate with a public sewer of that undertaker, the undertaker may—
(a)within fourteen days after the receipt of the notice; or
(b)if any question arising under the notice requires to be determined by the Authority, within fourteen days after the determination of that question,
give notice to that person that the undertaker intends itself to make the communication.
[F108(1A)A sewerage undertaker may not give notice to a person under subsection (1) if—
(a)the undertaker and the person entered into an agreement under section 104, and
(b)the agreement provides for the communication to which the person's proposal relates to be made by the person.]
(2)If, after a notice has been given to any person under subsection (1) above, that person proceeds himself to make the communication, he shall be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 4 on the standard scale.
(3)Where a sewerage undertaker has given a notice under subsection (1) above—
(a)the undertaker shall have all such rights in respect of the making of the communication as the person desiring it to be made would have; but
(b)it shall not be obligatory on the undertaker to make the communication until either—
(i)there has been paid to the sewerage undertaker any such sum, not exceeding the undertaker’s reasonable estimate of [F109the amount by way of charges that the undertaker may impose in accordance with charging rules for making the connection] , as the undertaker may have required to be paid to it; or
(ii)there has been given to the undertaker [F110such security for the payment of that amount as charging rules allow and it may have required.]
[F111(4)If a payment to a sewerage undertaker under subsection (3) exceeds the charges that may, in the event, be imposed in accordance with charging rules for making the connection in question, the excess is to be repaid by the undertaker; and, if and so far as those charges are not covered by a payment under subsection (3), those charges are to be paid by the person for whom the work was undertaken.]
F112[(4A)Any dispute between a sewerage undertaker and any other person as to—
(a)whether the undertaker’s estimate [F113of the amount of charges] given under subsection (3)(b)(i) above is reasonable,
[F114(b)the security required by the undertaker, or]
[F115(c)whether any excess is repayable, or any charges are payable, under subsection (4), or the amount of any such excess or charges,]
may be referred to [F29the Authority] for determination under section 30A above by either party to the dispute.]
(5)Sections 291, 293 and 294 of the M7Public Health Act 1936 (which provide for the means of, and for limitations on, the recovery of expenses incurred by a local authority) shall apply in relation to the recovery by a sewerage undertaker of any sums under this section as they apply in relation to the recovery of expenses under that Act by a local authority.
(6)For the purposes of this section, the making of the communication between a drain or private sewer and a public sewer includes all such work as involves the breaking open of a street.
[F116(7)A reference in this section to an agreement under section 104 includes a reference to—
(a)an order under section 105ZA which is deemed to be an agreement by virtue of section 105ZA(5), and
(b)an agreement which has been varied by order under section 105ZB(1).]
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F108S. 107(1A) inserted (1.10.2017 for E., 1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 11(4), 94(3); S.I. 2017/462, art. 4(b); S.I. 2017/1288, art. 3(d)
F109Words in s. 107(3)(b)(i) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(4)(a), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F110Words in s. 107(3)(b)(ii) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(4)(b), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F111S. 107(4) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(4)(c), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F112S. 107(4A) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(9); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt. II
F113Words in s. 107(4A) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(4)(d), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F114S. 107(4A)(b) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(4)(e), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F115S. 107(4A)(c) substituted (1.4.2018) by Water Act 2014 (c. 21), ss. 19(4)(f), 94(3); S.I. 2017/462, art. 5(b) (with art. 14)
F116S. 107(7) inserted (1.10.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 95; S.I. 2017/462, art. 4(d)(iii) (as substituted by S.I. 2017/926, art. 2(2))
Marginal Citations
(1)Where a sewerage undertaker does not under section 107 above elect itself to make a communication to which a person is entitled under section 106 above [F117or may not make such an election because of section 107(1A)], the person making it shall—
(a)before commencing the work, give reasonable notice to any person directed by the undertaker to superintend the carrying out of the work; and
(b)afford any such person all reasonable facilities for superintending the carrying out of the work.
(2)For the purpose—
(a)of exercising his rights under section 106 above; or
(b)of examining, repairing or renewing any drain or private sewer draining his premises into a public sewer,
the owner or occupier of any premises shall be entitled to exercise the same powers as, for the purpose of carrying out its functions, are conferred on a sewerage undertaker by sections 158 and 161(1) below.
(3)The provisions of Part VI of this Act shall apply, with the necessary modifications, in relation to the power conferred by subsection (2) above as they apply in relation to the power conferred by sections 158 and 161(1) below.
Textual Amendments
F117Words in s. 108(1) inserted (1.4.2019 for W.) by Water Act 2014 (c. 21), ss. 11(5), 94(3); S.I. 2017/1288, art. 3(d)
(1)Any person who causes a drain or sewer to communicate with a public sewer—
(a)in contravention of any of the provisions of section 106 or 108 above; or
(b)before the end of the period mentioned in subsection (4) of that section 106,
shall be guilty of an offence and liable, on summary conviction, to a fine not exceeding level 4 on the standard scale.
(2)Whether proceedings have or have not been taken by a sewerage undertaker in respect of an offence under this section, such an undertaker may—
(a)close any communication made in contravention of any of the provisions of section 106 or 108 above; and
(b)recover from the offender any expenses reasonably incurred by the undertaker in so doing.
(3)Sections 291, 293 and 294 of the M8Public Health Act 1936 (which provide for the means of, and for limitations on, the recovery of expenses incurred by a local authority) shall apply in relation to the recovery by a sewerage undertaker of any sums under this section as they apply in relation to the recovery of expenses under that Act by a local authority.
Marginal Citations
(1)Where any part of a sewer is vested in a sewerage undertaker by virtue of section 70 of the M9Water Act 1989 (cross boundary sewers), the terms on which that part of that sewer—
(a)communicates with such parts of that sewer or of any other sewer; or
(b)discharges into any such sewage disposal works,
as immediately before 1st September 1989 were vested in the same water authority as that part of that sewer but, by virtue of that section, are vested in another sewerage undertaker shall be determined, in default of agreement, by the Authority.
(2)A determination by [F29the Authority] under this section shall have effect as an agreement between the sewerage undertakers in question but may be varied or revoked by a subsequent determination made by [F29the Authority] on the application of either of those undertakers, as well as by agreement between the undertakers.
(3)In making a determination under this section, [F29the Authority] shall have regard to the desirability of a sewerage undertaker’s recovering the costs resulting from its allowing the sewers of other sewerage undertakers to communicate with its sewers or to discharge into its sewage disposal works and of its securing a reasonable return on its capital.
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
Marginal Citations
(1)This section applies where—
(a)a qualifying person requests a sewerage undertaker to permit a main connection into the established undertaker's sewerage system for the benefit of the qualifying person, or
(b)a sewerage undertaker proposes such an arrangement;
and references in this section to the established undertaker are references to the sewerage undertaker who is to permit the main connection.
(2)In this section “qualifying person” means—
(a)a sewerage undertaker, or
(b)a person who has made an application for an appointment or variation under section 8 which has not been determined.
(3)On the application of the qualifying person or the established undertaker, the Authority may—
(a)if it appears to the Authority that it is necessary or expedient for the purposes of this Part that the established undertaker should permit a main connection into its sewerage system, and
(b)if the Authority is satisfied that the established undertaker and qualifying person cannot reach agreement,
by order require the established undertaker to permit the connection for such period and on such terms and conditions as may be specified in the order.
(4)Before making an order under subsection (3), the Authority must consult the appropriate agency.
(5)Subject to subsection (6), an order under subsection (3) has effect as an agreement between the established undertaker and the qualifying person.
(6)If the Authority makes an order under subsection (3) on the application of a person who is a qualifying person by virtue of subsection (2)(b), the Authority must frame the order so that it does not have effect until—
(a)the person becomes a sewerage undertaker for the area specified in the order, or
(b)the person becomes a sewerage undertaker for an area that includes the area specified in the order (in the case of a sewerage undertaker applying for a variation).
(7)Neither the CMA nor the Authority may exercise, in respect of an agreement with a sewerage undertaker for it to permit a main connection into its sewerage system for the benefit of a qualifying person, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(8)Subsection (7)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with such agreement as is mentioned in subsection (7), and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(9)In exercising its functions under this section, the Authority must have regard to the desirability of—
(a)facilitating effective competition within the sewerage services industry;
(b)the established undertaker's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the established undertaker's being able to meet its existing obligations, and likely future obligations, to provide sewerage services without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the established undertaker to meet its existing obligations, or likely future obligations, to provide such services.
(10)In this section and section 110B “the appropriate agency”, in relation to a determination whether to make an order under subsection (3) or section 110B(1) which would result in, or which would vary or terminate, a main connection agreement, means—
(a)the Environment Agency, in a case where all parties to the main connection agreement are or would be—
(i)a sewerage undertaker whose area is wholly in England, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a sewerage undertaker;
(b)the NRBW, in a case where all parties to the main connection agreement are or would be—
(i)a sewerage undertaker whose area is wholly in Wales, or
(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a sewerage undertaker;
(c)both the Environment Agency and the NRBW, in any other case.
(11)In this section and sections 110B to 110J—
“main connection” means—
a connection between a sewer or disposal main and a sewer or disposal main, or
a connection which allows a sewer or disposal main to discharge directly into a sewage disposal works;
“main connection agreement” means an agreement with one or more sewerage undertakers for that undertaker or each of them to permit a main connection into its sewerage system and includes—
an order under subsection (3) which is deemed to be an agreement by virtue of subsection (5), and
any agreement which has been varied by order under section 110B(1).]
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)On the application of any party to a main connection agreement, the Authority may—
(a)if it appears to the Authority that it is necessary or expedient for the purpose of this Part that the main connection agreement should be varied or terminated, and
(b)if the Authority is satisfied that variation or termination cannot be achieved by agreement,
by order vary or terminate the main connection agreement.
(2)Before making an order under subsection (1), the Authority must consult the appropriate agency.
(3)If an order under subsection (1) is made in relation to a main connection agreement, the agreement—
(a)has effect subject to the provision made by the order, or
(b)ceases to have effect (as the case may be).
(4)An order under subsection (1) may require any party to the agreement to pay compensation to any other party.
(5)Neither the CMA nor the Authority may exercise, in respect of an agreement to vary or terminate a main connection agreement, the powers conferred by—
(a)section 32 of the Competition Act 1998 (directions in relation to agreements);
(b)section 35(2) of that Act (interim directions).
(6)Subsection (5)(b) does not apply to the exercise of powers in respect of conduct—
(a)which is connected with an agreement to vary or terminate a main connection agreement, and
(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.
(7)In exercising its functions under this section, the Authority must have regard to the expenses incurred by the established undertaker in complying with its obligations under the main connection agreement in question and to the desirability of—
(a)facilitating effective competition within the sewerage services industry;
(b)the established undertaker's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;
(c)the established undertaker's being able to meet its existing obligations, and likely future obligations, to provide sewerage services without having to incur unreasonable expenditure in carrying out works;
(d)not putting at risk the ability of the established undertaker to meet its existing obligations, or likely future obligations, to provide such services.
(8)In this section and sections 110C to 110J “established undertaker”, in relation to a sewerage agreement, means the sewerage undertaker which is required by the agreement to permit a main connection into its sewerage system.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)The Authority may issue one or more codes in respect of main connection agreements.
(2)A code may make provision about—
(a)procedures in connection with making an agreement to permit a main connection into a sewerage undertaker's sewerage system;
(b)procedures in connection with varying or terminating a main connection agreement;
(c)procedures to be followed by the Authority in determining whether to make an order under section 110A(3) or 110B(1);
(d)the terms and conditions of a main connection agreement, including terms as to the duration of such an agreement;
(e)principles for determining the terms and conditions that should or should not be incorporated into a main connection agreement;
(f)the steps to be taken by the Authority in determining whether a person is complying with the code.
