Description of worksU.K.

Work No. 43D—U.K.Realignment of an existing track between Blind Lane and Forge Lane on the northern side of the M2 (Work No. 42A), commencing at a point 370 metres north-east of the junction of that track with Blind Lane, passing north-eastwards on the northern side of the existing track then northwards and terminating by a junction with Forge Lane (Work No. 43E) at a point 260 metres south-east of its junction with Chapel Lane;