SCHEDULES

SCHEDULE 1 Scheduled Works

Description of works

Work No

A railway (650 metres in length) commencing by a junction with the railway (Work No. 1C) at its termination, passing northwards over the Regent’s Canal, then passing north-eastwards over the railways (Works Nos. 1BB and 1DD) in tunnel, then over the diverted York Way (Work No. 5Q) and terminating by a junction with the railway (Work No. 1AA) at a point 100 metres north-east of the existing York Way bridge, including bridges over the Regent’s Canal and Work No. 5Q;