(3)If the Authority considers that a sewerage undertaker is not acting as required by a code, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(4)The Authority may not give a direction under subsection (3) requiring a person to enter into, vary or terminate an agreement.
(5)It is the duty of a sewerage undertaker to comply with a direction under subsection (3), and this duty is enforceable by the Authority under section 18.
(6)A code may make different provision for different persons or different descriptions of person.
(7)The Authority may from time to time revise a code issued under this section and issue a revised code.
(8)A revised code may include provision for applying any of its revisions to main connection agreements made before the revised code comes into force.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)Before issuing a code under section 110C, the Authority must—
(a)prepare a draft of the proposed code under section 110C, and
(b)consult such persons about the proposed code as it considers appropriate.
(2)The Authority must specify the period (“the consultation period”) within which a person may make representations about the proposed code.
(3)Before a code under section 110C prepared by the Authority is issued, the Minister may direct the Authority—
(a)not to issue the code, or
(b)to issue the code with specified modifications.
(4)Subsection (3) is subject to subsections (6) and (7).
(5)In subsection (3) “the Minister” means—
(a)the Secretary of State, so far as a code prepared by the Authority relates to main connection agreements under which—
(i)the main connection into a sewerage system, or
(ii)each such connection,
is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of another such undertaker;
(b)the Welsh Ministers, so far as a code prepared by the Authority relates to main connection agreements under which—
(i)the main connection into a sewerage system, or
(ii)each such connection,
is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of another such undertaker;
(c)the Secretary of State and the Welsh Ministers acting jointly, so far as a code prepared by the Authority relates to main connection agreements under which one main connection into a sewerage system is or would be—
(i)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of a sewerage undertaker whose area is wholly or mainly in Wales, or
(ii)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of a sewerage undertaker whose area is wholly or mainly in England.
(6)If the power under subsection (3) is exercised to give a direction in respect of such main connection agreements as are referred to in paragraph (a), (b) or (c) of subsection (5), it may not be exercised again in respect of such main connection agreements as are referred to in that paragraph.
(7)If the power under subsection (3) to give a direction in respect of such main connection agreements as are referred to in paragraph (a), (b) or (c) of subsection (5) is not exercised on the first occasion on which it may be so exercised, it may not be exercised in respect of such main connection agreements as are referred to in that paragraph on a later occasion.
(8)A direction under subsection (3) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code in relation to which a direction may be given may not be issued before that period of 28 days has expired.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)This section applies if the Authority propose to issue a revised code under section 110C and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 110D does not apply to the revised code.
(3)Once the Authority has issued the revised code, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised code, and
(b)as regards each revision contained in it, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(4)Notice under subsection (3) is to be given to such persons as the Authority considers appropriate.
(5)Unless the Authority gives notice that a revision in a revised code is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised code is issued.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)The Authority may issue rules about charges that may be imposed by a sewerage undertaker under a main connection agreement.
(2)The rules may in particular make provision about—
(a)what types of charge may be imposed;
(b)the amount or the maximum amount, or a method for determining the amount or maximum amount, of any type of charge;
(c)principles for determining what types of charge may or may not be imposed;
(d)principles for determining the amount of any charge that may be imposed;
(e)publication of the charges that may be imposed.
(3)If the Authority considers that a sewerage undertaker is not acting as required by rules under this section, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(4)It is the duty of a sewerage undertaker to comply with a direction under subsection (3), and this duty is enforceable by the Authority under section 18.
(5)The rules may—
(a)make different provision for different sewerage undertakers or different descriptions of sewerage undertaker;
(b)make different provision for different purposes;
(c)make provision subject to exceptions.
(6)The Authority may from time to time revise rules issued under this section and issue revised rules.
(7)The Authority must issue revised rules if—
(a)guidance is issued under section 110J, and
(b)the Authority, having regard to that guidance, considers that it is appropriate to revise the rules.
(8)Revised rules may include provision for applying any of the revisions to main connection agreements made before the revised rules come into effect.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)Rules under section 110F may provide for the reduction of charges payable under a main connection agreement where conditions specified by the rules are satisfied.
(2)Rules made by virtue of subsection (1) may in particular—
(a)specify conditions by reference to any party to a main connection agreement;
(b)require that steps be taken for the purpose of reducing the cost to a sewerage undertaker of permitting a main connection into its sewerage system;
(c)specify conditions about reducing charges payable by a person who—
(i)is not party to the agreement, and
(ii)takes or proposes to take such steps as satisfy or would satisfy a condition falling within paragraph (b).
(3)The rules may provide that, where a charge falls to be reduced in accordance with rules made by virtue of subsection (1), the sewerage undertaker to which the charges are payable must give notice of that reduction to the Authority.
(4)Rules made by virtue of subsection (3) may—
(a)make provision as to the content of the notice;
(b)specify the period within which an undertaker is to give notice to the Authority.
(5)Provision under subsection (4)(a) may in particular require the notice to specify—
(a)the provision of the rules that brings about the reduction in the charge;
(b)the amount of the charge, with and without the reduction;
(c)the period for which the reduction has effect.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)Before issuing rules under section 110F, the Authority must—
(a)prepare a draft of the proposed rules, and
(b)consult such persons about the proposed rules as it thinks appropriate.
(2)The Authority must specify the period (“the consultation period”) within which persons may make representations about the proposed rules.
(3)The Authority must have regard to guidance issued under section 110J in making rules under section 110F.
(4)Before rules under section 110F prepared by the Authority are issued, the Minister may direct the Authority not to issue the rules.
(5)In subsection (4) “the Minister” means—
(a)the Secretary of State, so far as rules prepared by the Authority relate to main connection agreements under which—
(i)the main connection into a sewerage system, or
(ii)each such connection,
is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of another such undertaker;
(b)the Welsh Ministers, so far as rules prepared by the Authority relate to main connection agreements under which—
(i)the main connection into a sewerage system, or
(ii)each such connection,
is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of another such undertaker;
(c)the Secretary of State and the Welsh Ministers acting jointly, so far as rules prepared by the Authority relate to main connection agreements under which one main connection into a sewerage system is or would be—
(i)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of a sewerage undertaker whose area is wholly or mainly in Wales, or
(ii)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of a sewerage undertaker whose area is wholly or mainly in England.
(6)A direction under subsection (4) must be given within the period of 28 days beginning with the day after the end of the consultation period, and rules may not be issued before that period of 28 days has expired.
(7)This section is subject to section 110I.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)This section applies if the Authority proposes to issue revised rules under section 110F and, in the view of the Authority, the revision or each of the revisions proposed to be made is—
(a)a revision for which consultation is unnecessary, or
(b)a revision that it is necessary or desirable to make without delay.
(2)Section 110H does not apply to the proposed revised rules.
(3)Before issuing the revised rules, the Authority must give notice to the Minister of its intention to issue revised rules.
(4)Before the revised rules are issued, the Minister may direct the Authority not to issue the revised rules.
(5)A direction under subsection (4) must be given within the period of 14 days beginning with the day after the day on which notice is given under subsection (3), and the Authority may not issue the revised rules in question before—
(a)that period of 14 days expires, or
(b)the Minister notifies the Authority that no direction under subsection (4) will be given in relation to the revised rules,
whichever is the sooner.
(6)Once the Authority has issued the revised rules, it must give notice as soon as reasonably practicable of—
(a)the issuing of the revised rules, and
(b)as regards each revision contained in them, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).
(7)Notice under subsection (6) is to be given to such persons as the Authority considers appropriate.
(8)Unless the Authority gives notice that a revision in revised rules is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised rules are issued.
(9)In this section “the Minister” has the meaning given by section 110H.
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
(1)The Minister may issue guidance as to the content of rules under section 110F.
(2)Before issuing the guidance, the Minister must—
(a)prepare a draft of the proposed guidance;
(b)consult the relevant persons about the draft.
(3)The relevant persons are—
(a)the Welsh Ministers;
(b)the Secretary of State;
(c)such other persons as the Minister thinks appropriate.
(4)The Minister may from time to time revise the guidance and issue revised guidance.
(5)Subsections (2) and (3) apply to revised guidance as they apply to the original guidance.
(6)The Minister must arrange for the publication of guidance issued under this section.
(7)In this section “the Minister” means—
(a)the Secretary of State, in relation to main connection agreements under which—
(i)any main connection into a sewerage system, or
(ii)each such connection,
is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of another such undertaker;
(b)the Welsh Ministers, in relation to main connection agreements under which—
(i)any main connection into a sewerage system, or
(ii)each such connection,
is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of another such undertaker;
(c)the Secretary of State and the Welsh Ministers acting jointly, in relation to main connection agreements under which one main connection into a sewerage system is or would be—
(i)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of a sewerage undertaker whose area is wholly or mainly in Wales, or
(ii)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of a sewerage undertaker whose area is wholly or mainly in England.]
Textual Amendments
F118Ss. 110A-110J substituted for s. 110A (1.11.2016 for the substitution of ss. 110A, 110B, 110J, 1.4.2018 for E. for specified purposes, 1.4.2019 for W. in so far as not already in force) by Water Act 2014 (c. 21), ss. 9(1), 94(3) (with s. 9(2)(3)); S.I. 2016/1007, art. 2(c)(i); S.I. 2017/1288, art. 3(b); S.I. 2018/397, art. 2(b)
Textual Amendments
F119Ss. 110K-110O and cross-heading inserted (6.3.2017 for the insertion of s. 110K, 1.4.2017 in so far as not already in force) by Water Act 2014 (c. 21), ss. 32, 94(3); S.I. 2017/58, art. 2(a) (with art. 3(2)); S.I. 2017/462, art. 3(g)
(1)The owner or occupier of any premises may serve a notice on a sewerage undertaker—
(a)informing the undertaker that sewerage services to the premises are to be provided by a sewerage licensee, and
(b)specifying the time after which the undertaker will no longer be required to provide sewerage services to the premises.
(2)Where the charges for the sewerage services provided by the undertaker are, under Chapter 1 of Part 5 of this Act, fixed in relation to the premises by reference to volume, the time specified in the notice is to fall at least two working days after the notice is served.
(3)In this section a reference to two working days is a reference to a period of 48 hours calculated after disregarding any time falling on—
(a)a Saturday or Sunday, or
(b)Christmas Day, Good Friday or any day which is a bank holiday in England and Wales under the Banking and Financial Dealings Act 1971.
(1)This section applies where—
(a)a sewerage licensee (“the previous licensee”) ceases to provide sewerage services to any premises, and
(b)the owner or occupier of the premises has not notified the sewerage undertaker in whose area the premises are that—
(i)he has made arrangements for the continuation of the provision of sewerage services to the premises, or
(ii)he intends any provision of sewerage services to the premises to cease.
(2)It is to be the duty of the sewerage undertaker to continue to provide the sewerage services to the premises which were provided by the previous licensee.
(3)But the Authority may give a direction to an eligible sewerage licensee (an “interim licensee”) providing that it is to be the duty of that licensee to provide the sewerage services instead.
[F120(3A)Where the premises are in a retail exit area the Authority must give a direction under subsection (3).]
(4)An “eligible sewerage licensee” is a sewerage licensee with a retail authorisation who has elected to be an eligible sewerage licensee for the purposes of this section in accordance with the code issued under section 110O.
(5)If the Authority proposes to give a direction under subsection (3) to an eligible sewerage licensee—
(a)the Authority must give notice of the proposed direction to the licensee, and
(b)the licensee may, in accordance with the code issued under section 110O, temporarily suspend the election made by the licensee as mentioned in subsection (4), so that the proposed direction cannot be given to the licensee.
(6)Where sewerage services are provided by an undertaker under subsection (2)—
(a)the charges payable in respect of the provision of the services are to be fixed from time to time by a charges scheme under section 143, and
(b)the services are to be provided until—
(i)services are provided by an interim licensee by virtue of a direction under subsection (3),
(ii)services are provided by a sewerage licensee following the service of a notice under section 110K, or
(iii)services are provided to the premises by another sewerage undertaker following the service of a notice by the owner or occupier of the premises on the undertaker providing services under subsection (2) specifying the time after which the undertaker will no longer be required to provide sewerage services to the premises (see section 110M(5)),
whichever is the earlier.
(7)Where sewerage services are provided by an interim licensee by virtue of a direction given under subsection (3)—
(a)the provision of services by the interim licensee is to be treated as having begun on the date on which the previous licensee ceased to provide services to the premises,
(b)the terms and conditions in accordance with which the services are to be provided are to be—
(i)those provided for by a scheme made under section 110N, or
(ii)such other terms and conditions as may be agreed between the interim licensee and the owner or occupier of the premises, and
(c)the services are to be provided until they are discontinued in accordance with the terms and conditions mentioned in paragraph (b).
(8)Subsections (9) and (10) apply if, within a period of three months beginning with the date on which the previous licensee ceased to provide sewerage services to the premises, the owner or occupier of the premises serves notice—
(a)under section 110K, on the sewerage undertaker continuing the provision of services under subsection (2), or
(b)in accordance with the terms and conditions mentioned in subsection (7)(b), on the interim licensee continuing the provision of services by virtue of a direction given under subsection (3),
that instead another sewerage licensee (“the new licensee”) is to continue the provision of the services to the premises which were provided by the previous licensee.
(9)The notice must—
(a)specify the time from which the new licensee is to continue the provision of the services in question, and
(b)be served in accordance with the code issued under section 110O.
(10)In the case of a notice served as mentioned in subsection (8)(a), the provision of services by the new licensee is to be treated as having begun on the date on which the previous licensee ceased to provide services to the premises.
Textual Amendments
F120S. 110L(3A) inserted (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), reg. 1(2), Sch. 2 para. 8
(1)Where a duty is imposed by section 110L(2), or by virtue of a direction given under section 110L(3), in respect of any premises, any breach of the duty which causes the owner or occupier of the premises to sustain loss or damage is actionable at the suit of that owner or occupier.
(2)But in any proceedings brought against a sewerage undertaker or sewerage licensee in pursuance of subsection (1), it is a defence for the undertaker or licensee to show that the undertaker or, as the case may be, the licensee took all reasonable steps and exercised all due diligence to avoid the breach.
(3)For the purposes of section 110L, premises which are outside a sewerage undertaker's area are to be treated as being within that area if they are provided with sewerage services using the undertaker's sewerage system.
(4)In subsection (3), the reference to the undertaker's sewerage system is to be construed in accordance with section 17BA(7).
(5)Section 110K(2) and (3) apply to a notice served under section 110L(6)(b)(iii) as they apply to a notice served under section 110K.
(1)A person who is an eligible sewerage licensee for the purposes of section 110L must make, and from time to time revise, a scheme containing the terms and conditions which, in the absence of agreed terms and conditions, are to apply to the provision of sewerage services by the licensee by virtue of a direction given under section 110L(3).
(2)A scheme under this section may make different provision for different purposes, or for different areas.
(3)As soon as practicable after a sewerage licensee makes or revises a scheme under this section the licensee is to—
(a)publish the scheme, or revised scheme, on the licensee's website, and
(b)send a copy of the scheme, or revised scheme, to the Authority.
(4)The Authority may give a direction that terms and conditions applying to the provision of sewerage services in accordance with a scheme under this section must be modified as specified in the direction.
(5)A direction under subsection (4) may apply—
(a)generally to terms and conditions applying in accordance with a scheme under this section, or
(b)to terms and conditions so applying in any particular case.
(6)It is the duty of a sewerage licensee to comply with a direction under subsection (4), and this duty is enforceable under section 18.
(1)The Authority must issue a code in relation to—
(a)the provision of sewerage services under section 110L, and
(b)its power of direction under section 110L(3) (power to direct that eligible sewerage licensee provides interim sewerage services).
(2)The code may, in particular, make provision about—
(a)the procedure for electing to be an eligible sewerage licensee for the purposes of section 110L;
(b)the procedure for temporarily suspending such an election under section 110L(5)(b);
(c)the circumstances in which the Authority's power of direction under section 110L(3) or 110N(4) may or may not be exercised;
(d)how the Authority will determine the date on which a sewerage licensee ceased to provide sewerage services to premises for the purposes of section 110L;
(e)terms and conditions contained in schemes made under section 110N;
(f)eligible sewerage licensees informing owners or occupiers of premises of their schemes for terms and conditions made under section 110N, before agreeing any terms and conditions as mentioned in section 110L(7)(b)(ii);
(g)the giving of notices as mentioned in section 110L(8) (that a new licensee is to continue the provision of the sewerage services provided by the previous licensee) including, in particular, provision about—
(i)the earliest time that a notice may specify as the time from which a new licensee is to continue the provision of the sewerage services provided by a previous licensee;
(ii)the procedure for serving a notice.
(3)If the Authority considers that a sewerage licensee is not acting as required by provision contained in the code as mentioned in subsection (2)(e) or (f), the Authority may give the licensee a direction to do, or not to do, a particular thing specified in the direction.
(4)It is the duty of a sewerage licensee to comply with a direction under subsection (3), and this duty is enforceable under section 18.
(5)The Authority must from time to time review the code and, if appropriate, issue a revised code.
(6)References in section 110L to the code issued under this section are to the code issued under this section that has effect at the time in question.]
