Channel Tunnel Rail Link Act 1996

Dagenham Dock to WenningtonU.K.

Work No. 8—A railway (5,200 metres in length) commencing by a junction with the railway (Work No. 22) at its termination, passing eastwards under Thames Avenue (Work No. 8R), over the Beam River, and under the intended A13 link road (under construction), then continuing south-eastwards on viaduct over the new road (Work No. 8S) and Rainham Creek, and terminating beneath the intended A13 (under construction) at a point 20 metres south-west of the Tilbury Loop Railway;