SCHEDULES
SCHEDULE 1 Scheduled Works
Description of works
Work No
A road, forming an access road, commencing by a junction with the new road (Work No. 23B(1)) at a point 110 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway, passing eastwards and terminating at a point 105 metres south of that level crossing;