Part 3Nationally significant infrastructure projects

Energy

I119Gas reception facilities

1

The construction of a gas reception facility is within section 14(1)(e) only if (when constructed)—

a

the facility will be in England and will be within subsection (4), and

b

the maximum flow rate of the facility is expected to be at least 4.5 million standard cubic metres per day.

2

The alteration of a gas reception facility is within section 14(1)(e) only if—

a

the facility is in England and is within subsection (4), and

b

the effect of the alteration is expected to be to increase by at least 4.5 million standard cubic metres per day the maximum flow rate of the facility.

3

Gas reception facility” means a facility for—

a

the reception of natural gas in gaseous form from outside England, and

b

the handling of natural gas (other than its storage).

4

A gas reception facility is within this subsection if—

a

the gas handled by the facility does not originate in England, Wales or Scotland,

b

the gas does not arrive at the facility from Scotland or Wales, and

c

the gas has not already been handled at another facility after its arrival in England.

5

Maximum flow rate” means the maximum rate at which gas is able to flow out of the facility.