Search Legislation

Planning and Compulsory Purchase Act 2004

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Cross Heading: Authorisation of compulsory acquisition

 Help about opening options

Alternative versions:

Status:

Point in time view as at 31/10/2004.

Changes to legislation:

Planning and Compulsory Purchase Act 2004, Cross Heading: Authorisation of compulsory acquisition is up to date with all changes known to be in force on or before 21 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

Authorisation of compulsory acquisitionE+W

100Procedure for authorisation by authority other than a MinisterE+W

(1)The Acquisition of Land Act 1981 (c. 67) (the “1981 Act”) is amended as follows.

(2)In section 6 (service of documents), in subsection (4)—

(a)after “lessee” in each place there is inserted “ , tenant ”;

(b)after “ “lessee” there is inserted “ , “tenant” .

(3)In section 7 (interpretation), after subsection (2) there is added—

(3)But an instrument containing regulations made for the purposes of section 13A or paragraph 4A of Schedule 1 is subject to annulment in pursuance of a resolution of either House of Parliament.

(4)In section 11 (notices in newspapers), after subsection (2) there is added—

(3)In addition, the acquiring authority shall affix a notice in the prescribed form to a conspicuous object or objects on or near the land comprised in the order.

(4)The notice under subsection (3) must—

(a)be addressed to persons occupying or having an interest in the land, and

(b)set out each of the matters mentioned in subsection (2) (but reading the reference there to first publication of the notice as a reference to the day when the notice under subsection (3) is first affixed).

(5)In section 12 (notices to owners, lessees and occupiers)—

(a)in subsection (1), for the words from “owner” to “order” (where it first appears) there is substituted “ qualifying person ”;

(b)for subsection (2) there is substituted—

(2)A person is a qualifying person, in relation to land comprised in an order, if—

(a)he is an owner, lessee, tenant (whatever the tenancy period) or occupier of the land, or

(b)he falls within subsection (2A).

(2A)A person falls within this subsection if he is—

(a)a person to whom the acquiring authority would, if proceeding under section 5(1) of the Compulsory Purchase Act 1965, be required to give a notice to treat, or

(b)a person the acquiring authority thinks is likely to be entitled to make a relevant claim if the order is confirmed and the compulsory purchase takes place, so far as he is known to the acquiring authority after making diligent inquiry.

(2B)A relevant claim is a claim for compensation under section 10 of the Compulsory Purchase Act 1965 (compensation for injurious affection).

(6)For section 13 (confirmation of compulsory purchase order) there are substituted the following sections—

13Confirmation of order: no objections

(1)The confirming authority may confirm a compulsory purchase order with or without modifications if it is satisfied—

(a)that the notice requirements have been complied with, and

(b)that one of the conditions in subsection (2) is satisfied.

(2)The conditions are—

(a)no relevant objection is made;

(b)every relevant objection made is either withdrawn or disregarded.

(3)The confirming authority may require every person who makes a relevant objection to state the grounds of the objection in writing.

(4)If the confirming authority is satisfied that an objection relates exclusively to matters which can be dealt with by the tribunal by whom the compensation is to be assessed it may disregard the objection.

(5)The notice requirements are the requirements under sections 11 and 12 to publish, affix and serve notices in connection with the compulsory purchase order.

(6)A relevant objection is an objection by a person who is a qualifying person for the purposes of section 12(2), but if such a person qualifies only by virtue of section 12(2A)(b) and the confirming authority thinks that he is not likely to be entitled to make a relevant claim his objection is not a relevant objection.

(7)Disregarded means disregarded under subsection (4) or under any other power to disregard a relevant objection contained in the enactment providing for the compulsory purchase.

13AConfirmation of order: remaining objections

(1)This section applies to the confirmation of a compulsory purchase order if a relevant objection is made which is neither—

(a)withdrawn, nor

(b)disregarded,

(a remaining objection).

(2)The confirming authority may proceed under the written representations procedure—

(a)if the order is not subject to special parliamentary procedure,

(b)in the case of an order to which section 16 applies, if a certificate has been given under subsection (2) of that section, and

(c)if every person who has made a remaining objection consents in the prescribed manner.

(3)If subsection (2) does not apply or if the confirming authority decides not to proceed under that subsection, it must either—

(a)cause a public local inquiry to be held, or

(b)give every person who has made a remaining objection an opportunity of appearing before and being heard by a person appointed by the confirming authority for the purpose.

(4)If a person who has made a remaining objection takes the opportunity to appear before a person appointed under subsection (3)(b) the confirming authority must give the acquiring authority and any other person it thinks appropriate the opportunity to be heard at the same time.

(5)The confirming authority may confirm the order with or without modifications if it has considered the objection and either —

(a)it has followed the written representations procedure, or

(b)in a case which falls within subsection (3), if an inquiry was held or a person was appointed under subsection (3)(b), it has considered the report of the person who held the inquiry or who was so appointed.

(6)The written representations procedure is such procedure as is prescribed for the purposes of this section including provision affording an opportunity to—

(a)every person who has made a remaining objection,

(b)the acquiring authority, and

(c)any other person the confirming authority thinks appropriate,

to make written representations as to whether the order should be confirmed.

(7)Relevant objection and disregarded must be construed in accordance with section 13.

13BWritten representations procedure: supplementary

(1)This section applies where the confirming authority decides under section 13A to follow the written representations procedure.

(2)The confirming authority may make orders as to the costs of the parties to the written representations procedure, and as to which party must pay the costs.

(3)An order under subsection (2) may be made a rule of the High Court on the application of any party named in the order.

(4)The costs incurred by the confirming authority in connection with the written representations procedure must be paid by the acquiring authority, if the confirming authority so directs.

(5)The confirming authority may certify the amount of its costs, and any amount so certified and directed to be paid by the acquiring authority is recoverable summarily by the confirming authority as a civil debt.

(6)Section 42(2) of the Housing and Planning Act 1986 (recovery of Minister’s costs in connection with inquiries) applies to the written representations procedure as if the procedure is an inquiry specified in section 42(1) of that Act.

(7)Regulations under section 13A(6) may make provision as to the giving of reasons for decisions taken in cases where the written representations procedure is followed.

13CConfirmation in stages

(1)The confirming authority may confirm an order (with or without modifications) so far as it relates to part of the land comprised in the order (the “relevant part”) if each of the conditions in subsection (2) is met.

(2)The conditions are—

(a)the confirming authority is satisfied that the order ought to be confirmed so far as it relates to the relevant part but has not for the time being determined whether the order ought to be confirmed so far as it relates to the remaining part;

(b)the confirming authority is satisfied that the notice requirements have been complied with.

(3)If there is a remaining objection in respect of the order, the confirming authority may only act under subsection (1) after complying with section 13A(2) or (3) (as the case may be).

(4)But it may act under subsection (1) without complying with those provisions if it is satisfied that all remaining objections relate solely to the remaining part of the land.

(5)If the confirming authority acts under subsection (1)—

(a)it must give a direction postponing consideration of the order, so far as it relates to the remaining part, until such time as may be specified by or under the direction;

(b)the order so far as it relates to each part of the land must be treated as a separate order.

(6)The notices to be published, affixed and served under section 15 must include a statement as to the effect of the direction given under subsection (5)(a).

(7)Notice requirements must be construed in accordance with section 13.

(8)Remaining objection must be construed in accordance with section 13A.

(7)For section 15 there is substituted—

15Notices after confirmation of order

(1)After the order has been confirmed, the acquiring authority must—

(a)serve a confirmation notice and a copy of the order as confirmed on each person on whom a notice was required to be served under section 12, and

(b)affix a confirmation notice to a conspicuous object or objects on or near the land comprised in the order.

(2)The notice under subsection (1)(b) must—

(a)be addressed to persons occupying or having an interest in the land;

(b)so far as practicable, be kept in place by the acquiring authority until the expiry of a period of six weeks beginning with the date when the order becomes operative.

(3)The acquiring authority must also publish a confirmation notice in one or more local newspapers circulating in the locality in which the land comprised in the order is situated.

(4)A confirmation notice is a notice—

(a)describing the land;

(b)stating that the order has been confirmed;

(c)(except in the case of a notice under subsection (1)(a)) naming a place where a copy of the order as confirmed and of the map referred to there may be inspected at all reasonable hours;

(d)that a person aggrieved by the order may apply to the High Court as mentioned in section 23.

(5)A confirmation notice must be in the prescribed form.

(8)The amendments made by this section do not apply to orders of which notice under section 11 of the 1981 Act has been published before commencement of this section.

Commencement Information

I1S. 100 in force at 6.8.2004 for specified purposes by S.I. 2004/2097, art. 2

I2S. 100 in force at 31.10.2004 in so far as not already in force by S.I. 2004/2593, art. 2(a)

101Procedure for authorisation by a MinisterE+W

(1)Schedule 1 to the Acquisition of Land Act 1981 (c. 67) (the “1981 Act”) is amended as follows.

(2)In paragraph 2 (notices in newspapers), after sub-paragraph (2) there is added—

(3)In addition, the Minister shall affix a notice in the prescribed form to a conspicuous object or objects on or near the land comprised in the draft order.

(4)The notice under sub-paragraph (3) must—

(a)be addressed to persons occupying or having an interest in the land, and

(b)set out each of the matters mentioned in sub-paragraph (2) (but reading the reference there to first publication of the notice as a reference to the day when the notice under sub-paragraph (3) is first affixed).

(3)In paragraph 3 (notices to owners, lessees and occupiers)—

(a)in sub-paragraph (1), for the words from “owner” to “order” (where it first appears) there is substituted “ qualifying person ”;

(b)for sub-paragraph (2) there is substituted—

(2)A person is a qualifying person, in relation to land comprised in a draft order, if—

(a)he is an owner, lessee, tenant (whatever the tenancy period) or occupier of any such land, or

(b)he falls within sub-paragraph (2A).

(2A)A person falls within this sub-paragraph if he is—

(a)a person to whom the Minister would, if proceeding under section 5(1) of the Compulsory Purchase Act 1965, be required to give a notice to treat, or

(b)a person the Minister thinks is likely to be entitled to make a relevant claim if the order is made and the compulsory purchase takes place, so far as he is known to the Minister after making diligent inquiry.

(2B)A relevant claim is a claim for compensation under section 10 of the Compulsory Purchase Act 1965 (compensation for injurious affection).

(4)For paragraph 4 there are substituted the following paragraphs—

4(1)The Minister may make a compulsory purchase order with or without modifications if he is satisfied—

(a)that the notice requirements have been complied with, and

(b)that one of the conditions in sub-paragraph (2) is satisfied.

(2)The conditions are—

(a)no relevant objection is made;

(b)every relevant objection made is either withdrawn or disregarded.

(3)The appropriate authority may require every person who makes a relevant objection to state the grounds of the objection in writing.

(4)If the appropriate authority is satisfied that an objection relates exclusively to matters which can be dealt with by the tribunal by whom the compensation is to be assessed it may disregard the objection.

(5)The notice requirements are the requirements under paragraphs 2 and 3 to publish, affix and serve notices in connection with the compulsory purchase order.

(6)A relevant objection is an objection by a person who is a qualifying person for the purposes of paragraph 3(2), but if such a person qualifies only by virtue of paragraph 3(2A)(b) and the Minister thinks that he is not likely to be entitled to make a relevant claim his objection is not a relevant objection.

(7)Disregarded means disregarded under sub-paragraph (4) or under any other power to disregard a relevant objection contained in the enactment providing for the compulsory purchase.

(8)The appropriate authority is—

(a)in the case of an order proposed to be made in the exercise of highway land acquisition powers, the Minister and the planning Minister acting jointly,

(b)in any other case, the Minister.

(9)Highway land acquisition powers must be construed in accordance with the Highways Act 1980.

(10)The planning Minister is the Secretary of State for the time being having general responsibility in planning matters.

4A(1)This paragraph applies to the making of a compulsory purchase order if a relevant objection is made which is neither—

(a)withdrawn, nor

(b)disregarded,

(a remaining objection).

(2)The appropriate authority may proceed under the written representations procedure—

(a)if the order is not subject to special parliamentary procedure;

(b)in the case of an order to which section 16 applies, if a certificate has been given under subsection (2) of that section, and

(c)if every person who has made a remaining objection consents in the prescribed manner.

(3)If sub-paragraph (2) does not apply or if the appropriate authority decides not to proceed under that sub-paragraph, it must either—

(a)cause a public local inquiry to be held, or

(b)give every person who has made a remaining objection an opportunity of appearing before and being heard by a person appointed by the appropriate authority for the purpose.

(4)If a person who has made a remaining objection takes the opportunity to appear before a person appointed under sub-paragraph (3)(b) the appropriate authority must give any other person it thinks appropriate the opportunity to be heard at the same time.

(5)The Minister may make the order with or without modifications if—

(a)the appropriate authority has considered the objection, and

(b)one of the conditions in sub-paragraph (6) is satisfied.

(6)The conditions are—

(a)the appropriate authority has followed the written representations procedure;

(b)in a case which falls within sub-paragraph (3), if an inquiry was held or a person was appointed under sub-paragraph (3)(b), the appropriate authority has considered the report of the person who held the inquiry or who was so appointed.

(7)The written representations procedure is such procedure as is prescribed for the purposes of this paragraph including provision affording an opportunity to—

(a)every person who has made a remaining objection, and

(b)any other person the appropriate authority thinks appropriate,

to make written representations as to whether the order should be made.

(8)Regulations under sub-paragraph (7) may make provision as to the giving of reasons for decisions taken in cases where the written representations procedure is followed.

(9)Expressions used in this paragraph and in paragraph 4 must be construed in accordance with paragraph 4.

4B(1)The Minister may make an order (with or without modifications) so far as it relates to part of the land comprised in the draft order (the “relevant part”) if each of the conditions in sub-paragraph (2) is met.

(2)The conditions are—

(a)the Minister or, if there is a remaining objection in respect of the order, the appropriate authority is satisfied that the order ought to be made so far as it relates to the relevant part but has not for the time being determined whether the order ought to be made so far as it relates to the remaining part;

(b)the Minister is satisfied that the notice requirements have been complied with.

(3)If there is a remaining objection in respect of the order, the Minister may only act under sub-paragraph (1) after the appropriate authority has complied with paragraph 4A(2) or (3) (as the case may be).

(4)But he may act under sub-paragraph (1) without the appropriate authority having complied with those provisions if he is satisfied that all remaining objections relate solely to the remaining part of the land.

(5)If the Minister acts under sub-paragraph (1)—

(a)he must give a direction postponing consideration of the order, so far as it relates to the remaining part, until such time as may be specified by or under the direction;

(b)the order so far as it relates to each part of the land must be treated as a separate order.

(6)The notices to be published, affixed and served under paragraph 6 must include a statement as to the effect of the direction given under sub-paragraph (5)(a).

(7)Expressions used in this paragraph and in paragraph 4 or 4A must be construed in accordance with paragraph 4 or 4A (as the case may be).

(5)For paragraph 6 there is substituted—

6(1)After the order has been made, the Minister must—

(a)serve a making notice, and a copy of the order as made, on each person on whom a notice was required to be served under paragraph 3, and

(b)affix a making notice to a conspicuous object or objects on or near the land comprised in the order.

(2)The notice under sub-paragraph (1)(b) must—

(a)be addressed to persons occupying or having an interest in the land;

(b)so far as practicable, be kept in place by the acquiring authority until the expiry of a period of six weeks beginning with the date when the order becomes operative.

(3)The Minister must also publish a making notice in one or more local newspapers circulating in the locality in which the land comprised in the order is situated.

(4)A making notice is a notice—

(a)describing the land;

(b)stating that the order has been made;

(c)(except in the case of a notice under sub-paragraph (1)(a)) naming a place where a copy of the order as made and of the map referred to there may be inspected at all reasonable hours;

(d)that a person aggrieved by the order may apply to the High Court as mentioned in section 23.

(5)A making notice must be in the prescribed form.

(6)The amendments made by this section do not apply to orders of which notice under paragraph 2 of Schedule 1 to the 1981 Act has been published before commencement of this section.

Commencement Information

I3S. 101 in force at 6.8.2004 for specified purposes by S.I. 2004/2097, art. 2

I4S. 101 in force at 31.10.2004 in so far as not already in force by S.I. 2004/2593, art. 2(a)

102Confirmation by acquiring authorityE+W

(1)The Acquisition of Land Act 1981 (c. 67) (the “1981 Act”) is amended as follows.

(2)After section 14 there is inserted—

14AConfirmation by acquiring authority

(1)The power to confirm an order may be exercised by the acquiring authority (instead of the confirming authority) if—

(a)the confirming authority has notified the acquiring authority to that effect, and

(b)the notice has not been revoked.

(2)But this section does not apply to an order in respect of land—

(a)falling within section 16(1) or paragraph 3(1) of Schedule 3, or

(b)forming part of a common, open space or fuel or field garden allotment for the purposes of section 19.

(3)The confirming authority may give notice under subsection (1) if it is satisfied—

(a)that the notice requirements have been complied with,

(b)that no objection has been made in relation to the proposed confirmation or that all objections have been withdrawn, and

(c)that the order is capable of being confirmed without modification.

(4)An objection is an objection made by any person (whether or not a person mentioned in section 12(2)), including an objection which is disregarded.

(5)The power to confirm an order under subsection (1) does not include any power—

(a)to confirm the order with modifications, or

(b)to confirm only a part of the order.

(6)The acquiring authority must notify the confirming authority as soon as reasonably practicable after it has determined whether or not to confirm the order.

(7)The confirming authority may revoke a notice given by it under subsection (1).

(8)But a notice may not be revoked if the determination has already been made and notified by the acquiring authority under subsection (6).

(9)An order confirmed by the acquiring authority under subsection (1) is to have the same effect as if it were confirmed by the confirming authority.

(10)Notices under this section must be in writing.

(11)Notice requirements and disregarded must be construed in accordance with section 13.

(3)The amendments made by this section do not apply to orders of which notice has been published under section 11 of the 1981 Act before commencement of this section.

Commencement Information

I5S. 102 in force at 31.10.2004 by S.I. 2004/2593, art. 2(a)

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open the Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources