Search Legislation

Water Act 2014

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Cross Heading: Arrangements between relevant undertakers

 Help about opening options

Version Superseded: 01/11/2016

Status:

Point in time view as at 01/04/2016. This version of this cross heading contains provisions that are not valid for this point in time. Help about Status

Close

Status

Not valid for this point in time generally means that a provision was not in force for the point in time you have selected to view it on.

Changes to legislation:

Water Act 2014, Cross Heading: Arrangements between relevant undertakers is up to date with all changes known to be in force on or before 20 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

Arrangements between relevant undertakersE+W

8Bulk supply of water by water undertakersE+W

(1)For sections 40 and 40A of the Water Industry Act 1991 (agreements for the bulk supply of water etc) there is substituted—

40Bulk supplies

(1)This section applies where—

(a)a qualifying person requests a water undertaker to provide a supply of water in bulk to the qualifying person, or

(b)a water undertaker proposes such an arrangement;

and references in this section to the supplier are references to the water undertaker who is to provide the supply of water.

(2)In this section “qualifying person” means—

(a)a water undertaker;

(b)a person who has made an application for an appointment or variation under section 8 which has not been determined.

(3)On the application of the qualifying person or the supplier, the Authority may—

(a)if it appears to the Authority that it is necessary or expedient for the purposes of securing the efficient use of water resources, or the efficient supply of water, that the supplier should give a supply of water in bulk to the qualifying person, and

(b)if the Authority is satisfied that the supplier and qualifying person cannot reach agreement within a reasonable time,

by order require the supplier to give and the qualifying person to take a supply of water in bulk for such period and on such terms and conditions as may be specified in the order.

(4)Before making an order under subsection (3), the Authority must consult the appropriate agency, in particular about whether the proposed supply of water would secure an efficient use of water resources, taking into account the effect on the environment of the proposed supply.

(5)Subject to subsection (6), an order under subsection (3) has effect as an agreement between the supplier and the qualifying person.

(6)If the Authority makes an order under subsection (3) that affects a person who is a qualifying person by virtue of subsection (2)(b), the Authority must frame the order so that it does not have effect until—

(a)the person becomes a water undertaker for the area specified in the order, or

(b)the person becomes a water undertaker for an area that includes the area specified in the order (in the case of a water undertaker applying for a variation).

(7)Neither the CMA nor the Authority may exercise, in respect of an agreement for the supply of water in bulk by a water undertaker to a qualifying person, the powers conferred by—

(a)section 32 of the Competition Act 1998 (directions in relation to agreements);

(b)section 35(2) of that Act (interim directions).

(8)Subsection (7)(b) does not apply to the exercise of powers in respect of conduct—

(a)which is connected with an agreement for the supply of water in bulk by a water undertaker to a qualifying person, and

(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.

(9)In exercising its functions under this section, the Authority must have regard to the desirability of—

(a)facilitating effective competition within the water supply industry;

(b)the supplier's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;

(c)the supplier's being able to meet its existing obligations, and likely future obligations, to supply water without having to incur unreasonable expenditure in carrying out works;

(d)not putting at risk the ability of the supplier to meet its existing obligations, or likely future obligations, to supply water.

(10)In this section and section 40A “the appropriate agency”, in relation to a determination whether to make an order under subsection (3) or section 40A(1) which would result in, or which would vary or terminate, a bulk supply agreement, means—

(a)the Environment Agency, in a case where all parties to the bulk supply agreement are or would be—

(i)a water undertaker whose area is wholly in England, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(b)the NRBW, in a case where all parties to the bulk supply agreement are or would be—

(i)a water undertaker whose area is wholly in Wales, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(c)both the Environment Agency and the NRBW, in any other case.

(11)In this section and sections 40A to 40J “bulk supply agreement” means an agreement with one or more water undertakers for the supply of water in bulk and includes—

(a)an order under subsection (3) which is deemed to be an agreement by virtue of subsection (5), and

(b)any agreement which has been varied by order under section 40A(1).

40AVariation and termination of bulk supply agreements

(1)On the application of any party to a bulk supply agreement, the Authority may—

(a)if it appears to the Authority that it is necessary or expedient for the purpose of securing the efficient use of water resources, or the efficient supply of water, that the bulk supply agreement should be varied or terminated, and

(b)if the Authority is satisfied that variation or termination cannot be achieved by agreement within a reasonable time,

by order vary or terminate the bulk supply agreement.

(2)Before making an order under subsection (1), the Authority must consult the appropriate agency, in particular about whether the proposed variation or termination of the bulk supply agreement would secure an efficient use of water resources, taking into account the effect on the environment of what is proposed.

(3)If an order under subsection (1) is made in relation to a bulk supply agreement, the agreement—

(a)has effect subject to the provision made by the order, or

(b)ceases to have effect (as the case may be).

(4)An order under subsection (1) may require any party to the agreement to pay compensation to any other party.

(5)Neither the CMA nor the Authority may exercise, in respect of an agreement to vary or terminate a bulk supply agreement, the powers conferred by—

(a)section 32 of the Competition Act 1998 (directions in relation to agreements);

(b)section 35(2) of that Act (interim directions).

(6)Subsection (5)(b) does not apply to the exercise of powers in respect of conduct—

(a)which is connected with an agreement to vary or terminate a bulk supply agreement, and

(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.

(7)In exercising its functions under this section, the Authority must have regard to the expenses incurred by the supplier in complying with its obligations under the bulk supply agreement in question and to the desirability of—

(a)facilitating effective competition within the water supply industry;

(b)the supplier's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;

(c)the supplier's being able to meet its existing obligations, and likely future obligations, to supply water without having to incur unreasonable expenditure in carrying out works;

(d)not putting at risk the ability of the supplier to meet its existing obligations, or likely future obligations, to supply water.

(8)In this section and sections 40B to 40J—

  • qualifying person” has the meaning given by section 40;

  • supplier”, in relation to a bulk supply agreement, means any water undertaker which is required by the agreement to provide a bulk supply of water.

40BCodes in respect of bulk supply agreements

(1)The Authority may issue one or more codes in respect of bulk supply agreements.

(2)A code may make provision about—

(a)procedures in connection with making a bulk supply agreement;

(b)procedures in connection with varying or terminating a bulk supply agreement;

(c)procedures to be followed by the Authority in determining whether to make an order under section 40(3) or 40A(1);

(d)the terms and conditions of a bulk supply agreement, including terms as to the duration of such an agreement;

(e)principles for determining the terms and conditions that should or should not be incorporated into a bulk supply agreement;

(f)the steps to be taken by the Authority in determining whether a person is complying with a code.

(3)A code must include provision requiring persons proposing to make, vary or terminate a bulk supply agreement to consult the appropriate agency.

(4)If the Authority considers that a water undertaker is not acting as required by a code, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.

(5)The Authority may not give a direction under subsection (4) requiring a person to enter into, vary or terminate an agreement.

(6)It is the duty of a water undertaker to comply with a direction under subsection (4), and this duty is enforceable by the Authority under section 18.

(7)A code may make different provision for different persons or different descriptions of person.

(8)The Authority may from time to time revise a code issued under this section and issue a revised code.

(9)A revised code may include provision for applying any of its revisions to bulk supply agreements made before the revised code comes into force.

(10)In this section “the appropriate agency”, in relation to a bulk supply agreement or proposed bulk supply agreement, means the body that would be consulted by the Authority under section 40(4) or 40A(2) if an order under section 40(3) or 40A(1) were being considered in relation to the agreement or proposed agreement.

40CCodes under section 40B: procedure

(1)Before issuing a code under section 40B, the Authority must—

(a)prepare a draft of the proposed code under section 40B;

(b)consult the appropriate agency;

(c)consult such other persons about the proposed code as it considers appropriate.

(2)The Authority must specify the period (“the consultation period”) within which persons may make representations about the proposed code.

(3)Before a code under section 40B prepared by the Authority is issued, the Minister may direct the Authority—

(a)not to issue the code, or

(b)to issue the code with specified modifications.

(4)Subsection (3) is subject to subsections (6) and (7).

(5)In subsection (3) “the Minister” means—

(a)the Secretary of State, so far as a code prepared by the Authority relates to bulk supply agreements to which all parties are—

(i)a water undertaker whose area is wholly or mainly in England, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(b)the Welsh Ministers, so far as a code prepared by the Authority relates to bulk supply agreements to which all parties are—

(i)a water undertaker whose area is wholly or mainly in Wales, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(c)the Secretary of State and the Welsh Ministers acting jointly, so far as a code prepared by the Authority relates to bulk supply agreements to which—

(i)a person falling within paragraph (a)(i) or (ii) is party, and

(ii)a person falling within paragraph (b)(i) or (ii) is party.

(6)If the power under subsection (3) is exercised to give a direction in respect of such bulk supply agreements as are referred to in paragraph (a), (b) or (c) of subsection (5), it may not be exercised again in respect of such bulk supply agreements as are referred to in that paragraph.

(7)If the power under subsection (3) to give a direction in respect of such bulk supply agreements as are referred to in paragraph (a), (b) or (c) of subsection (5) is not exercised on the first occasion on which it may be so exercised, it may not be exercised in respect of such bulk supply agreements as are referred to in that paragraph on a later occasion.

(8)A direction under subsection (3) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code prepared by the Authority in relation to which a direction may be given may not be issued before that period of 28 days has expired.

(9)In this section “the appropriate agency” means—

(a)the Environment Agency, so far as a proposed code relates to bulk supply agreements to which all parties are persons mentioned in section 40(10)(a)(i) or (ii);

(b)the NRBW, so far as a proposed code relates to bulk supply agreements to which all parties are persons mentioned in section 40(10)(b)(i) or (ii);

(c)both the Environment Agency and the NRBW, in any other case.

(10)This section is subject to section 40D.

40DCodes under section 40B: minor or urgent revisions

(1)This section applies if the Authority proposes to issue a revised code under section 40B and, in the view of the Authority, the revision or each of the revisions proposed to be made is—

(a)a revision for which consultation is unnecessary, or

(b)a revision that it is necessary or desirable to make without delay.

(2)Section 40C does not apply to the proposed revised code.

(3)Once the Authority has issued the revised code, it must give notice as soon as reasonably practicable of—

(a)the issuing of the revised code, and

(b)as regards each revision contained in it, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).

(4)Notice under subsection (3) is to be given to such persons as the Authority considers appropriate.

(5)Unless the Authority gives notice that a revision in a revised code is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised code is issued.

40ERules about charges for the supply of water in bulk

(1)The Authority may issue rules about charges that may be imposed by a water undertaker under a bulk supply agreement.

(2)The rules may in particular make provision about—

(a)what types of charge may be imposed;

(b)the amount or the maximum amount, or a method for determining the amount or maximum amount, of any type of charge;

(c)principles for determining what types of charge may or may not be imposed;

(d)principles for determining the amount of any charge that may be imposed;

(e)publication of the charges that may be imposed.

(3)If the Authority considers that a water undertaker is not acting as required by rules under this section, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.

(4)It is the duty of a water undertaker to comply with a direction under subsection (3), and this duty is enforceable by the Authority under section 18.

(5)The rules may—

(a)make different provision for different water undertakers or different descriptions of water undertaker;

(b)make different provision for different purposes;

(c)make provision subject to exceptions.

(6)The Authority may from time to time revise rules issued under this section and issue revised rules.

(7)The Authority must issue revised rules if—

(a)guidance is issued under section 40I, and

(b)the Authority, having regard to that guidance, considers that it is appropriate to revise the rules.

(8)Revised rules may include provision for applying any of their revisions to bulk supply agreements made before the revised rules come into effect.

40FRules under section 40E: provision about the reduction of charges

(1)Rules under section 40E may provide for the reduction of charges payable for a supply of water under a bulk supply agreement where conditions specified by the rules are satisfied.

(2)Rules made by virtue of subsection (1) may in particular—

(a)specify conditions that affect any party to a bulk supply agreement;

(b)require that steps be taken for the purpose of reducing or managing water consumption;

(c)specify conditions about reducing charges payable by a person who—

(i)is not party to the agreement, and

(ii)takes or proposes to take such steps as satisfy or would satisfy a condition falling within paragraph (b).

(3)The rules may provide that, where a charge falls to be reduced in accordance with rules made by virtue of subsection (1), the water undertaker to which the charges are payable must give notice of that reduction to the Authority.

(4)Rules made by virtue of subsection (3) may—

(a)make provision as to the content of the notice;

(b)specify the period within which an undertaker is to give notice to the Authority.

(5)Provision under subsection (4)(a) may in particular require the notice to specify—

(a)the provision of the rules that brings about the reduction in the charge;

(b)the amount of the charge, with and without the reduction;

(c)the period for which the reduction has effect.

40GRules under section 40E: procedure

(1)Before issuing rules under section 40E, the Authority must—

(a)prepare a draft of the proposed rules, and

(b)consult such persons about the proposed rules as it thinks appropriate.

(2)The Authority must specify the period (“the consultation period”) within which persons may make representations about the proposed rules.

(3)The Authority must have regard to guidance issued under section 40I in making rules under section 40E.

(4)Before rules under section 40E prepared by the Authority are issued, the Minister may direct the Authority not to issue the rules.

(5)In subsection (4) “the Minister” means—

(a)the Secretary of State, so far as rules prepared by the Authority relate to bulk supply agreements to which all parties are—

(i)a water undertaker whose area is wholly or mainly in England, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(b)the Welsh Ministers, so far as rules prepared by the Authority relate to bulk supply agreements to which all parties are—

(i)a water undertaker whose area is wholly or mainly in Wales, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(c)the Secretary of State and the Welsh Ministers acting jointly, so far as rules prepared by the Authority relate to bulk supply agreements to which—

(i)a person falling within paragraph (a)(i) or (ii) is party, and

(ii)a person falling within paragraph (b)(i) or (ii) is party.

(6)A direction under subsection (4) must be given within the period of 28 days beginning with the day after the end of the consultation period, and rules may not be issued before that period of 28 days has expired.

(7)This section is subject to section 40H.

40HRules under section 40E: minor or urgent revisions

(1)This section applies if the Authority proposes to issue revised rules under section 40E and, in the view of the Authority, the revision or each of the revisions proposed to be made is—

(a)a revision for which consultation is unnecessary, or

(b)a revision that it is necessary or desirable to make without delay.

(2)Section 40G does not apply to the proposed revised rules.

(3)Before issuing the revised rules, the Authority must give notice to the Minister of its intention to issue revised rules.

(4)Before the revised rules are issued, the Minister may direct the Authority not to issue the revised rules.

(5)A direction under subsection (4) must be given within the period of 14 days beginning with the day after the day on which notice is given under subsection (3), and the Authority may not issue the revised rules in question before—

(a)that period of 14 days expires, or

(b)the Minister notifies the Authority that no direction under subsection (4) will be given in relation to the revised rules,

whichever is the sooner.

(6)Once the Authority has issued the revised rules, it must give notice as soon as reasonably practicable of—

(a)the issuing of the revised rules, and

(b)as regards each revision contained in them, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).

(7)Notice under subsection (6) is to be given to such persons as the Authority considers appropriate.

(8)Unless the Authority gives notice that a revision in revised rules is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised rules are issued.

(9)In this section “the Minister” has the meaning given by section 40G.

40IRules under section 40E: guidance

(1)The Minister may issue guidance as to the content of rules under section 40E.

(2)Before issuing the guidance, the Minister must—

(a)prepare a draft of the proposed guidance;

(b)consult the relevant persons about the draft.

(3)The relevant persons are—

(a)the Secretary of State;

(b)the Welsh Ministers;

(c)such other persons as the Minister thinks appropriate.

(4)The Minister may from time to time revise the guidance and issue revised guidance.

(5)Subsections (2) and (3) apply to revised guidance as they apply to the original guidance.

(6)The Minister must arrange for the publication of guidance issued under this section.

(7)In this section “the Minister” means—

(a)the Secretary of State, in relation to bulk supply agreements to which all parties are—

(i)a water undertaker whose area is wholly or mainly in England, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(b)the Welsh Ministers, in relation to bulk supply agreements to which all parties are—

(i)a water undertaker whose area is wholly or mainly in Wales, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a water undertaker;

(c)the Secretary of State and the Welsh Ministers acting jointly, in relation to bulk supply agreements to which—

(i)a person falling within paragraph (a)(i) or (ii) is party, and

(ii)a person falling within paragraph (b)(i) or (ii) is party.

40JDuty to provide information about bulk supplies

(1)A supplier under a bulk supply agreement must provide such information as the appropriate agency may request in relation to water supplied under the agreement.

(2)The requirement in subsection (1) is enforceable by the Authority under section 18.

(3)In subsection (1) “the appropriate agency” means the body that would be consulted by the Authority under section 40A(2) if the agreement were to be varied or terminated by an order under section 40A(1).

(2)In sections 40A to 40J of the Water Industry Act 1991 (as substituted by subsection (1))—

(a)a reference to a bulk supply agreement includes a reference to an old bulk supply agreement, and

(b)a reference to a supplier, in relation to a bulk supply agreement, is to be construed accordingly.

For these purposes, an old bulk supply agreement is a bulk supply agreement within the meaning of section 40A, as that section had effect before being substituted under subsection (1).

Commencement Information

I1S. 8(1) in force at 6.4.2015 for specified purposes by S.I. 2015/773, art. 2(1)(a)(i) (with art. 4)

I2S. 8(2) in force at 6.4.2015 for specified purposes by S.I. 2015/773, art. 2(1)(a)(ii) (with art. 4)

Valid from 01/11/2016

9Main connections into sewerage systemsE+W

(1)For section 110A of the Water Industry Act 1991 (new connections with public sewers) there is substituted—

110AMain connections

(1)This section applies where—

(a)a qualifying person requests a sewerage undertaker to permit a main connection into the established undertaker's sewerage system for the benefit of the qualifying person, or

(b)a sewerage undertaker proposes such an arrangement;

and references in this section to the established undertaker are references to the sewerage undertaker who is to permit the main connection.

(2)In this section “qualifying person” means—

(a)a sewerage undertaker, or

(b)a person who has made an application for an appointment or variation under section 8 which has not been determined.

(3)On the application of the qualifying person or the established undertaker, the Authority may—

(a)if it appears to the Authority that it is necessary or expedient for the purposes of this Part that the established undertaker should permit a main connection into its sewerage system, and

(b)if the Authority is satisfied that the established undertaker and qualifying person cannot reach agreement,

by order require the established undertaker to permit the connection for such period and on such terms and conditions as may be specified in the order.

(4)Before making an order under subsection (3), the Authority must consult the appropriate agency.

(5)Subject to subsection (6), an order under subsection (3) has effect as an agreement between the established undertaker and the qualifying person.

(6)If the Authority makes an order under subsection (3) on the application of a person who is a qualifying person by virtue of subsection (2)(b), the Authority must frame the order so that it does not have effect until—

(a)the person becomes a sewerage undertaker for the area specified in the order, or

(b)the person becomes a sewerage undertaker for an area that includes the area specified in the order (in the case of a sewerage undertaker applying for a variation).

(7)Neither the CMA nor the Authority may exercise, in respect of an agreement with a sewerage undertaker for it to permit a main connection into its sewerage system for the benefit of a qualifying person, the powers conferred by—

(a)section 32 of the Competition Act 1998 (directions in relation to agreements);

(b)section 35(2) of that Act (interim directions).

(8)Subsection (7)(b) does not apply to the exercise of powers in respect of conduct—

(a)which is connected with such agreement as is mentioned in subsection (7), and

(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.

(9)In exercising its functions under this section, the Authority must have regard to the desirability of—

(a)facilitating effective competition within the sewerage services industry;

(b)the established undertaker's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;

(c)the established undertaker's being able to meet its existing obligations, and likely future obligations, to provide sewerage services without having to incur unreasonable expenditure in carrying out works;

(d)not putting at risk the ability of the established undertaker to meet its existing obligations, or likely future obligations, to provide such services.

(10)In this section and section 110B “the appropriate agency”, in relation to a determination whether to make an order under subsection (3) or section 110B(1) which would result in, or which would vary or terminate, a main connection agreement, means—

(a)the Environment Agency, in a case where all parties to the main connection agreement are or would be—

(i)a sewerage undertaker whose area is wholly in England, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a sewerage undertaker;

(b)the NRBW, in a case where all parties to the main connection agreement are or would be—

(i)a sewerage undertaker whose area is wholly in Wales, or

(ii)a person who would, if the person's application for an appointment or variation is determined in accordance with the application, be such a sewerage undertaker;

(c)both the Environment Agency and the NRBW, in any other case.

(11)In this section and sections 110B to 110J—

  • main connection” means—

    (a)

    a connection between a sewer or disposal main and a sewer or disposal main, or

    (b)

    a connection which allows a sewer or disposal main to discharge directly into a sewage disposal works;

  • main connection agreement” means an agreement with one or more sewerage undertakers for that undertaker or each of them to permit a main connection into its sewerage system and includes—

    (a)

    an order under subsection (3) which is deemed to be an agreement by virtue of subsection (5), and

    (b)

    any agreement which has been varied by order under section 110B(1).

110BVariation and termination of main connection agreements

(1)On the application of any party to a main connection agreement, the Authority may—

(a)if it appears to the Authority that it is necessary or expedient for the purpose of this Part that the main connection agreement should be varied or terminated, and

(b)if the Authority is satisfied that variation or termination cannot be achieved by agreement,

by order vary or terminate the main connection agreement.

(2)Before making an order under subsection (1), the Authority must consult the appropriate agency.

(3)If an order under subsection (1) is made in relation to a main connection agreement, the agreement—

(a)has effect subject to the provision made by the order, or

(b)ceases to have effect (as the case may be).

(4)An order under subsection (1) may require any party to the agreement to pay compensation to any other party.

(5)Neither the CMA nor the Authority may exercise, in respect of an agreement to vary or terminate a main connection agreement, the powers conferred by—

(a)section 32 of the Competition Act 1998 (directions in relation to agreements);

(b)section 35(2) of that Act (interim directions).

(6)Subsection (5)(b) does not apply to the exercise of powers in respect of conduct—

(a)which is connected with an agreement to vary or terminate a main connection agreement, and

(b)in respect of which section 35(1) of the Competition Act 1998 applies because of an investigation under section 25 of that Act relating to a suspected infringement of the Chapter 2 prohibition imposed by section 18(1) of that Act.

(7)In exercising its functions under this section, the Authority must have regard to the expenses incurred by the established undertaker in complying with its obligations under the main connection agreement in question and to the desirability of—

(a)facilitating effective competition within the sewerage services industry;

(b)the established undertaker's recovering the expenses of complying with its obligations by virtue of this section and securing a reasonable return on its capital;

(c)the established undertaker's being able to meet its existing obligations, and likely future obligations, to provide sewerage services without having to incur unreasonable expenditure in carrying out works;

(d)not putting at risk the ability of the established undertaker to meet its existing obligations, or likely future obligations, to provide such services.

(8)In this section and sections 110C to 110J “established undertaker”, in relation to a sewerage agreement, means the sewerage undertaker which is required by the agreement to permit a main connection into its sewerage system.

110CCodes in respect of main connection agreements

(1)The Authority may issue one or more codes in respect of main connection agreements.

(2)A code may make provision about—

(a)procedures in connection with making an agreement to permit a main connection into a sewerage undertaker's sewerage system;

(b)procedures in connection with varying or terminating a main connection agreement;

(c)procedures to be followed by the Authority in determining whether to make an order under section 110A(3) or 110B(1);

(d)the terms and conditions of a main connection agreement, including terms as to the duration of such an agreement;

(e)principles for determining the terms and conditions that should or should not be incorporated into a main connection agreement;

(f)the steps to be taken by the Authority in determining whether a person is complying with the code.

(3)If the Authority considers that a sewerage undertaker is not acting as required by a code, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.

(4)The Authority may not give a direction under subsection (3) requiring a person to enter into, vary or terminate an agreement.

(5)It is the duty of a sewerage undertaker to comply with a direction under subsection (3), and this duty is enforceable by the Authority under section 18.

(6)A code may make different provision for different persons or different descriptions of person.

(7)The Authority may from time to time revise a code issued under this section and issue a revised code.

(8)A revised code may include provision for applying any of its revisions to main connection agreements made before the revised code comes into force.

110DCodes under section 110C: procedure

(1)Before issuing a code under section 110C, the Authority must—

(a)prepare a draft of the proposed code under section 110C, and

(b)consult such persons about the proposed code as it considers appropriate.

(2)The Authority must specify the period (“the consultation period”) within which a person may make representations about the proposed code.

(3)Before a code under section 110C prepared by the Authority is issued, the Minister may direct the Authority—

(a)not to issue the code, or

(b)to issue the code with specified modifications.

(4)Subsection (3) is subject to subsections (6) and (7).

(5)In subsection (3) “the Minister” means—

(a)the Secretary of State, so far as a code prepared by the Authority relates to main connection agreements under which—

(i)the main connection into a sewerage system, or

(ii)each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of another such undertaker;

(b)the Welsh Ministers, so far as a code prepared by the Authority relates to main connection agreements under which—

(i)the main connection into a sewerage system, or

(ii)each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of another such undertaker;

(c)the Secretary of State and the Welsh Ministers acting jointly, so far as a code prepared by the Authority relates to main connection agreements under which one main connection into a sewerage system is or would be—

(i)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of a sewerage undertaker whose area is wholly or mainly in Wales, or

(ii)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of a sewerage undertaker whose area is wholly or mainly in England.

(6)If the power under subsection (3) is exercised to give a direction in respect of such main connection agreements as are referred to in paragraph (a), (b) or (c) of subsection (5), it may not be exercised again in respect of such main connection agreements as are referred to in that paragraph.

(7)If the power under subsection (3) to give a direction in respect of such main connection agreements as are referred to in paragraph (a), (b) or (c) of subsection (5) is not exercised on the first occasion on which it may be so exercised, it may not be exercised in respect of such main connection agreements as are referred to in that paragraph on a later occasion.

(8)A direction under subsection (3) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code in relation to which a direction may be given may not be issued before that period of 28 days has expired.

110ECodes under section 110C: minor or urgent revisions

(1)This section applies if the Authority propose to issue a revised code under section 110C and, in the view of the Authority, the revision or each of the revisions proposed to be made is—

(a)a revision for which consultation is unnecessary, or

(b)a revision that it is necessary or desirable to make without delay.

(2)Section 110D does not apply to the revised code.

(3)Once the Authority has issued the revised code, it must give notice as soon as reasonably practicable of—

(a)the issuing of the revised code, and

(b)as regards each revision contained in it, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).

(4)Notice under subsection (3) is to be given to such persons as the Authority considers appropriate.

(5)Unless the Authority gives notice that a revision in a revised code is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised code is issued.

110FRules about charges for permitting main connections

(1)The Authority may issue rules about charges that may be imposed by a sewerage undertaker under a main connection agreement.

(2)The rules may in particular make provision about—

(a)what types of charge may be imposed;

(b)the amount or the maximum amount, or a method for determining the amount or maximum amount, of any type of charge;

(c)principles for determining what types of charge may or may not be imposed;

(d)principles for determining the amount of any charge that may be imposed;

(e)publication of the charges that may be imposed.

(3)If the Authority considers that a sewerage undertaker is not acting as required by rules under this section, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.

(4)It is the duty of a sewerage undertaker to comply with a direction under subsection (3), and this duty is enforceable by the Authority under section 18.

(5)The rules may—

(a)make different provision for different sewerage undertakers or different descriptions of sewerage undertaker;

(b)make different provision for different purposes;

(c)make provision subject to exceptions.

(6)The Authority may from time to time revise rules issued under this section and issue revised rules.

(7)The Authority must issue revised rules if—

(a)guidance is issued under section 110J, and

(b)the Authority, having regard to that guidance, considers that it is appropriate to revise the rules.

(8)Revised rules may include provision for applying any of the revisions to main connection agreements made before the revised rules come into effect.

110GRules under section 110F: provision about the reduction of charges

(1)Rules under section 110F may provide for the reduction of charges payable under a main connection agreement where conditions specified by the rules are satisfied.

(2)Rules made by virtue of subsection (1) may in particular—

(a)specify conditions by reference to any party to a main connection agreement;

(b)require that steps be taken for the purpose of reducing the cost to a sewerage undertaker of permitting a main connection into its sewerage system;

(c)specify conditions about reducing charges payable by a person who—

(i)is not party to the agreement, and

(ii)takes or proposes to take such steps as satisfy or would satisfy a condition falling within paragraph (b).

(3)The rules may provide that, where a charge falls to be reduced in accordance with rules made by virtue of subsection (1), the sewerage undertaker to which the charges are payable must give notice of that reduction to the Authority.

(4)Rules made by virtue of subsection (3) may—

(a)make provision as to the content of the notice;

(b)specify the period within which an undertaker is to give notice to the Authority.

(5)Provision under subsection (4)(a) may in particular require the notice to specify—

(a)the provision of the rules that brings about the reduction in the charge;

(b)the amount of the charge, with and without the reduction;

(c)the period for which the reduction has effect.

110HRules under section 110F: procedure

(1)Before issuing rules under section 110F, the Authority must—

(a)prepare a draft of the proposed rules, and

(b)consult such persons about the proposed rules as it thinks appropriate.

(2)The Authority must specify the period (“the consultation period”) within which persons may make representations about the proposed rules.

(3)The Authority must have regard to guidance issued under section 110J in making rules under section 110F.

(4)Before rules under section 110F prepared by the Authority are issued, the Minister may direct the Authority not to issue the rules.

(5)In subsection (4) “the Minister” means—

(a)the Secretary of State, so far as rules prepared by the Authority relate to main connection agreements under which—

(i)the main connection into a sewerage system, or

(ii)each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of another such undertaker;

(b)the Welsh Ministers, so far as rules prepared by the Authority relate to main connection agreements under which—

(i)the main connection into a sewerage system, or

(ii)each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of another such undertaker;

(c)the Secretary of State and the Welsh Ministers acting jointly, so far as rules prepared by the Authority relate to main connection agreements under which one main connection into a sewerage system is or would be—

(i)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of a sewerage undertaker whose area is wholly or mainly in Wales, or

(ii)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of a sewerage undertaker whose area is wholly or mainly in England.

(6)A direction under subsection (4) must be given within the period of 28 days beginning with the day after the end of the consultation period, and rules may not be issued before that period of 28 days has expired.

(7)This section is subject to section 110I.

110IRules under section 110F: minor or urgent revisions

(1)This section applies if the Authority proposes to issue revised rules under section 110F and, in the view of the Authority, the revision or each of the revisions proposed to be made is—

(a)a revision for which consultation is unnecessary, or

(b)a revision that it is necessary or desirable to make without delay.

(2)Section 110H does not apply to the proposed revised rules.

(3)Before issuing the revised rules, the Authority must give notice to the Minister of its intention to issue revised rules.

(4)Before the revised rules are issued, the Minister may direct the Authority not to issue the revised rules.

(5)A direction under subsection (4) must be given within the period of 14 days beginning with the day after the day on which notice is given under subsection (3), and the Authority may not issue the revised rules in question before—

(a)that period of 14 days expires, or

(b)the Minister notifies the Authority that no direction under subsection (4) will be given in relation to the revised rules,

whichever is the sooner.

(6)Once the Authority has issued the revised rules, it must give notice as soon as reasonably practicable of—

(a)the issuing of the revised rules, and

(b)as regards each revision contained in them, whether in the view of the Authority the revision falls within paragraph (a) or (b) of subsection (1).

(7)Notice under subsection (6) is to be given to such persons as the Authority considers appropriate.

(8)Unless the Authority gives notice that a revision in revised rules is in the view of the Authority a revision falling within subsection (1)(a), the revision ceases to have effect at the end of the period of six months beginning with the day after that on which the revised rules are issued.

(9)In this section “the Minister” has the meaning given by section 110H.

110JRules under section 110F: guidance

(1)The Minister may issue guidance as to the content of rules under section 110F.

(2)Before issuing the guidance, the Minister must—

(a)prepare a draft of the proposed guidance;

(b)consult the relevant persons about the draft.

(3)The relevant persons are—

(a)the Welsh Ministers;

(b)the Secretary of State;

(c)such other persons as the Minister thinks appropriate.

(4)The Minister may from time to time revise the guidance and issue revised guidance.

(5)Subsections (2) and (3) apply to revised guidance as they apply to the original guidance.

(6)The Minister must arrange for the publication of guidance issued under this section.

(7)In this section “the Minister” means—

(a)the Secretary of State, in relation to main connection agreements under which—

(i)any main connection into a sewerage system, or

(ii)each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of another such undertaker;

(b)the Welsh Ministers, in relation to main connection agreements under which—

(i)any main connection into a sewerage system, or

(ii)each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of another such undertaker;

(c)the Secretary of State and the Welsh Ministers acting jointly, in relation to main connection agreements under which one main connection into a sewerage system is or would be—

(i)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of a sewerage undertaker whose area is wholly or mainly in Wales, or

(ii)a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of a sewerage undertaker whose area is wholly or mainly in England.

(2)In sections 110B to 110J of the Water Industry Act 1991 (as substituted by subsection (1))—

(a)a reference to a main connection agreement includes a reference to an old main connection agreement, and

(b)a reference to an established undertaker, in relation to a main connection agreement, is to be construed accordingly.

(3)For the purposes of subsection (2)—

(a)old main connection agreement” means an agreement made before the coming into force of subsection (1) that is an agreement with one or more sewerage undertakers for that undertaker or each of them to permit a main connection into its sewerage system, and includes an order under old section 110A which is deemed to be an agreement by virtue of old section 110A(5);

(b)references to old section 110A are references to section 110A, as that section had effect before being substituted under subsection (1).

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources