SCHEDULES

SCHEDULE 1Scheduled works

In the London Borough of Ealing–

  • Work No. 3/16– A railway (469 metres in length) commencing by a junction with the Greenford Branch Railway at West Ealing Station at a point 130 metres west of the junction of Drayton Avenue with Manor Road, passing south-eastwards then eastwards and terminating at a point in West Ealing Station 20 metres south of the junction of Drayton Road with Manor Road;

  • Work No. 3/17– A deviation of the Reading Railway (2,068 metres in length partly in tunnel) commencing by a junction with that railway at a point 300 metres west of the bridge carrying Hanger Lane over that railway, passing eastwards and terminating by a junction with that railway at a point 25 metres west of the bridge carrying Horn Lane over that railway;

  • Work No. 3/17A– A railway (1,500 metres in length) commencing by a junction with the Reading Railway at a point 54 metres east of London Underground bridge No. D29 over that railway, passing eastwards and terminating by a junction with the Poplar Lines 5 metres west of the bridge carrying Horn Lane over those lines;

  • Work No. 3/17B– A railway (881 metres in length) forming sidings within the Acton Yard, commencing by a junction with Work No. 3/17A at a point 160 metres north-east of the bridge carrying Noel Road over the Reading Railway, passing eastwards and terminating at a point 155 metres west of the junction of York Road with Horn Lane;