(1)Subject to the provisions of Chapter III of this Part, no person shall throw, empty or turn, or suffer or permit to be thrown or emptied or to pass, into any public sewer, or into any drain or sewer communicating with a public sewer—
(a)any matter likely to injure the sewer or drain, to interfere with the free flow of its contents or to affect prejudicially the treatment and disposal of its contents; or
(b)any such chemical refuse or waste steam, or any such liquid of a temperature higher than [F121forty-three degrees Celsius] , as by virtue of subsection (2) below is a prohibited substance; or
(c)any petroleum spirit or carbide of calcium.
(2)For the purposes of subsection (1) above, chemical refuse, waste steam or a liquid of a temperature higher than that mentioned in that subsection is a prohibited substance if (either alone or in combination with the contents of the sewer or drain in question) it is or, in the case of the liquid, is when so heated—
(a)dangerous;
(b)the cause of a nuisance; or
(c)injurious, or likely to cause injury, to health.
(3)A person who contravenes any of the provisions of this section shall be guilty of an offence and liable—
(a)on summary conviction, to a fine not exceeding the statutory maximum and to a further fine not exceeding £50 for each day on which the offence continues after conviction;
(b)on conviction on indictment, to imprisonment for a term not exceeding two years or to a fine or to both.
(4)For the purposes of so much of subsection (3) above as makes provision for the imposition of a daily penalty—
(a)the court by which a person is convicted of the original offence may fix a reasonable date from the date of conviction for compliance by the defendant with any directions given by the court; and
(b)where a court has fixed such a period, the daily penalty shall not be imposed in respect of any day before the end of that period.
(5)In this section the expression “petroleum spirit” means any such—
(a)crude petroleum;
(b)oil made from petroleum or from coal, shale, peat or other bituminous substances; or
(c)product of petroleum or mixture containing petroleum,
as, when tested in the manner prescribed by or under the M10Petroleum (Consolidation) Act 1928, gives off an inflammable vapour at a temperature of less than [F122twenty-three degrees Celsius] .
Textual Amendments
F121Words in s. 111(1)(b) substituted (1.4.2007) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 7 para. 39(2)(a); S.I. 2007/1021, art. 2(d)
F122Words in s. 111(5) substituted (1.4.2007) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 7 para. 39(2)(b); S.I. 2007/1021, art. 2(d)
Modifications etc. (not altering text)
C148S. 111 amended (27.8.1993) by 1993 c. 12, ss. 40, 51(2), Sch. 3 Pt. I para. 8 (with ss. 42, 46).
C149S. 111 modified by S.I. 2010/675, Sch. 23 Pt. 8 para. 3 Table 9 (as substituted (1.10.2011) by The Environmental Permitting (England and Wales) (Amendment) Regulations 2011 (S.I. 2011/2043), reg. 1(b), Sch. 1)
C150S. 111 modified (1.1.2017) by The Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154), reg. 1(1), Sch. 23 paras. 1(3), 2 Table 9 (with regs. 1(3), 77-79, Sch. 4)
Marginal Citations
(1)Where—
(a)a person proposes to construct a drain or sewer; and
(b)a sewerage undertaker considers that the proposed drain or sewer is, or is likely to be, needed to form part of a general sewerage system which that undertaker provides or proposes to provide,
the undertaker may require that person to construct the drain or sewer in a manner differing, as regards material or size of pipes, depth, fall, direction or outfall or otherwise, from the manner in which that person proposes, or could otherwise be required by the undertaker, to construct it.
(2)If any person on whom requirements are imposed under this section by a sewerage undertaker is aggrieved by the requirements, he may within twenty-eight days appeal to the Authority.
(3)On an appeal under subsection (2) above with respect to any requirements, [F29the Authority] may either disallow the requirements or allow them with or without modification.
(4)It shall be the duty of a person on whom requirements are imposed by a sewerage undertaker under this section to comply with those requirements.
(5)The duty of any person by virtue of subsection (4) above to comply with the requirements of a sewerage undertaker shall be owed to the undertaker; and any breach of that duty which causes the undertaker to sustain loss or damage shall be actionable at the suit of the undertaker.
(6)A sewerage undertaker which exercises the powers conferred on it by this section shall—
(a)repay to the person constructing the drain or sewer the extra expenses reasonably incurred by that person in complying with the undertaker’s requirements; and
(b)until the drain or sewer becomes a public sewer, from time to time repay to that person so much of any expenses reasonably incurred by him in repairing or maintaining the drain or sewer as may be attributable to the undertaker’s requirements having been imposed and complied with.
(7)Nothing in this section shall apply in relation to so much of any drain or sewer as is proposed to be constructed by any railway undertakers or dock undertakers in or on land which—
(a)belongs to them; and
(b)is held or used by them for the purposes of their undertaking.
[F123(8)A requirement imposed under this section may not be inconsistent with, or more onerous than, standards published for the purposes of section 106B.]
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F123S. 112(8) added (1.10.2010 for specified purposes; 1.10.2012 for specified purposes) by Flood and Water Management Act 2010 (c. 29), ss. 42(4), 49(3) (with s. 49(1)(6)); S.I. 2010/2169, art. 4, Sch.; S.I. 2012/2048, art. 2 (with art. 3)
Modifications etc. (not altering text)
C151S. 112 excluded (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), regs. 1(1)(b), 6(7) (with reg. 1(1)(c))
(1)Where any premises have a drain or sewer communicating with a public sewer or a cesspool, but that system of drainage, though sufficient for the effectual drainage of the premises—
(a)is not adapted to the general sewerage system of the area; or
(b)is, in the opinion of the sewerage undertaker for the area, otherwise objectionable,
the undertaker may, at its own expense, close the existing drain or sewer and fill up the cesspool, if any, and do any work necessary for that purpose.
(2)The power conferred on a sewerage undertaker by subsection (1) above shall be exercisable on condition only that the undertaker first provides, in a position equally convenient to the owner of the premises in question, a drain or sewer which—
(a)is equally effectual for the drainage of the premises; and
(b)communicates with a public sewer.
(3)A sewerage undertaker which proposes to carry out any work under this section shall give [F124notice of its proposals to the owner of the premises in question.] [F124notice of its proposals to—
(a)the owner of the premises in question, and
(b)any sewerage licensee providing sewerage services to those premises.]
(4)If the owner of the premises is aggrieved by the proposals, whether as regards the position or the sufficiency of the drain or sewer proposed to be provided for the drainage of the premises, he may [F125refer the matter to the Authority for determination under section 30A above].
F126(5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(6)The Secretary of State may by regulations make provision with respect to consents and the conditions of consents for discharges of trade effluent into the sewer of a sewerage undertaker through a drain or sewer provided in pursuance of this section.
(7)In this section—
“cesspool” includes a settlement tank or other tank for the reception or disposal of foul matter from buildings; and
“trade effluent” has the same meaning as in Chapter III of this Part.
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F124Words in s. 113(3) substituted (1.10.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 96; S.I. 2017/462, art. 4(d)(iii) (as substituted by S.I. 2017/926, art. 2(2))
F125Words in s. 113(4) substituted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(11)(a); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt.II
F126S. 113(5) repealed (1.7.1992) and is expressed to cease to have effect (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), ss. 35(11)(b), 56(7), Sch. 2; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, arts. 3, 4, Sch. Pts. I, II
Modifications etc. (not altering text)
C152S. 113(6) amended (27.8.1993) by 1993 c. 12, ss. 40, 51(2), Sch. 3 Pt. I para. 8 (with ss. 42, 46).
C153S. 113(6) modified by S.I. 2010/675, Sch. 23 Pt. 8 para. 3 Table 9 (as substituted (1.10.2011) by The Environmental Permitting (England and Wales) (Amendment) Regulations 2011 (S.I. 2011/2043), reg. 1(b), Sch. 1)
C154S. 113(6) modified (1.1.2017) by The Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154), reg. 1(1), Sch. 23 paras. 1(3), 2 Table 9 (with regs. 1(3), 77-79, Sch. 4)
(1)Where it appears to a sewerage undertaker that there are reasonable grounds for believing—
(a)that any drain connecting with a public sewer, or any private sewer so connecting, is in such a condition as to be injurious or likely to cause injury to health or as to be a nuisance; or
(b)that any such drain or private sewer is so defective as to admit subsoil water,
the undertaker may examine the condition of the drain or sewer and, for that purpose, may apply any test, other than a test by water under pressure and, if the undertaker deems it necessary, open the ground.
(2)If on examination the drain or sewer is found to be in proper condition, the undertaker shall, as soon as possible, reinstate any ground which has been opened by it and make good any damage done by the undertaker.
Textual Amendments
F127S. 114A and cross-heading inserted (14.7.2014) by Water Act 2014 (c. 21), ss. 21(1), 94(2)(d)
(1)Sewerage undertakers may construct, on their own or on another's land, drainage systems for the purpose of reducing the volume of surface water entering public sewers or the rate at which it does so.
(2)A sewerage undertaker may maintain and operate a drainage system constructed by it under subsection (1).
(3)In this section—
“drainage system” means a structure designed to receive rainwater and other surface water, other than a natural watercourse;
“natural watercourse” means a river or stream;
“rainwater” includes snow and other precipitation;
“structure” includes—
any part of an existing or proposed structure, and
any feature or aspect of a design that is intended to receive or facilitate the receipt of rainwater or other surface water.
(4)The powers conferred by subsections (1) and (2) are not to be regarded as functions of a sewerage undertaker for the purposes of section 155 (compulsory purchase of land required for the purposes of carrying out functions of relevant undertakers).]
(1)Subject to the provisions of this section, a relevant authority and a sewerage undertaker may agree that—
(a)any drain or sewer which is vested in the authority in their capacity as a highway authority may, upon such terms as may be agreed, be used by the undertaker for the purpose of conveying surface water from premises or streets;
(b)any public sewer vested in the undertaker may, upon such terms as may be agreed, be used by the authority for conveying surface water from roads repairable by the authority.
(2)Where a sewer or drain with respect to which a relevant authority and a sewerage undertaker propose to make an agreement under this section discharges, whether directly or indirectly, into the sewers or sewage disposal works of another sewerage undertaker, the agreement shall not be made without the consent of that other undertaker.
(3)Subject to subsection (4) below, a consent given by a sewerage undertaker for the purposes of subsection (2) above may be given on such terms as that undertaker thinks fit.
(4)Neither a relevant authority nor a sewerage undertaker shall—
(a)unreasonably refuse to enter into an agreement for the purposes of this section; or
(b)insist unreasonably upon terms unacceptable to the other party;
and a sewerage undertaker shall not unreasonably refuse to consent to the making of such an agreement or insist unreasonably upon terms unacceptable to either party.
(5)Any question arising under this section as to whether or not any authority or undertaker is acting unreasonably shall be referred to the Secretary of State, whose decision shall be final.
[F128(5A)A sewerage undertaker must accept any use by a highway authority which is in accordance with a drainage system approved under Schedule 3 to the Flood and Water Management Act 2010.]
(6)The powers by virtue of paragraph (a) of subsection (1) above of a relevant authority and a sewerage undertaker to enter into an agreement shall be exercisable by two relevant authorities as they would be exercisable if one of them were a sewerage undertaker.
(7)Nothing in this section shall be construed as limiting the rights of a relevant authority under section 264 of the M11Highways Act 1980.
(8)Part XII of the M12Public Health Act 1936 shall apply for the purposes of the provisions of this section which confer functions on relevant authorities as they apply for the purposes of the provisions of that Act.
(9)In this section “relevant authority” means a county council or any local authority except a non-metropolitan district council.
(10)The provisions of this section are subject to the provisions of section 146(4) below.
Textual Amendments
F128S. 115(5A) inserted (2.5.2018 for W. for specified purposes, 7.1.2019 for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 3 para. 16(3) (with s. 49(1)(6)); S.I. 2018/557, arts. 2(b), 3(b)
Marginal Citations
(1)Subject to subsection (3) below, a sewerage undertaker may discontinue and prohibit the use of any public sewer which is vested in the undertaker.
(2)A discontinuance or prohibition under this section may be for all purposes, for the purpose of foul water drainage or for the purpose of surface water drainage.
(3)Before any person who is lawfully using a sewer for any purpose is deprived under this section by a sewerage undertaker of the use of the sewer for that purpose, the undertaker shall—
(a)provide a sewer which is equally effective for his use for that purpose; and
(b)at the undertaker’s own expense, carry out any work necessary to make that person’s drains or sewers communicate with the sewer provided in pursuance of this subsection.
F129[(4)Any dispute arising under subsection (3)(a) above between a sewerage undertaker and any other person as to the effectiveness of any sewer provided by the undertaker for that person’s use may be referred to the Authority for determination under section 30A above by either party to the dispute.]
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F129S. 116(4) inserted (1.9.1992) by Competition and Service (Utilities) Act 1992 (c. 43), s. 35(12); Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 4, Sch. Pt. II
Textual Amendments
F130S. 116A inserted (1.7.1992) by Competition and Service (Utilities) Act 1992 c. 43, s.33; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt.I
(1)Each sewerage undertaker shall establish a procedure for dealing with complaints made by its customers or potential customers in connection with the provision of sewerage services.
(2)No such procedure shall be established, and no modification of such a procedure shall be made, unless—
(a)the sewerage undertaker has consulted the [F132regional committee] to which it has been allocated; and
(b)the proposed procedure or modification has been approved by the Authority].
(3)The sewerage undertaker shall—
(a)publicise the procedure in such manner as may be approved by [F29the Authority]; and
(b)send a description of the procedure, free of charge, to any person who asks for one.
(4)[F29The Authority] may give a direction to a sewerage undertaker requiring the undertaker to review its procedure or the manner in which the procedure operates.
(5)A direction under subsection (4) above—
(a)may specify the manner in which the review is to be conducted; and
(b)shall require a written report of the review to be made to [F29the Authority].
(6)Where [F29the Authority] receives a report under subsection (5)(b) above, [F29it] may, after consulting the sewerage undertaker, direct the undertaker to make such modifications of—
(a)the procedure; or
(b)the manner in which the procedure operates,
as may be specified in the direction.
(7)Subsection (2) above does not apply to any modification made in compliance with a direction under subsection (6) above.
(8)The duty of a sewerage undertaker to comply with subsection (1) above and with any direction given to it under subsection (4) or (6) above shall be enforceable by [F29the Authority] under section 18 above.
(9)Where [F29the Authority] is considering whether to exercise [F29its] powers under subsection (4) or (6) above in relation to a sewerage undertaker, it shall be the duty of that undertaker to give [F29it] such information as [F29it] may reasonably require for the purpose of assisting [F29it] in coming to a decision.
(10)Section 202 below shall have effect, with the necessary modifications, in relation to information which [F29the Authority] requires for that purpose as it has effect in relation to information which the Secretary of State requires for purposes mentioned in subsection (1) of that section.]
Textual Amendments
F29Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
F131S. 116A inserted (1.7.1992) by Competition ant Service (Utilities) Act 1992 (c. 43), s.33; Competition and Service (Utilities) Act 1992 (Commencement No. 1) Order 1992, art. 3, Sch. Pt. I
F132Words in s. 116A(2)(a) substituted (1.10.2005) by Water Act 2003 (c. 37), ss. 101(1), 105(3), Sch. 7 para. 27(3); S.I. 2005/2714, art. 2(l)(v)(aa) (with Sch. para. 8)
(1)In this Chapter, except in so far as the context otherwise requires—
“dock undertakers” means persons authorised by any enactment, or by any order, rule or regulation made under any enactment, to construct, work or carry on any dock, harbour, canal or inland navigation;
“domestic sewerage purposes”, in relation to any premises, means any one or more of the following purposes, that is to say—
(a)the removal, from buildings on the premises and from land occupied with and appurtenant to the buildings, of the contents of lavatories;
(b)the removal, from such buildings and from such land, of water which has been used for cooking or washing; and
(c)the removal, from such buildings and such land, of surface water;
but does not, by virtue of paragraph (b) of this definition, include the removal of any water used for the business of a laundry or for a business of preparing food or drink for consumption otherwise than on the premises.
(2)References in this Chapter to the construction of a sewer or of any sewage disposal works include references to the extension of any existing sewer or works.
(3)In this Chapter “local authority”, in relation to the Inner Temple and the Middle Temple, includes, respectively, the Sub-Treasurer of the Inner Temple and the Under-Treasurer of the Middle Temple.
(4)Every application made or consent given under this Chapter shall be made or given in writing.
(5)Nothing in sections 102 to 109 above or in sections 111 to 116 above shall be construed as authorising a sewerage undertaker to construct or use any public or other sewer, or any drain or outfall—
(a)in contravention of any applicable provision of the M13Water Resources Act 1991 or [F133the Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154)]; or
(b)for the purpose of conveying foul water into any natural or artificial stream, watercourse, canal, pond or lake, without the water having been so treated as not to affect prejudicially the purity and quality of the water in the stream, watercourse, canal, pond or lake.
(6)A sewerage undertaker shall so carry out its functions under sections 102 to 105, 112, 115 and 116 above as not to create a nuisance.
Textual Amendments
F133Words in s. 117(5)(a) substituted (1.1.2017) by The Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154), reg. 1(1), Sch. 29 para. 8(2) (with regs. 1(3), 77-79, Sch. 4)
Marginal Citations
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: