Valid from 01/10/2011
Valid from 30/07/2013
8E+WIn section 7 (certificates of construction engineers) in subsection (5) after “a reservoir” insert “ which is designated, or in the opinion of the engineer is likely to be designated, as a high-risk reservoir ”.