SCHEDULES
SCHEDULE 4Reservoirs
Construction and alteration
11
1
In section 7 (certificates of construction engineers) in subsection (1)—
a
for “addition”, in the first and second places it occurs, substitute “
alteration
”
, and
b
omit “or addition” in the last place it occurs.
2
In section 7(2) for “addition” substitute “
alteration
”
.
3
In section 7(3)—
a
for “addition”, in the first place it occurs, substitute “
alteration
”
, and
b
omit “or, as the case may be, the reservoir with the addition”.
4
In section 7(4) and (6) for “addition” substitute “
alteration
”
.
5
In section 8 (failure to comply with construction or alteration requirements) in subsection (1)—
a
in paragraph (a) after “increase” insert “
or decrease
”
, and
b
for “addition” substitute “
alteration
”
.
6
At the end of section 8(3) add “
within the period which the report must specify in respect of each recommendation.
”
7
In section 8(4) for “addition” substitute “
alteration
”
.
8
In section 8(5)—
a
omit “or addition”, and
b
omit “or, as the case may be, the reservoir with the addition”.
9
In section 8(6) omit “or, as the case may be, the reservoir with the addition”.
10
In section 10 (inspections) in subsection (9)(b) for “addition” substitute “
alteration
”
.