C1PART 6Planning in England
Planning permission etc
I1152Approval condition where development order grants permission for building
1
In section 60 of the Town and Country Planning Act 1990 (permission granted by development order), after subsection (1) insert—
1A
Without prejudice to the generality of subsection (1), where planning permission is granted by a development order for building operations in England, the order may require the approval of the local planning authority, or the Secretary of State, to be obtained—
a
for those operations, or
b
with respect to any matters that relate to those operations, or to the use of the land in question following those operations, and are specified in the order.
I22
In subsection (2) of that section, after “any buildings” insert “
in Wales
”
.
I23
In subsection (2B) of that section, for “subsection (1)” substitute “
subsections (1) and (1A)
”
.
I24
In section 70A of that Act (power to decline to determine subsequent application), in subsection (5)(b), for “section 60(2)” substitute “
section 60(1A), (2)
”
.
Pts. 6, 7: power to amend conferred (26.12.2023) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 132, 255(3)(a) (with s. 247)