Works
1Construction and maintenance of scheduled works
1
The nominated undertaker may construct and maintain the works specified in Schedule 1 (“the scheduled works”), being—
a
works for the construction of an underground railway between, in the west, a tunnel portal at Royal Oak in the City of Westminster and, in the east, tunnel portals at Custom House and Pudding Mill Lane in the London Borough of Newham,
b
works for the construction of other railways in the London Boroughs of Barking & Dagenham, Bexley, Ealing, Greenwich, Hammersmith and Fulham, Havering, Hillingdon, Newham, Redbridge and Tower Hamlets, the City of Westminster, the Royal Borough of Kensington & Chelsea, the District of Basildon and the Borough of Brentwood in the County of Essex, the Royal Borough of Windsor & Maidenhead and the Borough of Slough in the County of Berkshire and the District of South Bucks in the County of Buckinghamshire,
c
works consequent on, or incidental to, the construction of the works mentioned in paragraph (a) or (b).
2
Subject to subsections (3) to (5), the scheduled works shall be constructed—
a
in the lines or situations shown on the deposited plans,
b
in accordance with the levels shown on the deposited sections, and
c
in the case of any station, depot or shaft for which an upper limit is shown on the deposited sections, within the limit so shown.
3
In constructing or maintaining any of the scheduled works, the nominated undertaker may deviate laterally from the lines or situations shown on the deposited plans to any extent within the limits of deviation for that work so shown.
4
In constructing or maintaining any of the scheduled works, the nominated undertaker may deviate vertically from the level shown for that work on the deposited sections to any extent downwards.
5
In constructing or maintaining any of the scheduled works, the nominated undertaker may, subject to subsection (6), deviate vertically from the level shown for that work on the deposited sections to the following extent upwards—
a
in the case of the following, to any extent not exceeding 6 metres—
i
so much of Work No. 1/3B as lies between a point 10,200 metres from its commencement and its termination;
ii
so much of Work No. 1/4B as lies between its commencement and a point 600 metres from its commencement;
iii
so much of Work No. 2/1B as lies between its commencement and a point 800 metres from its commencement;
b
in the case of the remainder of the scheduled works, to any extent not exceeding 3 metres.
6
In the case of any station, depot or shaft for which an upper limit is shown on the deposited sections, the power of deviation under subsection (5) is subject to the limit so shown.