SCHEDULES

SCHEDULE 1Scheduled works

Construction and maintenance of works

1

1

The scheduled works must be constructed—

a

in the lines or situations shown on the deposited plans,

b

in accordance with the levels shown on the deposited sections, and

c

in the case of any station, depot or shaft for which an upper limit is shown on the deposited sections, within the limit so shown.

This is subject to sub-paragraphs (2) and (3).

2

In constructing or maintaining any of the scheduled works, the nominated undertaker may deviate—

a

laterally to any extent from the lines or situations shown on the deposited plans, within the limits of deviation so shown,

b

vertically downwards to any extent from the level shown for that work on the deposited sections, and

c

vertically upwards to any extent not exceeding 3 metres from the level shown for that work on the deposited sections, but doing so in a case mentioned in sub-paragraph (1)(c) does not increase the limit referred to in that sub-paragraph.

3

In constructing any of the scheduled works, the nominated undertaker may substitute an engineering work not shown on the deposited plans or sections for an engineering work which is so shown.

4

In sub-paragraph (3), “engineering work” includes a bridge, tunnel, viaduct, cutting or embankment.