SCHEDULES

Section 1

SCHEDULE 1U.K.Scheduled works

Construction and maintenance of worksU.K.

1(1)The scheduled works must be constructed—U.K.

(a)in the lines or situations shown on the deposited plans,

(b)in accordance with the levels shown on the deposited sections, and

(c)in the case of any station, depot or shaft for which an upper limit is shown on the deposited sections, within the limit so shown.

This is subject to sub-paragraphs (2) and (3).

(2)In constructing or maintaining any of the scheduled works, the nominated undertaker may deviate—

(a)laterally to any extent from the lines or situations shown on the deposited plans, within the limits of deviation so shown,

(b)vertically downwards to any extent from the level shown for that work on the deposited sections, and

(c)vertically upwards to any extent not exceeding 3 metres from the level shown for that work on the deposited sections, but doing so in a case mentioned in sub-paragraph (1)(c) does not increase the limit referred to in that sub-paragraph.

(3)In constructing any of the scheduled works, the nominated undertaker may substitute an engineering work not shown on the deposited plans or sections for an engineering work which is so shown.

(4)In sub-paragraph (3), “engineering work” includes a bridge, tunnel, viaduct, cutting or embankment.

Description of scheduled worksU.K.

Section 2(4)

SCHEDULE 2U.K.Works

Authority to survey and investigate land etcU.K.

1(1)The nominated undertaker may for the purposes of this Act—U.K.

(a)survey or investigate land which is within the Act limits or which may be affected by the works authorised by this Act;

(b)take steps to protect or remove any flora or fauna on land which may be affected by the works authorised by this Act.

(2)The nominated undertaker may, in connection with the exercise of the powers under sub-paragraph (1), enter—

(a)land within the Act limits, or

(b)land which may be affected by the works authorised by this Act.

(3)The land referred to in sub-paragraph (2)(a) or (b) need not be the same as the land in relation to which the powers under sub-paragraph (1) are being or are to be exercised.

(4)The power under sub-paragraph (1)(a) includes power to monitor the effectiveness of landscaping or other measures which have been taken to mitigate the adverse effects of the construction, maintenance or operation of the works authorised by this Act.

(5)The following provisions of Part 7 of the Housing and Planning Act 2016 apply in relation to the exercise of the powers conferred by sub-paragraphs (1) and (2) as they apply in relation to the exercise of the power conferred by section 172(1) of that Act to enter and survey or value land—

(6)In the application of the provisions specified in sub-paragraph (5)—

(a)references to the acquiring authority are to be read as references to the nominated undertaker;

(b)references to—

(i)a person authorised in writing by the acquiring authority, or

(ii)a person exercising or seeking to exercise the power conferred by section 172(1) of the Housing and Planning Act 2016,

are to be read as references to the nominated undertaker or (as the case may be) to a person authorised to exercise any of the powers conferred by sub-paragraphs (1) and (2) on the nominated undertaker's behalf;

(c)where the person exercising or seeking to exercise the power is the nominated undertaker, section 172(3)(a) is to be read as if it required the nominated undertaker to produce evidence of authority to exercise the power in question.

Support of buildings and apparatus etcU.K.

2(1)The nominated undertaker may support or strengthen a building within 50 metres of any of the works authorised by this Act if—U.K.

(a)it is necessary or expedient, in consequence of or for the purposes of or in connection with the construction of the work, for the building to be supported or strengthened, and

(b)the nominated undertaker gives at least 8 weeks' notice to the owners and occupiers of the building of its intention to support or strengthen it.

(2)If, within 21 days of the giving of a notice under sub-paragraph (1)(b), the person to whom the notice has been given gives to the nominated undertaker notice disputing that the condition in sub-paragraph (1)(a) is met, the dispute must be referred to arbitration.

(3)If—

(a)on a referral under sub-paragraph (2) the arbitrator decides that the condition in sub-paragraph (1)(a) is met, and

(b)one of the parties to the dispute so requires,

the arbitrator must prescribe how the supporting or strengthening is to be carried out.

(4)Where the supporting or strengthening of a building under this paragraph cannot be carried out reasonably conveniently without entering land adjacent to the building, the nominated undertaker may, on giving at least 14 days' notice to the owners and occupiers of the adjacent land, enter the land (but not any building on it) and carry out the work.

(5)In case of emergency, the power under sub-paragraph (1) or (4) is exercisable without notice.

(6)For the purpose of deciding whether or how to exercise its powers under this paragraph, the nominated undertaker may enter and survey—

(a)any building within 50 metres of any of the works authorised by this Act, or

(b)any land adjacent to such a building (but not any building on any such land).

(7)Before exercising the power under sub-paragraph (6), the nominated undertaker must give at least 14 days' notice to the owners and occupiers of the building or land of its intention to enter and survey the building or land.

(8)The nominated undertaker may, in connection with the exercise of the power under this paragraph to support or strengthen a building, place and leave (temporarily or permanently) any equipment or material in, next to or under the building or on or under land in the vicinity of the building.

3(1)The nominated undertaker may, at any time within the permitted period, further support or strengthen a building which has been supported or strengthened under paragraph 2 if—U.K.

(a)it is necessary or expedient, in consequence of or for the purposes of or in connection with the construction of any of the works authorised by this Act, for the building to be further supported or strengthened, and

(b)the nominated undertaker gives at least 8 weeks' notice to the owners and occupiers of the building of its intention further to support or strengthen it.

(2)In sub-paragraph (1), “the permitted period” is the period beginning with the completion of the supporting or strengthening under paragraph 2 and ending 5 years after the date on which the work which necessitated the supporting or strengthening was brought into general use.

(3)If, within 21 days of the giving of a notice under sub-paragraph (1)(b), the person to whom the notice has been given gives to the nominated undertaker notice disputing that the condition in sub-paragraph (1)(a) is met, the dispute must be referred to arbitration.

(4)If—

(a)on a referral under sub-paragraph (3), the arbitrator decides that the condition in sub-paragraph (1)(a) is met, and

(b)one of the parties to the dispute so requires,

the arbitrator must prescribe how the supporting or strengthening is to be carried out.

(5)Where the supporting or strengthening of a building under this paragraph cannot be carried out reasonably conveniently without entering land adjacent to the building, the nominated undertaker may, on giving at least 14 days' notice to the owners and occupiers of the adjacent land, enter the land (but not any building on it) and carry out the work.

(6)In case of emergency, the power under sub-paragraph (1) or (5) is exercisable without notice.

(7)For the purpose of deciding whether or how to exercise its powers under this paragraph, the nominated undertaker may enter and survey—

(a)any building which has been supported or strengthened under paragraph 2, or

(b)any land adjacent to such a building (but not any building on any such land).

(8)Before exercising the power under sub-paragraph (7), the nominated undertaker must give at least 14 days' notice to the owners and occupiers of the building or land of its intention to enter and survey the building or land.

(9)Paragraph 2(8) (power to place and leave equipment or material) applies for the purposes of this paragraph.

4(1)The nominated undertaker may, for a purpose mentioned in sub-paragraph (2), affix movement-measuring apparatus to a building within 50 metres of any of the works authorised by this Act on giving at least 8 weeks' notice to the owners and occupiers of the building of its intention to do so.U.K.

(2)The purposes referred to in sub-paragraph (1) are—

(a)determining the extent of any movement in the building;

(b)determining the effectiveness of support or strengthening work in respect of the building under paragraph 2 or 3.

(3)In a case where movement-measuring apparatus is to be affixed inside a building, the notice under sub-paragraph (1) must state that fact.

(4)If, within 21 days of the giving of the notice under sub-paragraph (1), the person to whom the notice has been given gives to the nominated undertaker notice objecting to the affixing of movement-measuring apparatus (generally or in relation to how or where it is affixed), the question must be referred to arbitration.

(5)Where, on a referral under sub-paragraph (4), the arbitrator decides that movement-measuring apparatus may be affixed to the building, the arbitrator must, if the nominated undertaker or the person who made the objection so requires, prescribe how or where the affixing of the apparatus is to be carried out.

(6)Where the affixing of movement-measuring apparatus under this paragraph cannot be carried out reasonably conveniently without entering land adjacent to the building, the nominated undertaker may, on giving at least 14 days' notice to the owners and occupiers of the adjacent land, enter the land (but not any building on it) and carry out the affixing.

(7)The nominated undertaker may—

(a)maintain, repair or alter the position of movement-measuring apparatus affixed under sub-paragraph (1);

(b)take readings or data from any such apparatus.

(8)In case of emergency, the power under sub-paragraph (1) or (6) is exercisable without notice.

(9)For the purpose of deciding whether or how to exercise its powers under this paragraph, the nominated undertaker may enter and survey—

(a)any building within 50 metres of any of the works authorised by this Act, or

(b)any land adjacent to such a building (but not any building on any such land).

(10)In this paragraph, “movement-measuring apparatus” means apparatus for use in measuring any movement in a building or the ground on which a building is erected.

5(1)The nominated undertaker may replace, support or strengthen apparatus belonging to a utility undertaker, or relevant pipe-line belonging to a person other than a utility undertaker, where—U.K.

(a)the apparatus or pipe-line is within 50 metres of any of the works authorised by this Act (“the relevant work”), and

(b)the conditions specified in sub-paragraph (2) are met.

(2)Those conditions are that—

(a)it is necessary or expedient, in consequence of or for the purposes of or in connection with the construction of the relevant work, for the apparatus or pipe-line to be replaced, supported or strengthened,

(b)the nominated undertaker gives at least 8 weeks' notice to the owner of the apparatus or pipe-line of its intention to replace, support or strengthen it, and

(c)where the nominated undertaker proposes to replace the apparatus or pipe-line, the replacement apparatus or pipe-line is likely to operate at least as effectively as the apparatus or pipe-line which is proposed to be replaced.

(3)Paragraphs 2(2) to (8), 3 and 4 apply to the exercise of the power under sub-paragraph (1) as they apply to the exercise of the power under paragraph 2(1), subject to the modifications specified in sub-paragraph (4).

(4)Those modifications are that—

(a)references to a building are to be read as references to the apparatus or pipe-line (and references to the support or strengthening of a building are to be read as references to the replacement, support or strengthening of the apparatus or pipe-line);

(b)references to the owners and occupiers of a building are to be read as references to the owner of the apparatus or pipe-line;

(c)references to land adjacent to a building are to be read, in the case of apparatus or a pipe-line situated below the surface of the ground, as including land above the site of the apparatus or pipe-line;

(d)in paragraph 2—

(i)the reference in sub-paragraph (2) to a notice under sub-paragraph (1)(b) is to be read as a reference to a notice under sub-paragraph (2)(b) of this paragraph,

(ii)references to the condition in sub-paragraph (1)(a) are to be read as references to the conditions in sub-paragraph (2)(a) and (if applicable) (c) of this paragraph, and

(iii)in sub-paragraph (8), the reference to placing or leaving equipment or material in, next to or under the building or on or under land in the vicinity of the building were to placing and leaving equipment or material on any land above, next to or below the site of the apparatus or pipe-line, or on or under land in the vicinity of that site.

(5)In this paragraph, “relevant pipe-line” means—

(a)a cross-country pipe-line (within the meaning of the Pipe-lines Act 1962), and

(b)a local pipe-line (within the meaning of that Act) in relation to the construction of which a direction under section 6 of that Act has or had effect.

6(1)This paragraph has effect for the purposes of paragraphs 2 to 5.U.K.

(2)Building” includes any structure.

(3)A building (or, in the case of paragraph 5, apparatus or pipe-line) is within 50 metres of a work if all or part of it is within that distance.

(4)In the case of a work under the surface of the ground, a reference to a building (or, in the case of paragraph 5, apparatus or pipe-line) within 50 metres of that work includes a reference to a building (or apparatus or pipe-line) all or part of which is within 50 metres of any point on the surface below which the work is situated.

Trees on neighbouring landU.K.

7(1)This paragraph applies where—U.K.

(a)a tree overhangs land used for Phase 2a purposes, or

(b)the roots of a tree encroach on such land.

(2)The nominated undertaker may by notice to the occupier of the land on which the tree is growing (a “tree works notice”) require the tree to be removed, topped or lopped, or its roots to be cut back, if it is necessary for that to be done—

(a)to enable works authorised by this Act to be constructed or maintained, or

(b)for reasons of safety in connection with such works or the operation of Phase 2a of High Speed 2.

(3)The person to whom a tree works notice is given may object to the notice by giving the nominated undertaker a counter-notice to that effect before the end of 28 days beginning with the day on which the tree works notice is given.

(4)If a counter-notice is given, the tree works notice has no effect unless confirmed by an order of the county court.

(5)The nominated undertaker may carry out the works required by a tree works notice if the notice has been in effect for a continuous period of at least 28 days and has not been complied with.

(6)Where the power under sub-paragraph (5) is exercisable, the nominated undertaker may, after giving 7 days' notice to the occupier of the land on which the tree concerned is growing, enter the land for the purpose of exercising the power in relation to it.

(7)If the nominated undertaker tops or lops a tree, or cuts back the roots of a tree, in exercise of the power under sub-paragraph (5), it must do so—

(a)in accordance with good arboricultural practice, and

(b)in such a way as to cause the minimum of damage to the tree.

(8)The following do not apply to works required by a tree works notice—

(a)an order under section 198(1) or 202(1) of TCPA 1990 and regulations under section 202A(1) of that Act (tree preservation orders);

(b)section 211(1) and (5) of that Act (preservation of trees in conservation areas).

(9)On application by a person who has incurred expenses in complying with a tree works notice, the county court must order the nominated undertaker to pay the person such compensation in respect of the expenses as the court thinks fit.

Exercise of powers of entry under paragraphs 2 to 7U.K.

8(1)This paragraph applies where the nominated undertaker has a power to enter land under any provision of paragraphs 2 to 7.U.K.

(2)The following provisions of Part 7 of the Housing and Planning Act 2016 (compulsory purchase etc) apply in relation to the exercise of the power as they apply in relation to the exercise of the power conferred by section 172(1) of that Act to enter and survey or value land—

(3)The following modifications have effect for the purposes of the application of the provisions of the Housing and Planning Act 2016 specified in sub-paragraph (2)—

(a)references to the acquiring authority are to be read as references to the nominated undertaker;

(b)references to—

(i)a person authorised in writing by the acquiring authority, or

(ii)a person exercising or seeking to exercise the power conferred by section 172(1) of the Housing and Planning Act 2016,

are to be read as references to the nominated undertaker or (as the case may be) to a person authorised to exercise the power on the nominated undertaker's behalf;

(c)where the person exercising or seeking to exercise the power is the nominated undertaker, section 172(3)(a) is to be read as if it required the nominated undertaker to produce evidence of authority to enter the land;

(d)the reference in section 174(4) to a notice given in accordance with section 174(1) is to be read as a reference to the notice required in relation to the exercise of the power of entry in question (and the reference in section 175(1)(b) to the notice period mentioned in section 174(1) is to be construed accordingly);

(e)references in section 175(3) to a survey are to be read as including references to the activity for the purposes of which the nominated undertaker has the power to enter land.

Noise mitigation for buildingsU.K.

9(1)The nominated undertaker may carry out noise mitigation works in respect of a building if it is necessary or expedient to do so in consequence of, for the purposes of or in connection with the construction or operation of any of the works authorised by this Act.U.K.

(2)Noise mitigation works” means works for the purpose of mitigating the effects of noise caused, or expected to be caused, by the construction or operation of any of the works authorised by this Act.

(3)The nominated undertaker must not exercise the power under sub-paragraph (1) without the consent of the owners and occupiers of the building.

Discharge of waterU.K.

10(1)The nominated undertaker may use any watercourse or any public sewer or drain for the drainage of water for the purposes of or in connection with the construction or maintenance of the works authorised by this Act and for that purpose—U.K.

(a)may lay down, take up and alter pipes, and

(b)on any land within the Act limits, may make connections with the watercourse, sewer or drain.

(2)The nominated undertaker must not discharge any water into any public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as that person may reasonably impose, but must not be unreasonably withheld.

(3)The nominated undertaker must not make any opening into any public sewer or drain except—

(a)in accordance with plans approved by the person to whom the sewer or drain belongs, such approval not to be unreasonably withheld; and

(b)where that person has been given the opportunity to supervise the making of the opening.

(4)The nominated undertaker must not, in the exercise of the powers under this paragraph, damage or interfere with the beds or banks of any watercourse forming part of a main river.

(5)The nominated undertaker must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain under the powers under this paragraph is as free as may be practicable from gravel, soil or other solid substance or oil or matter in suspension.

(6)Any dispute as to the giving of consent under this paragraph must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State.

(7)In this paragraph—

(a)public sewer or drain” means a sewer or drain which belongs to a sewerage undertaker, the Environment Agency, the Homes and Communities Agency, an internal drainage board, a local authority, a joint planning board, an urban development corporation or a harbour authority within the meaning of the Harbours Act 1964;

(b)watercourse” includes a river, stream, ditch, drain, cut, culvert, dyke, sluice, sewer or passage through which water flows, except a public sewer or drain;

(c)other expressions used both in this paragraph and in the Water Resources Act 1991 have the same meaning as in that Act.

Temporary interference with waterwaysU.K.

11(1)The powers under this paragraph are exercisable in relation to the following waterways for the purposes of or in connection with the works authorised by this Act—U.K.

(2)The nominated undertaker may—

(a)temporarily interfere with a waterway mentioned in sub-paragraph (1) at any point within the Act limits by constructing or maintaining such temporary works, or by carrying out such dredging works, as it considers necessary or expedient;

(b)temporarily moor or anchor barges or other vessels or craft in a waterway mentioned in sub-paragraph (1);

(c)temporarily close a waterway mentioned in sub-paragraph (1), or a part of such a waterway, to navigation.

(3)The power under sub-paragraph (2)(c) must be exercised in a way which secures—

(a)that no more of the waterway is closed to navigation at any time than is necessary in the circumstances, and

(b)that, if complete closure of the waterway to navigation becomes necessary, all reasonable steps are taken to secure that the minimum obstruction, delay or interference is caused to vessels or craft which may be using or intending to use it.

(4)The nominated undertaker is not liable for any loss suffered, or costs or expenses incurred, by any person as a direct or indirect result of any interference in accordance with this paragraph with a public right of navigation.

(5)The nominated undertaker must compensate any person who suffers loss as a result of any interference in accordance with this paragraph with a private right of navigation.

(6)Any dispute as to a person's entitlement to compensation under sub-paragraph (5), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

Electronic communications apparatusU.K.

12(1)The nominated undertaker may, in installing any electronic communications apparatus in exercise of the powers conferred by this Act—U.K.

(a)provide additional capacity for electronic communications apparatus belonging to any other person;

(b)construct any extension or other alteration of electronic communications apparatus in connection with providing such additional capacity.

(2)In sub-paragraph (1), “electronic communications apparatus”—

(a)has the meaning given by paragraph 5(1) of Schedule 3A to the Communications Act 2003, but

(b)excludes any radio mast.

Section 2(5)

SCHEDULE 3U.K.Overhead line diversions

(1)(2)(3)
AreaOverhead line to be taken downNew overhead line to be provided
County of StaffordshireDistrict of LichfieldParish of Kings BromleyOverhead electric line to be taken down between points E1, E2, E3 (on Replacement Sheet No. 1-06), points E4, E5 and E6 (on Replacement Sheet No. 1-05), points E7, E8, E9 (on Replacement Sheet No. 1-08) and point E10 (on Sheet No. 1-09)Temporary overhead electric line to be provided on land within Act limits between points E1, E2, E3 (on Replacement Sheet No. 1-06), points E4, E5B, E6 (on Replacement Sheet No. 1-05) points E7, E8, E9 (on Sheet No. 1-08) and point E10 (on Sheet No. 1-09)
New permanent electric line to be provided on land within Act limits overhead between points E1, E2, E3 (on Replacement Sheet No. 1-06), points E4, E5A, E6 (on Replacement Sheet No. 1-05) points E7, E8, E9 (on Sheet No. 1-08) and point E10 (on Sheet No. 1-09)
Parishes of Colton and ColwichOverhead electric line to be taken down between points E1 (on Sheet No. 1-20) and E10 (on Sheet No. 1-21)Temporary overhead electric line to be provided on land within Act limits between points E1, E4, E6 (on Sheet No. 1-20), E9 (on Sheets Nos. 1-20 and 1-21) and E10 (on Sheet No. 1-21) and between points E1, E3, E5 (on Sheet No. 1-20), E7 and E10 (on Sheet No. 1-21)
New permanent electric line to be provided on land within Act limits overhead between points E1 and E2, buried underground between points E2 and E8 and overhead between points E8 and E10
Borough of East Staffordshire, Parishes of Hoar Cross and NewboroughOverhead electric line to be taken down between points E1, E2 (on Sheet No. 1-15F) and E3 (on Sheet No. 1-15G)Temporary overhead electric line to be provided on land within Act limits between points E1, E4 (on Sheet No. 1-15F) and E3 (on Sheet No. 1-15G)
New pemanent electric line to be provided on land within Act limits between points E1, E5 (on Sheet No. 1-15F), E6 and E3 (on Sheet No. 1-15G)
Borough of StaffordParishes of Stone Rural and SwynnertonOverhead electric line to be taken down between points E1, E2, E4, E6 (on Sheet No. 1-41) and E7 (on Sheet No. 1-42)New permanent electric line to be provided on land within Act limits overhead between points E1 and E3 (on Sheet No. 1-41), buried underground between points E3 and E5 (on Sheet No. 1-41) and overhead between points E5 (on Sheet No. 1-41) and E7 (on Sheet No. 1-42)
Parish of SwynnertonOverhead electric line to be taken down between points E1, E2, E3 (on Sheet No. 1-46) and E4 (on Sheet No. 1-47)Electric line to be provided on land within Act limits overhead between points E1 and E2 (on Sheet No. 1-46), buried underground between points E2 and E3 (on Sheet No. 1-46) and overhead between points E3 (on Sheet No. 1-46) and E4 (on Sheet No. 1-47)
County of Cheshire Borough of Cheshire EastParishes of Checkley cum Wrinehill, Blakenhall and ChorltonOverhead electric lines to be taken down between points E1, E2 (on Replacement Sheet No. 1-58) points E3A, E3, E4, E5, E6, E7, E8 (on Replacement Sheet No. 1-59) and points E9, E10, E11, E12 and E13 (on Replacement Sheet No. 1-60)New permanent electric line to be provided on land within Act limits overhead between points E1 and E2A (on Replacement Sheet No. 1-58) buried underground between point E2A (on Replacement Sheet No. 1-58) and E6A (on Replacement Sheet No. 1-59) overhead between points E6A, E7, E8 (on Replacement Sheet No. 1-60) buried underground between E9A and E12A (on Replacement Sheet No. 1-60) and overhead between points E12A and E13 (on Replacement Sheet No. 1-60)

Section 3(2)

SCHEDULE 4U.K.Highways

PART 1 U.K.Highway access

1(1)The nominated undertaker may, for Phase 2a purposes—U.K.

(a)form and lay out means of access, and

(b)improve existing means of access,

at any place within the Act limits.

(2)In the case of works at a place shown on the deposited plans which require the opening of an access on to, or the alteration of, a highway used by vehicular traffic, the power under sub-paragraph (1) is exercisable on giving at least 28 days' notice to the highway authority.

(3)Works which are the subject of a notice under sub-paragraph (2) may not be carried out at the place shown on the deposited plans if, within 28 days of the giving of the notice, the highway authority objects to the works being carried out there by giving the nominated undertaker notice to that effect.

(4)The only ground on which the highway authority may object under sub-paragraph (3) is that works under sub-paragraph (1) should be carried out instead at another place within the Act limits to prevent or reduce—

(a)injury to local amenity, or

(b)prejudicial effects on road safety or on the free flow of traffic in the local area,

and are reasonably capable of being carried out there.

(5)If, in the case of works under sub-paragraph (1) at a place shown on the deposited plans, the works require the opening of an access on to, or the alteration of, a highway used by vehicular traffic, they must be carried out in accordance with plans and specifications approved by the highway authority at the request of the nominated undertaker.

(6)The only ground on which the highway authority may refuse to approve plans or specifications for the purposes of sub-paragraph (5) is that they ought to be modified to prevent or reduce—

(a)injury to local amenity, or

(b)prejudicial effects on road safety or on the free flow of traffic in the local area,

and are reasonably capable of being so modified.

(7)Works under sub-paragraph (1) may only be carried out at a place not shown on the deposited plans if the highway authority consents to the siting of the works; and such consent is not to be unreasonably withheld.

(8)Works under sub-paragraph (1) at a place not shown on the deposited plans must be carried out in accordance with plans and specifications approved by the highway authority at the request of the nominated undertaker; and such approval is not to be unreasonably withheld.

(9)In considering whether to give consent for the purposes of sub-paragraph (7), or approval for the purposes of sub-paragraph (8), in a case where the works require the opening of an access on to, or the alteration of, a highway used by vehicular traffic, the highway authority must have regard in particular to effects on road safety and on the free flow of traffic in the local area.

(10)If, on application by the nominated undertaker for the approval of plans or specifications under sub-paragraph (5) or (8), the highway authority fails to notify the nominated undertaker of its decision on the application before the end of 28 days beginning with the date on which the application was made, it is to be treated as having approved the plans or specifications as submitted.

(11)If a highway authority which receives an application for consent under sub-paragraph (7) fails to notify the applicant of its decision on the application before the end of 28 days beginning with the date on which the application was made, it is to be treated as having granted it.

(12)Where an objection under sub-paragraph (3) leads to the carrying out of works under sub-paragraph (1) at a place not shown on the deposited plans, sub-paragraphs (5), (7) and (8) have effect in relation to the works as if the place were shown on the deposited plans.

(13)Any dispute with a highway authority under this paragraph must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State.

PART 2 U.K.Interference with highways

Stopping upU.K.

2(1)The nominated undertaker may, for the purposes of or in connection with the construction of the works authorised by this Act, stop up each highway or part of a highway specified in table 1 or 2 in Schedule 5.U.K.

(2)Where a highway or part of a highway is specified in table 1 in Schedule 5, it may not be stopped up under sub-paragraph (1) unless all of the land which abuts on it falls within one or more of the following categories, namely—

(a)land to which there is no right of access directly from the highway or part to be stopped up;

(b)land to which there is reasonably convenient access otherwise than directly from the highway or part to be stopped up;

(c)land the owners and occupiers of which have agreed to the stopping up of the highway or part;

(d)land which is in the possession of the Secretary of State.

(3)Where a highway or part of a highway is specified in columns (1) and (2) of table 2 in Schedule 5—

(a)it may not be stopped up under sub-paragraph (1) until the date on which the new highway to be provided in substitution for the highway or part, as specified in column (3) of table 2, is first open for public use, but

(b)the nominated undertaker may, at any time before that date, temporarily stop up so much of the highway or part as is within the Act limits for the purposes of or in connection with the provision of the new highway to be provided in substitution for the highway or part.

(4)Before exercising the power conferred by sub-paragraph (3)(b) in relation to a highway or part of a highway, the nominated undertaker must consult the highway authority.

(5)The purpose of consultation under sub-paragraph (4) is to ensure public safety and, so far as reasonably practicable, to reduce public inconvenience.

(6)Where a new highway specified in column (3) of table 2 in Schedule 5 is provided in exercise of the powers conferred by this Act, the date on which the new highway is first open for public use is to be taken for the purposes of sub-paragraph (3) to be—

(a)where a date has been determined in relation to the highway under paragraph 17(6), the date so determined, and

(b)where it has not, the date certified under paragraph 17(5).

(7)There is no need to reinstate a highway or part of a highway in relation to which the power conferred by sub-paragraph (3)(b) has been exercised where the exercise of the power comes to an end on the exercise, in relation to the highway or part, of the power under sub-paragraph (1).

3(1)The nominated undertaker may, for the purposes of or in connection with the construction of the works authorised by this Act, stop up a bridleway or footpath, or part of a bridleway or footpath, where—U.K.

(a)the bridleway or footpath (or part) is within the Act limits, and

(b)there is no power under paragraph 2 to stop up the bridleway or footpath (or part).

(2)The power under sub-paragraph (1) may not be exercised unless the proposed stopping up has been confirmed by the appropriate Ministers on application by the nominated undertaker.

(3)The appropriate Ministers must grant an application under sub-paragraph (2) if, but only if, they are satisfied—

(a)that an alternative bridleway or footpath has been provided,

(b)that an alternative bridleway or footpath will be provided before the proposed stopping up takes place, or

(c)that the provision of an alternative bridleway or footpath is not required.

(4)Where the appropriate Ministers grant an application under sub-paragraph (2), they must notify the nominated undertaker of the basis on which the application is granted.

(5)Where an application under sub-paragraph (2) is granted on the basis that an alternative bridleway or footpath will be provided, the proposed stopping up may not take place until the alternative has been provided.

(6)Before making an application under sub-paragraph (2), the nominated undertaker must publish in at least one local newspaper circulating in the relevant area a notice—

(a)specifying—

(i)the bridleway or footpath, or part, proposed to be stopped up,

(ii)what, if any, alternative bridleway or footpath is proposed, and

(iii)if no alternative is proposed, the reasons why,

(b)specifying a place in the relevant area where a map or plan illustrating the proposals may be inspected by any person free of charge at all reasonable hours during a period of 28 days from the date of the publication of the notice (“the publication date”),

(c)stating that any person may within that period make representations about confirmation under sub-paragraph (2) of the proposed stopping up, and

(d)specifying the manner in which such representations may be made.

(7)Not later than the publication date, the nominated undertaker must—

(a)give a copy of the notice, together with any map or plan to which it refers, to every local authority whose area includes any of the land on which the bridleway or footpath, or part, proposed to be stopped up is situated, and

(b)cause a copy of the notice to be displayed in a prominent position at the ends of the bridleway or footpath, or part, proposed to be stopped up.

(8)Before granting an application under sub-paragraph (2), the appropriate Ministers must consider any representations made to them in accordance with the nominated undertaker's notice which have not been withdrawn.

(9)Unless they direct otherwise, the appropriate Ministers' functions in relation to an application under sub-paragraph (2) must, instead of being carried out by them, be carried out by a person appointed by them for the purpose.

(10)In sub-paragraph (6), references to the relevant area are to the area in which the bridleway or footpath, or part, proposed to be stopped up is situated.

(11)In sub-paragraph (7)(a), “local authority” means—

(a)the council of a county, district or parish,

(b)a joint authority established by Part 4 of the Local Government Act 1985,

(c)a housing action trust established under Part 3 of the Housing Act 1988, and

(d)the parish meeting of a rural parish not having a separate parish council.

(12)In this paragraph, references to the appropriate Ministers are to the Secretary of State for Transport and the Secretary of State for Environment, Food and Rural Affairs and, in relation to the carrying out of any functions, are to those Ministers acting jointly.

Effect of stopping up of highwayU.K.

4(1)On a highway or part of a highway being stopped up under paragraph 2(1) or 3—U.K.

(a)all rights of way over or along it are extinguished, and

(b)the Secretary of State may appropriate and use, without making any payment, so much of the site of it as is bounded on both sides by land owned by the Secretary of State.

(2)The nominated undertaker must compensate any person who suffers loss by the extinction under this paragraph of a private right of way.

(3)Any dispute as to a person's entitlement to compensation under sub-paragraph (2), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(4)The Secretary of State is not entitled to any mines or minerals under land which the Secretary of State is entitled to appropriate and use under sub-paragraph (1)(b), with the exception of minerals necessarily extracted or used in the construction of the undertaking which the nominated undertaker is authorised to carry on by this Act.

(5)Part 3 of Schedule 2 to the Acquisition of Land Act 1981 (regulation of the working of mines or minerals underlying an authorised undertaking) has effect in relation to the working of any mines or minerals underlying land which the Secretary of State is entitled to appropriate and use under sub-paragraph (1)(b) as if—

(a)references to the undertaking were to the undertaking which the nominated undertaker is authorised to carry on by this Act,

(b)in paragraphs 3 to 5 and 7 to 9, references to the acquiring authority were to the nominated undertaker, and

(c)in paragraph 6, the first reference to the acquiring authority were to the nominated undertaker.

Creation of public rights of way over new footpaths, bridleways etcU.K.

5(1)This paragraph applies where a footpath, bridleway or other kind of way specified in column (3) of table 2 in Schedule 5 (substitute highways) or in table 3 in that Schedule (new rights of way) is provided in exercise of the powers conferred by this Act.U.K.

(2)A public right of way of the kind specified in column (3) of table 2 or in table 3 in Schedule 5 (as the case may be) is created on the date on which the footpath, bridleway or other way is first open for public use.

(3)Section 28 of the Highways Act 1980 (compensation for loss suffered by landowner) applies as if the public right of way created by virtue of sub-paragraph (2) had been created by an order under section 26 of that Act (public path creation orders).

(4)In its application by virtue of sub-paragraph (3), section 28 of that Act has effect as if it were modified as follows—

(a)in subsection (1), for “the authority by whom the order was made” there were substituted “ the Secretary of State ”;

(b)for subsection (2) there were substituted—

(2)A claim for compensation under this section must be made by notice in writing to the Secretary of State before the end of the period of 6 months beginning with the day on which the public right of way first becomes exercisable.;

(c)subsection (3) were omitted.

(5)In its application to a claim under section 28 of that Act (as applied by virtue of sub-paragraph (3)), section 307 of that Act (determination of disputes as to compensation) has effect as if, in subsection (2), for “the authority from whom the compensation in question is claimed” there were substituted “ the Secretary of State ”.

(6)For the purposes of sub-paragraph (2), the date on which a path or way is first open for public use is to be taken to be—

(a)where a date has been determined in relation to the path or way under paragraph 17(6), the date so determined, and

(b)where it has not, the date certified under paragraph 17(5).

Deviation of new footpaths, bridleways etcU.K.

6(1)This paragraph applies where the nominated undertaker, in exercise of the powers conferred by this Act, provides a footpath, bridleway or other kind of way which is specified in column (3) of table 2 in Schedule 5 (substitute highways) or in table 3 in that Schedule (new rights of way).U.K.

(2)In providing the path or way, the nominated undertaker may deviate laterally to any extent from the lines shown on the deposited plans, within the limits shown on those plans (and references in this Part of this Schedule to a highway specified in column (3) of table 2 or in table 3 in Schedule 5 are to be construed accordingly).

Permanent obstructionU.K.

7(1)The powers under section 2(1), (3) and (5) may be exercised in such a way as to obstruct the highway, but only with the consent of the highway authority, such consent not to be unreasonably withheld.U.K.

(2)Any dispute with a highway authority under sub-paragraph (1) must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State.

(3)If a highway authority which receives an application for consent under sub-paragraph (1) fails to notify the applicant of its decision on the application before the end of 28 days beginning with the date on which the application was made, it is to be treated as having granted it.

Temporary interferenceU.K.

8(1)For the purposes of the works authorised by this Act, the nominated undertaker may—U.K.

(a)temporarily stop up or alter or divert any highway or part of a highway;

(b)for any reasonable time divert traffic from, and prevent persons passing along, any highway or part of a highway;

(c)break up or interfere with any highway or part of a highway (including any sewer, drain or tunnel in it);

(d)temporarily remove any street furniture in or beside a highway.

(2)The nominated undertaker must provide reasonable access for pedestrians going to or from premises abutting on a highway affected by the exercise of the powers under sub-paragraph (1)(a) to (c) if there would otherwise be no such access.

(3)Before exercising the powers under sub-paragraph (1) in relation to a highway, and to an extent, specified in table 4 in Schedule 5, the nominated undertaker must consult the relevant authority.

(4)The purpose of consultation under sub-paragraph (3) is to ensure public safety and, so far as reasonably practicable, to reduce public inconvenience.

(5)Before exercising the powers under sub-paragraph (1) in relation to a highway, or to an extent, not specified in table 4 in Schedule 5, the nominated undertaker must obtain the consent in writing of the relevant authority.

(6)Consent under sub-paragraph (5) must not be unreasonably withheld, but may be given subject to such conditions as the relevant authority may reasonably require in the interest of public safety or convenience.

(7)If a relevant authority which receives an application for consent under sub-paragraph (5) fails to notify the applicant of its decision on the application before the end of 28 days beginning with the date on which the application was made, it is to be treated as having granted the application.

(8)Any dispute with a relevant authority about consent under sub-paragraph (5) must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State.

(9)There is no need to reinstate a highway or part of a highway in relation to which any of the powers under sub-paragraph (1)(a) to (c) has been exercised where the exercise of the power comes to an end on the exercise, in relation to the highway or part, of the power under paragraph 2(1) or 3(1).

(10)In this paragraph—

Street worksU.K.

9(1)The nominated undertaker may, for the purposes of the works authorised by this Act, enter upon any highway within the Act limits and—U.K.

(a)place, maintain or alter, or change the position of, apparatus in it,

(b)remove apparatus from it, and

(c)execute any works required for, or incidental to, any works authorised by paragraph (a) or (b).

(2)In this paragraph, “apparatus” has the same meaning as in Part 3 of the New Roads and Street Works Act 1991.

10(1)Works executed under this Act in relation to a highway which consists of or includes a carriageway are to be treated for the purposes of Part 3 of the New Roads and Street Works Act 1991 (street works) as major transport works if—U.K.

(a)they are of a description mentioned in section 86(3)(a), (c) to (e), (g) or (h) of that Act (which defines what highway authority works are major highway works), or

(b)they are works which, had they been executed under the powers of the highway authority, might have been carried out in exercise of the powers under section 64 (dual carriageways and roundabouts) or 184 (vehicle crossings over footways and verges) of the Highways Act 1980.

(2)Sub-paragraph (1) does not apply to works executed under powers delegated to a highway authority by an agreement under paragraph 14(2) of this Schedule (construction delegation agreements).

Working sites in highwaysU.K.

11U.K.Any highway or part of a highway which is stopped up under paragraph 2(3)(b) or 8(1)(a) may be used as a working site if it is within the Act limits.

PART 3 U.K.Construction and maintenance of highways

Construction and alterationU.K.

12(1)Where under this Act the nominated undertaker—U.K.

(a)constructs a new highway, or

(b)alters a highway, otherwise than by carrying out street works within the meaning of Part 3 of the New Roads and Street Works Act 1991,

the construction or alteration must be completed to the reasonable satisfaction of the highway authority.

(2)Where work mentioned in sub-paragraph (1) has been completed to the reasonable satisfaction of a highway authority, it must certify that fact in writing to the nominated undertaker.

(3)If the nominated undertaker requests a highway authority to issue a certificate under sub-paragraph (2) and the highway authority does not before the end of the period of 28 days beginning with the date on which the request was made—

(a)issue a certificate under that sub-paragraph, or

(b)notify the nominated undertaker of its decision to refuse to issue such a certificate,

it is to be treated as having issued such a certificate at the end of that period.

(4)Any dispute with a highway authority under this paragraph must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State.

13(1)Sub-paragraph (2) applies where under this Act the nominated undertaker—U.K.

(a)constructs a new highway which is constituted by or comprises a carriageway, or

(b)realigns a highway which is constituted by or comprises a carriageway.

(2)The construction or realignment must be carried out in accordance with plans, sections and specifications approved by the highway authority at the request of the nominated undertaker; and such approval is not to be unreasonably withheld.

(3)Any dispute with a highway authority under sub-paragraph (2) must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State.

(4)If, on application by the nominated undertaker for the approval of plans, sections or specifications under sub-paragraph (2), the highway authority fails to notify the nominated undertaker of its decision on the application before the end of 28 days beginning with the date on which the application was made, it is to be treated as having approved the plans, sections or specifications as submitted.

14(1)Where under this Act the nominated undertaker is authorised to stop up or interfere with an existing highway or part of an existing highway, it may enter into an agreement with the controllers of the highway concerning the construction (or contribution towards the expenses of construction) of—U.K.

(a)any new highway to be provided in substitution,

(b)any alteration of the existing highway, and

(c)any related matters.

(2)Where the nominated undertaker has entered into an agreement under sub-paragraph (1) with the controllers of an existing highway, the nominated undertaker may, by agreement with them, delegate to them the power of constructing—

(a)any new highway to be provided in substitution, or

(b)any alteration of the existing highway,

including any bridge over any railway.

(3)Works executed by the controllers of an existing highway under a delegation agreement under sub-paragraph (2) which could have been carried out by them under section 64 or 184 of the Highways Act 1980 are to be treated for the purposes of section 86(3) of the New Roads and Street Works Act 1991 as having been so carried out by them.

(4)References in this paragraph to the controllers of a highway are to the persons having the charge, management or control of it.

15(1)This paragraph applies in relation to a work authorised by this Act which appears to the Secretary of State to constitute—U.K.

(a)the construction of an extension to a trunk road or special road, or

(b)the realignment of a trunk road or special road.

(2)The Secretary of State may by regulations made by statutory instrument provide that the highway comprising the extension or realignment is to become a trunk road or special road (or both) as from a date—

(a)specified in the regulations, or

(b)if the regulations so provide, specified in an instrument in writing after the making of the regulations.

(3)Where, under regulations under this paragraph, a highway becomes a special road—

(a)the regulations must specify the special road authority for the highway,

(b)the highway is to be regarded as provided by the specified special road authority under a scheme under section 16 of the Highways Act 1980 made on the day the regulations are made, and

(c)the highway is to be regarded as so provided for the use of traffic of such classes referred to in Schedule 4 to that Act as may be provided for in the regulations (and the regulations may make different provision for different parts of the highway).

(4)Provision under sub-paragraph (3)(c) may be expressed by reference to classes of traffic which are at any time authorised under a scheme under section 16 of the Highways Act 1980 in relation to the road of which the highway is a realignment or extension.

Roads constructed as highwaysU.K.

16(1)This paragraph applies where under this Act the nominated undertaker constructs a road as a highway.U.K.

(2)The resulting highway is created on the date on which the road is first open for public use.

(3)For the purposes of sub-paragraph (2), the date on which the road is first open for public use is the date on which the resulting highway is taken to be first open for public use for the purposes of paragraph 17(2).

(4)Where the resulting highway is a temporary highway, it ceases to be a highway on the day after the date on which the road is last open for public use.

(5)For the purposes of sub-paragraph (4), the date on which the road is last open for public use is to be taken to be the date notified by the nominated undertaker, in accordance with sub-paragraph (6), to the highway authority as being the date on which the road is to be last open for public use.

(6)The notification must be given to the highway authority by the nominated undertaker at least 28 days before the date on which the road is to be last open for public use.

MaintenanceU.K.

17(1)Sub-paragraph (2) applies where under this Act the nominated undertaker—U.K.

(a)provides a new highway, or

(b)alters a highway, otherwise than by carrying out street works within the meaning of Part 3 of the New Roads and Street Works Act 1991.

(2)The new or altered highway must be maintained by and at the expense of the nominated undertaker for a period of 12 months from—

(a)the date of practical completion, or

(b)if later, the date on which it is first open for public use;

and after the end of that period must be maintained by and at the expense of the highway authority.

(3)Sub-paragraph (2) is subject to—

(a)any agreement between the nominated undertaker and the highway authority as to alternative arrangements relating to the maintenance of the highway, and

(b)sub-paragraph (4), in respect of a period for which the nominated undertaker is under a duty to maintain the highway.

(4)Unless otherwise agreed between the highway authority and the nominated undertaker, the highway authority must ensure, so far as reasonably practicable, that safe passage along the new or altered highway is not endangered by snow or ice.

(5)Where the highway authority is satisfied that a highway mentioned in sub-paragraph (2) is practically complete or is open for public use, it must, at the request of the nominated undertaker, certify to it in writing the date of practical completion of the highway or, as the case may be, the date on which it was first open for public use.

(6)If the highway authority refuses a request to issue a certificate under sub-paragraph (5), or if the nominated undertaker disputes the date given in a certificate under that sub-paragraph, the matter must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State.

(7)For the purposes of sub-paragraph (2), the date of practical completion of a highway, or the date on which it is first open for public use, is to be taken to be—

(a)where the date has been determined under sub-paragraph (6), the date so determined, and

(b)where it has not, the date certified under sub-paragraph (5).

(8)Sub-paragraph (2) does not have effect to impose any obligation in relation to—

(a)the structure of any bridge carrying a highway over any railway of the nominated undertaker, or

(b)the structure of any tunnel carrying a highway under any such railway.

(9)Nothing in this paragraph affects the operation of section 87 of the New Roads and Street Works Act 1991.

18U.K.Where the nominated undertaker is responsible for maintaining a bridge carrying either of the following over a railway—

(a)a new highway constructed under this Act, or

(b)a highway altered under this Act,

the nominated undertaker may, by agreement with the persons having the charge, management or control of the highway, delegate to them the function of maintaining the bridge.

19U.K.Section 58(1) and (2) of the Highways Act 1980 (special defence in action against highway authority for damages for non-repair of highway) applies to an action against the nominated undertaker in respect of damage resulting from its failure to maintain a highway under paragraph 17(2) or (3)(a) as it applies to an action against a highway authority as mentioned in section 58(1) of that Act (and references in section 58(1) and (2) to the highway authority are to be read accordingly).

20U.K.Notwithstanding anything in section 46 of the Railways Clauses Consolidation Act 1845, as incorporated with this Act (see paragraph 4 of Schedule 28 to this Act), the nominated undertaker is not liable to maintain the surface of any highway under or over which the scheduled works are constructed, or the immediate approaches to any such highway.

Bridges carrying highwaysU.K.

21U.K.Each of sections 116 and 117 of the Transport Act 1968 (duties as respects bridges carrying highways over railways) has effect as if the nominated undertaker were one of the boards mentioned in the section in question.

Section 3(3)

SCHEDULE 5U.K.Highways: tables relevant to Part 2 of Schedule 4

TABLE 1

(1)(2)
AreaHighway or part to be stopped up

County of Staffordshire

District of Lichfield

Parish of Kings Bromley

Common Lane between points P6 and P7
Footpath Kings Bromley 12 between points P1a and P1
Parishes of Mavesyn Ridware and ColtonHadley Gate Lane between points P5 and P11
Parish of ColtonByway Open to all Traffic Colton 16 between points P5 (on Sheet No. 1-14) and P11 (on Sheet No. 1-15)
Footpath Colton 52 between points P10 and P9

Borough of Stafford

Parish of Colwich

Bridleway Colwich 58 within the limits of deviation of Work No. 17
Parish of SwynnertonBridleway Swynnerton 54 between points P11 and P12
Stab Lane between points P10 and P14
Bottom Lane between points P15 (on Sheet No. 1-43) and P2 (on Sheet No. 1-44)

County of Cheshire

Borough of Cheshire

East Parish of Chorlton

Footpath Chorlton 13 between points P12 and P13
Footpath Chorlton 17 between points P6 and P7
Footpath Chorlton 11 between points P7 and P15
Footpath Chorlton 12 between points P2 and P3
Parish of BasfordFootpath Basford 5 between points P8 and P15

TABLE 2

NOTE: References in column (3) of table 2 to a footpath or bridleway include any highway over which members of the public have, or are to have, a right of way on foot and (in the case of a bridleway) on horseback or leading a horse, whether or not with any other public rights of way.

(1)(2)(3)
AreaHighway or part to be stopped upNew highway to be provided in substitution

County of Staffordshire

District of Lichfield

Parish of Kings Bromley

Crawley Lane within the limits of deviation of Work No. 6Work No. 6
Crawley Lane within the limits of deviation of Work No. 6AWork No. 6A
Crawley Lane within the limits of deviation of Work No. 6BWork No. 6B
A515 Lichfield Road between points P12 and P16 (on Sheet No. 1-05) and between points P17 (on Sheet No. 1-05) and P13 (on Sheet No. 1-06)Work No. 7
Common Lane betwen points P6 and P6aWork No. 7D
A515 Lichfield Road within the limits of deviation of Work No. 7FWork No. 7F
Wood End Land within the limits of deviation of Work No. 7GWork No. 7G
A515 Lichfield Road between points P14 (on Sheet No. 1-08) and P15 (on Sheet No. 1-05)Work No. 8 (part)
Footpath Kings Bromley 0.390 between points P3 and P5Footpath between points P3, P4 and P5
Shaw Lane between points P11 (on Sheet No. 1-05) and P2 (on Sheet No. 1-10) and between points P3 and P4 (on Sheet No. 1-10)Work No. 9
A513 Rugeley Road between points P15 (on Sheet No. 1-05) and P1 (on Sheet No. 1-10)Work No. 8 (part)
Footpath Kings Bromley 1 between points P5 and P6Footpath between points P6, P7, P8 and P9 (connecting to the A513 Rugeley Road)
Footpath Kings Bromley 6 between points P1, P2, P3 and P4Footpath between points P1, P5, P6, P7 and P4
Parish of Mavesyn RidwareFootpath Mavesyn Ridware 30 between points P1 and P3Footpath between points P1, P2 and P3
Pipe Lane within the limits of deviation of Work No. 15 and between points P4 (on Sheet No. 1-11) and P1 (on Sheet No. 1-13)Work No. 15
Pipe Lane within the limits of deviation of Work No. 15AWork No. 15A
Dawson Lane within Act limitsWork No. 15
Footpath Mavesyn Ridware 32 between points P5 and P7Footpath between points P5, P6 and P7
Footpath Mavesyn Ridware 33 between points P8 and P9Footpath between points P8 and P10 (connecting to Mavesyn Ridware 32), footpath between points P5, P6, P7 (connecting to Mavesyn Ridware 32), Work No. 15A (part) and footpath between Work No. 15A and point P9
Footpath Mavesyn Ridware 38 between points P2 and P3Footpath between point P2, Work No. 16 (part) and point P3
Uttoxeter Road within the limits of deviation of Work No. 18Work No. 18
Footpath Mavesyn Ridware 8 between points P4 and P5Footpath between points P4, P6 and P7, between points P7 and P8 over Work No. 16 (part) and between points P8, P9 and P5
Stonyford Lane within the limits of deviation of Work No. 18AWork No. 18A
Common Lane and Uttoxeter Road within the limits of deviation of Work No. 15DWork No. 15D
Uttoxeter Road/Blithbury Road within the limits of deviation of Work No. 18DWork No. 18D
Parishes of Mavesyn Ridware and ColtonStonyford Lane within the limits of deviation of Works Nos. 20 and 20AWork No. 20A
Hadley Gate Lane within the limits of deviation of Works Nos. 20B and 20CWorks Nos. 20B and 20C
Blithbury Road between points P3 (on Sheet No. 1-14), P1 (on Sheet No. 1-15) and between points P2 and P3 (on Sheet No. 1-15)Work No. 20 (part)
Footpath Colton 17 between points P4 and P5 (on Sheet No. 1-15)Footpath between points P4 (on Sheet No. 1-15) and P4 (on Sheet No. 1-14)
Parish of ColtonFootpath Colton 73 between points P8 and P9Footpath between points P8 and P9 over Work No. 21
Newlands Lane between points P12 and P13Work No. 22
Footpath Colton 34 between points P10 (on Sheet No. 1-15) and P1 (on Sheet No. 1-19)Footpath between points P10 and P11 (on Sheet No. 1-15) over Work No. 22B (part), Work No. 22 (part) (connecting to Newlands Lane)
Footpath Colton 36 between points P4 and P5Footpath between points P4 and P6, and Work No. 24 (part)
Footpath Colton 76 between points P7 and P8Footpath between points P7 and P6 and between Work No. 24 (part) and point P8
Newlands Lane between points P2 and P3Work No. 24
Moor Lane between points P11 and P12Work No. 24A
Moor Lane within the limits of deviation of Work No. 24BWork No. 24B
Uttoxeter Road within the limits of deviation of Work No. 26Work No. 26
Jonghams Lane within Act limitsWork No. 26A (up to existing termination point of Jonghams Lane)
Hollow Lane within the limits of deviation of Work No. 20Work No. 20
Footpath Colton 19 between points P14 and P15Footpath along Work No. 22C (part)

Borough of Stafford

Parish of Colwich

Bridleway Colwich 23 between points P1 and P2Work No. 30 (part), bridleway over Work No. 30A and bridleway between Work No. 30A and point P2
Footpath Colwich 36 between points P3 and P4Footpath between points P4 and P5 and Work No. 30 (part)
Bishton Lane within the limits of deviation of Work No. 30Work No. 30 (to the junction with the termination of Work No. 30A)
Bridleway Colwich 35 between points P1 and P2Bridleway between points P1 and P2 over Work No. 31
Footpath Colwich 26 between points P3 and P4Footpath between points P3, P15, P6 and P16 (connecting to Bridleway Colwich 35) and footpath between points P5 and P4
Footpath Colwich 54 between points P7, P9, P8 and P10Footpath between points P7 and P11, bridleway between points P11 and P16, between P16 and P12 over Work No. 34, and between points P12 and P10
Footpath Colwich 55 between points P1 (on Sheet No. 1-24) and P2 and P10 (on Sheet No. 1-23)Work No. 36A (part) (connecting to Tolldish Lane) and Bridleway between points P13 and P11
Tolldish Lane between points P14 (on Sheet No. 1-23) and P2 on (Sheet No. 1-24)Work No. 36A
A51 Lichfield Road between points P3 and P4Work No. 36
Parish of TixallHoo Mill Lane within the limits of deviation of Work No. 43Work No. 43
Footpath Tixall 0.1630(b) between points P1 and P2Footpath between point P1 and Work No. 49 and footpath between that Work and point P2
Bridleway Tixall 0.1628 between points P3 and P4Bridleway between points P3 and P2 over Works Nos. 49A and Work No. 49 (part)
Footpath Tixall 0.1630(b) between points P2 and P4Bridleway between points P2 and P4
Great Haywood Road within the limits of deviation of Work No. 43AWork No. 43A
Great Haywood Road within the limits of deviation of Work No. 43BWork No. 43B
Parish of Hopton and CotonA518 Weston Road within the limits of deviation of Work No. 51Work No. 51
Footpath Hopton and Coton 5 and Footpath Hopton and Coton 24 between points P1, P4 and P6Footpath between points P1 and P2 over Work No. 52, and between points P2 and P6
Footpath Hopton and Coton 6 between points P1 (on Replacement Sheet No. 1-31) and P4 (on Replacement Sheet No. 1-31)Footpath between points P1 (on Replacement Sheet No. 1-31) and P2 (on Replacement Sheet No 1-30), between P2 and P5 over Work No. 52 (part), footpath between points P5, P4 (on Replacement Sheet No. 1-30), P2 and P3 (connecting to Hopton and Coton 7) (on Replacement Sheet No. 1-31)
Hopton Lane between points P5 and P6 and between points P17 and P12Work No. 54B, Work No. 54 (part) and Work No. 54C
Sandon Road between points P9 and P10, between points P11 and P12 and between points P13 and P14Work No. 54
Bridleway Hopton and Coton 12 between points P1 and P2Bridleway between points P1 and P3
Bridleway Hopton and Coton 11 between points P3 and P4Bridleway between point P3, Work No. 56 and point P4
Bridleway Hopton and Coton 16 between points P5 and P6Bridleway between points P5 and P7
Parish of MarstonBridleway Marston 8 between points P8 and P9Bridleway between points P8 and P9 over Work No. 59 (part)
Footpath Marston 2 between points P2 and P3Footpath between points P2 and P4 and Work No. 60 (part) (connecting into Marston 9)
Marston Lane between points P10, P9 (on Sheet No. 1-32) and P1 (on Sheet No. 1-33)Work No. 60
Marston Lane/Yarlet Lane within the limits of deviation of Work No. 60AWork No. 60A
Parishes of Marston and CresswellMarston Lane within the limits of deviation of Work No. 60BWork No. 60B
Parishes of Stone Rural, Marston and WhitgreaveA34 Stone Road between points P1 and P2Work No. 61
Parishes of Stone Rural and WhitgreaveFootpath Stone Rural 28 and Footpath Whitgreave 3 between points P1 and P2Footpath between points P1, P3, P4 and P5, between points P5 and P6 over Work No. 64 and between points P6 and P2
Parish of Stone RuralBridleway Stone Rural 0.1135 between points P1 and P2Bridleway between points P1, Work No. 65 and point P2
Footpath Stone Rural 32 between points P3 and P4Footpath between points P3, P5, P6, P6a and P7, between points P7 and P8 over Work No. 66 (part) and between points P8, P9 and P4
Footpath Stone Rural 33 between points P1 and P2Footpath between points P1, P3 and P2
Byway Open to All Traffic Stone Rural 34 within the limits of deviation of Work No. 72Work No. 72 (part)
Yarnfield Lane within the limits of deviation of Work No. 69BWork No. 69B
Parishes of Stone Rural and StoneEccleshall Road within the limits of deviation of Work No. 68Work No. 68
Parishes of Stone Rural and SwynnertonYarnfield Lane within the limits of deviation of Work No. 69Work No. 69
Parishes of Stone Rural, Chebsy and SwynnertonM6 Motorway within the limits of deviation of Work No. 70Work No. 70
Parish of SwynnertonFootpath Swynnerton 27 between points P1 and P2Work No. 72 (part)
Footpath Swynnerton 17 between points P3 and P4Footpath between points P4 and P1 and between points P1 and P5 (connecting into Sywnnerton 17) over Work No. 72 (part)
Tittensor Road between points P1 and P4Work No. 75
A51 Stone Road between points P9 (on Sheet No. 1-43) and P1 (on Sheet No. 1-44)Work No. 78A
A519 Newcastle Road between points P3 and P4Work No. 78
Footpath Swynnerton 52 within the limits of deviation of Work No. 84Work No. 84
Common Lane within the limits of deviation of Work No. 84Work No. 84 (part)
Footpath Swynnerton 15 between points P1 and P2Footpath between point P1, Work No. 85 and point P2
Footpath Swynnerton 10 between points P4 and P5Footpath between points P4, P6, P7 and P5
A51 The Rowe and Bent Lane within the limits of deviation of Work No. 87AWork No. 87A
Sheldon under Harley Lane between points P11 and P13Work No. 88B

Borough of Stafford

Parish of Swynnerton and Borough of Newcastle-under-Lyme

Parish of Whitmore

Footpath Swynnerton 10 between points P8 and P9New Footpath from point P8 over Work No. 90 (part) to P10 over Work No. 89 and Work No. 88 (part) to P9
Dog Lane between points P1 and P2Work No. 88 (part) and Work No. 87
Bent Lane between point P12 (on Replacement Sheet No. 1-46) and P1 (on Replacement Sheet No. 1-47)Work No. 87A (part), Work No. 87 and Work No. 88 (part)

Borough of Newcastle-under-Lyme

Parish of Whitmore

A53 Newcastle Road within the limits of deviation of Work No. 91Work No. 91
Snape Hall Road between points P1 and P3Works Nos. 92 (from its junction with Common Lane to its junction with the termination of Work No. 92A) and 92A
Snape Hall Road between points P2 and P3Footpath between points P2, P4 and P5
Common Lane within the limits of deviation of Work No. 92Work No. 92 (part)
Parishes of Whitmore and MadeleyFootpath Whitmore 6 and Footpath Madeley 14 between points P1 and P7Work No. 92 (part)
Parish of MaerA53 Newcastle Road within the limits of deviation of Works Nos. 91C and 91DWork No. 91C (part) and Work No. 91D
Parish of MadeleyManor Road between points P1 and P2 (on Sheet No. 1-51) and between points P3 (on Sheet No. 1-51) and P1 (on Sheet No. 1-53)Work No. 97
A525 Bar Hill Road and A525 Bar Hill within the limits of deviation of Work No. 101Work No. 101
A525 Bar Hill Road within the limits of deviation of Work No. 101BWork No. 101B
A525 Bar Hill Road within the limits of deviation of Work No. 101CWork No. 101C
A525 Bar Hill Road within the limits of deviation of Work No. 101DWork No. 101D
Bridleway Madeley 1 (Red Lane) within the limits of deviation of Work No. 100Work No. 100
Footpath Madeley 24 between points P1 and P6Work No. 101A
Footpath Madeley 26 between points P2, P6, P5 and P3Footpath between points P2 and P3 over Work No. 101A (part)
Bridleway Madeley 5 between points P2, P8 and P3 and Footpath Madeley 28 between points P2, P4 and P5Bridleway between points P2, P4 and P5 (connecting to Madeley 2) and bridleway between points P7 and P3 over Work No. 104 (part)
Bridleway Madeley 5 between points P4 (on Sheet No. 1-53) and P1 (on Sheet No. 1-57)Bridleway between point P4 (on Sheet No. 1-53) and Work No. 103, Work No. 103 (part) and bridleway between that Work and point P1 (on Sheet No. 1-57)
Bridleway Madeley 2 between points P6 and P7Work No. 104
Bower End Lane within the limits of deviation of Work No. 103Work No. 103 (part)

County of Staffordshire

Borough of Newcastle-under-Lyme

Parish of Madeley and Unitary District of Shropshire

Parish of Woore

A525 Bar Hill Road/ A525 Woore Road within the limits of deviation of Work No. 101EWork No. 101E

Unitary District of Shropshire

Parish of Woore

A525 Newcastle Road/A525 Woore Road within the limits of deviation of Work No. 101FWork No. 101F
A525 Newcastle Road within the limits of deviation of Work No. 101GWork No. 101G
A525 Newcastle Road within the limits of deviation of Work No. 101HWork No. 101H

County of Cheshire

Borough of Cheshire East

Parish of Checkley cum Wrinehill

Footpath Checkley cum Wrinehill 8 between points P1 and P2Footpath between point P1 and Checkley cum Wrinehill 4 and between points P3, P4 and P2
Footpath Checkley cum Wrinehill 5 between points P5 and P6Footpath between points P5 and P12 (at the commencement of Work No. 108C), between points P12 (at the commencement of Work No. 108C), and P7 over Work No. 108C
Checkley Lane within the limits of deviation of Work No. 108Work No. 108
Parishes of Checkley cum Wrinehill and BlakenhallFootpath Checkley cum Wrinehill 9, Footpath Checkley cum Wrinehill 15 and Footpath Blakenhall 17 between points P8, P9 and P11Footpath between points P9, P10 and P8 (connecting into Checkley cum Wrinehill 9) and footpath between points P13 (on the centreline of Work No. 108) and P11
Parish of BlakenhallDen Lane and Wrinehill Road between points P1 and P2Work No. 111
Footpath Blakenhall 9 between points P3 and P1Footpath between points P3 and P4, and Work No. 111 (part)
Bridleway Blakenhall 8 between points P5 and P6Work No. 114
Bridleway Blakenhall 12 between points P2, P4 and P5Work No. 116
Footpath Blakenhall 7 between points P1 and P2Footpath between points P1 and P5 over Work No. 116 (part) (connecting into Wrinehill Road)
Footpath Blakenhall 11 between points P4 and P6Footpath between points P6 and P7, Work No. 116 (part) and point P5
Parish of ChorltonFootpath Chorlton 7 between points P4 and P5Footpath between points P4 and P10, between points P10 and P11 over Work No. 120 (part) and between points P11 and P5
Footpath Chorlton 9 between points P6, P10 (on Sheet No. 1-61) and P14 (on Sheet No. 1-62)Footpath between points P6, P4 and P10 (on Sheet No. 1-61) and between points P10 (on Sheet No. 1-61) and P14 (on Sheet No. 1-62) over Work No.120 (part)
Chorlton Lane between points P8 and P9Work No. 118
Newcastle Road within the limits of deviation of Work No. 123Work No. 123
Parishes of Chorlton and HoughFootpath Chorlton 3 between points P8 and P9Footpath between points P9 and P7 over Works Nos. 116A (part) and 116 (part) and footpath between points P7 and P6 (connecting with Hough 11)
Parishes of Chorlton and BasfordNewcastle Road within the limits of deviation of Work No. 122 and between points P6 and P7Work No. 122
Parish of BasfordCasey Lane between points P1 and P2Works Nos. 126 and 122 (part)
Casey Lane between points P2 and P18Works Nos. 126 (part) and 126A
Footpath Basford 4 between points P3 and P4Footpath between points P3, P5 and Work No. 122, Work No. 122 (part), Work No. 126 (part) and footpath between points P16 and P4
Footpath Basford 3 between points P11 and P12Work No. 126A (part)
Town of SandbachFootpath Sandbach 51 within the limits of deviation of Work No. 131Work No. 131

TABLE 3

(1)(2)
AreaRight of way which may be provided

County of Staffordshire

District of Lichfield

Parish of Kings Bromley

New footpath between points P1 and P2
Parish of Mavesyn RidwareNew footpath between points P1 and P2

Borough of Stafford

Parish of Colwich

New footpath between points P6 (on Sheet No. 1-21) and P1 (on Sheet No. 1-23)
New bridleway between points P11 and P13
Parish of Hopton and CotonNew bridleway between points P6, P7, Work No. 53 and point P8
New footpath between point P6, Work No. 53A point P7, Work No. 53 and point P8
Parish of Stone RuralNew byway open to all traffic between points P1 and P10
Parish of SwynnertonNew bridleway between points P5, P6 and P13
New bridleway between points P2, P7, P7A, along Work No. 74 (part) and point P1
New footpath between points P14 and P12

Borough of Cheshire East

Parish of Blakenhall

New footpath between points P1 and P5
New bridleway along Work No. 115
Parish of ChorltonNew bridleway between points P10 (on Sheet No. 1-60) and P1 (on Sheet No. 1-61)
New footpath between points P1, P13 and P6
New footpath between point P11 (on Sheet No. 1-61), Work No. 120 and point P13 (on Sheet No. 1-62)

TABLE 4

(1)(2)(3)
AreaHighway or part to be stopped upExtent of temporary stopping up

County of Staffordshire

District of Lichfield

Parish of Fradley and Streethay

Footpath Fradley and Streethay 35Within Act limits
Footpath Fradley and Streethay 53Within Act limits
Bridleway Fradley and Streethay 33Within Act limits
Wood End LaneWithin Act limits
Netherstowe LaneWithin Act limits
Parishes of Fradley and Streethay and Kings BromleyTrent and Mersey Canal TowpathWithin Act limits
Parish of Kings BromleyFootpath Kings Bromley 0.392(a)Within Act limits
Common LaneWithin Act limits
Bridleway Kings Bromley 13Within Act limits
Footpath Kings Bromley 12Within Act limits
A515 Lichfield RoadWithin Act limits
Shaw LaneWithin Act limits
Footpath Kings Bromley 0.390Within Act limits
Footpath Kings Bromley 0.391Within Act limits
Lichfield RoadWithin Act limits
Footpath Kings Bromley 11Within Act limits
Footpath Kings Bromley 8Within Act limits
Footpath Kings Bromley 7Within Act limits
A513 Alrewas RoadWithin Act limits
Footpath Kings Bromley 1Within Act limits
Footpath Kings Bromley 3Within Act limits
Tuppenhurst LaneWithin Act limits
Crawley LaneWithin Act limits
Footpath Kings Bromley 16Within Act limits
Footpath Kings Bromley 17Within Act limits
Footpath Kings Bromley 0.392Within Act limits
Parish of AlrewasFootpath Alrewas 0.248Within Act limits
Bridleway Alrewas 33Within Act limits
Alrewas Hayes RoadWithin Act limits
Parishes of Kings Bromley and Armitage with HandsacreA513 Rugeley RoadWithin Act limits
Parish of Armitage with HandsacreFootpath Armitage with Handsacre 25Within Act limits
Footpath Armitage with Handsacre 26Within Act limits
A513 Uttoxeter RoadWithin Act limits
A513 Kings Bromley LaneWithin Act limits
Spode AvenueWithin Act limits
Proctors RoadWithin Act limits
Alandale AvenueWithin Act limits
Lichfield RoadWithin Act limits
Old RoadWithin Act limits
Ford WayWithin Act limits
Parish of Hamstall RidwareFootpath Hamstall Ridware 3Within Act limits
Footpath Hamstall Ridware 26Within Act limits
Parish of Mavesyn RidwareFootpath Mavesyn Ridware 29Within Act limits
Footpath Mavesyn Ridware 18Within Act limits
Footpath Mavesyn Ridware 32Within Act limits
Footpath Mavesyn Ridware 30Within Act limits
Pipe LaneWithin Act limits
Footpath Mavesyn Ridware 28Within Act limits
Footpath Mavesyn Ridware 33Within Act limits
Footpath Mavesyn Ridware 38Within Act limits
Footpath Mavesyn Ridware 8Within Act limits
Quintons OrchardWithin Act limits
Footpath Mavesyn Ridware 6Within Act limits
Dawson LaneWithin Act limits
Footpath Mavesyn Ridware 9Within Act limits
Footpath Mavesyn Ridware 31Within Act limits
Uttoxeter RoadWithin Act limits
Blithbury RoadWithin Act limits
Stoneyford LaneWithin Act limits
Newlands LaneWithin Act limits
Parishes of Mavesyn Ridware and ColtonHadley Gate LaneWithin Act limits
Parish of ColtonHollow LaneWithin Act limits
Blithbury RoadWithin Act limits
Byway Open to All Traffic Colton 16Within Act limits
Footpath Colton 15Within Act limits
Footpath Colton 73Within Act limits
Bridleway Colton 32Within Act limits
Bridleway Colton 31Within Act limits
Bridleway Colton 33Within Act limits
Footpath Colton 19Within Act limits
Newlands LaneWithin Act limits
Moor LaneWithin Act limits and between points T1 and T2
Footpath Colton 74Within Act limits
Footpath Colton 4Within Act limits
Footpath Colton 11Within Act limits
Footpath Colton 12Within Act limits
Footpath Colton 20Within Act limits
Footpath Colton 21Within Act limits
Footpath Colton 36Within Act limits
Footpath Colton 52Within Act limits
Footpath Colton 76Within Act limits
Footpath Colton 17Within Act limits
Footpath Colton 6Within Act limits
Footpath Colton 34Within Act limits
Footpath Colton 5Within Act limits
Footpath Colton 10Within Act limits
Footpath Colton 77Within Act limits
Footpath Colton 18Within Act limits
Footpath Colton 79Within Act limits
High StreetWithin Act limits
Narrow LaneWithin Act limits
Uttoxeter RoadWithin Act limits
Lount LaneWithin Act limits
Sherracop LaneWithin Act limits
Footpath Colton 23Within Act limits
Footpath Colton 30Within Act limits

District of East Staffordshire

Parish of Blithfield

Uttoxeter RoadWithin Act limits
Parish of Abbots BromleyFootpath Abbots Bromley 48Within Act limits
Footpath Abbots Bromley 49Within Act limits
Lichfield RoadWithin Act limits
Orange LaneWithin Act limits
Footpath Abbots Bromley 30Within Act limits
Footpath Abbots Bromley 29Within Act limits
Footpath Abbots Bromley 26Within Act limits
Footpath Abbots Bromley 24Within Act limits
Footpath Abbots Bromley 38Within Act limits
Footpath Abbots Bromley 23Within Act limits
Glass LaneWithin Act limits
Footpath Abbots Bromley 39Within Act limits
Footpath Abbots Bromley 40Within Act limits
Footpath Abbots Bromley 41Within Act limits
Footpath Abbots Bromley 44Within Act limits
Abbots Bromley RoadWithin Act limits
Footpath Abbots Bromley 46Within Act limits
Poplar Farm RoadWithin Act limits
Parishes of Abbots Bromley and Hoar CrossBromley RoadWithin Act limits
Parish of Hoar CrossFootpath Hoar Cross 10Within Act limits
Newborough RoadWithin Act limits
Parishes of Hoar Cross and NewboroughThorney LanesWithin Act limits
Roost HillWithin Act limits
Newborough EndWithin Act limits

Borough of Stafford

Parish of Colwich

Bridleway Colwich 19Within Act limits
Footpath Colwich 20Within Act limits
Footpath Colwich 6Within Act limits
Footpath Colwich 26Within Act limits
Tolldish LaneWithin Act limits
Footpath Colwich 54Within Act limits
Footpath Colwich 56Within Act limits
A51 Lichfield RoadWithin Act limits
Footpath Colwich 63Within Act limits
Bridleway Colwich 23Within Act limits
Bridleway Colwich 21Within Act limits
Footpath Colwich 32Within Act limits
Bridleway Colwich 35Within Act limits
Bridleway Colwich 58Within Act limits
Main RoadWithin Act limits
Parish of HixonPasturefields LaneWithin Act limits
Footpath Hixon 3Between points T1 and T2
Parish of IngestreByway open to all traffic Ingestre 1Within Act limits
Hoo Mill LaneWithin Act limits
Parish of TixallIngestre Park RoadWithin Act limits
Great Haywood RoadWithin Act limits and between points T1 (on Sheet No. 1-24) and T1 (on Sheet No. 1-26) and between points T1 and T2 (on Sheet No. 1-27)
Mill LaneWithin Act limits
Bridleway Tixall 0.1629Within Act limits
Footpath Tixall 0.1630(b)Within Act limits
Bridleway Tixall 0.1628Within Act limits
Tixall Village RoadWithin Act limits
Hanyards LaneWithin Act limits
Parish of Hopton and CotonHopton LaneWithin Act limits
Bridleway Hopton and Coton 12Within Act limits
Footpath Hopton and Coton 5Within Act limits
Lower LaneWithin Act limits
Bridleway Hopton and Coton 16Within Act limits
A518 Weston RoadWithin Act limits
Footpath Hopton and Coton 14Within Act limits
Station RoadWithin Act limits
Footpath Hopton and Coton 0.1535Within Act limits
Footpath Hopton and Coton 9Within Act limits
Sandon RoadWithin Act limits
Footpath Hopton and Coton 23Within Act limits
Bridleway Hopton and Coton 19Within Act limits
Town of Stafford and Parish of Hopton and CotonHydrant WayWithin Act limits
Town of Stafford and Parishes of Hopton and Coton and CreswellA513 BeaconsideWithin Act limits
Town of StaffordCommon RoadWithin Act limits
A518 Weston RoadWithin Act limits
Parish of CreswellMarston LaneWithin Act limits
Parish of Salt and EnsonFootpath Salt and Enson 6Within Act limits
Parish of MarstonBridleway Marston 8Within Act limits
Footpath Marston 2Within Act limits
Marston LaneWithin Act limits and between points T1 and T2
Footpath Marston 9Within Act limits
Parishes of Marston and WhitgreaveA34 Stone RoadWithin Act limits
Parish of WhitgreaveFootpath Whitgreave 2Within Act limits
Town of StonePirehill LaneWithin Act limits
Coombe Park RoadWithin Act limits
Eccleshall RoadWithin Act limits
A34 The FillybrooksWithin Act limits
Tilling DriveWithin Act limits
Whitemill LaneWithin Act limits
Longfield AvenueWithin Act limits
Grove RoadWithin Act limits
Park AvenueWithin Act limits
The FillybrooksWithin Act limits
Trent RoadWithin Act limits
Yarnfield LaneWithin Act limits
Footpath Stone Town 40Within Act limits
Town of Stone and Parish of Stone RuralA51 Stone BypassWithin Act limits
A34 Stafford RoadWithin Act limits
Parish of Stone RuralBridleway Stone Rural 0.1135Within Act limits
Footpath Stone Rural 31Within Act limits
Footpath Stone Rural 33Within Act limits
Footpath Stone Rural 28Within Act limits
Yarnfield LaneWithin Act limits
A51 Stone RoadWithin Act limits
A34 Stone RoadWithin Act limits
A34 The FillybrooksWithin Act limits
A51 Bury BankWithin Act limits
Jervis LaneWithin Act limits
Byway open to All Traffic Stone Rural 63Within Act limits
Parishes of Stone Rural and SwynnertonM6 MotorwayWithin Act limits
Winghouse LaneWithin Act limits
Chase LaneWithin Act limits
Parish of SwynnertonFootpath Swynnerton 27Within Act limits
Yarnfield LaneWithin Act limits
Footpath Swynnerton 17Within Act limits
Hall LaneWithin Act limits
Bridleway Swynnerton 54Within Act limits
Footpath Swynnerton 53Within Act limits
Bottom LaneWithin Act limits
A519 Newcastle RoadWithin Act limits
Stab LaneWithin Act limits
Footpath Swynnerton 9Within Act limits
Footpath Swynnerton 10Within Act limits
A51 The RoweWithin Act limits
Green Lane G2084Within Act limits
Footpath Swynnerton 38Within Act limits
Bridleway Swynnerton 39Within Act limits
Footpath Swynnerton 58Within Act limits
Main StreetWithin Act limits
Footpath Swynnerton 15Within Act limits
Bent LaneWithin Act limits
A51 Stone RoadWithin Act limits
Footpath Swynnerton 16Within Act limits
A5182 Whitmore RoadWithin Act limits
Whitmore RoadWithin Act limits
Footpath Swynnerton 19Within Act limits
Biddles LaneWithin Act limits
Common LaneWithin Act limits
Dog LaneWithin Act limits
Parishes of Swynnerton and BarlastonA34 Stone RoadWithin Act limits
Tittensor RoadWithin Act limits
Parishes of Stone Rural and BarlastonMeaford RoadWithin Act limits
Parish of BarlastonStation RoadWithin Act limits
Old RoadWithin Act limits
Parish of StandonMill Meece MarshWithin Act limits

Borough of Newcastle-under-Lyme

Parish of Whitmore

Footpath Whitmore 4Within Act limits
Green Lane G2085Within Act limits
Heath RoadWithin Act limits
Byway Open to All Traffic Whitmore 3Within Act limits
Footpath Whitmore 5Within Act limits and between points T1 and T2
Footpath Whitmore 6Within Act limits
Snape Hall RoadWithin Act limits
A53 Newcastle RoadWithin Act limits
Bent LaneWithin Act limits
The Old HollowWithin Act limits
Three Mile LaneWithin Act limits
Dab GreenWithin Act limits
Parish of MaerA51 Stone RoadWithin Act limits
A53 Newcastle RoadWithin Act limits
A51 Nantwich RoadWithin Act limits
Parishes of Whitmore and MadeleyFootpath Madeley 14Within Act limits
Parish of MadeleyManor RoadWithin Act limits
Footpath Madeley 33Within Act limits
Bridleway Madeley 1Within Act limits
Footpath Madeley 26Within Act limits
Bridleway Madeley 5Within Act limits
Footpath Madeley 28Within Act limits
Bridleway Madeley 2Within Act limits
Footpath Madeley 27Within Act limits
Netherset Hey LaneWithin Act limits
Footpath Madeley 53Within Act limits
Bower End LaneWithin Act limits
A525 Bar Hill RoadWithin Act limits
Footpath Madeley 7Within Act limits
Footpath Madeley 70Within Act limits
Footpath Madeley 23Within Act limits
School LaneWithin Act limits
Moss LaneWithin Act limits
Station RoadWithin Act limits
Footpath Madeley 59Within Act limits
A525 Bar HillWithin Act limits
A525 Woore RoadWithin Act limits
A525 PoolsideWithin Act limits
A525 Newcastle RoadWithin Act limits
A525 Keele RoadWithin Act limits
A531 Crewe RoadWithin Act limits
Vicarage LaneWithin Act limits
Lindops LaneWithin Act limits
The HolbornWithin Act limits
Beck RoadWithin Act limits
Agger HillWithin Act limits
Honeywall LaneWithin Act limits
Ridge Hill DriveWithin Act limits
Leycett LaneWithin Act limits
New RoadWithin Act limits
Bevan PlaceWithin Act limits
Wharf TerraceWithin Act limits
Parish of KeeleA525 Station RoadWithin Act limits
Station RoadWithin Act limits
Pepper StreetWithin Act limits
Quarry Bank RoadWithin Act limits
Hollywood LaneWithin Act limits
Parish of SilverdalePepper StreetWithin Act limits
Underwood RoadWithin Act limits
Scot Hay RoadWithin Act limits
Ashbourne DriveWithin Act limits
Sneyd TerraceWithin Act limits
Park RoadWithin Act limits
Madeley StreetWithin Act limits
Parkfields CloseWithin Act limits
RacecourseWithin Act limits
High StreetWithin Act limits
Mill StreetWithin Act limits
Bridge StreetWithin Act limits
Chapel StreetWithin Act limits
West StreetWithin Act limits
Kinsey StreetWithin Act limits
Stonewall PlaceWithin Act limits
Parish of Silverdale and Town of Newcastle-under-LymeCemetery RoadWithin Act limits
Silverdale RoadWithin Act limits
Brock WayWithin Act limits
Newcastle StreetWithin Act limits
Church LaneWithin Act limits
Parish of Swynnerton and Town of Newcastle-under-LymeA500 QueenswayWithin Act limits
A519 Clayton RoadWithin Act limits
Town of Newcastle-under-LymeKnutton LaneWithin Act limits
Lower Milehouse LaneWithin Act limits
High StreetWithin Act limits
St Bernards RoadWithin Act limits
A34 Liverpool RoadWithin Act limits
Brymbo RoadWithin Act limits
Camillus RoadWithin Act limits
Douglas RoadWithin Act limits
Milehouse LaneWithin Act limits
Spencroft RoadWithin Act limits

County of Staffordshire

Borough of Newcastle-under-Lyme

Parish of Madeley and Unitary District of Shropshire

Parish of Woore

A525 Newcastle RoadWithin Act limits
A525 Woore RoadWithin Act limits

Unitary District of Shropshire

Parish of Woore

Footpath Woore 0236/29/1Within Act limits
A51 Nantwich RoadWithin Act limits
Audlem RoadWithin Act limits

County of Cheshire

Borough of Cheshire East

Parish of Checkley cum Wrinehill

Turncocks LaneWithin Act limits
Footpath Checkley cum Wrinehill 5Within Act limits
Footpath Checkley cum Wrinehill 4Within Act limits
Footpath Checkley cum Wrinehill 15Within Act limits
Checkley LaneWithin Act limits
Parish of BlakenhallFootpath Blakenhall 7Within Act limits
Mill LaneWithin Act limits
Wrinehill RoadWithin Act limits
Bridleway Blakenhall 12Within Act limits
Footpath Blakenhall 17Within Act limits
Footpath Blakenhall 6Within Act limits
Footpath Blakenhall 9Within Act limits
Footpath Blakenhall 13Within Act limits
Bridleway Blakenhall 8Within Act limits
Den LaneWithin Act limits
Parish of WybunburyWybunbury RoadWithin Act limits

County of Staffordshire

Borough of Newcastle-under-Lyme

Parish of Betley

Footpath Betley 29Within Act limits
Den LaneWithin Act limits

County of Cheshire

Borough of Cheshire East

Parish of Chorlton

Footpath Chorlton 3Within Act limits
Footpath Chorlton 1Within Act limits
Footpath Chorlton 7Within Act limits
Footpath Chorlton 9Within Act limits
Bridleway Chorlton 2Within Act limits
Waybutt LaneWithin Act limits
Footpath Chorlton 8Within Act limits
Footpath Chorlton 12Within Act limits
Footpath Chorlton 16Within Act limits
Chorlton LaneWithin Act limits
Footpath Chorlton 14Within Act limits
Parishes of Chorlton and BasfordNewcastle RoadWithin Act limits
Parish of HoughFootpath Hough 11Within Act limits
Parish of BasfordCasey LaneWithin Act limits
Weston LaneWithin Act limits
Footpath Basford 6Within Act limits
Footpath Basford 11Within Act limits
Footpath Basford 12Within Act limits
Footpath Basford 4Within Act limits
Footpath Basford 3Within Act limits
Footpath Basford 10Within Act limits
Back LaneWithin Act limits
Footpath Basford 1Within Act limits
Parishes of Basford and Shavington cum GrestyA500 Shavington BypassWithin Act limits
B5071 Link RoadWithin Act limits
Parishes of Basford and Weston and Town of CreweA5020 David Whitby WayWithin Act limits
Parish of WestonA500 Shavington BypassWithin Act limits
Town of SandbachFootpath Sandbach 46Within Act limits
Footpath Sandbach 51Within Act limits
Town of CreweSavoy RoadWithin Act limits

Section 4(2)

SCHEDULE 6U.K.Acquisition of land for particular purposes

The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table.

AreaNumber of land shown on deposited plansPurpose for which land may be acquired or used

County of Staffordshire

District of Lichfield

Parish of Fradley and Streethay

1 to 15, 22aProvision of railway infrastructure and access
16

Provision of railway infrastructure and access

Utility works

20, 21, 24, 25c, 29, 35Worksite and access for construction
23, 28Utility works
19b, 30a, 31a, 32aProvision of environmental mitigationWorksite and access for construction
Parish of Kings Bromley1, 2, 23, 37, 41, 42, 87, 88, 90, 200, 222, AP2-31Provision of environmental mitigation
9, 16a, 16b, 50, 96, AP2-37, AP2-38, AP2-51, AP2-52, AP2-56, AP2-58, AP2-65, AP2-69, AP2-71a, AP2-72, AP2-84Provision of environmental mitigationWorksite and access for construction
12, 116a, AP2-28

Utility works

Worksite and access for construction

15, 17, 25a, 29 to 31, 43, 55, 56, 58, 62, 63, 84, 102, 141, 153, 160, 182, 185, 187, 198, 202 to 206, 209, 214, 243 to 246, 248 to 250, 252, AP1-4 to AP1-8, AP1-10 to AP1-13, AP2-101Utility works
20, 21, 35, 101, 136, 137a, 137b, 139a, 142, 147, 149, 152, 155, 162, 211, AP2-34, AP2-85, AP2-88Worksite and access for construction
38, 39, 52, 54, 134a, 172Borrow pit
49Highway works
51

Provision of railway infrastructure and access

Borrow pit

66, 140

Worksite and access for construction Borrow pit

70, 169

Provision of railway infrastructure and access

Provision of environmental mitigation

77

Highway works

Worksite and access for construction

92a, 93, 100c, 112, 129b, 138b

Provision of environmental mitigation

Utility works

100a

Provision of environmental mitigationUtility worksProvision of a public right of way

122a

Provision of environmental mitigation

Worksite and access for construction

Borrow pit

143

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

148

Provision of environmental mitigation

Borrow pit

260

Provision of environmental mitigation

Utility works

Worksite and access for construction

Provision of a public right of way

261

Provision of environmental mitigation

Utility works

Worksite and access for construction

AP2-26, AP2-29, AP2-75, AP2-86, AP2-90, AP2-93Dewatering operations
AP2-50, AP2-50a, AP2-73

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

AP2-89, AP2-96

Worksite and access for construction

Dewatering operations

Parish of Alrewas1

Provision of environmental mitigation

Worksite and access for construction

3, 7Worksite and access for construction
11 to 13Borrow pit
AP2-1

Utility works

Worksite and access for construction

Parish of Armitage with Handsacre3, 7, 10, 11Provision of environmental mitigation
6, 17, 18, 20, 21Worksite and access for construction
AP2-5, AP2-5a, AP2-9, AP2-10Utility works
AP2-14 to AP2-18Provision of railway infrastructure and access
Parish of Hamstall Ridware1, 3Worksite and access for construction
2Provision of environmental mitigation
4, 5, 8Worksite and access for constructionBorrow pit
Parish of Mavesyn Ridware2, 4, 39a, 46, 50, 63, 80, 112, 113, 115, 125, 132, 133, 148, 152, 179, 180, 190, 192, 193, AP1-13a, AP1-13b, AP1-23a, AP1-24a, AP1-25, AP2-10, AP2-17Worksite and access for construction
6 to 8, 51, 53, 97, 102, 118, 119, 126, 131, 139, 159, 161, 162, 166, 167, 172, 173, AP2-56, AP2-57, AP2-63 to AP2-67Provision of environmental mitigation
9Borrow pit
11

Borrow pit

Provision of a public right of way

23, 30, 32a, 33a, AP1-16a, AP1-17a, AP1-18a, AP1-19a, AP1-21a, AP2-16, AP2-19, AP2-32, AP2-33, AP2-35, AP2-36

Utility works

Worksite and access for construction

98, 104, 117, 216, AP1-27 to AP1-29, AP2-21, AP2-23, AP2-70 to AP2-75, AP2-79 to AP2-81Utility works
42 to 44, 89

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

49

Provision of environmental mitigation

Provision of a public right of way

64, 105

Provision of railway infrastructure and access

Provision of environmental mitigation

66, 93, 114, 134, 147, 150, 156, 205, AP2-25, AP2-26, AP2-30, AP2-31, AP2-52, AP2-54

Provision of environmental mitigation

Highway works

71

Highway works

Worksite and access for construction

74

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

76, 82

Worksite and access for construction

Provision of a public right of way

90

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

93a, 95a, 108, 140, 142, 143, 160, 163, 169, 175, 177, 182

Provision of environmental mitigation

Worksite and access for construction

185, 202, AP1-15, AP1-30, AP1-32, AP1-34Highway works
AP1-33, AP1-35, AP1-37

Highway works

Utility Works

AP2-6 to AP2-8Dewatering operations
AP2-1 to AP2-5, AP2-9, AP2-11, AP2-14, AP2-20, AP2-37, AP2-39, AP2-44 to AP2-51Provision of railway infrastructure and access
AP2-38, AP2-40, AP2-41, AP2-43Provision of residential facility
Parish of Colton45a, 46a, 48, 56, 57a, 61a, 63a, 73a, 95, 98, 100, 103, 106, 111, 112, 120, 121, 124, 134 to 136, 144, 145, 183, 187, 191, 215, 221 to 224, 226, 232, 243, 244, AP1-1 to AP1-3, AP1-7 to AP1-9, AP2-1, AP2-3 to AP2-7, AP2-14, AP2-18, AP2-20, AP2-25, AP2-31 to AP2-33, AP2-35, AP2-36, AP2-43, AP2-48 to AP2-51Utility works
32, 67, 70, 90, 115, 118, 127, 138, 155, 169, 177, 195, 199, 201, 205, 206, 209, 228, 230, 238, AP2-16, AP2-26 to AP2-28, AP2-56 to AP2-60Provision of environmental mitigation
197, AP2-9, AP2-24, AP2-34, AP2-40, AP2-54, AP2-55

Provision of environmental mitigation

Utility works

33

Provision of environmental mitigation

Highway works

43, 44, 49, 65, 65a, 66, 69, 71, 78, 82, 83, 109, 137, 185, 186, 193, 202, 212, 250Worksite and access for construction
79a, 79b, 91, 113, 117

Provision of environmental mitigation

Worksite and access for construction

151, 158, 161, 165, 220, AP1-5Highway works
214

Provision of environmental mitigation

Highway works

Worksite and access for construction

217, 218, 240, 242, AP2-45, AP2-47

Utility works

Worksite and access for construction

231, 236

Provision of railway infrastructure and access

Provision of environmental mitigation

Borough of East Staffordshire

Parish of Blithfield

1Highway works
Parish of Abbots BromleyAP2-1 to AP2-8, AP2-23, AP2-25, AP2-26, AP2-30, AP2-37, AP2-38, AP2-43, AP2-46, AP2-47, AP2-52, AP2-64, AP2-66, AP2-67, AP2-72, AP2-74, AP2-76, AP2-77, AP2-79, AP2-80, AP2-117, AP2-118Provision of environmental mitigation
AP2-9, AP2-11, AP2-12, AP2-15, AP2-16, AP2-19, AP2-21, AP2-24, AP2-29, AP2-34, AP2-48, AP2-49, AP2-55, AP2-58, AP2-62, AP2-63, AP2-78, AP2-82, AP2-83, AP2-84, AP2-86 to AP2-90, AP2-93, AP2-93a, AP2-94, AP2-95, AP2-95a, AP2-96Utility works
AP2-14, AP2-17, AP2-20, AP2-27, AP2-31, AP2-33, AP2-40, AP2-41, AP2-54, AP2-59, AP2-68, AP2-70

Provision of environmental mitigation

Utility works

AP2-44, AP2-60Worksite and access for construction
AP2-98

Provision of environmental mitigation

Utility works

Worksite and access for construction

Parish of Hoar CrossAP2-1, AP2-3Utility works
AP2-5

Provision of environmental mitigation

Utility works

Worksite and access for construction

AP2-6 to AP2-9, AP2-34

Provision of environmental mitigation

Utility works

AP2-15, AP2-22, AP2-23, AP2-26Provision of environmental mitigation
AP2-28, AP2-37, AP2-38Worksite and access for construction
Parish of NewboroughAP2-1 to AP2-6, AP2-8Provision of environmental mitigation Utility works

Borough of Stafford

Parish of Colwich

22, 142 to 144, 151

Provision of environmental mitigation

Worksite and access for construction

25, 52a, 54, 58, 64a, 76 to 79, 158, 220aProvision of environmental mitigation
28, 30, 32, 33, 37, 40, 42, 52, 55, 57, 59, 60, 64, 65, 94c, 104, 107, 110, 161a, 177b, 180, AP1-2, AP1-4, AP1-9, AP1-11, AP1-13, AP1-19 to AP1-22, AP2-1, AP2-2, AP2-4, AP2-7a, AP2-11a, AP2-12, AP2-22, AP2-23, AP2-36 to AP2-38Utility works
47, 83, 85, 86a, 95

Worksite and access for construction

Provision of a public right of way

49, 51, 86b, 86c, 86d, 99, 100, 133, 134, 140, 146, 159, 171, 172, 182a, 185, 187, 193, 198a, 199a, 201, 210, 212, 216a, 217, 224 to 228, AP2-8, AP2-9Worksite and access for construction
69, 90a, 101a

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

94b, 103a, 103b, 109c, 109d, 111b, 112a, 121a, 129, 130, 157, 164, 167a, 170a, 184, 188, 197b, AP2-15, AP2-18, AP2-42, AP2-65 to AP2-67

Utility works

Worksite and access for construction

126a, 149a, 215a

Provision of railway infrastructure and access

Worksite and access for construction

132

Highway works

Worksite and access for construction

155

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

229 to 232Provision of railway infrastructure and access
108a, 109b, AP2-31, AP2-34, AP2-35

Utility works

Creation of new rights of way

Parish of Hixon1Provision of railway infrastructure and access
2Provision of railway infrastructure and accessWorksite and access for construction
Parish of Ingestre1, 4, 5, 7a, 7b, 10, 11, 43, AP2-4, AP2-24Utility works
12

Provision of environmental mitigation

Worksite and access for construction

14, 18, 21, 23, 30, 33Provision of environmental mitigation
15Highway works
16

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

19

Provision of railway infrastructure and access

Worksite and access for construction

20, AP2-2

Provision of environmental mitigation

Utility works

27Worksite and access for construction
AP2-6, AP2-7, AP2-9 to AP2-11, AP2-13, AP2-14, AP2-14a, AP2-15

Utility works

Worksite and access for construction

AP2-18, AP2-19, AP2-21, AP2-22Reinstatement of golf facilities
Parish of Tixall4, 5, 39, 73, AP2-1, AP2-10, AP2-16Utility works
7, 38, 43, AP2-12, AP2-13, AP2-15

Provision of railway infrastructure and access

Provision of environmental mitigation

8, 30, 36, 49, 51, 56, 57a, 60, 84Worksite and access for construction
40Highway works
15, 24, 62, AP2-3 to AP2-5

Utility works

Worksite and access for construction

20, 27, 33, 46, 47, 55, 61, 64, 67, 72Provision of environmental mitigation
48

Provision of environmental mitigation

Worksite and access for construction

50

Provision of environmental mitigation

Utility works

Worksite and access for construction

63Provision of railway infrastructure and access
Parish of Hopton and Coton1, 15, 21, 28, 29, 32, 80, 103, 104a, 104b, 108a, 109a, 121a, 161, 173a, 175Provision of environmental mitigation
34, 56, 81b, 89a, 93, 94a, 95, 96, 100b, 101b, 101c, 117, 166, 186a, AP2-12, AP2-17, AP2-56a, AP2-72Worksite and access for construction
11, 16a, 17, 23a, 23b, 123a

Provision of railway infrastructure and access

Provision of environmental mitigation

36, 42, 44, 48, 66, 68, 72, 73, 84, 85, 99, 105, 148, 153, 156, 157, 163, 164, 180, 188, 194, AP1-12, AP1-14, AP1-15a, AP1-16, AP2-25, AP2-28, AP2-36, AP2-37, AP2-41, AP2-45 to AP2-48, AP2-59, AP2-60, AP2-62 to AP2-64, AP2-66, AP2-70, AP2-74, AP2-76 to AP2-79, AP2-81 to AP2-86, AP2-95, AP2-98Utility works
18a, 19a, 64, AP2-3 to AP2-6, AP2-93

Utility works

Worksite and access for construction

33, 37a, 74, AP2-65

Provision of environmental mitigation

Utility works

35a

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

57, 181

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

60, 61, 63, 65

Provision of environmental mitigation

Provision of a public right of way

70, 116, 187Provision of railway infrastructure and access
78, AP2-24Highway works
91a, 92b, 97b, 100c, 183, 184a, AP2-31 to AP2-34

Provision of environmental mitigation

Worksite and access for construction

AP2-16, AP2-18, AP2-19, AP2-21Reinstatement of business or facilities
AP2-92

Utility works

Provision of a public right of way

Parish of Salt and Enson2, 3Utility works
AP2-1Worksite and access for construction
Parish of Marston1, 44, 61, 70, 103, 105, 109, AP2-9, AP2-10

Provision of environmental mitigation

Worksite and access for construction

6, 43Provision of railway infrastructure and access
7, 16, 29, 31, 36, 63, 74, 78, 82, 83, 110, AP1-3, AP1-5, AP1-6a, AP2-11, AP2-19, AP2-21, AP2-23, AP2-26, AP2-29 to AP2-32, AP2-33a, AP2-34Utility works
12, 39, 46, 47, 50, 53, 56, 59, 60, 62, 64, 69, 75, 77, 94, 99, 104, 108Provision of environmental mitigation
20, 54, 92

Provision of railway infrastructure and access

Worksite and access for construction

27, 49Worksite and access for construction
42, AP1-1, AP1-2Highway works
45

Worksite and access for construction

Provision of a public right of way

90

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

98

Provision of railway infrastructure and access

Provision of environmental mitigation

AP2-8

Provision of environmental mitigation

Utility works

AP2-22, AP2-24

Utility works

Worksite and access for construction

Parish of CreswellAP2-3Highway works
Parish of Whitgreave3

Provision of environmental mitigation

Worksite and access for construction

4Provision of environmental mitigation
AP2-2

Utility works

Worksite and access for construction

Parish of Stone Rural1, 3, 10a, 30, 35, 40, 47, 59 to 61, 68, 88a, 113, 118, 119Worksite and access for construction
4, 13, 24 to 26, 44a, 51, 55, 56, 74 to 76, 81a, 122, 123, 126, 153, 155, AP2-48, AP2-49Provision of environmental mitigation
6

Worksite and access for construction

Provision of a public right of way

11a, 14, 17, 31, 41, 42, 70, 105, 128a

Provision of environmental mitigation

Worksite and access for construction

15, 18, 19a, 22, 23, 48, 135, 139, 140, AP1-2 to AP1-11, AP1-15, AP2-10, AP2-11, AP2-22, AP2-30a, AP2-31 to AP2-33, AP2-38, AP2-39, AP2-62, AP2-63, AP2-68, AP2-77, AP2-82, AP2-83Utility works
20, 91, 92

Provision of railway infrastructure and access

Worksite and access for construction

37, 107a, 116a

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

54, 57

Provision of environmental mitigation

Provision of a public right of way

73a, 157

Provision of railway infrastructure and access

Provision of environmental mitigation

Utility works

Worksite and access for construction

77, 129Provision of railway infrastructure and access
90a, 90b

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

131

Provision of railway infrastructure and access

Provision of environmental mitigation

AP2-3 to AP2-6, AP2-8, AP2-29, AP2-81, AP2-84, AP2-85

Utility works

Worksite and access for construction

AP2-57

Highway works

Utility works

AP2-58, AP2-59

Provision of environmental mitigation

Highway works

Utility works

AP2-72 to AP2-74

Provision of environmental mitigation

Provision of water treatment facility

Parish of Stone5, 7

Provision of environmental mitigation

Worksite and access for construction

AP1-1, AP2-22a, AP2-26Utility works
Parish of Chebsey1, 3Provision of environmental mitigation
4, 7, 11Provision of railway infrastructure and access
Parish of Swynnerton1, 221, 273, 274Provision of railway infrastructure and access
13, 14, 28, 32, 34, 39, 40, 44, 60, 75, 83, 84, 98, 99, 107, 108, 111, 140, 169a, 170a, 188, 190 to 192, 199, 200, 204, 218, 223, 231, 234, 236, 237, 240, 242, 245, 247, 269, 278, 284a, 294, 308, 322, 324, 325, AP1-41, AP2-39Provision of environmental mitigation
19, 23, 55, 56, 62, 92, 104, 112, 115, 117, 174, 179, 208, 219, 225, 246, 256, 264, 271, 272, 281, 283, 288, 290, 292, 293, 298, 329, AP1-72Worksite and access for construction
35, 38, 41, 46, 51 to 53, 57, 109a, 121a, 122, 125, 165b, 196, 201, 228, 232, 241, 251 to 253, 266, 279, 282

Provision of environmental mitigation

Worksite and access for construction

63, 77, 81, 82, 85, 91b, 95, 97, 105, 118, 135, 144b, 144c, 144d, 146, 148, 153 to 155, 157, 159, 163, 175, 177, 257, 301, 309, 310, 316, 319, AP1-21, AP1-22, AP1-26, AP1-32, AP1-33, AP1-35, AP1-37, AP1-39, AP1-42, AP1-44, AP1-45, AP1-47, AP1-79, AP1-83 to AP1-88, AP2-3, AP2-4, AP2-13, AP2-14, AP2-21, AP2-22, AP2-27, AP2-30 to AP2-32, AP2-34, AP2-41, AP2-42, AP2-44, AP2-45Utility works
64a, 261, AP1-4

Provision of railway infrastructure and access

Provision of environmental mitigation

67, 72a, 259

Provision of environmental mitigation

Utility works

Worksite and access for construction

68

Provision of environmental mitigation

Utility works

Worksite and access for construction

Provision of a public right of way

86, 88, 137, AP2-28

Utility works

Worksite and access for construction

132a

Provision of railway infrastructure and access

Provision of environmental mitigation

Utility works

Worksite and access for construction

149, 150, 156, 158

Utility works

Provision of a public right of way

151

Utility works

Worksite and access for construction

Provision of a public right of way

152a, 152b, 167, 168

Worksite and access for construction

Provision of a public right of way

202, 226, 227, 229, 230, 332aHighway works
203, 326a

Provision of environmental mitigation

Highway works

207

Highway works

Worksite and access for construction

217

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

295a

Provision of railway infrastructure and access

Utility works

Worksite and access for construction

Provision of a public right of way

276, 300a, 300b

Provision of railway infrastructure and access

Worksite and access for construction

AP2-25, AP2-26, AP2-40

Provision of environmental mitigation

Utility works

AP2-66, AP2-68 to AP2-71Provision of water treatment facility
AP2-67

Provision of environmental mitigation

Provision of water treatment facility

Parish of StandonAP2-1, AP2-3, AP2-8, AP2-11Provision of water treatment facility
AP2-5

Provision of environmental mitigation

Provision of water treatment facility

Borough of Newcastle-under-Lyme

Parish of Whitmore

1, 2, 38, 57, 62, 131, 133, 136, 137, 148a, 166, AP2-2Worksite and access for construction
11, 13, 14, 18 to 20, 32, 44, 49, 66, 118, AP2-1, AP2-7, AP2-9Utility works
16

Utility works

Worksite and access for construction

21

Provision of environmental mitigation

Highway works

Worksite and access for construction

23 to 25, 102, 134a, 141b, 142, 146a, 147a 152, 153, 158, 163, 165, 168, 169, 174Provision of environmental mitigation
30Highway works
27, 42, 91b, 139, 141d, 149a, 150, AP2-14

Provision of environmental mitigation

Worksite and access for construction

36

Provision of environmental mitigation

Highway works

120a

Provision of railway infrastructure and access

Provision of environmental mitigation

140, 143Provision of environmental mitigation and installation of ground anchors
151, 159, 172, 173, 176, 177Provision of railway infrastructure and access
114a

Provision of environmental mitigation

Creation of new rights of way

144a

Provision of railway infrastructure

Provision of environmental mitigation

Creation of new rights of way

Town of Newcastle-under-LymeAP2-6, AP2-7Utility works
Parish of MaerAP2-3, AP2-6Highway works
Parish of Madeley1, 2, 3, 23, 24, 26, 29, 34, 36, 37, 65, 81, 99 to 101, 134, 135, 147, 148, 174, 175, 183, 184, 191, 192, 199, 200, 219 to 221, 242, 243Provision of railway infrastructure and access
5, 12a, 12b, 25, 30, 83, 85, 89, 91, 126, 139, 140, 156, 180, 185, 198, 251

Provision of environmental mitigation

Worksite and access for construction

6, 27, 40a, 45 to 47, 51, 52, 68, 71, 72, 74, 76, 78, 82, 102, 104, 109, 112, 116, 138, 177, 179, 188, 189, AP2-21, AP2-22Provision of environmental mitigation
10b, 14, 15, 17, 18, 39, 57, 60, 61, 63, 73, 79, 90, 115, 117, 121, 129, 136, 186, 190, 193, 210, 211, 214, 216 to 218, AP2-49 to AP2-54Worksite and access for construction
31, 37a, 77, 241

Provision of environmental mitigation

Worksite and access for construction

Borrow pit

35, 48

Utility works

Worksite and access for construction

69

Provision of railway infrastructure and access

Utility works

70Borrow pit
92, 173, 209, AP2-10, AP2-12, AP2-13, AP2-35, AP2-36Utility works
97, 144, 197, 202

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

152 to 155

Provision of railway infrastructure and access

Provision of environmental mitigation

203

Worksite and access for construction

Provision of a public right of way

206

Provision of environmental mitigation

Utility works

Worksite and access for construction

222, 232, 237

Provision of environmental mitigation

Highway works

AP2-2Dewatering operations
AP2-14

Provision of environmental mitigation

Utility works

Unitary District of Shropshire21 to 23

Provision of environmental mitigation

Highway works

Parish of Woore26Provision of environmental mitigation
Parish of Betley1, AP2-1, AP2-3, AP2-5, AP2-6Worksite and access for construction
2, 3, 5, 6a, 7, AP1-1Utility works
8, 10, 11Provision of railway infrastructure and access

County of Cheshire

Borough of Cheshire East

Parish of Checkley cum Wrinehill

1a, 3

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

4, 5, 26, 27Provision of environmental mitigation
6, 7, 33Utility works
14, 15, 28 to 32Provision of railway infrastructure and access
16, 19

Worksite and access for construction

Provision of a public right of way

20, 24, AP2-1 to AP2-3, AP2-5, AP2-8, AP2-9Worksite and access for construction
22e

Borrow pit

Provision of a public right of way

22b, 22c, 22dBorrow pit
AP2-12

Utility works

Worksite and access for construction

Parish of Blakenhall1b, 1c, 1d

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

1a, 31a, 136, 136a, 143

Provision of a public right of way

Worksite and access for construction

3a, 3c

Provision of environmental mitigation

Utility works

Worksite and access for construction

Creation of new rights of way

3b

Provision of environmental mitigation

Utility works

Worksite and access for construction

Borrow pit

4

Utility works

Borrow pit

5a, 97, 121, 124, 126, 141Provision of environmental mitigation
7a, 7b, 7c, 10, 10a, 13, 50, 115, 123, 127, 130, AP2-1, AP2-2, AP2-5 to AP2-7, AP2-40, AP2-51, AP2-61

Utility works

Worksite and access for construction

8a, 8b, 9b, 9c

Utility works

Worksite and access for construction

Borrow pit

11a, 11b, 11c, 17b, 38b

Provision of railway infrastructure and access

Provision of environmental mitigation

Utility works

14a, 28a, 46, 52, 53a, 54

Provision of railway infrastructure and access

Provision of environmental mitigation

15a, 15b, 15c, 21a

Provision of environmental mitigation

Borrow pit

16, 18, 24, 25Provision of railway infrastructure and access
19, 27, 31b, 31c, 49a, 60, 101a, 101b, 113a, 116, 120, 144, AP2-11, AP2-13, AP2-28, AP2-35Worksite and access for construction
23Borrow pit
7d, 29a, 35, 70, 74, AP1-1a, AP1-2a, AP1-4, AP1-6, AP1-8 to AP1-11, AP1-13, AP1-14a, AP1-18, AP1-19, AP2-23, AP2-27, AP2-66 to AP2-68Utility works
65, 79a, 81b, 106a, 125, 131, AP2-56

Provision of environmental mitigation

Worksite and access for construction

66a

Provision of environmental mitigation

Highway works

Worksite and access for construction

68a

Provision of environmental mitigation

Highway works

85, 122, AP1-7a, AP1-7b

Provision of environmental mitigation

Utility works

86Highway works
112, AP2-48

Provision of environmental mitigation

Utility works

Worksite and access for construction

135

Provision of environmental mitigation

Utility works

Provision of a public right of way

AP2-62, AP2-63, AP2-65

Highway works

Utility works

Parish of Hough1

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

2Worksite and access for construction
3, 6Utility works
4, 5

Utility works

Provision of a public right of way

Parish of Chorlton3, 57, 82, 92, 93

Provision of environmental mitigation

Worksite and access for construction

4, 39

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

5, 9, 74, AP1-4 to AP1-6, AP1-8, AP1-9, AP1-11, AP1-13 to AP1-19, AP2-4, AP2-6, AP2-8, AP2-9, AP2-11Utility works
7, 90, 96, 97a, 98, 101, 102, 104, 106, 107, AP2-10Worksite and access for construction
8, 8a, 23, 29

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

12, 48

Worksite and access for construction

Provision of a public right of way

16, 41, 44, 56, 59, 81, 84, 86Provision of environmental mitigation
22, 34, 36, 46,Provision of railway infrastructure and access
25

Highway works

Utility works

38

Provision of railway infrastructure and access

Provision of environmental mitigation

Worksite and access for construction

Provision of a public right of way

47

Provision of railway infrastructure and access

Worksite and access for construction

Provision of a public right of way

49

Provision of environmental mitigation

Provision of a public right of way

71, 73

Provision of environmental mitigation

Highway works

AP2-1, AP2-2

Utility works

Worksite and access for construction

AP2-5, AP2-7

Provision of environmental mitigation

Utility works

Parish of Basford6, 7, 11, 48

Provision of environmental mitigation

Highway works

9, 13, AP1-1, AP1-5 to AP1-8, AP1-10 to AP1-12, AP1-14, AP1-15, AP1-22, AP2-1 to AP2-3Utility works
14, 16, 19, 22, 44

Provision of environmental mitigation

Worksite and access for construction

18, 20, 40, 41, 55, 56, 59, 69, 72, 73, 76Provision of environmental mitigation
23, 26, 27, 31, 37, 39, 43, 47, 63, 75, 78 to 81, 86, 88, 91a, 97, AP1-28, AP2-4, AP2-6 to AP2-10Worksite and access for construction
32

Provision of environmental mitigation

Provision of a public right of way

33

Worksite and access for construction

Provision of a public right of way

57

Provision of railway infrastructure and access

Provision of environmental mitigation

66Provision of railway infrastructure and access
Parish of Weston1, 2, AP1-1, AP1-2Utility works
Parish of Shavington cum Gresty2 to 5, 5a, 6, AP2-2, AP2-3Worksite and access for construction
7Provision of environmental mitigation
Town of Crewe3, 41Worksite and access for construction
9, 16, 17, 19 to 22, 24, 26, 29 to 32, 34, 37, 38, AP2-4, AP2-8, AP2-9Provision of railway infrastructure and access
Parish of Haslington2Provision of railway infrastructure and access
Parish of Moston1Provision of railway infrastructure and access
Town of Sandbach2

Provision of railway infrastructure and access

Worksite and access for construction

5Worksite and access for construction
6 to 9Provision of railway infrastructure and access

Section 4(5)

SCHEDULE 7U.K.Acquisition of land: application of compulsory purchase legislation

Land Clauses Consolidation Act 1845 (c. 18)U.K.

1U.K.The Land Clauses Consolidation Act 1845 does not apply to the acquisition of land under section 4(1).

Compulsory Purchase Act 1965 (c. 56)U.K.

2(1)In its application by virtue of section 4(3), the Compulsory Purchase Act 1965 has effect with the following modifications.U.K.

(2)Omit section 4 (time for exercise of compulsory purchase powers).

(3)In section 11(1B) (power to enter on and take possession of land the subject of a notice to treat after giving the specified notice)—

(a)in a case where the notice to treat relates only to one or more of the following—

(i)the acquisition of subsoil or under-surface of land, where the subsoil or under-surface lies more than 9 metres below the surface;

(ii)the acquisition of airspace over land;

(iii)an easement, restrictive covenant or other right over land,

for “3 months” substitute “ 1 month ”, and

(b)after “11A(4)” insert “ or (6) and (7) ”.

(4)In section 11A (powers of entry: further notices of entry)—

(a)in subsection (1)(a), after “land” insert “ under that provision ”,

(b)in subsection (2), after “land” insert “ under that provision, to the extent that the newly identified person is the owner, lessee or occupier of the land, ”,

(c)in subsection (4)(a), for “14 days” substitute “ 7 days ”, and

(d)at the end insert—

(5)Subsections (6) and (7) apply for the purposes of determining the period to be specified in the notice of entry under section 11(1) served on the newly identified person in a case where subsection (4) does not apply.

(6)The period specified in the notice must be—

(a)in a case where the notice to treat relates only to one or more of the following—

(i)the acquisition of subsoil or under-surface of land, where the subsoil or under-surface lies more than 9 metres below the surface;

(ii)the acquisition of airspace over land;

(iii)an easement, restrictive covenant or other right over land,

a period that ends no earlier than the end of the period of 7 days beginning with the day on which the notice of entry is served, and

(b)in any other case, a period that ends no earlier than the end of the period of 28 days beginning with the day on which the notice of entry is served.

(7)The period specified in the notice must end no earlier than the end of the period specified in any previous notice of entry given by the acquiring authority in respect of the land.

(5)In section 22(2) (expiry of time limit for exercise of compulsory purchase power not to affect acquisition of interests omitted from purchase), for “section 4 of this Act” substitute “ section 9(1) of the High Speed Rail (West Midlands - Crewe) Act 2021 ”.

(6)In Schedule 2A (proposal to acquire part only of a house, building or factory)—

(a)omit paragraphs 1(2) and 14(2), and

(b)at the end insert—

PART 4 U.K.Interpretation

30In this Schedule, references to entering on and taking possession of land do not include doing so under Schedule 15 to the High Speed Rail (West Midlands - Crewe) Act 2021 (temporary possession and use of land).

Compulsory Purchase (Vesting Declarations) Act 1981 (c. 66)U.K.

3U.K.In its application by virtue of section 4(4), the Compulsory Purchase (Vesting Declarations) Act 1981 has effect as if—

(a)before section 4 there were inserted—

3APreliminary notices

(1)Before making a declaration under section 4 with respect to any land which is subject to a compulsory purchase order, the acquiring authority must include the particulars specified in subsection (3) in a notice which is—

(a)given to every person with a relevant interest in the land with respect to which the declaration is to be made (other than a mortgagee who is not in possession), and

(b)published in the London Gazette.

(2)A notice under subsection (1) must be given before the service of any notice to treat in respect of the land with respect to which the declaration is to be made.

(3)The notice must—

(a)contain a statement, in the form prescribed for the purposes of section 15(4)(e) of the Acquisition of Land Act 1981 (with any necessary modifications), about the effect of Parts 2 and 3 of this Act, and

(b)invite any person who would be entitled to claim compensation if a declaration were executed under section 4 to give the acquiring authority information about the person's name, address and interest in land, using the form prescribed for the purposes of section 15(4)(f) of the Acquisition of Land Act 1981 (with any necessary modifications).

(4)A notice complying with the preceding provisions of this section must be sent to the Chief Land Registrar and it shall be a local land charge.

(5)For the purposes of this section, a person has a relevant interest in land if—

(a)the person is for the time being entitled to dispose of the fee simple of the land, whether in possession or reversion, or

(b)the person holds, or is entitled to the rents and profits of, the land under a lease or agreement, the unexpired term of which exceeds one month.,

(b)sections 5 and 5A (which respectively set out the earliest date, and the time limit, for the execution of a general vesting declaration) were omitted,

(c)in section 6 (notices after execution of general vesting declaration), the reference to the invitation under section 15 of, or paragraph 6 of Schedule 1 to, the Acquisition of Land Act 1981 were a reference to the invitation under section 3A(3) (as set out in sub-paragraph (a) above),

(d)in section 9 (minor tenancies and tenancies about to expire: power to enter on and take possession of land the subject of a notice to treat after giving the specified notice), for “3 months” there were substituted “ 14 days ”,

(e)in Schedule A1 (counter-notice requiring purchase of land not in general vesting declaration), paragraph 1(2) were omitted, and

(f)references to the Compulsory Purchase Act 1965 were to that Act as applied by section 4(3) to the acquisition of land under section 4(1).

Acquisition of Land Act 1981 (c. 67)U.K.

4(1)Section 4 of the Acquisition of Land Act 1981 (assessment of compensation in relation to compulsory purchase where unnecessary things done with view to obtaining compensation) has effect in relation to a compulsory purchase under this Act as if it were a compulsory purchase for the purposes of that Act.U.K.

(2)Section 5A of the Acquisition of Land Act 1981 (power to require information) has effect in relation to land to which section 4(1) applies as if it were land referred to in section 5A(1) of that Act.

(3)Parts 2 and 3 of Schedule 2 to the Acquisition of Land Act 1981 (exception of minerals from compulsory purchase and regulation of working of mines or minerals underlying an authorised undertaking) have effect in relation to land to which section 4(1) applies as if it were comprised in a compulsory purchase order providing for the incorporation with that order of those Parts of that Schedule.

(4)In their application by virtue of sub-paragraph (3), Parts 2 and 3 of Schedule 2 to the Acquisition of Land Act 1981 have effect as if—

(a)references to the acquiring authority, except the second reference in paragraph 6, were to the nominated undertaker, and

(b)references to the undertaking were to the undertaking which the nominated undertaker is authorised by this Act to carry on.

Section 5(2)

SCHEDULE 8U.K.Land where powers of acquisition are limited to acquisition of rights or imposition of restrictive covenants

AreaNumber of land shown on deposited plansPurpose for which rights may be acquired or restrictive covenants imposed

County of Staffordshire

District of Lichfield

Parish of Kings Bromley

AP1-3Provision of access for construction and maintenance
Parish of Armitage with Handsacre1Preservation of ground reprofiling
Parish of Mavesyn RidwareAP1-39, AP1-40Provision of access for construction and maintenance
Parish of Colton77Provision of access for construction
AP2-15, AP2-17, AP2-19, AP2-21, AP2-29, AP2-37, AP2-37aProvision of access for construction and maintenance

Borough of East Staffordshire

Parish of Abbots Bromley

AP2-56, AP2-57, AP2-71, AP2-94a, AP2-99, AP2-101, AP2-103, AP2-104, AP2-108, AP2-109, AP2-111, AP2-115Provision of access for construction and maintenance
Parish of Hoar CrossAP2-18, AP2-20, AP2-25, AP2-33Provision of access for construction and maintenance

Borough of Stafford

Parish of Colwich

AP1-8, AP1-10, AP1-15 to AP1-17, AP2-11Provision of access for construction and maintenance
Parish of IngestreAP2-20, AP2-23Provision of access for construction and maintenance
Parish of Tixall22, 28, 29, AP1-1, AP1-2, AP1-4 to AP1-7Provision of access for construction and maintenance
Parish of Hopton and CotonAP1-7, AP1-9, AP1-10, AP1-17, AP1-23, AP1-24, AP2-58Provision of access for construction and maintenance
Parish of Stone Rural125Provision of access for construction
AP2-46, AP2-47, AP2-75Provision of access for construction and maintenance
Parish of Swynnerton31, 320, 321, AP1-6, AP1-9, AP1-11, AP1-12, AP1-24, AP1-27, AP1-29, AP1-30, AP1-40a, AP1-54, AP1-57, AP1-59, AP1-60, AP1-64 to AP1-66, AP2-7, AP2-72, AP2-73Provision of access for construction and maintenance

Borough of Newcastle-under-Lyme

Parish of Whitmore

AP2-21Provision of access for construction and maintenance
Parish of Madeley7, 207Preservation of ground reprofiling
AP2-7, AP2-11Provision of access for construction and maintenance

County of Cheshire

Borough of Cheshire East

Parish of Chorlton

AP1-12Provision of access for construction and maintenance
Parish of BasfordAP1-29Provision of access for construction and maintenance
Town of CreweAP1-1 to AP1-3Provision of access for construction and maintenance
Town of SandbachAP1-1, AP1-2Provision of access for construction and maintenance

Section 5(6)

SCHEDULE 9U.K.Acquisition of rights in land etc: application of compulsory purchase legislation

Compulsory Purchase Act 1965 and compensation enactmentsU.K.

1U.K.Part 1 of the Compulsory Purchase Act 1965 (referred to in this Schedule as “CPA 1965”), as applied by section 4(3) to the acquisition of land under section 4(1), and the enactments relating to compensation for the compulsory purchase of land, apply to a compulsory acquisition under section 4(1) by virtue of section 5—

(a)with the modifications specified in paragraph 2, and

(b)with such other modifications as may be necessary.

2(1)The modifications referred to in paragraph 1(a) are as follows.U.K.

(2)References in CPA 1965 to land are, in appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—

(a)the right acquired or to be acquired or (as the case may be) the restrictive covenant imposed or to be imposed, or

(b)the land over which the right is, or is to be, exercisable or (as the case may be) the land over which the restrictive covenant is, or is to be, enforceable.

(3)For section 7 of CPA 1965 substitute—

7Measure of compensation in case of purchase of new right or imposition of new restrictive covenant

In assessing the compensation to be paid by the acquiring authority under this Act, regard shall be had, not only to the extent (if any) to which the value of the land over which the right is acquired or the restrictive covenant is imposed is depreciated by the acquisition of the right or the imposition of the covenant, but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

(4)The following provisions of CPA 1965 (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land)—

are so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be acquired compulsorily or the benefit of the covenant which is to be imposed is vested absolutely in the acquiring authority.

(5)Section 11 of CPA 1965 (powers of entry) is modified so as to secure that, where the acquiring authority have served notice to treat in respect of any right or restrictive covenant as well as the notice required by subsection (1) of that section (as it applies to a compulsory acquisition under section 4(1)), they have power, exercisable in the same circumstances and subject to the same conditions, to enter for the purpose of exercising that right or enforcing that covenant; and sections 12 (penalty for unauthorised entry) and 13 (entry on enforcement officer's or sheriff's warrant in the event of obstruction) of that Act are modified accordingly.

(6)Section 20 of CPA 1965 (compensation for short-term tenants) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition of the land, but taking into account only the extent (if any) of such interference with such interests as is actually caused, or likely to be caused, by the exercise of the right or enforcement of the restrictive covenant in question.

(7)Section 22 of CPA 1965 (protection of acquiring authority's possession of land where interest accidentally omitted from purchase) is so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or enforce the restrictive covenant imposed, subject to compliance with that section as respects compensation.

(8)For Schedule 2A to CPA 1965 substitute the version of that Schedule set out in Schedule 10 to this Act.

(9)In section 5A of the Land Compensation Act 1961 (relevant valuation date)—

(a)for subsection (5A) substitute—

(5A)If—

(a)the acquiring authority enters on land for the purpose of exercising a right or enforcing a restrictive covenant in pursuance of a notice of entry under section 11(1) of the Compulsory Purchase Act 1965,

(b)the authority is subsequently required by a determination under paragraph 13 of Schedule 2A to that Act (as substituted by paragraph 2(8) of Schedule 9 to the High Speed Rail (West Midlands - Crewe) Act 2021) to acquire an interest in the land, and

(c)the authority enters on and takes possession of that land,

the authority is deemed for the purposes of subsection (3)(a) to have entered on and taken possession of that land when it entered on it for the purpose of exercising the right or enforcing the covenant., and

(b)in subsection (5B), for paragraphs (a) and (b) substitute—

(a)a right over, or restrictive covenant affecting, land is the subject of a general vesting declaration,

(b)by virtue of paragraph 11(2) or 16(2) of Schedule A1 to the Compulsory Purchase (Vesting Declarations) Act 1981, the declaration has effect as if it included an interest in the land, and

(c)the vesting date for the right or covenant is different from the vesting date for the interest in the land,.

(10)In the Land Compensation Act 1973, for section 44 substitute—

44Compensation for injurious affection

(1)Where—

(a)a right over land is acquired from any person for the purpose of works which are to be situated partly on that land and partly elsewhere, or

(b)a restrictive covenant over land is imposed on any person for the purpose of such works,

compensation for injurious affection of land retained by that person shall be assessed by reference to the whole of the works and not only the part situated on the land over which the right is exercisable or the covenant is enforceable.

(2)In this section, “compensation for injurious affection” means compensation for injurious affection under section 7 or 20 of the Compulsory Purchase Act 1965 as applied by paragraph 1 of Schedule 9 to the High Speed Rail (West Midlands - Crewe) Act 2021.

Compulsory Purchase (Vesting Declarations) Act 1981 and compensation enactmentsU.K.

3(1)The Compulsory Purchase (Vesting Declarations) Act 1981 (“the 1981 Act”), as applied by section 4(4) to the acquisition of land under section 4(1), applies to a compulsory acquisition under section 4(1) by virtue of section 5—U.K.

(a)with the modifications specified in paragraph 4, and

(b)with such other modifications as may be necessary.

(2)The enactments relating to compensation for the compulsory purchase of land also apply to a compulsory acquisition under section 4(1) by virtue of section 5.

4(1)The modifications referred to in paragraph 3(1)(a) are as follows.U.K.

(2)References in the 1981 Act to land are, in appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—

(a)the right acquired or to be acquired or (as the case may be) the restrictive covenant imposed or to be imposed, or

(b)the land over which the right is, or is to be, exercisable or (as the case may be) the restrictive covenant is, or is to be, enforceable.

(3)References in the 1981 Act to the Compulsory Purchase Act 1965 are to be read as references to that Act as it applies to a compulsory acquisition under section 4(1) by virtue of section 5.

(4)Section 8(1) of the 1981 Act (vesting, and right to enter and take possession) is modified so as to secure—

(a)that a general vesting declaration in respect of any right or restrictive covenant vests the right or the benefit of the covenant in the acquiring authority on the vesting date, and

(b)that, as from the vesting date, the acquiring authority have power, exercisable in the same circumstances and subject to the same conditions, to enter land for the purpose of exercising that right or enforcing that covenant as if the circumstances mentioned in section 8(1)(a) and (b) of the 1981 Act had arisen.

(5)Section 9(2) of the 1981 Act (right of entry under section 8(1) not exercisable in respect of land subject to certain tenancies, unless notice has been served on occupiers of the land) is modified so as to require a notice served by the appropriate authority under that provision to refer to the authority's intention to enter land specified in the notice in order to exercise the right or enforce the restrictive covenant.

(6)In section 10(1) of the 1981 Act (acquiring authority's liability on vesting of land), the reference to the acquiring authority's taking possession of the land under section 11(1) of CPA 1965 is to be read instead as a reference to the authority's exercising the power to enter the land under that provision as modified by paragraph 2(5) of this Schedule.

(7)Schedule A1 to the 1981 Act (counter-notice requiring purchase of land not in general vesting declaration) has effect as if—

(a)in paragraph 1(1), for “part only of” there were substituted “ only the acquisition of a right over, or the imposition of a restrictive covenant affecting, ”,

(b)paragraph 1(2) were omitted,

(c)references to the land proposed to be acquired were (subject to paragraph (e) below) to the right proposed to be acquired or the restrictive covenant proposed to be imposed,

(d)references to the additional land were to the house, building or factory over which the right or covenant is proposed to be exercisable or enforceable,

(e)in paragraphs 14 and 15, references to the severance of the land proposed to be acquired were to the acquisition of the right or the imposition of the restrictive covenant, and

(f)in paragraph 15, after “in addition to” there were substituted “ or in substitution for ”.

Schedule 9 to High Speed Rail (London - West Midlands) Act 2017U.K.

5U.K.In paragraph 2 of Schedule 9 to the High Speed Rail (London - West Midlands) Act 2017 (which makes provision corresponding to this Schedule), for sub-paragraph (8B) (inserted by paragraph 8(4) of Schedule 14 to that Act) substitute—

(8B)In section 5A of the Land Compensation Act 1961 (relevant valuation date)—

(a)for subsection (5A) substitute—

(5A)If—

(a)the acquiring authority enters on land for the purpose of exercising a right or enforcing a restrictive covenant in pursuance of a notice of entry under section 11(1) of the Compulsory Purchase Act 1965,

(b)the authority is subsequently required by a determination under paragraph 13 of Schedule 2A to that Act (as substituted by paragraph 2(8A) of Schedule 9 to the High Speed Rail (London - West Midlands) Act 2017) to acquire an interest in the land, and

(c)the authority enters on and takes possession of that land,

the authority is deemed for the purposes of subsection (3)(a) to have entered on and taken possession of that land when it entered on it for the purpose of exercising the right or enforcing the covenant., and

(b)in subsection (5B), for paragraphs (a) and (b) substitute—

(a)a right over, or restrictive covenant affecting, land is the subject of a general vesting declaration,

(b)by virtue of paragraph 11(2) or 16(2) of Schedule A1 to the Compulsory Purchase (Vesting Declarations) Act 1981, the declaration has effect as if it included an interest in the land, and

(c)the vesting date for the right or covenant is different from the vesting date for the interest in the land,.

Section 5(6)

SCHEDULE 10U.K.Acquisition of rights in land: substituted Schedule 2A for Compulsory Purchase Act 1965

This is the version of Schedule 2A to the Compulsory Purchase Act 1965 referred to in paragraph 2(8) of Schedule 9—

SCHEDULE 2AU.K.Counter-notice requiring purchase of land

IntroductionU.K.

1This Schedule applies where an acquiring authority serve a notice to treat in respect of a right over, or restrictive covenant affecting, the whole or part of a house, building or factory.

2In this Schedule, “house” includes any park or garden belonging to a house.

Counter-notice requiring purchase of landU.K.

3A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner's interest in the house, building or factory.

4A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served.

Response to counter-noticeU.K.

5On receiving a counter-notice, the acquiring authority must decide whether to—

(a)withdraw the notice to treat,

(b)accept the counter-notice, or

(c)refer the counter-notice to the Upper Tribunal.

6The authority must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”).

7If the authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period.

8If the authority do not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period.

9If the authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner's interest in the house, building or factory.

Determination by Upper TribunalU.K.

10On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would—

(a)in the case of a house, building or factory, cause material detriment to the house, building or factory, or

(b)in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs.

11In making its determination, the Upper Tribunal must take into account—

(a)the effect of the acquisition of the right or the imposition of the covenant,

(b)the use to be made of the right or covenant proposed to be acquired or imposed, and

(c)if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land.

12If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the authority ought to be required to take.

13If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner's interest in that land.

14(1)If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land.

(2)If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice.

(3)Any dispute as to the compensation is to be determined by the Upper Tribunal.

Section 7

SCHEDULE 11U.K.Land where powers of acquisition are limited to sub-surface acquisition

Restriction of power of compulsory acquisition to land under the surfaceU.K.

1U.K.In the case of land specified in the following table, the power under section 4(1) may be exercised only in relation to so much of the subsoil or under-surface of the land as lies more than 9 metres below the level of the surface.

AreaNumber of land shown on deposited plans

Borough of Newcastle-under-Lyme

Parish of Whitmore

74, 77, 79, 82, 85, 87, 89, 92, 94, 96, 98, 100, 103, 105, 107, 109, 110, 178 to 181
Parish of Madeley142, 145, 158, 160, 164, 166

SupplementaryU.K.

2(1)Paragraph 1 is subject to the power to impose restrictive covenants by virtue of section 5(1)(b).U.K.

(2)Paragraph 1 does not restrict the exercise of the power under section 4(1) in relation to a cellar, vault, arch or other construction in, on or under a highway which forms part of a building fronting on to the highway where—

(a)the building is within the Act limits, and

(b)the power under section 4(1) is exercisable in relation to the building.

Section 8

SCHEDULE 12U.K.Highways: restrictions on powers to use subsoil and acquire land

AreaNumber of land shown on deposited plans

County of Staffordshire

District of Lichfield

Parish of Kings Bromley

4, 27, 53, 92, 104, 105, 109, 110, 166, 184, 193, 196, 215, 217, 241, 256, 257, 264 to 267, AP1-9, AP2-42c, AP2-94, AP2-102, AP2-103
Parish of Alrewas21, 22
Parish of Armitage with Handsacre4, 5, 28 to 31, AP2-1 to AP2-4, AP2-11, AP2-12
Parish of Hamstall Ridware6, 7
Parish of Mavesyn Ridware31a, 31b, 68, 191, 203, 204, 206a, AP1-14, AP1-26, AP1-31, AP1-38, AP1-20a, AP2-12, AP2-13, AP2-22, AP2-27, AP2-28, AP2-34, AP2-42, AP2-51a, AP2-53, AP2-60 to AP2-62, AP2-68, AP2-69, AP2-76
Parish of Colton42, 97, 119, 179, 232, AP1-4, AP1-6, AP2-22, AP2-23, AP2-38, AP2-39, AP2-41, AP2-42, AP2-44, AP2-46, AP2-53

Borough of East Staffordshire

Parish of Abbots Bromley

AP2-18, AP2-22, AP2-28, AP2-42, AP2-45, AP2-61, AP2-61a, AP2-65, AP2-73, AP2-81, AP2-85, AP2-92, AP2-92a, AP2-97
Parish of Hoar CrossAP2-2, AP2-4, AP2-11, AP2-13, AP2-29, AP2-29a, AP2-31, AP2-36, AP2-39
Parish of NewboroughAP2-11, AP2-13, AP2-14, AP2-14a, AP2-15

Borough of Stafford

Parish of Colwich

127a, 128a, 131, 173, 174a, 186, 223, AP1-18, AP2-10, AP2-46, AP2-47, AP2-51, AP2-52, AP2-71
Parish of Ingestre40, 41, AP2-16, AP2-17
Parish of Tixall6a, 37, 78, 79, AP2-19, AP2-20
Town of StaffordAP2-2, AP2-4 to AP2-6
Parish of Hopton and Coton2a, 54a, 76, 83, 98, 115a, 150, 152 ,193, AP2-2, AP2-26, AP2-91
Parish of Marston13, 24, 26, 30, AP1-4, AP2-28
Parish of CreswellAP2-1, AP2-2
Parish of Stone Rural112, 132 to 134, AP2-23, AP2-24, AP2-26, AP2-28, AP2-30, AP2-41, AP2-42, AP2-50 to AP2-53, AP2-55, AP2-56, AP2-60, AP2-61, AP2-64 to AP2-67, AP2-69 to AP2-71, AP2-76, AP2-78 to AP2-80, AP2-86 to AP2-88
Parish of BarlastonAP2-1 to AP2-8
Parish of StoneAP2-1, AP2-2, AP2-4 to AP2-14, AP2-16 to AP2-22, AP2-23
Parish of Swynnerton73, 76, 79, 80, 87, 90, 120, 166, 205, 206, 216, 220, 235, 296a, AP1-1, AP1-2, AP1-38, AP1-48, AP1-55, AP1-56, AP1-56a, AP1-58, AP2-15, AP2-16, AP2-18, AP2-37, AP2-38, AP2-43, AP2-46 to AP2-56, AP2-76 to AP2-79, AP2-81 to AP2-91
Parish of StandonAP2-2

Borough of Newcastle-under-Lyme

Parish of Whitmore

22, 26, 45, 64, 129, 161, AP2-3 to AP2-6, AP2-11, AP2-13
Town of Newcastle-under-LymeAP2-1 to AP2-5, AP2-8 to AP2-14, AP2-17 to AP2-19
Parish of MaerAP2-1, AP2-2, AP2-4, AP2-5
Parish of Madeley9a, 11a, 172, 223, 231, 238, 245, AP2-14a, AP2-15 to AP2-20, AP2-23, AP2-24, AP2-28, AP2-30 to AP2-33, AP2-39 to AP2-47
Parish of KeeleAP2-1, AP2-3 to AP2-14
Parish of SilverdaleAP2-1 to AP2-7

Unitary District of Shropshire

Parish of Woore

19, 20, 24, 25, 27 to 31

County of Staffordshire

Borough of Newcastle-under-Lyme

Parish of Betley

4, 9a, AP1-2, AP2-2, AP2-4

County of Cheshire

Borough of Cheshire East

Parish of Checkley cum Wrinehill

4a, 25, AP1-1
Parish of Blakenhall36, 47a, 57, 61, 62a, 62b, 64a, 64b, 72, 87, AP1-3, AP1-5, AP1-12, AP1-17, AP1-20, AP2-57, AP2-60, AP2-64
Parish of Chorlton15, 37, 51, 71a, 72, 76, 77, 100, 108, 109, AP1-1 to AP1-3, AP1-7, AP1-10, AP1-20, AP1-21
Parish of Basford4, 5, 10, 10a, 10b, 12, 42, 62, 67, 68, 71, AP1-2 to AP1-4, AP1-9, AP1-13, AP1-16 to AP1-21, AP2-5, AP2-11 to AP2-13
Parish of WestonAP1-3, AP2-1 to AP2-5
Parish of Wybunbury1
Parish of Shavington cum Gresty8, 9, AP1-1, AP2-1, AP2-4, AP2-5
Town of CreweAP2-1 to AP2-3

Section 9

SCHEDULE 13U.K.Right to require acquisition where time limit extended

1(1)If the Secretary of State makes an order under section 9(2), paragraphs 2 to 4 have effect as from the coming into force of the order.U.K.

(2)Those paragraphs do not apply to any subsoil or under-surface of land required only for the construction of a work at a level more than 9 metres below the level of the surface of the land.

2(1)Sub-paragraph (2) applies if a person with a qualifying interest in any of the land in relation to which the order is made gives notice to the Secretary of State (a “relevant notice”) that the person desires his or her interest in such of that land as is specified in the notice to be acquired by the Secretary of State.U.K.

(2)The Secretary of State must, within 3 months immediately following receipt of the relevant notice—

(a)enter into an agreement with the person for the acquisition of the person's interest in the whole or part of the land specified in the notice,

(b)exercise the applicable compulsory acquisition powers in respect of the person's interest in the whole or part of that land, or

(c)give the person notice of the Secretary of State's intention not to proceed with the purchase of the person's interest in any of that land.

(3)For the purposes of sub-paragraph (1) a person has a “qualifying interest” in land if the person is the owner or lessee of the land.

3(1)Where a person gives the Secretary of State a relevant notice and the Secretary of State—U.K.

(a)fails to comply with the requirements of sub-paragraph (2) of paragraph 2,

(b)withdraws a notice to treat served in compliance with paragraph (b) of that sub-paragraph, or

(c)gives the person a notice under paragraph (c) of that sub-paragraph,

the applicable compulsory acquisition powers cease to be exercisable in respect of that person's interest in any of the land specified in the relevant notice.

(2)Where—

(a)a person gives the Secretary of State a relevant notice, and

(b)the Secretary of State acquires in pursuance of paragraph 2(2)(a) or (b) the person's interest in some, but not all, of the land specified in the notice,

the applicable compulsory acquisition powers cease to be exercisable in respect of that person's interest in the remainder of that land.

4(1)References in this Schedule to the “applicable compulsory acquisition powers” are to—U.K.

(a)the power to serve a notice to treat under Part 1 of the Compulsory Purchase Act 1965, as applied by section 4(3) to the acquisition of land under section 4(1), and

(b)the power to execute a declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981, as applied by section 4(4) to the acquisition of land under section 4(1).

(2)In this Schedule—

Section 10

SCHEDULE 14U.K.Extinction of rights over land

Land to which Schedule appliesU.K.

1U.K.This Schedule applies to—

(a)land within the Act limits which is held by the Secretary of State for Phase 2a purposes, and

(b)land within the Act limits in relation to which the Secretary of State has acquired a right (whether by creating a new right or acquiring an existing right) or imposed a restrictive covenant for Phase 2a purposes.

Private rightsU.K.

2(1)All private rights over land within paragraph 1(a) are extinguished at the appropriate time.U.K.

(2)All private rights over land within paragraph 1(b) are extinguished at the appropriate time, so far as the continuance of those rights would be inconsistent with the exercise of the right acquired or the restrictive covenant imposed.

(3)In this Schedule, “private rights” include—

(a)private rights of way over land,

(b)rights of common,

(c)easements, liberties, privileges, rights or advantages annexed to land and adversely affecting other land, including any natural right to support, and

(d)restrictions as to the user of land arising under a contract.

(4)Where the power under section 11(1) of the Compulsory Purchase Act 1965 (power of entry following notice to treat) is exercised in the case of land within paragraph 1(a) or (b), sub-paragraph (1) or (2) (as the case may be) has effect in relation to rights of common over the land notwithstanding anything in Schedule 4 to that Act (which preserves rights of common over land until payment of compensation).

3(1)The Secretary of State may, in relation to a private right, direct—U.K.

(a)that paragraph 2 does not apply to the right, or

(b)that paragraph 2 applies to the right only to the extent specified in the direction.

(2)A direction under sub-paragraph (1) must be given before the appropriate time.

(3)Paragraph 2 does not apply to—

(a)a right over land which, were the land held otherwise than by the Secretary of State, would not be capable of being acquired under section 4(1), or

(b)a right to which section 271 or 272 of TCPA 1990 (extinguishment of rights of statutory undertakers etc) applies (and see section 11 of this Act as to the application of those sections).

4(1)Any person who suffers loss by the extinction of a private right under paragraph 2 is entitled to be compensated by the nominated undertaker.U.K.

(2)Any dispute as to a person's entitlement to compensation under this paragraph, or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(3)This paragraph does not apply where compensation in respect of rights of common is payable under Schedule 4 to the Compulsory Purchase Act 1965.

General rightsU.K.

5(1)All general rights over land within paragraph 1(a) are extinguished at the appropriate time.U.K.

(2)All general rights over land within paragraph 1(b) are extinguished at the appropriate time, so far as the continuance of those rights would be inconsistent with the exercise of the right acquired or the restrictive covenant imposed.

(3)In this Schedule, references to “general rights” over land are to—

(a)rights to access land (however expressed) which are exercisable as a result of section 2(1) of the Countryside and Rights of Way Act 2000 or an enactment mentioned in section 15 of that Act,

(b)other public rights over land which are conferred by an enactment, and

(c)rights exercisable as a result of trusts, or incidents, to which a common, town or village green, open space or allotment is subject.

6(1)The Secretary of State may, in relation to a general right, direct—U.K.

(a)that paragraph 5 does not apply to the right, or

(b)that paragraph 5 applies to the right only to the extent specified in the direction.

(2)A direction under sub-paragraph (1) must be given before the appropriate time.

Meaning of “the appropriate time”U.K.

7(1)References in this Schedule to “the appropriate time” are to be read as follows.U.K.

(2)In the case of—

(a)land held immediately before the day on which this Act is passed, or

(b)land which, immediately before that day, was land in relation to which a right had been acquired or a restrictive covenant had been imposed,

the appropriate time is the end of the period of 14 days beginning with that day.

(3)In the case of—

(a)land acquired on or after the day on which this Act is passed, or

(b)land in relation to which a right has been acquired or a restrictive covenant has been imposed on or after that day,

the appropriate time is the time of acquisition or (in the case of a restrictive covenant) imposition.

(4)Sub-paragraph (3) is subject to sub-paragraphs (5) and (6) (which apply to land or a right acquired compulsorily or to a restrictive covenant imposed compulsorily).

(5)Where the power under section 11(1) of the Compulsory Purchase Act 1965 has been exercised in relation to the land, the appropriate time is—

(a)the time of entry under that provision, or

(b)in the case of the acquisition of a right or the imposition of a restrictive covenant, the time when the power to enter the land for the purpose of exercising the right or enforcing the covenant becomes exercisable under that provision (as modified in accordance with paragraph 2(5) of Schedule 9 to this Act).

(6)Where a declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 has been made in relation to the land, the appropriate time is the vesting date (within the meaning of that Act).

Amendments to registers of common land or town or village greensU.K.

8(1)This paragraph applies where—U.K.

(a)the Secretary of State acquires land within the Act limits for Phase 2a purposes, or

(b)the Secretary of State acquires a right, or imposes a restrictive covenant, over land within the Act limits.

(2)The Secretary of State must notify the commons registration authority of the acquisition or (in the case of a restrictive covenant) imposition if it relates to—

(a)land registered in a register of common land as common land,

(b)land registered in a register of town or village greens as a town or village green, or

(c)a right of common registered in relation to land within paragraph (a) or (b).

(3)A notice under sub-paragraph (2) must include—

(a)a copy of this Schedule,

(b)a copy of the instrument by which the acquisition or imposition was effected,

(c)the number of the register unit and (where applicable) the number of the rights section entry in the register of common land or of town or village greens to which the notice relates, and

(d)a description of the amendment required to the register in question in consequence of the acquisition or imposition.

(4)Sub-paragraph (5) applies where, in connection with the acquisition or imposition—

(a)other land is given in exchange, or

(b)other land is to be made subject to a right of common equivalent to a right of common extinguished by virtue of paragraph 2.

(5)The notice under sub-paragraph (2) must contain—

(a)details of the land being given or the right of common being granted, and

(b)an application for (as the case may be)—

(i)the registration of the land as common land or as a town or village green, or

(ii)the registration of the right being granted.

(6)The commons registration authority must make such amendments as may be necessary to a register in consequence of sub-paragraph (2) (including any amendments necessary in consequence of sub-paragraph (5)).

(7)Nothing in—

(a)regulations under section 14 of the Commons Act 2006, or

(b)regulations under section 13 of the Commons Registration Act 1965,

applies to an acquisition or imposition mentioned in sub-paragraph (1).

InterpretationU.K.

9U.K.In this Schedule—

(a)references to section 11(1) of the Compulsory Purchase Act 1965 are to that provision as applied by section 4(3) of this Act to the acquisition of land under section 4(1) of this Act;

(b)references to section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 are to that section as applied by section 4(4) of this Act to the acquisition of land under section 4(1) of this Act;

(c)right of common” has the same meaning as in the Commons Act 2006.

Section 13

SCHEDULE 15U.K.Temporary possession and use of land

PART 1 U.K.Temporary possession for construction of works

Right to enter on and take possession of landU.K.

1(1)The nominated undertaker may enter on and take possession of the land specified in the table in Schedule 16—U.K.

(a)for the purpose specified in relation to the land in column (3) of that table in connection with the authorised works specified in column (4) of the table,

(b)for the purpose of constructing such works as are mentioned in column (5) of that table in relation to the land, or

(c)otherwise for Phase 2a purposes.

(2)The nominated undertaker may (subject to paragraph 2(1)) enter on and take possession of any other land within the Act limits for Phase 2a purposes.

(3)The reference in sub-paragraph (1)(a) to the authorised works specified in column (4) of the table in Schedule 16 includes a reference to any works which are necessary or expedient for the purposes of or in connection with those works.

ExceptionsU.K.

2(1)Paragraph 1(2) does not apply in relation to—U.K.

(a)land which is subject to a restricted power of compulsory acquisition,

(b)land in respect of which a notice of entry has been served under section 11 of the Compulsory Purchase Act 1965 (as applied by section 4(3) to the acquisition of land under section 4(1)), other than in connection with the acquisition of rights or subsoil only or the imposition of a restrictive covenant, or

(c)land in respect of which a declaration has been made under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 (as applied by section 4(4) to the acquisition of land under section 4(1)), other than in connection with the acquisition of rights or subsoil only or the imposition of a restrictive covenant.

(2)The power under section 4(1) (power to acquire land compulsorily) is not exercisable in relation to land specified in the table in Schedule 16.

(3)But sub-paragraph (2) does not apply in relation to land specified in that table to the extent (if any) that the land is subject to a restricted power of compulsory acquisition.

(4)For the purposes of this Schedule, land is subject to a restricted power of compulsory acquisition if the power under section 4(1) may be exercised in relation to the land only—

(a)so as to acquire rights or impose restrictive covenants relating to the land (see section 5(2));

(b)so as to acquire the subsoil or under-surface of the land (ignoring the power by virtue of section 5(1)(b) to impose restrictive covenants over the land).

Powers exercisable on land of which temporary possession has been takenU.K.

3(1)Where under paragraph 1(1) or (2) the nominated undertaker has entered upon and taken possession of land, the nominated undertaker may, for the purposes of or in connection with the construction of the works authorised by this Act—U.K.

(a)remove any structure or vegetation from the land;

(b)construct such works as are mentioned in relation to the land in column (5) of the table in Schedule 16;

(c)construct temporary works (including the provision of means of access) and structures on the land;

(d)construct landscaping and other works on the land to mitigate any adverse effects of the construction, maintenance or operation of the works authorised by this Act.

(2)The other works referred to in sub-paragraph (1)(d) include works involving the planting of trees and shrubs and the provision of replacement habitat for wild animals.

(3)In this paragraph, “structure” includes any erection.

Procedure and compensationU.K.

4(1)Not less than 28 days before entering upon and taking possession of land under paragraph 1(1) or (2), the nominated undertaker must give notice to the owners and occupiers of the land of its intention to do so.U.K.

(2)The nominated undertaker may not, without the agreement of the owners of the land, remain in possession of land under paragraph 1(1) or (2) after the end of the period of one year beginning with the date of completion of the work for which temporary possession of the land was taken.

(3)Sub-paragraph (2) does not apply, in the case of land mentioned in paragraph 1(2), if before the end of the one-year period either of the following powers has been exercised in relation to the land—

(a)the power to serve a notice to treat under Part 1 of the Compulsory Purchase Act 1965 (as applied by section 4(3) of this Act to the acquisition of land under section 4(1));

(b)the power to execute a declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 (as applied by section 4(4) of this Act to the acquisition of land under section 4(1)).

(4)The nominated undertaker must pay compensation to the owners and occupiers of land of which possession is taken under paragraph 1(1) or (2) for any loss which they may suffer by reason of the exercise in relation to the land of the power or powers under that paragraph.

(5)Any dispute as to a person's entitlement to compensation under sub-paragraph (4), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(6)Nothing in this paragraph affects any liability to pay compensation under section 10(2) of the Compulsory Purchase Act 1965 (as applied by section 4(3) to the acquisition of land under section 4(1)) or under any other enactment, otherwise than for loss for which compensation is payable under sub-paragraph (4).

5(1)Before giving up possession of land of which possession has been taken under paragraph 1(1) or (2), the nominated undertaker must, in accordance with a scheme agreed with the owners of the land and the relevant planning authority, put the land into such condition as the scheme may provide.U.K.

(2)If no scheme has been agreed for the purposes of this paragraph within 6 months of the date of completion mentioned in paragraph 4(2) in relation to the land, the scheme is to be such as may be determined by the appropriate Ministers after consulting the nominated undertaker, the owners of the land and the relevant planning authority.

(3)Unless the owners of the land and the nominated undertaker otherwise agree, a scheme determined under sub-paragraph (2) must provide for land to be restored to its former condition.

(4)Sub-paragraph (3) does not require land on which works referred to in paragraph 1(1)(b) or 3(1)(d) have been constructed to be restored to its former condition.

(5)Unless the nominated undertaker otherwise agrees, a scheme determined under sub-paragraph (2) may not provide for the nominated undertaker to replace a structure removed under paragraph 3, other than a fence.

(6)Where the appropriate Ministers ask the relevant planning authority for assistance in connection with the carrying out by them of their function under sub-paragraph (2), they may require the nominated undertaker to reimburse to the relevant planning authority any expenses which it reasonably incurs in meeting the request.

(7)The duty under sub-paragraph (1) in relation to any land is owed separately to the owners of the land and to the relevant planning authority.

(8)Where a scheme for the purposes of this paragraph provides for any step to be taken by the nominated undertaker before a specified date and that step has not been taken before that date, the relevant planning authority may—

(a)enter the land concerned and take that step, and

(b)require the nominated undertaker to reimburse to it any expenses which it reasonably incurs in acting under paragraph (a).

(9)In this paragraph—

PART 2 U.K.Temporary possession for maintenance of works

Right to enter on and take possession of landU.K.

6(1)At any time during the maintenance period relating to any of the scheduled works, the nominated undertaker may—U.K.

(a)enter on and take possession of any land which is—

(i)within 20 metres from that work, and

(ii)within the Act limits,

if possession of the land is reasonably required for the purposes of or in connection with maintaining the work or any ancillary works connected with it, and

(b)construct on the land such temporary works (including the provision of means of access) and structures as may be reasonably so required, unless the land is specified in the table in Schedule 16.

(2)Sub-paragraph (1) does not authorise the nominated undertaker to take possession of—

(a)a house, any other structure which is for the time being occupied, or a garden belonging to a house, or

(b)land which is subject to a restricted power of compulsory acquisition.

(3)The nominated undertaker may only remain in possession of the land for so long as may be reasonably required to carry out the maintenance works for which possession of the land was taken.

(4)In this paragraph—

(a)the maintenance period”, in relation to any work, means the period beginning with the date on which the work is completed and ending 5 years after the date on which it is brought into general use;

(b)structure” includes any erection;

(c)the reference in sub-paragraph (1)(a) to land within a specified distance of a work includes, in the case of a work under the surface of the ground, a reference to land within the specified distance of any point on the surface below which the work is situated.

Procedure and compensationU.K.

7(1)Not less than 28 days before entering upon and taking possession of land under paragraph 6, the nominated undertaker must give notice to the owners and occupiers of the land of its intention to do so.U.K.

(2)Before giving up possession of the land, the nominated undertaker must restore the land to the reasonable satisfaction of its owners.

(3)The nominated undertaker must pay compensation to the owners and occupiers of the land for any loss which they may suffer by reason of the exercise in relation to the land of the powers under paragraph 6.

(4)Any dispute as to a person's entitlement to compensation under sub-paragraph (3), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(5)Nothing in this paragraph affects any liability to pay compensation under section 10(2) of the Compulsory Purchase Act 1965 (as applied by section 4(3) of this Act to the acquisition of land under section 4(1)), or under any other enactment, otherwise than for loss for which compensation is payable under sub-paragraph (3).

PART 3 U.K.Suspension of rights and enforcement

Suspension of rights relating to landU.K.

8(1)All private rights over land of which the nominated undertaker takes possession under paragraph 1(1) or (2) or 6 are suspended and unenforceable for as long as the nominated undertaker remains in lawful possession of the land.U.K.

(2)The nominated undertaker may, in relation to a private right, direct—

(a)that sub-paragraph (1) does not apply to the right, or

(b)that sub-paragraph (1) applies to the right only to the extent specified in the direction.

(3)In this paragraph, “private rights” include—

(a)private rights of way over land,

(b)rights of common,

(c)easements, liberties, privileges, rights or advantages annexed to land and adversely affecting other land, including any natural right to support, and

(d)restrictions as to the user of land arising under a contract.

(4)Any person who suffers loss by reason of the suspension of a right under sub-paragraph (1) is entitled to be compensated by the nominated undertaker.

(5)Any dispute as to a person's entitlement to compensation under sub-paragraph (4), or as to the amount of compensation, must be determined under and in accordance with Part 1 of the Land Compensation Act 1961.

(6)This paragraph applies to a private right which is for the benefit of Crown land if the Crown authority consents (and consent may be subject to conditions).

9(1)All general rights over land of which the nominated undertaker takes possession under paragraph 1(1) or (2) or 6 are suspended and unenforceable for as long as the nominated undertaker remains in lawful possession of the land.U.K.

(2)The nominated undertaker may, in relation to a general right, direct—

(a)that sub-paragraph (1) does not apply to the right, or

(b)that sub-paragraph (1) applies to the right only to the extent specified in the direction.

(3)In this paragraph, references to “general rights” over land are to—

(a)rights to access land (however expressed) which are exercisable as a result of section 2(1) of the Countryside and Rights of Way Act 2000 or an enactment mentioned in section 15 of that Act,

(b)other public rights over land which are conferred by an enactment, and

(c)rights exercisable as a result of trusts, or incidents, to which a common, town or village green, open space or allotment is subject.

EnforcementU.K.

10(1)Section 13 of the Compulsory Purchase Act 1965 (refusal to give possession to acquiring authority) applies for the purposes of this Schedule as if—U.K.

(a)references to the acquiring authority were to the nominated undertaker,

(b)references to compensation payable to the person refusing to give possession were to compensation payable under this Schedule, and

(c)in subsection (1), for “this Act” there were substituted “ Schedule 15 to the High Speed Rail (West Midlands - Crewe) Act 2021 ”.

(2)In the case of Crown land, that section does not, by virtue of sub-paragraph (1), apply as against the Crown authority for that land.

Section 13

SCHEDULE 16U.K.Temporary possession and use of land: table of land

(1)(2)(3)(4)(5)
AreaNumber of land shown on deposited plansPurpose for which temporary possession may be takenSpecified authorised worksSpecified works which may be carried out

County of Staffordshire

District of Lichfield

Parish of Kings Bromley

3, 6, 8, 10a, 11a, 18a, 19, 32a, 34, 36a, 36b, 46, 57, 60, 69, 74, 78, 82, 83, 85, 89, 103, 107, 114, 123, 159, 164, 165, 168, 170, 173, 174, 180, 181, 183, 188, 199, 201, 208, 212, 216, 218, AP1-1Diversion or installation of, or works to, utilities apparatusDiversion or installation of, or works to, utilities apparatus
219, AP2-89a, AP2-89bProvision of access for construction and diversion of, or works to, utilities apparatusDiversion or installation of, or works to, utilities apparatus
221, 224, 226 to 228, 230 to 237, 239, 240, 247, 268 to 270, 272, AP2-104Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
Parish of Longdon1, 2Provision of access for construction and diversion of, or works to, utilities apparatusDiversion or installation of, or works to, utilities apparatus
Parish of Armitage with Handsacre1Provision of environmental mitigationEnvironmental mitigation works
Parish of Mavesyn Ridware12, 77, 78Creation of new public right of wayCreation of new public right of wayWorks required in connection with the provision of a new public right of way
AP2-24, AP2-55, AP2-58, AP2-59Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
Parish of Colton101, 102, 142, AP2-30, AP2-37, AP2-37b, AP2-61Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
189a, 194Provision of access for construction and diversion of, or works to, utilities apparatusDiversion or installation of, or works to, utilities apparatus
Borough of Stafford, Parish of Colwich66, 84, 88, 89Creation of new public right of wayCreation of new public right of wayWorks required in connection with the provision of a new public right of way
87Creation of new public right of way and provision of access for utility worksCreation of new public right of way and diversion or installation of, or works to, utilities apparatusWorks required in connection with the provision of a new public right of way
122, 139, 166, 181, AP2-7, AP2-64Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
AP2-69, AP2-70Provision of access for construction worksDiversion or installation of, or works to, utilities apparatus

Borough of East Staffordshire

Parish of Abbots Bromley

AP2-32, AP2-100, AP2-101, AP2-104, AP2-106 to AP2-111, AP2-113, AP2-115, AP2-116, AP2-119Provision of access for construction worksDiversion or installation of, or works to, utilities apparatus
Parish of Hoar CrossAP2-10, AP2-12, AP2-14, AP2-16, AP2-17, AP2-19, AP2-21, AP2-24, AP2-27, AP2-30, AP2-33, AP2-35Provision of access for construction worksDiversion or installation of, or works to, utilities apparatus
Parish of NewboroughAP2-7, AP2-9, AP2-10, AP2-12Provision of access for construction worksDiversion or installation of, or works to, utilities apparatus
Borough of Stafford, Parish of IngestreAP2-1Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
Parish of Tixall3a, 9, AP2-14Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
AP2-2Provision of access for construction and diversion of, or works to, utilities apparatusDiversion or installation of, or works to, utilities apparatus
Parish of Hopton and Coton46, 59, 67, 69, 71, 86, 87, 90, 110, 113, 120, 125, 126, 129, 131 to 133, 135, 137, 139, 143, 146, 182, 185a, AP2-23, AP2-29, AP2-61, AP2-67, AP2-69, AP2-75Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
179Provision of access for utility works and creation of new public right of wayDiversion or installation of, or works to, utilities apparatus and creation of new public right of wayWorks required in connection with the provision of a new public right of way
Parish of Salt and Enson1Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
Parish of Marston10, 17, 21, 33, 72, 79, AP2-1 to AP2-7, AP2-15, AP2-33, AP2-35Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
Parish of WhitgreaveAP2-3, AP2-4Creation of a new public right of wayCreation of a new public right of wayWorks required in connection with the provision of a new public right of way
Parish of Stone Rural36, 38, 58a, AP2-9, AP2-13, AP2-15, AP2-16, AP2-43Creation of new public right of wayCreation of new public right of wayWorks required in connection with the provision of a new public right of way
52, 67, 136, 138, AP2-20, AP2-21, AP2-34 to AP2-37, AP2-40, AP2-46, AP2-47Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
AP1-17, AP1-22Diversion or installation of, or works to, utilities apparatusDiversion or installation of, or works to, utilities apparatus
Parish of Swynnerton66, 70, 74, 138, 147, 160, 164, 171, 173, 176, 178, 302 to 304, 317, 318, AP2-5 to AP2-7, AP2-12Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
91c, AP1-3, AP1-5, AP1-7, AP1-8, AP1-10, AP1-12 to AP1-15Diversion or installation of, or works to, utilities apparatusDiversion or installation of, or works to, utilities apparatus
AP2-57Creation of a new public right of wayCreation of a new public right of wayWorks required in connection with the provision of a new public right of way

Borough of Newcastle-under-Lyme

Parish of Whitmore

51, 55Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
102a, AP2-12Creation of new public right of wayCreation of new public right of wayWorks required in connection with the provision of a new public right of way
Town of Newcastle-under-LymeAP2-15, AP2-16Worksite and access for constructionWorks Nos. 78F ,78G and 78H
Parish of Madeley7, 207Provision of environmental mitigationEnvironmental mitigation works
38, 181, 195, 196, 201Creation of new public right of wayCreation of new public right of wayWorks required in connection with the provision of a new public right of way
93, AP2-25, AP2-27, AP2-29, AP2-34Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus

County of Cheshire

Borough of Cheshire East

Parish of Blakenhall

22, 26a, 33, 37, 42, 78, 107, 137, 139Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
Parish of Chorlton2, 10, 11Provision of access for utility worksDiversion or installation of, or works to, utilities apparatus
14, 53, 58, 60aCreation of new public right of wayCreation of new public right of wayWorks required in connection with the provision of a new public right of way
Parish of Basford21Creation of new public right of wayCreation of new public right of wayWorks required in connection with the provision of a new public right of way

Section 17

SCHEDULE 17U.K.Conditions of deemed planning permission

PART 1 U.K.Conditions

IntroductoryU.K.

1U.K.The requirements in paragraphs 2 to 12 are conditions of deemed planning permission under section 17(1).

Condition relating to building worksU.K.

2(1)To the extent that development consists of building works, it must be carried out in accordance with plans and specifications for the time being approved by the relevant planning authority.U.K.

(2)In this paragraph “relevant planning authority” means the unitary authority or, in a non-unitary area, the district council in whose area the development is carried out.

(3)The relevant planning authority may, on approving a plan or specification for the purposes of this paragraph, specify any respect in which it requires additional details of the building works to be submitted for approval.

(4)Where the relevant planning authority exercises the power conferred under sub-paragraph (3), the plans and specifications referred to in sub-paragraph (1) must, as regards the specified respect, include a plan or specification showing the additional details.

(5)If the relevant planning authority is a qualifying authority, it may only refuse to approve plans or specifications for the purposes of this paragraph on the ground that—

(a)the design or external appearance of the building works ought to be modified—

(i)to preserve the local environment or local amenity,

(ii)to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or

(iii)to preserve a site of archaeological or historic interest or nature conservation value,

and is reasonably capable of being so modified, or

(b)the development ought to, and could reasonably, be carried out elsewhere within the development's permitted limits.

(6)If the relevant planning authority is not a qualifying authority, it may only refuse to approve plans or specifications for the purposes of this paragraph on the ground that—

(a)the design or external appearance of the building works ought to be modified to preserve the local environment or local amenity and is reasonably capable of being so modified, or

(b)the development ought to, and could reasonably, be carried out elsewhere within the development's permitted limits.

(7)The relevant planning authority may only impose conditions on approval for the purposes of this paragraph on a ground referred to in sub-paragraph (5) or (6) (as the case may be).

(8)In this paragraph, “building works” means the erection, construction, alteration or extension of any building, other than a temporary building.

(9)For these purposes, a building ancillary to a scheduled work is only a temporary building if it is intended to remain in place for no longer than two years after the date on which the scheduled work is brought into general use.

(10)The requirements in this paragraph do not apply to building works to the extent that they are ancillary to development consisting of—

(a)the disposal of waste or spoil, or

(b)the excavation of bulk materials from borrow pits.

(See paragraph 7 as to such development.)

Condition relating to other construction worksU.K.

3(1)If the relevant planning authority is a qualifying authority, development to which this paragraph applies must be carried out in accordance with plans and specifications for the time being approved by that authority.U.K.

(2)This paragraph applies to development to the extent that it consists of the construction of any of the following—

(a)a road vehicle park;

(b)earthworks;

(c)sight, noise or dust screens;

(d)transformers, telecommunications masts or pedestrian accesses to railway lines;

(e)fences or walls;

(f)lighting equipment.

(3)In this paragraph “relevant planning authority” means the unitary authority or, in a non-unitary area, the district council in whose area the development is carried out.

(4)The relevant planning authority may, on approving a plan or specification for the purposes of this paragraph, specify any respect in which it requires there to be submitted for approval additional details of the operation or work which gives rise to the need for approval under sub-paragraph (1).

(5)Where the relevant planning authority exercises the power conferred under sub-paragraph (4), the plans and specifications in accordance with which the development is required under sub-paragraph (1) to be carried out must, as regards the specified respect, include a plan or specification showing the additional details.

(6)The relevant planning authority may only refuse to approve plans or specifications for the purposes of this paragraph on a ground specified in relation to the work in question in the following table.

DevelopmentPossible grounds for refusal of approval
1. A road vehicle park.

That the design or external appearance of the works ought to, and could reasonably, be modified—

(a)

to preserve the local environment or local amenity,

(b)

to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or

(c)

to preserve a site of archaeological or historic interest or nature conservation value.

That the development ought to, and could reasonably, be carried out elsewhere within the development's permitted limits.

2. Earthworks.

3. Sight, noise or dust screens.

That the design or external appearance of the works ought to, and could reasonably, be modified—

(a)

to preserve the local environment or local amenity,

(b)

to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or

(c)

to preserve a site of archaeological or historic interest or nature conservation value.

If the development does not form part of a scheduled work, that the development ought to, and could reasonably, be carried out elsewhere within the development's permitted limits.
4. Transformers, telecommunications masts or pedestrian accesses to railway lines.That the design or external appearance of the works ought to, and could reasonably, be modified to preserve the local environment or local amenity.
That the development ought to, and could reasonably, be carried out on land elsewhere within the development's permitted limits.
5. Fences and walls (except for sight, noise and dust screens).That the development ought to, and could reasonably, be carried out elsewhere within the development's permitted limits.
6. Artificial lighting equipment.That the design of the equipment, with respect to the emission of light, ought to, and could reasonably, be modified to preserve the local environment or local amenity.
If the development does not form part of a scheduled work, that the development ought to, and could reasonably, be carried out elsewhere within the development's permitted limits.

(7)The relevant planning authority may only impose conditions on approval for the purposes of this paragraph on a ground specified in the table in sub-paragraph (6) in relation to the work in question.

(8)Any reference in sub-paragraph (2) or (6) to a description of works does not include works of that description of a temporary nature.

(9)In this paragraph—

(10)The requirements in this paragraph do not apply where development to which this paragraph applies is ancillary to development consisting of—

(a)the disposal of waste or spoil, or

(b)the excavation of bulk materials from borrow pits.

(See paragraph 7 as to such development.)

Condition relating to matters ancillary to developmentU.K.

4(1)If the relevant planning authority is a qualifying authority, development must be carried out in accordance with arrangements about ancillary matters which have been approved by that authority.U.K.

(2)In this paragraph “ancillary matters” means—

(a)handling of re-useable spoil or topsoil;

(b)storage sites for construction materials, spoil or topsoil;

(c)construction camps;

(d)works screening;

(e)artificial lighting;

(f)dust suppression;

(g)road mud control measures.

(3)In this paragraph, “relevant planning authority” means, subject to sub-paragraph (4), the unitary authority or, in a non-unitary area, the district council in whose area the development is carried out.

(4)Where the development is in a non-unitary area and consists of the disposal of waste or spoil or the excavation of bulk material from borrow pits, the relevant planning authority in respect of arrangements relating to ancillary matters is the county council.

(5)The reference in sub-paragraph (1) to arrangements does not, in the case of artificial lighting, include detailed arrangements.

(6)The relevant planning authority may only refuse to approve arrangements for the purposes of this paragraph—

(a)on the ground that the arrangements relate to development which, for the purposes of regulating the matter in question, ought to and can reasonably be considered in conjunction with other development which has deemed planning permission under section 17(1) and which is to be carried out in the authority's area, or

(b)on a ground specified in relation to the matter in the following table.

MattersGrounds
1. Handling of re-useable spoil and topsoilThat the arrangements ought to be modified to ensure that the spoil or topsoil remains in good condition, and are reasonably capable of being so modified.

2. Storage sites for construction materials, spoil or topsoil.

3. Construction camps.

4. Works screening.

That the arrangements ought to be modified—

(a)

to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or

(b)

to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,

and are reasonably capable of being so modified.

5. Artificial lighting.

6 Dust suppression.

That the arrangements ought to be modified to preserve the local environment or local amenity, and are reasonably capable of being so modified.
7. Road mud control measures.

That the arrangements ought to be modified—

(a)

to preserve the local environment or local amenity, or

(b)

to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area,

and are reasonably capable of being so modified.

(7)The relevant planning authority may only impose conditions on approval for the purposes of this paragraph—

(a)with the agreement of the nominated undertaker, and

(b)on a ground specified in the table in sub-paragraph (6)(b) in relation to the matter in question.

(8)In this paragraph—

5(1)The Secretary of State may for the purposes of paragraph 4 make a class approval of arrangements relating to the ancillary matters referred to in paragraph 4(2)(a), (b) and (d) to (g).U.K.

(2)A class approval may be made—

(a)generally or in relation to specific areas or specific descriptions of works, and

(b)subject to conditions.

(3)A class approval may make different provision for different cases.

(4)Before making a class approval the Secretary of State must consult the planning authorities who would be affected by it.

(5)Where arrangements made by the nominated undertaker are approved under a class approval, they do not require the approval of the relevant planning authority under paragraph 4.

(6)But the nominated undertaker may in the case of any particular arrangements request approval under paragraph 4.

(7)If the relevant planning authority to which such a request is made considers that the circumstances of the case justify it, the authority may grant approval under paragraph 4 (and, accordingly, the arrangements are subject to that approval instead of the class approval).

(8)A class approval may be varied or revoked.

Condition relating to road transportU.K.

6(1)Where—U.K.

(a)the relevant planning authority is a qualifying authority, and

(b)development consists of the use of an authorised site,

arrangements relating to the routes by which anything is to be transported to the site on a highway by a large goods vehicle must be approved by the relevant planning authority.

(2)In this paragraph, “authorised site” means—

(a)a working or storage site,

(b)a site where anything transported to the site will be re-used, or

(c)a waste disposal site.

(3)Where a route to an authorised site includes a special road or trunk road, sub-paragraph (1) requires arrangements to be approved only in relation to transportation on so much of the route as lies between (but does not include) the site and—

(a)the special road or trunk road, or

(b)where the route includes more than one special road or trunk road, the last such road before reaching the site.

(4)In this paragraph “relevant planning authority” means the unitary authority or, in a non-unitary area, the county council in whose area the development is carried out.

(5)The relevant planning authority may only refuse to approve arrangements for the purposes of this paragraph on the ground that—

(a)the arrangements relate to development which, for the purposes of regulating the matter in question, ought to and can reasonably be considered in conjunction with development which has deemed planning permission under section 17(1) and which is to be carried out in the authority's area, or

(b)the arrangements ought to be modified—

(i)to preserve the local environment or local amenity,

(ii)to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or

(iii)to preserve a site of archaeological or historic interest or nature conservation value,

and are reasonably capable of being so modified.

(6)The relevant planning authority may only impose conditions on approval for the purposes of this paragraph—

(a)with the agreement of the nominated undertaker, and

(b)on the ground referred to in sub-paragraph (5)(b).

(7)Sub-paragraph (1) does not require arrangements to be approved in relation to transportation to an authorised site where the number of large goods vehicle movements (whether to or from the site) does not on any day exceed 24.

(8)In this paragraph—

Conditions relating to waste and spoil disposal and excavationU.K.

7(1)If the relevant planning authority is a qualifying authority, development to which this paragraph applies must be carried out in accordance with plans and specifications for the time being approved by that authority.U.K.

(2)This paragraph applies to development to the extent that it consists of—

(a)the disposal of waste or spoil, or

(b)the excavation of bulk materials from borrow pits.

(3)In this paragraph “relevant planning authority” means the unitary authority or, in a non-unitary area, the county council in whose area the development is carried out.

(4)The relevant planning authority may, on approving a plan or specification for the purposes of this paragraph, specify any respect in which it requires there to be submitted for approval additional details of the operation or work which gives rise to the need for approval under sub-paragraph (1).

(5)Where the relevant planning authority exercises the power conferred under sub-paragraph (4), the plans and specifications in accordance with which the development is required under sub-paragraph (1) to be carried out must, as regards the specified respect, include a plan or specification showing the additional details.

(6)The relevant planning authority may only refuse to approve plans or specifications for the purposes of this paragraph on a ground specified in sub-paragraph (7) or (8).

(7)The grounds in this sub-paragraph are that—

(a)the design or external appearance of disposal sites (in the case of the disposal of waste or spoil) or borrow pits (in the case of excavation of bulk material from such pits) on land within the Act limits,

(b)the methods by which such sites or pits are worked, or

(c)the noise, dust, vibration or screening arrangements during the operation of such sites or pits,

ought to, and could reasonably, be modified.

(8)The grounds in this sub-paragraph are that in order to—

(a)preserve the local environment or local amenity,

(b)prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or

(c)preserve a site of archaeological or historic interest or nature conservation value,

the development ought to, and could reasonably, be carried out elsewhere within the development's permitted limits.

(9)The grounds in sub-paragraph (8) do not apply where the development is—

(a)within the limits of deviation for the scheduled works, or

(b)consists of the use of land specified in columns (1) and (2) of the table in Schedule 6 for a purpose specified in relation to the land in column (3) of that table.

(10)The relevant planning authority may only impose conditions on approval for the purposes of this paragraph—

(a)with the agreement of the nominated undertaker, and

(b)on a ground referred to in sub-paragraph (7) or (8) (taken with sub-paragraph (9)).

8(1)If the relevant planning authority is a qualifying authority, development to which paragraph 7 applies may not be begun unless the authority has approved a scheme for the restoration of the land on which the development is to be carried out.U.K.

(2)In this paragraph “relevant planning authority” has the same meaning as in paragraph 7.

(3)The relevant planning authority may only refuse to approve, or impose conditions on the approval of, a scheme for the purposes of this paragraph on the ground that the scheme ought to be modified, and is reasonably capable of being modified.

(4)The nominated undertaker must carry out a scheme approved for the purposes of this paragraph once it has completed its use of the land to which the scheme relates for the purpose of carrying out the development to which paragraph 7 applies.

(5)In sub-paragraph (1), the reference to restoration includes a reference to restoration in the longer term; and, accordingly, a scheme for the restoration of land may include provision about aftercare.

Conditions on bringing scheduled works and depots into useU.K.

9(1)If the relevant planning authority is a qualifying authority, no work to which this paragraph applies may be brought into use without the approval of that authority.U.K.

(2)This paragraph applies to—

(a)any scheduled work, except to the extent that the work is underground, and

(b)any depot constructed, in exercise of the powers conferred under this Act, for use for or in connection with the maintenance of railway vehicles or track, whether or not constructed for use also for other purposes.

(3)In this paragraph “relevant planning authority” means the unitary authority or, in a non-unitary area, the district council in whose area the work is carried out.

(4)The relevant planning authority must grant approval for the purposes of this paragraph if—

(a)it considers that there are no reasonably practicable measures which need to be taken for the purpose of mitigating the effect of the work or its operation on the local environment or local amenity, or

(b)it has approved, at the request of the nominated undertaker, a scheme consisting of provision with respect to the taking of measures for that purpose.

(5)The relevant planning authority may not refuse to approve, or impose conditions on the approval of, a scheme submitted for the purposes of sub-paragraph (4)(b) unless it is satisfied that it is expedient to do so on the ground that the scheme ought to be modified—

(a)to preserve the local environment or local amenity,

(b)to preserve a site of archaeological or historic interest, or

(c)in the interests of nature conservation,

and that the scheme is reasonably capable of being so modified.

(6)In this paragraph “railway vehicle” and “track” have the same meaning as in Part 1 of the Railways Act 1993.

10U.K.Where the relevant planning authority approves a scheme for the purposes of paragraph 9(4)(b), the nominated undertaker must—

(a)carry out the scheme, and

(b)comply with any condition subject to which the scheme is approved.

Condition relating to discontinuation of ancillary operationsU.K.

11U.K.Where development consists of or includes the carrying out on any site of operations ancillary to the construction of any of the scheduled works, the operations must be discontinued as soon as reasonably practicable after the completion of the scheduled work or works.

Condition relating to site restorationU.K.

12(1)The nominated undertaker must, after discontinuation of the use of any site for carrying out operations ancillary to the construction of any of the scheduled works, restore the site in accordance with a scheme agreed with the relevant planning authority.U.K.

(2)In this paragraph “relevant planning authority” means the unitary authority or, in a non-unitary area, the district council in whose area the work is carried out.

(3)For the purposes of sub-paragraph (1) the nominated undertaker must, within four months of the discontinuation of the use, submit a proposed scheme to the relevant planning authority.

(4)If—

(a)the nominated undertaker fails to submit a proposed scheme in accordance with sub-paragraph (3), or

(b)the nominated undertaker submits a proposed scheme in accordance with sub-paragraph (3) but no scheme is agreed for the purposes of sub-paragraph (1) before the end of the relevant period,

the scheme for the purposes of sub-paragraph (1) is to be such as the appropriate Ministers may determine after consulting the nominated undertaker and the relevant planning authority.

(5)In sub-paragraph (4)(b) “the relevant period” means—

(a)eight weeks beginning with the date on which the proposed scheme is submitted, or

(b)such longer period as the nominated undertaker and the relevant planning authority may agree.

(6)A scheme agreed or determined for the purposes of sub-paragraph (1) may reserve particulars for subsequent agreement between the nominated undertaker and the relevant planning authority.

(7)Where a particular reserved under sub-paragraph (6) is not agreed—

(a)by the time specified by or determined in accordance with the scheme, or

(b)by such later time as the nominated undertaker and the relevant planning authority may agree,

that particular is to be determined by the appropriate Ministers after consulting the nominated undertaker and the authority.

(8)Where, independently of any consultation under sub-paragraph (4) or (7), the appropriate Ministers ask the relevant planning authority for assistance in connection with their function under the sub-paragraph in question, they may require the nominated undertaker to reimburse to the relevant planning authority any expenses which the authority reasonably incurs in meeting the request.

(9)Sub-paragraph (1) does not apply to a site—

(a)to the extent that the site consists of land to which a scheme under paragraph 8 (waste or spoil etc) applies, or

(b)in relation to which the nominated undertaker is subject to an obligation under paragraph 5(1) of Schedule 15 (obligation to put land into such condition as an agreed scheme provides, before giving up possession of the land).

PART 2 U.K.Qualifying authorities

Specification of qualifying authoritiesU.K.

13(1)As soon after the day on which this Act is passed as the Secretary of State considers reasonably practicable, the Secretary of State must by regulations specify every planning authority which—U.K.

(a)had, on or before the day on which the Bill for this Act was reported from Select Committee in the House of Lords, given the Secretary of State undertakings with respect to the handling of planning matters arising under this Schedule which he or she considered satisfactory, and

(b)has not subsequently been released from its undertakings.

(2)Subject to the following provisions of this paragraph, an authority which is specified under sub-paragraph (1) is a qualifying authority for the purposes of this Schedule.

(3)The Secretary of State may, if he or she considers it expedient to do so, by regulations provide that an authority is to cease to be a qualifying authority for the purposes of this Schedule.

(4)If, in relation to a planning authority which is not a qualifying authority for the purposes of this Schedule, the Secretary of State considers that the way in which the authority carries out its functions has been significantly affected by a change of circumstances occurring since the relevant day, the Secretary of State may by regulations provide that the authority is to be a qualifying authority for the purposes of this Schedule.

(5)In sub-paragraph (4), the reference to the relevant day is—

(a)in relation to an authority which has never been a qualifying authority for the purposes of this Schedule, to the day mentioned in sub-paragraph (1)(a), and

(b)in relation to an authority which has been a qualifying authority for the purposes of this Schedule, to the day on which it ceased, or last ceased, to be such an authority.

(6)Before making regulations under sub-paragraph (3) or (4), the Secretary of State must consult—

(a)the nominated undertaker, and

(b)unless the authority concerned has requested the making of the regulations, that authority.

TransitionU.K.

14(1)Regulations under paragraph 13 may contain such transitional provision and savings as the Secretary of State thinks fit.U.K.

(2)Without prejudice to the generality of sub-paragraph (1), provision under that sub-paragraph may include provision with respect to the effect of the authority becoming or ceasing to be a qualifying authority in relation to an approval which has already been requested or given.

(3)The Secretary of State may by agreement fetter the exercise of his or her discretion under sub-paragraph (1).

PART 3 U.K.Approvals: supplementary

Requests for planning approvalU.K.

15U.K.A planning authority may only grant approval under Part 1 of this Schedule at the request of the nominated undertaker.

16(1)A planning authority need not consider a request for approval under Part 1 of this Schedule unless—U.K.

(a)the nominated undertaker has deposited with the authority a document setting out its proposed programme with respect to the making of requests under that Part to the authority, and

(b)the request is accompanied by a document explaining how the matters to which the request relates fit into the overall scheme of the works authorised by this Act.

(2)Sub-paragraph (1) does not apply to a request for approval of additional details.

Fees for requests for approvalU.K.

17(1)The appropriate Ministers may by regulations make provision about fees for requests to a planning authority for approval under Part 1 of this Schedule.U.K.

(2)Regulations under this paragraph may, in particular, make provision—

(a)for the payment of a fee and for the amount of a fee;

(b)about when a fee must be paid;

(c)for circumstances in which a fee is to be treated as paid;

(d)for the remission or refunding of a fee in whole or part;

(e)about the consequences of non-payment of a fee, including provision for the termination of the application concerned or any appeal against its refusal;

(f)for the resolution of disputes.

(3)Regulations under this paragraph may make such supplementary, incidental or consequential provision as the appropriate Ministers think fit.

(4)Nothing in regulations under section 303 of TCPA 1990 (fees for planning applications) applies to a request for approval under Part 1 of this Schedule.

Consultation on requests for approvalU.K.

18(1)This paragraph applies where a planning authority considers that a request for approval under Part 1 of this Schedule relates to matters which may affect any of the following—U.K.

(a)nature conservation,

(b)the conservation of the natural beauty or amenity of the countryside,

(c)the conservation of the natural beauty or amenity of inland or coastal waters or land associated with them,

(d)the conservation of flora or fauna which are dependent on an aquatic environment,

(e)the use of inland or coastal waters, or land associated with them, for recreational purposes, or

(f)a site of archaeological or historic interest.

(2)The planning authority must, within 5 days of receiving the request, invite the appropriate body or bodies to make representations.

(3)The appropriate body is—

(a)for the matters in sub-paragraph (1)(a) and (b), Natural England,

(b)for the matters in sub-paragraph (1)(c) and (e), Canal & River Trust so far as the matters relate to inland waters owned or managed by the Trust or land associated with such waters,

(c)for the matters in sub-paragraph (1)(c) and (e) other than as mentioned in paragraph (b), the Environment Agency,

(d)for the matter in sub-paragraph (1)(d), the Environment Agency, and

(e)for the matter in sub-paragraph (1)(f), the Historic Buildings and Monuments Commission for England.

(4)Where under sub-paragraph (2) a planning authority has invited a body to make representations about a request for approval under Part 1 of this Schedule, it must not make any decision about the request until—

(a)it has received representations from the body about the request,

(b)it has been informed by the body that it does not wish to make any representations, or

(c)21 days have elapsed since the date of the invitation.

(5)An invitation under sub-paragraph (2) must specify the time limit for making representations.

Directions restricting powers of approvalU.K.

19(1)The appropriate Ministers may by directions restrict a planning authority's powers in relation to the giving of approval under Part 1 of this Schedule.U.K.

(2)Directions under this paragraph may—

(a)be given in relation to a specified approval or approvals of a specified description,

(b)be expressed to have effect without a time-limit or during a specified period, and

(c)revoke or vary previous directions under this paragraph.

Compulsory reference of requests for approvalU.K.

20(1)The appropriate Ministers may by directions require a planning authority to refer any request for approval under Part 1 to them.U.K.

(2)In determining a request referred to them under this paragraph, the appropriate Ministers have the same powers as the authority making the reference.

(3)The determination by the appropriate Ministers of a request referred to them under this paragraph is final.

(4)Directions under this paragraph may—

(a)be given in relation to a specified request or requests of a specified description, and

(b)revoke or vary previous directions under this paragraph.

Non-material changes to approvalsU.K.

21(1)A planning authority may at the request of the nominated undertaker make a non-material change to any approval given under Part 1 of this Schedule.U.K.

(2)In deciding whether a change is material, a planning authority must have regard to the effect of the change, together with any previous changes made under this paragraph, on the approval as originally given.

(3)The power under sub-paragraph (1) includes power to impose new conditions or to alter or remove existing conditions.

(4)The approval as changed must represent an approval the authority could have given originally.

(5)The consultation requirements in this Part of this Schedule do not apply to a change under this paragraph.

Termination of approval relating to road transportation arrangementsU.K.

22(1)An approval under paragraph 6 of arrangements relating to transportation ceases to have effect at the end of the relevant period if the nominated undertaker gives a termination notice to the planning authority which approved the arrangements.U.K.

(2)In sub-paragraph (1)—

(a)“termination notice” is a written notice that the arrangements in question are to cease to have effect;

(b)the relevant period” means the period of 28 days beginning with the day on which the termination notice is given.

AppealsU.K.

23(1)Where the nominated undertaker is aggrieved by a decision of a planning authority on a request for approval under Part 1 (including a decision to require additional details), it may appeal to the appropriate Ministers by giving notice of the appeal in the prescribed form to them and to the authority whose decision is appealed against within 42 days of notification of the decision.U.K.

(2)On an appeal under this paragraph, the appropriate Ministers may allow or dismiss the appeal or vary the decision of the authority whose decision is appealed against, but may only make a determination involving—

(a)the refusal of approval, or

(b)the imposition of conditions on approval,

on a ground open to that authority.

(3)Where, following receipt by a planning authority of a request by the nominated undertaker for approval under Part 1, the authority does not notify the undertaker within the appropriate period—

(a)of its decision on the request, or

(b)that the request has been referred to the appropriate Ministers in accordance with directions under paragraph 20,

this paragraph applies as if the authority had refused the request and notified the undertaker of its decision on the last day of the appropriate period.

(4)For the purposes of sub-paragraph (3), the appropriate period is—

(a)the period of 8 weeks beginning with the date on which the request was received by the planning authority, or

(b)such extended period as may be agreed upon in writing between the authority and the nominated undertaker.

(5)The appropriate Ministers may by regulations make provision for the extension of the appropriate period for the purposes of sub-paragraph (3) in connection with the payment of fees by means of cheque.

(6)An agreement under sub-paragraph (4)(b) may be made after, as well as before, the end of the appropriate period.

(7)No agreement may be made under sub-paragraph (4)(b) to extend a period after it has ended if the nominated undertaker has given notice of appeal against the refusal which is deemed under sub-paragraph (3) to have occurred because of the ending of the period.

(8)Where an agreement under sub-paragraph (4)(b) to extend a period is made after the period has ended, sub-paragraph (3) is to be treated as not having applied when the period ended.

(9)In this paragraph, “prescribed” means prescribed by regulations made by the appropriate Ministers.

(10)No appeal under section 78 of TCPA 1990 (right to appeal against planning decisions and failure to take such decisions) may be made against a decision, or failure to notify a decision, in relation to which a right of appeal arises under this paragraph.

24(1)Unless the appropriate Ministers direct otherwise, their functions in relation to the determination of an appeal under paragraph 23 must, instead of being carried out by them, be carried out by a person appointed by them for the purpose.U.K.

(2)The appropriate Ministers may by a further direction revoke a direction under sub-paragraph (1) at any time before the determination of the appeal.

(3)A direction under sub-paragraph (1) or (2) must be served on the nominated undertaker and the planning authority whose decision is appealed against.

(4)At any time before the determination of an appeal by a person appointed for the purpose under this paragraph, the appropriate Ministers may revoke the appointment and appoint another person to determine the appeal instead.

(5)Where the function of determining an appeal under paragraph 23 is transferred from one person to another, the person to whom the function is transferred must consider the matter afresh, but the fact that the function is transferred does not entitle any person to make fresh representations or to modify or withdraw any representations already made.

(6)If the appropriate Ministers determine an appeal which another person was previously appointed to determine, they may, in determining it, take into account any report made to them by that person.

25U.K.The decision of the person appointed under paragraph 24 or, as the case may be, of the appropriate Ministers on an appeal under paragraph 23 is final.

26(1)An appeal under paragraph 23 is to be dealt with on the basis of written representations, unless the person deciding the appeal directs otherwise.U.K.

(2)Subject to that, the appropriate Ministers may by regulations make such provision as they think fit about procedure in relation to appeals under paragraph 23.

(3)Regulations under this paragraph may, in particular—

(a)make provision for a time limit within which any person entitled to make representations must submit them in writing and any supporting documents,

(b)empower the person deciding an appeal to proceed to a decision taking into account only such written representations and supporting documents as were submitted within the time limit, and

(c)empower the person deciding an appeal, after giving written notice of intention to do so to the nominated undertaker and the planning authority whose decision is appealed against, to proceed to a decision notwithstanding that no written representations were made within the time limit, if it appears to the person that there is sufficient material before the person to enable a decision on the merits of the case.

(4)Regulations under this paragraph may, in relation to such a time limit as is mentioned in sub-paragraph (3)(a)—

(a)prescribe the time limit in regulations, or

(b)enable the appropriate Ministers to give directions setting the time limit in a particular case or class of case.

Guidance by Secretary of StateU.K.

27(1)The Secretary of State may give guidance to planning authorities in relation to the exercise of their functions under this Schedule.U.K.

(2)A planning authority must have regard to the guidance.

(3)The guidance may make different provision for different cases.

(4)The guidance may be varied or revoked.

PART 4 U.K.Supplementary and general

RegulationsU.K.

28(1)Regulations under this Schedule may make different provision for different cases.U.K.

(2)Regulations under this Schedule must be made by statutory instrument.

(3)A statutory instrument containing regulations under this Schedule is subject to annulment in pursuance of a resolution of either House of Parliament.

InterpretationU.K.

29U.K.In this Schedule—

Section 21(1)

SCHEDULE 18U.K.Listed buildings

Buildings authorised to be demolished, altered or extendedU.K.

1(1)This paragraph applies to—U.K.

(a)a listed building which—

(i)was a listed building immediately before 12 June 2017, and

(ii)is specified in table 1 (see the end of this Schedule), and

(b)a listed building which was not a listed building immediately before that date.

(2)If a listed building is one to which this paragraph applies—

(a)section 7 of the Listed Buildings and Conservation Areas Act (restriction on works affecting listed buildings) does not apply to works carried out in relation to the building in exercise of the powers under this Act,

(b)to the extent that a notice issued in relation to the building under section 38(1) of that Act (enforcement) requires the taking of steps which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers under this Act, the notice does not have effect or, as the case may be, ceases to have effect,

(c)no steps may be taken in relation to the building under section 42(1) of that Act (execution of works specified in notice under section 38(1)) which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers under this Act, and

(d)no works may be executed for the preservation of the building under section 54 of that Act (urgent works to preserve unoccupied listed buildings) which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers under this Act.

(3)In the case of a building specified in table 1 in relation to which any description of works is specified in column (3) of the table, sub-paragraph (2)(a) has effect as if the reference to works carried out in exercise of the powers under this Act were, as regards demolition or alteration works (as opposed to extension works), to works so carried out which are of the specified description.

(4)The reference in sub-paragraph (3) to alteration works does not include alteration works carried out—

(a)for heritage or monitoring purposes (see paragraph 9(2)), or

(b)for noise mitigation purposes (see paragraph 9(3)).

Buildings in respect of which noise mitigation works are authorisedU.K.

2(1)This paragraph applies to a listed building which—U.K.

(a)was a listed building immediately before 12 June 2017, and

(b)is specified in table 2 (see the end of this Schedule).

(2)In the case of a listed building to which this paragraph applies—

(a)section 7 of the Listed Buildings and Conservation Areas Act (restriction on works affecting listed buildings) does not apply to works carried out in relation to the building for noise mitigation purposes (see paragraph 9(3)),

(b)to the extent that a notice issued in relation to the building under section 38(1) of that Act (enforcement) requires the taking of steps which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers under this Act, the notice does not have effect or, as the case may be, ceases to have effect,

(c)no steps may be taken in relation to the building under section 42(1) of that Act (execution of works specified in notice under section 38(1)) which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers under this Act, and

(d)no works may be executed for the preservation of the building under section 54 of that Act (urgent works to preserve unoccupied listed buildings) which would be rendered ineffective, or substantially ineffective, by works proposed to be carried out in exercise of the powers under this Act.

Damage to buildingsU.K.

3U.K.Section 59 of the Listed Buildings and Conservation Areas Act (acts causing or likely to result in damage to listed buildings) does not apply to anything done in exercise of the powers under this Act with respect to works.

Power to disapply provision made by paragraphs 1 to 3U.K.

4(1)The Secretary of State may by regulations make any provision specified in sub-paragraph (2) in relation to any work constructed in exercise of the powers under this Act.U.K.

(2)The provision referred to in sub-paragraph (1) is—

(a)provision that paragraph 1(2)(a) or 2(2)(a) does not apply in relation to relevant works;

(b)provision that paragraph 1(2)(b) to (d) or 2(2)(b) to (d) does not apply in relation to proposed relevant works;

(c)provision that paragraph 3 does not apply in relation to relevant works.

(3)Relevant works” means works which are—

(a)carried out in exercise of the powers under this Act for the maintenance or alteration of the work referred to in sub-paragraph (1), and

(b)begun on or after such day as may be specified in regulations under that sub-paragraph.

(4)Regulations under sub-paragraph (1) may make different provision for different purposes.

(5)Regulations under sub-paragraph (1) must be made by statutory instrument; and a statutory instrument containing such regulations must be laid before Parliament after being made.

Heritage partnership agreementsU.K.

5U.K.The provisions of any agreement under section 26A of the Listed Buildings and Conservation Areas Act (heritage partnership agreements) in relation to a building have effect subject to the powers under this Act with respect to works.

Inspection and observation of worksU.K.

6(1)Any person duly authorised in writing by the Historic Buildings and Monuments Commission for England (“the Commission”) or the relevant planning authority may at any reasonable time enter land for the purpose of inspecting or observing the carrying out in relation to any building on the land of decontrolled works.U.K.

(2)Relevant planning authority” means the unitary authority or, in a non-unitary area, the district council in whose area the building is situated.

(3)The right under sub-paragraph (1) is not exercisable at a time when the nominated undertaker reasonably considers that it is not safe to exercise it.

(4)A person exercising the right under sub-paragraph (1) must comply with directions given by the nominated undertaker for the purpose of securing compliance with relevant health and safety provisions.

Recording of buildingsU.K.

7(1)The nominated undertaker must not carry out decontrolled works consisting of the demolition of a listed building unless—U.K.

(a)notice of the proposal to carry out the works has been given to the Commission, and

(b)the appropriate period since the giving of the notice has expired.

(2)The appropriate period, subject to sub-paragraph (3), is—

(a)8 weeks, or

(b)such longer period as may have been agreed between the nominated undertaker and the Commission.

(3)In case of emergency, the appropriate period is such period as is reasonable in the circumstances.

(4)In determining whether the appropriate period has expired, any day on which entry to the building is refused under paragraph 8(2) is to be disregarded.

8(1)Following the giving of a notice under paragraph 7(1) in relation to a listed building, any person duly authorised in writing by the Commission may, at any reasonable time during the inspection period, enter the building for the purpose of recording it.U.K.

(2)The right under sub-paragraph (1) is not exercisable at a time when the nominated undertaker reasonably considers that it is not safe to exercise it.

(3)A person exercising the right under sub-paragraph (1) must comply with directions given by the nominated undertaker for the purpose of securing compliance with relevant health and safety provisions.

(4)For the purposes of sub-paragraph (1), the inspection period, in relation to a building which is the subject of a notice under paragraph 7(1), is the period—

(a)beginning when notice under that provision is given, and

(b)ending when the prohibition under that provision ceases to apply to the building.

InterpretationU.K.

9(1)In this Schedule—U.K.

(2)For the purposes of this Schedule, works relating to a building are carried out for heritage or monitoring purposes if the works are carried out for the purpose of—

(a)maintaining or restoring the building's character as a building of special architectural or historical interest, or

(b)affixing apparatus to any part of the building with a view to measuring any movement in the building or the ground on which it is erected in consequence of the carrying out of works in exercise of the powers under this Act.

(3)For the purposes of this Schedule, works relating to a building are carried out for noise mitigation purposes if the works are carried out in exercise of the power in paragraph 9 of Schedule 2.

(4)Anything which, by virtue of section 1(5) of the Listed Buildings and Conservation Areas Act (objects or structures fixed to, or within curtilage of, a building), is treated as part of a building for the purposes of that Act is to be treated as part of the building for the purposes of this Schedule.

TablesU.K.

TABLE 1: buildings authorised to be demolished, altered or extended
(1)(2)(3)
AreaBuildingWorks

County of Staffordshire

District of Newcastle-under-Lyme

Parish of Madeley

Milepost at NGR SJ 7687 4413 LB

Grade II

Removal to storage and replacement following completion of the authorised works
Parish of Whitmore

Milepost at NGR SJ 7980 4054

Grade II

Removal to storage and replacement following completion of the authorised works
Parish of Maer

Milepost at NGR SJ 7724 3878

Grade II

Removal to storage and replacement following completion of the authorised works

County of Cheshire

Town of Crewe

1867 buildings at Crewe Railway Station

Grade II

Modifications to platforms, signage, overhead lines, cable routes and other associated railway systems to facilitate additional services running through Crewe on the West Coast Main Line and the construction of footbridges to link platforms
TABLE 2: buildings in respect of which noise mitigation works are authorised
(1)(2)
AreaBuilding

County of Staffordshire

District of Rugeley

Parish of Blithbury

Woodhouse Farm

Grade II

District of Newcastle-under-Lyme

Parish of Madeley

Hey House

Grade II

Parish of Whitmore

Snape Hall Farmhouse

Grade II

Section 21(2)

SCHEDULE 19U.K.Ancient monuments

Disapplication of controlsU.K.

1(1)This paragraph has effect in relation to the Ancient Monuments and Archaeological Areas Act 1979.U.K.

(2)Section 2 (control of works affecting scheduled monuments) does not apply to works authorised by this Act.

(3)The powers of entry under the following provisions are not exercisable in relation to land used for or in connection with the carrying out of any of the works authorised by this Act—

(4)The provisions of the Act with respect to the functions of a person as a guardian by virtue of the Act, and the provisions of any agreement under section 17 (agreement concerning ancient monuments and land in their vicinity), have effect subject to the powers under this Act with respect to works.

(5)Section 19 (public access to monuments under public control) does not apply in relation to a monument which is closed by the nominated undertaker for the purposes of, in connection with or in consequence of the carrying out of any of the works authorised by this Act.

(6)Regulations under section 19(3) or (4A) (which may include provision prohibiting or regulating acts which would tend to injure or disfigure a monument or its amenities or to disturb the public in their enjoyment of it) do not apply to anything done in exercise of the powers under this Act with respect to works.

(7)The power under section 19(6) (power to refuse admission to monuments under public control) is not exercisable so as to prevent or restrict the exercise of the powers under this Act with respect to works.

(8)In section 25 (treatment of ancient monuments)—

(a)subsection (2) (superintendence by Commission) does not authorise the superintendence of the carrying out of any of the works authorised by this Act, and

(b)subsection (3) (power of Commission to charge for advice under subsection (1)) does not apply in relation to advice given in connection with the carrying out of any of those works.

(9)Section 28 (offence of damaging certain ancient monuments) does not apply to anything done in exercise of the powers under this Act with respect to works.

(10)Section 35 (notice required of operations in areas of archaeological importance) does not apply to operations carried out in exercise of the powers under this Act with respect to works.

(11)Section 39(1) (power to investigate in advance of operations notice any site which may be acquired compulsorily) has effect as if operations carried out in exercise of the powers under this Act with respect to works were exempt operations for the purposes of that provision.

(12)Section 42(1) (prohibition on use of metal detectors in protected places without consent) does not apply to the use of a metal detector for the purposes of or in connection with the exercise of the powers under this Act with respect to works.

(13)Section 42(3) (prohibition on removal without consent of object discovered by use of a metal detector in a protected place) does not apply to the removal of objects discovered by the use of a metal detector for the purposes of or in connection with the exercise of the powers under this Act with respect to works.

2(1)The consent of the nominated undertaker is required for the exercise of the power of entry under section 36(1) of the National Heritage Act 1983 (entry to obtain information about ancient monuments and historic buildings for the purposes of the records kept by the Commission) in relation to land used, or intended for use, for or in connection with the carrying out of any of the works authorised by this Act.U.K.

(2)Consent for the purposes of sub-paragraph (1)—

(a)must not be unreasonably withheld;

(b)may be granted subject to compliance with any reasonable requirements or conditions imposed for reasons of safety or for the purpose of preventing interference with or delay to the works.

(3)Section 36(6) of the National Heritage Act 1983 (which, in relation to land on which works are being carried out, regulates the exercise of the power under section 36(1) to enter land to obtain information) does not apply in relation to land on which works authorised by this Act are being carried out.

(4)Any dispute under this paragraph must be referred to arbitration if the parties so agree, but must otherwise be determined by the Secretary of State for Transport and [F3the Secretary of State for Culture, Media and Sport] acting jointly.

Power to disapply provision made by paragraphs 1 and 2U.K.

3(1)The Secretary of State may by regulations make any provision specified in sub-paragraph (2) in relation to any work constructed in exercise of the powers under this Act.U.K.

(2)The provision referred to in sub-paragraph (1) is—

(a)provision that paragraph 1(2) does not apply in relation to relevant works;

(b)provision that paragraph 1(3) does not apply in relation to land used for or in connection with the carrying out of relevant works;

(c)provision that paragraph 1(8)(a) and (b) do not apply in relation to relevant works;

(d)provision that paragraph 1(10) and (11) do not apply in relation to operations carried out in exercise of the powers under this Act which are, or are carried out in connection with, relevant works;

(e)provision that paragraph 1(12) does not apply in relation to use of a metal detector for the purposes of or in connection with relevant works;

(f)provision that paragraph 1(13) does not apply in relation to removal of objects discovered by any such use;

(g)provision that paragraph 2(1) does not apply in relation to land used, or intended for use, for or in connection with the carrying out of relevant works;

(h)provision that paragraph 2(3) does not apply in relation to land on which relevant works are being carried out.

(3)In this paragraph, “relevant works” means works which are—

(a)carried out in exercise of the powers under this Act for the maintenance or alteration of the work referred to in sub-paragraph (1), and

(b)begun on or after such day as may be specified in regulations under that sub-paragraph.

(4)Regulations under sub-paragraph (1) may make different provision for different purposes.

(5)Regulations under sub-paragraph (1) must be made by statutory instrument; and a statutory instrument containing such regulations must be laid before Parliament after being made.

Inspection and observation of works etcU.K.

4(1)Any person duly authorised in writing by the Commission may at any reasonable time enter land on which (or in or under which) a scheduled monument is situated—U.K.

(a)for the purpose of observing or advising upon the exercise in relation to the land of any of the powers under paragraph 1 of Schedule 2 to this Act, or

(b)for the purpose of inspecting, observing or advising upon the carrying out of any works on the land in exercise of any of the other powers under this Act.

(2)The right under sub-paragraph (1) is not exercisable at a time when the nominated undertaker reasonably considers that it is not safe to exercise it.

(3)A person exercising the right under sub-paragraph (1) must comply with directions given by the nominated undertaker for the purpose of securing compliance with relevant health and safety provisions.

(4)In this paragraph, “scheduled monument” has the same meaning as in the Ancient Monuments and Archaeological Areas Act 1979.

InterpretationU.K.

5U.K.In this Schedule, references to “the Commission” are to the Historic Buildings and Monuments Commission for England.

Section 22

SCHEDULE 20U.K.Burial grounds

Notice of removal of remains or monumentU.K.

1(1)Before removing from the land in question any remains or any monument to the deceased, the nominated undertaker must—U.K.

(a)publish a notice complying with sub-paragraph (2) in each of two successive weeks in a newspaper circulating in the area where the land is situated, and

(b)at the same time leave such a notice displayed in a conspicuous place on or near the land.

(2)A notice under sub-paragraph (1) must—

(a)identify the land to which it relates,

(b)set out in general terms the effect of paragraphs 2 to 7 (so far as relevant to remains to which sub-paragraph (1) applies),

(c)state where, and in what form, an application under paragraph 2(1) may be made, and

(d)state how the nominated undertaker proposes to carry out its functions under this Schedule with respect to the disposal of the remains or monument.

(3)No notice is required under sub-paragraph (1) before the removal of any remains or any monument to the deceased where the Secretary of State notifies the nominated undertaker that the Secretary of State is satisfied—

(a)that the remains were buried more than 100 years ago, and

(b)that no relative or personal representative of the deceased is likely to object to the remains or monument being removed in accordance with this Schedule.

(4)No notice is required under sub-paragraph (1) before the removal of any remains or any monument to the deceased if—

(a)a court has granted a faculty, in relation to the remains, to the nominated undertaker or a body corporate which is a member of the same group as the nominated undertaker, or

(b)on the passing of this Act, a licence under section 25 of the Burial Act 1857 (bodies not to be removed from burial grounds without licence of the Secretary of State) is in force in relation to the remains and the holder of the licence is the nominated undertaker or a body corporate which is a member of the same group as the nominated undertaker.

(5)In sub-paragraph (4)—

Removal of remains under licenceU.K.

2(1)In the case of remains in relation to which paragraph 1(1) applies, the nominated undertaker must issue a licence for the removal of the remains if—U.K.

(a)it receives an application in writing from a relative or personal representative of the deceased, and

(b)the application is received before the end of the period of 56 days after the day on which notice relating to the remains is first published under paragraph 1(1)(a).

(2)In the case of remains in relation to which paragraph 1(3) applies, the nominated undertaker must issue a licence for the removal of the remains if—

(a)it receives an application in writing from a relative or personal representative of the deceased, and

(b)the application is received before the nominated undertaker has removed the remains under paragraph 4(1).

(3)A licensee under this paragraph may remove the remains to which the licence relates and bury them elsewhere or cremate them.

(4)The nominated undertaker must pay the reasonable costs of removal and reburial or cremation under this paragraph.

Removal of remains by nominated undertakerU.K.

3(1)In the case of remains in relation to which paragraph 1(1) applies, the nominated undertaker may remove the remains after the expiry of the period of 56 days referred to in paragraph 2(1)—U.K.

(a)if no application under paragraph 2(1) has been received, or

(b)in a case where one or more applications under paragraph 2(1) have been received, if in the case of each application—

(i)a licence has been issued, and

(ii)at least 28 days have passed since the issue of the licence without the remains having been removed.

(2)The nominated undertaker must within two months of the removal of remains under sub-paragraph (1)—

(a)bury them in a place (whether or not consecrated) which is set apart for the purposes of burial, or

(b)cremate them in a crematorium.

(3)If—

(a)an application is made to the nominated undertaker under paragraph 2(1),

(b)the application is refused on the ground that the nominated undertaker is not satisfied that the applicant is a relative or personal representative of the deceased,

(c)within the period of 28 days beginning with the date of the notice of refusal the applicant has applied to the county court for a declaration that he or she is a relative or personal representative of the deceased (see paragraph 11(2)(b)), and

(d)that period of 28 days has elapsed without the court having determined the application made to it,

the nominated undertaker may remove the remains and any monument to the deceased.

(4)The nominated undertaker must, pending the court's determination, deal with any remains or monument removed under sub-paragraph (3) in such manner as the Secretary of State may direct.

4(1)In the case of remains in relation to which paragraph 1(3) applies, the nominated undertaker may remove the remains—U.K.

(a)if no application under paragraph 2(2) has been received, or

(b)in a case where one or more applications under paragraph 2(2) have been received, if in the case of each application—

(i)a licence has been issued, and

(ii)at least 28 days have passed since the issue of the licence without the remains having been removed.

(2)The nominated undertaker must after the removal of remains under sub-paragraph (1)—

(a)within 12 months or such longer period as the Secretary of State may direct in relation to the case—

(i)bury them in a place (whether or not consecrated) which is set apart for the purposes of burial, or

(ii)cremate them in a crematorium, or

(b)deal with them in such other manner, and subject to such conditions, as the Secretary of State may direct.

(3)If—

(a)an application is made to the nominated undertaker under paragraph 2(2),

(b)the application is refused on the ground that the nominated undertaker is not satisfied that the applicant is a relative or personal representative of the deceased,

(c)within the period of 28 days beginning with the date of the notice of refusal the applicant has applied to the county court for a declaration that he or she is a relative or personal representative of the deceased (see paragraph 11(2)(b)), and

(d)that period of 28 days has elapsed without the court having determined the application made to it,

the nominated undertaker may remove the remains and any monument to the deceased.

(4)The nominated undertaker must, pending the court's determination, deal with any remains or monument removed under sub-paragraph (3) in such manner as the Secretary of State may direct.

5(1)In the case of remains in relation to which paragraph 1(4) applies—U.K.

(a)the nominated undertaker may remove the remains, and

(b)if it does so, it is to be treated for the purposes of this Act as acting under this paragraph and not under the faculty or licence mentioned in paragraph 1(4).

(2)The nominated undertaker must within two months of the removal of remains under sub-paragraph (1)—

(a)bury them in a place (whether or not consecrated) which is set apart for the purposes of burial, or

(b)cremate them in a crematorium.

(3)Sub-paragraph (2) does not apply if the Secretary of State is satisfied that the remains were buried more than 100 years ago; and in such a case the nominated undertaker must, after the removal of remains under sub-paragraph (1)—

(a)within 12 months or such longer period as the Secretary of State may direct in relation to the case—

(i)bury them in a place (whether or not consecrated) which is set apart for the purposes of burial, or

(ii)cremate them in a crematorium, or

(b)deal with them in such other manner, and subject to such conditions, as the Secretary of State may direct.

Removal of monumentsU.K.

6(1)Where a licence to remove any remains is issued under paragraph 2(1) or (2), the licensee may remove from the land any monument to the deceased and re-erect it elsewhere or otherwise dispose of it.U.K.

(2)The nominated undertaker must pay the reasonable costs of removal and re-erection under sub-paragraph (1).

7(1)Where any remains are removed under a licence under paragraph 2(1) or (2), the nominated undertaker may remove from the land any monument to the deceased which is not removed by the licensee within 28 days of the issue of the licence.U.K.

(2)Where the nominated undertaker removes any remains under paragraph 3, 4 or 5, it may also remove from the land any monument to the deceased.

(3)Where any remains are removed (by a person other than the nominated undertaker) under a faculty or a licence under section 25 of the Burial Act 1857, the nominated undertaker may remove from the land any monument to the deceased which is not removed by the person to whom the faculty is granted or the licensee (as the case may be).

(4)The nominated undertaker may move any monument removed under this paragraph to the place, if any, where the remains of the deceased are buried or to some other appropriate place.

(5)The nominated undertaker must break and deface any monument removed under this paragraph which is not dealt with under sub-paragraph (4).

RecordsU.K.

8(1)Where any remains in relation to which paragraph 1(1) applies are removed under this Schedule, or remains in relation to which paragraph 1(4) applies are removed under paragraph 5(2), the nominated undertaker must, within two months of the removal, provide the Registrar General with a certificate which—U.K.

(a)identifies the remains, so far as practicable,

(b)states the date on which, and the place from which, the remains were removed, and

(c)states the date and place of reburial or cremation.

(2)Where any remains in relation to which paragraph 1(3) applies are removed under this Schedule, or remains in relation to which paragraph 1(4) applies are removed under paragraph 5(3), the nominated undertaker must, within 12 months of the removal or such longer period as the Secretary of State may direct in relation to the case, provide the Registrar General with a certificate which—

(a)identifies the remains, so far as practicable,

(b)states the date on which, and the place from which, the remains were removed,

(c)if at the time the certificate is provided the remains have been reburied or cremated, states the date and place of reburial or cremation, and

(d)if at that time the remains have not been reburied or cremated, states where and by whom they are kept.

(3)Where any monument is removed under this Schedule, the nominated undertaker must, within two months of the removal—

(a)deposit with the local authority in whose area the monument was situated prior to the removal a record which—

(i)identifies the monument,

(ii)gives any inscription on it,

(iii)states the date on which, and the place from which, it was removed, and

(iv)states the place, if any, to which it was moved or how it was disposed of, and

(b)provide the Registrar General with a copy of the record deposited under paragraph (a).

(4)The nominated undertaker may require any person who removes remains or a monument under this Schedule to provide it with any information about the remains or monument removed which it needs in order to comply with sub-paragraph (1), (2) or (3).

(5)In sub-paragraph (3)(a), “local authority” means the unitary authority or, in a non-unitary area, the district council.

Discharge of functions by nominated undertakerU.K.

9(1)Where the nominated undertaker removes remains in relation to the removal of which a licence has been granted under paragraph 2(1) or (2), it must carry out in accordance with the reasonable requests of the licensee—U.K.

(a)its functions under paragraph 3 or 4 with respect to disposal of the remains, and

(b)if it removes any monument to the deceased, the functions under paragraph 7 with respect to disposal of the monument.

(2)In a case where more than one licence is granted under paragraph 2(1) or (2) and the licensees make different reasonable requests for the purposes of sub-paragraph (1), the nominated undertaker must carry out the functions referred to in that sub-paragraph in accordance with directions given by the Secretary of State.

(3)Directions under sub-paragraph (2) may include directions that—

(a)a licensee may apply to the county court to determine how remains or a monument are to be disposed of, and

(b)how the remains or monument are to be dealt with pending the court's determination.

10U.K.The Secretary of State may give such directions as the Secretary of State thinks fit with respect to the carrying out of any function of the nominated undertaker under this Schedule.

Relatives and personal representativesU.K.

11(1)In this Schedule, references to a relative of the deceased are to a person who—U.K.

(a)is a husband, wife, civil partner, parent, grandparent, child or grandchild of the deceased, or

(b)is, or is a child of, a brother, sister, uncle or aunt of the deceased.

(2)For the purposes of this Schedule, a person is to be taken to be a relative or personal representative of the deceased if—

(a)the nominated undertaker is satisfied that the person is a relative or personal representative of the deceased, or

(b)the county court, on the application of the person, has declared that the person is a relative or personal representative of the deceased.

Section 27

SCHEDULE 21U.K.Water

Water abstraction and impoundingU.K.

1U.K.The restriction imposed by section 24(1) of WRA 1991 (restriction on the abstraction of water) does not apply in relation to the abstraction of water for the purposes of or in connection with the construction of the works authorised by this Act.

2U.K.Section 25 of WRA 1991 (restrictions on impounding) does not apply to anything done in exercise of the powers conferred by this Act with respect to works.

3(1)Section 48A(1) of WRA 1991 (duty not to cause loss or damage to another by the abstraction of water) does not apply in relation to the abstraction of water in connection with the exercise of the powers conferred by this Act.U.K.

(2)Where—

(a)the nominated undertaker causes loss or damage to another person by the abstraction of water in connection with the exercise of the powers conferred by this Act, and

(b)the circumstances are such that causing the loss or damage would have constituted breach of the duty under section 48A(1) of WRA 1991, but for sub-paragraph (1),

the nominated undertaker must compensate the other person for the loss or damage.

(3)Compensation under sub-paragraph (2) is to be assessed on the same basis as damages for breach of the duty under section 48A(1) of WRA 1991.

(4)Section 48A(5) of WRA 1991 (prohibition of claims in respect of loss or damage caused by abstraction of water which are not claims under that section) has no application to claims under—

(a)this paragraph, or

(b)Part 4 of Schedule 32.

No environmental permit required for operating regulated facility etcU.K.

4(1)Regulation 12(1) of the Environmental Permitting Regulations (which requires an environmental permit for certain activities) does not apply to the carrying on of a relevant flood risk activity, a water discharge activity or a groundwater activity in exercise of the powers conferred by this Act with respect to works.U.K.

(2)In this paragraph—

(a)“groundwater activity” and “water discharge activity” have the meaning given, respectively, by paragraph 3 of Schedule 22 and paragraph 3 of Schedule 21 to the Environmental Permitting Regulations;

(b)relevant flood risk activity” means an activity within paragraph 3(1)(a), (b) or (c) of Schedule 25 to those Regulations;

(c)Environmental Permitting Regulations” means the Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154).

FloodsU.K.

5U.K.Paragraph 5 of Schedule 1 to FWMA 2010 (consent required for alteration, removal or replacement of designated feature) does not apply to anything done in exercise of the powers conferred by this Act with respect to works.

DrainageU.K.

6U.K.Paragraph 7 of Schedule 3 to FWMA 2010 (approval required for drainage system for construction work) does not apply in relation to anything done in exercise of the powers conferred by this Act with respect to works.

EelsU.K.

7U.K.Part 4 of the Eels (England and Wales) Regulations 2009 (S.I. 2009/3344) (passage of eels) does not apply to anything done in exercise of the powers conferred by this Act with respect to works.

InterpretationU.K.

8U.K.In this Schedule—

Section 28(1)

SCHEDULE 22U.K.Buildings

Building regulationsU.K.

1(1)Nothing in—U.K.

(a)Part 1 of the 1984 Act with respect to building regulations, or

(b)any building regulations,

applies to a building held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

(2)Sub-paragraph (1) does not apply in relation to a building which is a house or hotel.

(3)Sub-paragraph (1) does not apply in relation to a building which is used as offices or showrooms unless it forms part of a railway station or other railway facility.

(4)In sub-paragraph (3), “railway facility” includes a maintenance depot, electrical supply facility or stabling facility used for the purposes of a railway.

(5)The reference in sub-paragraph (1)(b) to building regulations does not include the provisions listed in regulation 34(1) of the Building Regulations 2010 (S.I. 2010/2214) (requirements relating to energy efficiency).

Drain repairsU.K.

2U.K.In section 61 of the 1984 Act—

(a)subsection (2) (local authority officers to have access to drain repair works), and

(b)subsection (3) (offence for failure to comply with section 61),

do not apply to the repair, reconstruction or alteration of an underground drain which is carried out for Phase 2a purposes.

Drain disconnectionsU.K.

3U.K.Where works described in section 62(1)(a), (b) or (c) of the 1984 Act (reconstruction and other drain works) are carried out for Phase 2a purposes, section 62 of the 1984 Act (which requires drains to be disconnected when they become disused or unnecessary in consequence of reconstruction and other works) has effect as if—

(a)in subsection (1), for “as the local authority may reasonably require” there were substituted “ as the person considers necessary ”,

(b)subsections (2) and (3) were omitted,

(c)for subsection (4) there were substituted—

(4)Before carrying out works described in subsection (1)(a), (b) or (c), the person carrying out the works must give at least 48 hours' notice to the local authority., and

(d)subsection (5) were omitted.

Raising of chimneysU.K.

4(1)This paragraph applies where—U.K.

(a)the nominated undertaker is given a notice under section 73(1) of the 1984 Act (notice requiring chimney of adjoining building to be raised and requiring owner or occupier of that building to allow access to it for that purpose),

(b)the taller building is a building held, or to be held, by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act, and

(c)the owner or occupier of the adjoining building referred to in section 73(1)(b) of the 1984 Act serves a counter-notice on the nominated undertaker.

(2)The owner or occupier of the adjoining building may not enter upon relevant Phase 2a land, for the purposes of carrying out the work to which the counter-notice relates, without the consent of the Secretary of State or the nominated undertaker.

(3)Relevant Phase 2a land” means land held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under the Act.

(4)Where, by reason of the withholding of consent for the purposes of sub-paragraph (2), the owner or occupier of the adjoining building is unable to carry out the work to which the counter-notice relates, the counter-notice ceases to have effect.

(5)In this paragraph, references to “the taller building” and a “counter-notice” are to be construed in accordance with section 73 of the 1984 Act.

Construction of cellars and rooms below subsoil water levelU.K.

5(1)Section 74(1) of the 1984 Act (which requires local authority consent for the construction of a cellar or room below subsoil water level in, or as part of, a house, shop, inn, hotel or office) does not apply to the construction of a cellar or room in connection with a shop, inn, hotel or office which forms part of a railway station or other railway facility which is being used, or which is intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.U.K.

(2)In sub-paragraph (1), “railway facility” includes a maintenance depot, electrical supply facility or stabling facility used for the purposes of a railway.

Demolition of whole or part of buildingU.K.

6U.K.Sections 80(2)(b), 81 and 82 of the 1984 Act (which concern a local authority's power to serve notice about a demolition) do not apply to the demolition of the whole or part of a building carried out in exercise of the powers under this Act and to which section 80 of the 1984 Act otherwise applies.

InterpretationU.K.

7U.K.In this Schedule—

Section 28(2)

SCHEDULE 23U.K.Party walls etc

1U.K.In this Schedule, “the 1996 Act” means the Party Wall etc. Act 1996.

2U.K.No notice under section 1(2) or (5) of the 1996 Act (notice before building on line of junction with adjoining land) is required before the building of any wall for Phase 2a purposes.

3U.K.Sections 1(6) and 2 of the 1996 Act (rights of adjoining owners) do not have effect to confer rights in relation to—

(a)anything held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act, or

(b)land on which there is any such thing.

4U.K.No party structure notice under section 3 of the 1996 Act is required before the exercise of any right conferred by section 2 of that Act (right to repair etc party wall) for the purposes of or in connection with—

(a)the construction of the works authorised by this Act, or

(b)the maintenance of any such work during the period beginning with the date on which the work is completed and ending 5 years after the date on which it is brought into general use.

5U.K.Section 6 of the 1996 Act (underpinning of adjoining buildings) does not apply in relation to a proposal to excavate, or excavate for and erect anything, for Phase 2a purposes.

6(1)Where—U.K.

(a)a building owner (within the meaning of the 1996 Act) serves a notice under section 6(5) of that Act, and

(b)the building or structure of the adjoining owner (within the meaning of that Act) referred to in that provision is a building or structure—

(i)erected for Phase 2a purposes, or

(ii)situated on land held by the Secretary of State or the nominated undertaker for the purposes of the nominated undertaker's undertaking under this Act,

section 6 of that Act has effect with the following modifications.

(2)Those modifications are—

(a)subsection (3) is omitted;

(b)for subsections (6) and (7) substitute—

(6)The notice referred to in subsection (5) (“the proposals notice”)—

(a)shall be accompanied by plans and sections showing—

(i)the site and depth of any excavation the building owner proposes to make; and

(ii)if he proposes to erect a building or structure, its site; and

(b)where the notice includes a proposal to underpin or otherwise strengthen or safeguard the foundations of the building or structure of the adjoining owner, shall—

(i)include a detailed description of those works; and

(ii)specify the building owner's programme for carrying them out.

(6A)The adjoining owner may serve a notice on the building owner consenting to the proposals notice.

(6B)Where the proposals include the carrying out of works mentioned in subsection (6)(b), the consent notice served under subsection (6A) must state whether the adjoining owner—

(a)is to carry out those works himself, or

(b)requires the works to be carried out by the building owner.

(7)If an owner on whom a proposals notice has been served does not serve a consent notice within the period of 14 days beginning with the day on which the proposals notice was served, he shall be deemed to have dissented from the notice and a dispute shall be deemed to have arisen between the parties.

(7A)Works to underpin or otherwise strengthen or safeguard the foundations of the building or structure of the adjoining owner (whether proposed in the proposals notice or otherwise) are to be carried out by the adjoining owner, unless the building owner is required to carry them out—

(a)by virtue of a requirement within subsection (6B)(b), or

(b)where a dispute is deemed to have arisen between the parties in relation to any matter, by a notice served by the adjoining owner on the building owner within the period of 14 days beginning with—

(i)the day on which the parties settle the dispute, or

(ii)the day on which an award is made under section 10 in relation to the dispute.

(7B)The works (whether carried out by the adjoining owner or the building owner) are to be carried out—

(a)at the building owner's expense, and

(b)in accordance with the description and programme agreed by the parties (whether by virtue of a consent notice or in connection with the settlement of any dispute) or determined in accordance with section 10 (in the case of a dispute in relation to which an award is made under that section).

7(1)This paragraph applies where a dispute arises or is deemed to have arisen in respect of a matter connected with any work to which the 1996 Act relates and the work—U.K.

(a)is required for Phase 2a purposes, or

(b)relates to a building or structure situated on land held by the Secretary of State or the nominated undertaker for the purposes of the nominated undertaker's undertaking under this Act.

(2)In such a case, the 1996 Act has effect as if for section 10 (resolution of disputes) there were substituted—

10Resolution of disputes

(1)Where a dispute arises or is deemed to have arisen between a building owner and an adjoining owner in respect of any matter connected with any work to which this Act applies, the dispute is to be settled by a single arbitrator, who is to be—

(a)agreed on by both parties, or

(b)in default of agreement, appointed on the application of either party, after notice in writing to the other, by the President of the Institution of Civil Engineers.

(2)If the arbitrator—

(a)refuses to act,

(b)neglects to act for a period of 10 days beginning with the day on which either party serves a request on the arbitrator,

(c)dies before the dispute is settled, or

(d)becomes or deems himself or herself incapable of acting,

subsection (1) applies again.

(3)The arbitrator must settle by award any matter—

(a)which is connected with any work to which this Act relates, and

(b)which is in dispute between the building owner and the adjoining owner.

(4)An award may determine—

(a)the right to execute any work;

(b)the time and manner of executing any work; and

(c)any other matter arising out of or incidental to the dispute including the costs of making the award.

(5)But, unless otherwise agreed between the building owner and the adjoining owner, any period appointed by the award for executing any work does not begin to run until after the end of the period prescribed by this Act for service of the notice in respect of which the dispute arises or is deemed to have arisen.

(6)The reasonable costs incurred in—

(a)making or obtaining an award under this section,

(b)reasonable inspections of work to which the award relates, and

(c)any other matter arising out of the dispute,

are to be paid by such of the parties as the arbitrator determines.

(7)Where the arbitrator makes an award, the arbitrator must serve it forthwith on the parties.

(8)The award is conclusive and must not except as provided by this section be questioned in any court.

(9)Either of the parties to the dispute may appeal to the county court against the award within the period of 14 days beginning with the day on which the award is served on the party making the appeal.

(10)On such an appeal, the county court may—

(a)rescind the award or modify it in such manner as the court thinks fit; and

(b)make such order as to costs as the court thinks fit.

(3)Where the 1996 Act has effect as mentioned in sub-paragraph (2)—

(a)section 7(5) has effect as if the words “(or surveyors acting on their behalf)” were omitted,

(b)section 8(5) has effect as if the reference to a surveyor appointed or selected under section 10 were to an arbitrator agreed or appointed under section 10 (as modified by sub-paragraph (2)),

(c)section 8(6) has effect as if it provided for the arbitrator to give notice of its intention to enter land or premises, and

(d)section 12(3)(b) has effect as if the reference to the surveyor or surveyors were to the arbitrator.

8(1)Where, by virtue of paragraph 6, work to which a notice under section 6(5) of the 1996 Act relates is carried out by an adjoining owner, sections 13 and 14 of that Act have effect subject to the following modifications.U.K.

(2)Section 13(1) has effect as if it enabled the adjoining owner, within the period of two months beginning with the day of the completion of the work, to serve on the building owner an account in writing showing particulars and expenses of the work.

(3)Section 13(2) has effect as if it enabled the building owner to serve on the adjoining owner a notice objecting to the account served under section 13(1) (as modified by sub-paragraph (2)).

(4)Section 14 has effect as if—

(a)for subsection (1) there were substituted—

(1)All expenses to be defrayed by a building owner in accordance with an account served under section 13 shall be paid by the building owner.,and

(b)subsection (2) were omitted.

Section 29

SCHEDULE 24U.K.Street works

Works in or near highwaysU.K.

1(1)Section 141 of the Highways Act 1980 (restriction on planting trees or shrubs in or near carriageway) does not apply to any tree or shrub planted for the purposes of or in connection with the exercise of the powers conferred by this Act.U.K.

(2)Section 167 of that Act (powers relating to retaining walls near streets) does not apply to any length of a retaining wall erected on land held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

(3)Section 169(1) of that Act (control of scaffolding on highways) does not apply to anything erected, placed or retained in, upon or over a highway for the purposes of or in connection with the exercise of the powers conferred by this Act.

(4)The provisions of this paragraph apply in relation to a highway for which the Secretary of State or a strategic highways company is the highway authority only if the Secretary of State or the strategic highways company consents (and consent may be subject to conditions).

Street worksU.K.

2(1)The powers conferred by section 56(1) and (1A) of the New Roads and Street Works Act 1991 (powers to give directions as to the timing of proposed and subsisting street works) do not apply in relation to works proposed to be, or being, carried out under the powers conferred by this Act.U.K.

(2)Section 56A of that Act (power to give directions as to placing of apparatus) does not apply in relation to the placing of apparatus in exercise of the powers conferred by this Act.

(3)No restriction under section 58(1) of that Act (power to impose restriction on execution of street works following completion of substantial road works) has effect in relation to works carried out under the powers conferred by this Act.

(4)Section 61(1) of that Act (under which the consent of the street authority is required for the placing of apparatus in a protected street) does not apply to the placing of apparatus in exercise of the powers conferred by this Act.

(5)Section 62(2) of that Act (power following designation of protected street to require removal or repositioning of apparatus already placed in the street) does not apply in relation to apparatus placed in exercise of the powers conferred by this Act.

(6)Section 62(4) of that Act (power, when designation as protected street commences or ceases, to give directions with respect to works in progress) does not apply in relation to works being carried out under the powers conferred by this Act.

(7)Section 63(1) of that Act (under which Schedule 4 to that Act has effect for requiring the settlement of a plan and section of street works to be executed in a street designated by the street authority as having special engineering difficulties) does not apply in relation to works to be executed under the powers conferred by this Act.

(8)The power conferred by section 73A(1) of that Act (power to require undertaker to re-surface street) may not be exercised in relation to an undertaker who is within subsection (2) of that section because of—

(a)having given a notice in respect of works proposed to be carried out under the powers conferred by this Act, or

(b)executing, or having executed, works under those powers.

(9)Nothing in section 74A of that Act (power to make regulations requiring payment of charges for street works), or in regulations made under it, applies in relation to the execution of works under the powers conferred by this Act.

(10)No contribution is payable under section 78A(1)(b) of that Act (contributions by other undertakers to costs incurred in executing works specified in a re-surfacing notice) because of the execution of works under the powers conferred by this Act.

(11)Schedule 3A to that Act (restriction on works following substantial street works) does not apply where a notice under section 54 (advance notice of certain works) or section 55 (notice of starting date of works) of that Act is in respect of works to be executed under the powers conferred by this Act.

(12)No notice under paragraph 2(1)(d) of that Schedule (power by notice to require notification of works which an undertaker proposes to carry out in a part of a highway to which a proposed restriction applies) has effect to require the notification of works proposed to be carried out under the powers conferred by this Act.

(13)No directions under paragraph 3 of that Schedule (directions as to the date on which undertakers may begin to execute proposed works) may be issued to the nominated undertaker.

(14)Paragraph 3(4) of that Schedule (under which it is an offence for an undertaker to execute street works before the completion of certain other street works) does not apply in relation to the execution of works under the powers conferred by this Act.

(15)Paragraph 5(1) of that Schedule (effect of direction under paragraph 4 restricting further works) does not apply in relation to the execution of works under the powers conferred by this Act.

(16)The provisions of this paragraph apply in relation to a street for which the Secretary of State or a strategic highways company is the street authority only if the Secretary of State or the strategic highways company consents (and consent may be subject to conditions).

Permit schemesU.K.

3(1)Nothing in Part 3 of the Traffic Management Act 2004 (permit schemes), or in any permit scheme or permit regulations under that Part, applies in relation to the carrying out of works under the powers conferred by this Act.U.K.

(2)Where a permit scheme under Part 3 of the 2004 Act is in respect of a street for which the Secretary of State or a strategic highways company is the highway authority, sub-paragraph (1) applies in relation to the scheme only if the highway authority in respect of the street consents (and consent may be subject to conditions).

Section 30

SCHEDULE 25U.K.Lorries

Lorry ban ordersU.K.

1(1)In this Schedule, “lorry ban order” means an order made at any time under section 1, 9 or 14 of the Road Traffic Regulation Act 1984 which to any extent imposes—U.K.

(a)a prohibition or restriction on the use of heavy commercial vehicles, or any class of such vehicles, in an area, zone or place, or on a road, specified in the order, or

(b)a requirement that heavy commercial vehicles, or any class of such vehicles, use a specified through route.

(2)The reference in sub-paragraph (1)(a) to a prohibition or restriction on the use of heavy commercial vehicles on a road does not include a prohibition or restriction on their use on part of the width of a road.

(3)It is immaterial for the purposes of sub-paragraph (1) whether the prohibition, restriction or requirement is subject to exceptions.

(4)This paragraph applies in relation to a lorry ban order made by the Secretary of State or a strategic highways company only if the Secretary of State or the strategic highways company consents (and consent may be subject to conditions).

Required provision in lorry ban ordersU.K.

2(1)If a lorry ban order does not contain the required provision, it is to be treated as if it did.U.K.

(2)The required provision is provision to the effect that—

(a)a person proposing to use heavy commercial vehicles in connection with authorised works in a way which would otherwise constitute a breach of the prohibition, restriction or requirement referred to in paragraph 1(1) may apply for the issue of a permit in respect of that use, and

(b)the use authorised by such a permit does not constitute a breach of the prohibition, restriction or requirement.

Issue of emergency permitsU.K.

3(1)This paragraph applies where a person proposes to undertake a journey before the end of the next complete eight working days, being a journey—U.K.

(a)proposed to be undertaken in connection with the carrying out of authorised works, and

(b)for which a permit under a lorry ban order is required if the prohibition, restriction or requirement is not to be breached.

(2)The person may apply for a permit under the lorry ban order for the journey by giving the details mentioned in sub-paragraph (3), by telephone or by electronic means, to the authority responsible for dealing with permits under the order.

(3)The details referred to above are—

(a)the identity of the applicant,

(b)how the applicant may be contacted by telephone or by electronic means,

(c)the registration number of the vehicle to which the application relates,

(d)the authorised works in connection with which the journey is to be undertaken,

(e)whether any approved arrangements are relevant to the application and, if so, what they are,

(f)the date when the journey is proposed to be undertaken,

(g)in the case of an order made otherwise than by the Secretary of State or a strategic highways company, whether it is proposed to stop in the area of the traffic authority for delivery or collection purposes and, if so, the place or places and time or times at which it is proposed to do so, and

(h)in the case of an order made by the Secretary of State or a strategic highways company, such details of the place or places and time or times at which it is proposed to stop for delivery or collection purposes as may be set out in conditions attaching to consent given under paragraph 1(4).

4(1)An authority responsible for dealing with permits under a lorry ban order must make arrangements enabling applications under paragraph 3 to be made at any time.U.K.

(2)Once an application for a permit has been made under paragraph 3, then, for the purpose of any relevant journey, the application is to be treated as granted subject to such conditions as the Secretary of State may by order specify.

(3)A journey is a relevant journey for the purposes of sub-paragraph (2) if it is begun before the authority to which the application is made has communicated its decision on the application to the applicant by the means specified by the application under paragraph 3(3)(b).

(4)The power to make an order under sub-paragraph (2) includes—

(a)power to make different provision for different cases, and

(b)power to make an order varying or revoking any order previously made under that provision.

Grant of applications for permitU.K.

5(1)This paragraph applies where an application for the issue of a permit under a lorry ban order—U.K.

(a)is made under paragraph 3, or

(b)is otherwise expressed to be made in connection with the carrying out of authorised works.

(2)The application must be granted if the issue of a permit is reasonably required—

(a)for the purpose of enabling authorised works to be carried out in a timely and efficient manner, or

(b)for the purpose of enabling authorised works to be carried out in accordance with approved arrangements.

(3)If the application is granted, no condition may be imposed which is likely to obstruct the carrying out of authorised works—

(a)in a timely and efficient manner, or

(b)in accordance with approved arrangements.

(4)An applicant aggrieved by a decision under sub-paragraph (2) or (3) may appeal to the Secretary of State by giving notice of the appeal to—

(a)the Secretary of State, and

(b)the authority whose decision is appealed against,

within 28 days of notification of the decision.

(5)On an appeal under sub-paragraph (4), the Secretary of State may allow or dismiss the appeal or vary the decision of the authority whose decision is appealed against.

(6)If, on an appeal under sub-paragraph (4) against a decision under sub-paragraph (3), the Secretary of State varies the decision, the variation has effect from and including the date on which the appeal was instituted or such later date as the Secretary of State may specify.

(7)The applicant may not challenge a decision under sub-paragraph (3) otherwise than by an appeal under sub-paragraph (4).

Supplementary interpretationU.K.

6(1)In this Schedule—U.K.

(2)In this Schedule, references to the issuing of a permit include the giving of any consent.

Section 31

SCHEDULE 26U.K.Noise

Control of noise on construction sitesU.K.

1(1)In the Control of Pollution Act 1974, sections 60 (control of noise on construction sites) and 61 (prior consent for work on construction sites) each have effect, in relation to works carried out in exercise of the powers conferred by this Act, as if—U.K.

(a)in subsection (7) (appeal against notice or against failure to give consent or the giving of qualified consent), for “a magistrates' court” there were substituted “ the Secretary of State ”, and

(b)after that subsection there were inserted—

(7A)If within seven days of the giving of notice of appeal under subsection (7) of this section the appellant and the local authority so agree, the appeal shall, instead of being determined by the Secretary of State, be referred to arbitration.

(2)The Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport acting jointly may, in relation to appeals which (by virtue of sub-paragraph (1)) are referred to arbitration under section 60(7A) or 61(7A) of the Control of Pollution Act 1974, by regulations make any such provision as may be made by regulations under section 70 of that Act in relation to appeals under Part 3 of that Act to the Secretary of State.

(3)Regulations under sub-paragraph (2) must be made by statutory instrument; and a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of either House of Parliament.

Defences to proceedings relating to statutory nuisanceU.K.

2U.K.In proceedings for an offence under section 80(4) of the Environmental Protection Act 1990 (offence of contravening abatement notice) in respect of a statutory nuisance falling within section 79(1)(g) or (ga) of that Act where the offence consists in contravening requirements imposed by virtue of section 80(1)(a) or (b) of that Act, it is a defence to show that the nuisance—

(a)is a consequence of—

(i)the construction, use or maintenance of the works authorised by this Act, or

(ii)the operation of Phase 2a of High Speed 2, and

(b)cannot reasonably be avoided.

3(1)Where proceedings are brought under section 82(1) of the Environmental Protection Act 1990 (summary proceedings by person aggrieved by statutory nuisance) in relation to—U.K.

(a)a statutory nuisance falling within section 79(1)(g) of that Act (noise emitted from premises), or

(b)a statutory nuisance falling within section 79(1)(ga) of that Act (noise emitted by vehicle, machinery or equipment in a street),

no order may be made, and no fine may be imposed, under section 82(2) of that Act if the defendant shows that sub-paragraph (2) or (3) applies.

(2)This sub-paragraph applies if the nuisance—

(a)relates to premises or, as the case may be, to a vehicle, machinery or equipment, used by the nominated undertaker for the purposes of or in connection with the exercise of the powers conferred by this Act with respect to works, and

(b)is attributable to the carrying out of works which are being carried out in accordance with a notice served under section 60, or a consent given under section 61 of the Control of Pollution Act 1974.

(3)This sub-paragraph applies if the nuisance—

(a)is a consequence of—

(i)the construction, use or maintenance of the works authorised by this Act, or

(ii)the operation of Phase 2a of High Speed 2, and

(b)cannot reasonably be avoided.

4U.K.Section 61(9) of the Control of Pollution Act 1974 (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) does not apply where the consent relates to the use of premises or, as the case may be, of a vehicle, machinery or equipment by the nominated undertaker for the purposes of or in connection with the exercise of the powers conferred by this Act with respect to works.

Section 32

SCHEDULE 27U.K.Local Acts

Cheshire County Council Act 1968 (c. xxxvi)U.K.

1U.K.Section 12 of the Cheshire County Council Act 1968 (prohibition of parking of heavy commercial vehicles) does not apply to the use of any parking place by a heavy commercial vehicle (within the meaning of that section) which is reasonably necessary—

(a)for the purposes of, or in connection with, the exercise of the powers conferred by this Act with respect to works, or

(b)for the purposes of the nominated undertaker's undertaking under this Act.

Cheshire County Council Act 1980 (c. xiii)U.K.

2(1)Section 12 of the Cheshire County Council Act 1980 (plans for new streets) does not apply to any work carried out in exercise of the powers conferred by this Act.U.K.

(2)Part 8 of that Act (storage of flammable materials) does not apply in relation to a stack on land held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

(3)Section 50 of that Act (building plans: access for fire brigade) does not apply to plans relating to a building held, or to be held, by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

(4)Section 57 of that Act (prescription of signs to be used on certain buildings) does not apply in relation to a building held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

Staffordshire Act 1983 (c. xviii)U.K.

3(1)Section 7 of the Staffordshire Act 1983 (plans for new streets) does not apply to any work carried out in exercise of the powers conferred by this Act.U.K.

(2)Where—

(a)a local authority (within the meaning of that Act) proposes to exercise the power conferred by section 9(1) of that Act (provision of parking places in parks, etc), and

(b)the power is proposed to be exercised in relation to an area of park, pleasure ground or open space which is situated over or within a distance of 15 metres (measured in any direction) from any railway forming part of Phase 2a of High Speed 2,

section 9(5) of that Act has effect as if it also required the local authority to consult the nominated undertaker.

(3)Section 10(1)(b) of that Act (ornamental or mown land) does not apply to the use of a vehicle which is reasonably necessary—

(a)for the purposes of, or in connection with, the exercise of the powers conferred by this Act with respect to works, or

(b)for the purposes of the nominated undertaker's undertaking under this Act.

(4)Section 12 of that Act (dust) does not apply to building operations carried out in exercise of the powers conferred by this Act.

(5)Section 16 of that Act (powers of entry for Prevention of Damage by Pests Act 1949) does not apply in relation to any land held by the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

(6)Section 26 of that Act (building plans: access for fire brigade) does not apply to plans relating to a building held, or to be held, by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

(7)Part 7 of that Act (storage of flammable materials) does not apply in relation to a stack on land held by the Secretary of State or the nominated undertaker and used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act.

(8)Where—

(a)the county council proposes to make an order under section 40(1) of that Act (power to stop up highways), and

(b)the highway is part of a route identified in a deposited statement as a construction traffic route,

section 40(1) of that Act has effect as if it also required the council to give notice to the nominated undertaker.

Section 37

SCHEDULE 28U.K.Application of other railway legislation etc

Highway (Railway Crossings) Act 1839 (c. 45)U.K.

1U.K.The Highway (Railway Crossings) Act 1839 does not apply to a railway authorised by this Act.

Railway Regulation Act 1840 (c. 97)U.K.

2(1)In its application to Phase 2a of High Speed 2, or a train all or part of whose journey is on Phase 2a of High Speed 2, section 16 of the Railway Regulation Act 1840 (obstruction of officers of railway company or trespass upon railway) has effect as if—U.K.

(a)the maximum fine which may be imposed on summary conviction of the offence for which it provides were level 3 on the standard scale (instead of level 1), and

(b)the court had, as an alternative to imposing a fine, the power to award imprisonment for a period not exceeding 51 weeks (in the case of an offence committed in England and Wales) or 12 months (in the case of an offence committed in Scotland).

(2)In relation to an offence committed in England and Wales before the commencement of section 281(5) of the Criminal Justice Act 2003, the reference in sub-paragraph (1)(b) to 51 weeks is to be read as a reference to one month.

Railway Regulation Act 1842 (c. 55)U.K.

3U.K.Section 9 of the Railway Regulation Act 1842 does not apply to a railway authorised by this Act.

Railways Clauses Consolidation Act 1845 (c. 20)U.K.

4(1)The following provisions only of the Railways Clauses Consolidation Act 1845 are incorporated with this Act, in so far as they are applicable for the purposes of this Act and not inconsistent with its provisions—U.K.

sections 2 to 4, 6, 16, 18, 21, 24, 30, 31, 37 and 38 (so far as relating to section 31), 46, 67 to 70, 73, 86, 97, 103, 105, 140, 142, 144, 145 and 162 to 164.

(2)In their application by virtue of sub-paragraph (1)—

(a)section 2 has effect with the substitution for “so incorporated as aforesaid” of “incorporated”;

(b)section 6 has effect with the omission of “and to take lands for that purpose”, “taken or” and “for the value of the lands so taken or used, and”;

(c)sections 18 and 21 do not apply in any case where the relations between the nominated undertaker and any other person are regulated by sections 84 and 85 of the New Roads and Street Works Act 1991 or Part 2 of Schedule 32 (protective provisions relating to utility undertakers);

(d)section 46 has effect with the omission of the words from “of the height” to “in that behalf provided”;

(e)section 68 has effect with the omission of the words from “Such and” to “formation thereof” and from “together with all necessary gates” to “all necessary stiles”.

Regulation of Railways Act 1889 (c. 57)U.K.

5U.K.In its application to Phase 2a of High Speed 2, or a train all or part of whose journey is on Phase 2a of High Speed 2, section 5 of the Regulation of Railways Act 1889 has effect as follows—

(a)section 5(1) (failure to produce ticket, pay fare or give name and address) has effect as if the maximum fine which may be imposed on summary conviction of the offence for which it provides were level 2 on the standard scale (instead of level 1);

(b)section 5(2) (power to arrest passenger who fails to produce ticket and refuses to give name and address) has effect as if after “refuses” there were inserted “ or fails ”;

(c)section 5(3) (travel with intent to avoid payment of fare) has effect as if the maximum fine which may be imposed on summary conviction of the offence for which it provides were level 3 on the standard scale (instead of level 2).

British Transport Commission Act 1949 (c xxix)U.K.

6(1)Section 55 of the British Transport Commission Act 1949 (penalty for trespass on railways etc) also applies in relation to any railway, siding, tunnel, railway embankment, cutting or similar work constructed in exercise of the powers conferred by this Act.U.K.

(2)Section 56 of that Act (penalty for stone throwing etc on railways) also applies in relation to any railway or siding constructed in exercise of the powers conferred by this Act.

Section 38

SCHEDULE 29U.K.Arbitration between railway operators

Directions as to results to be achievedU.K.

1(1)This paragraph applies where a difference is referred under section 38(3) to arbitration.U.K.

(2)The parties must notify the Secretary of State of the referral without delay after the commencement of the arbitral proceedings.

(3)The Secretary of State may, on request or otherwise, direct the arbitrator as to results that are to be achieved by the agreement for which terms are to be determined by the arbitration.

(4)A direction under this paragraph may be made even though the making of the direction affects the outcome of proceedings to which the Secretary of State, or a body in which the Secretary of State has an interest, is a party.

(5)A request for a direction under this paragraph may be made by the arbitrator (as well as by a party).

(6)For the purpose of determining whether or not the arbitrator has to comply with a direction under this paragraph, the rule is that the arbitrator must comply with the direction in determining terms of the agreement if the direction—

(a)is relevant to the determination of those terms, and

(b)is given to the arbitrator before the award determining those terms is made.

(7)For the purpose of determining what the arbitrator has to do to comply with a direction under this paragraph, the rule is that the arbitrator must carry out the function of determining terms of the agreement so as to secure, so far as is reasonably practicable, that the results concerned are achieved by the agreement.

Directions as to consolidation and grouping of proceedingsU.K.

2(1)The Secretary of State may, on request or otherwise, direct—U.K.

(a)that a group of proceedings is to be consolidated, or

(b)that concurrent hearings are to be held in a group of proceedings.

(2)In sub-paragraph (1) “group of proceedings” means a group consisting of—

(a)section 38(3) proceedings, and

(b)any one or more of the following—

(i)other section 38(3) proceedings,

(ii)arbitral proceedings related to the proceedings mentioned in paragraph (a), and

(iii)arbitral proceedings related to section 38(3) proceedings that are to be consolidated with the proceedings mentioned in paragraph (a).

(3)A request for a direction under this paragraph may be made by the arbitrator or any of the arbitrators (as well as by a party).

(4)A direction under this paragraph must specify the terms on which the proceedings are to be consolidated or on which concurrent hearings are to be held.

(5)Where a direction under this paragraph provides for the consolidation of proceedings that do not all have the same arbitrator, the terms that may be specified in the direction include (in particular)—

(a)terms specifying the person who is to be the arbitrator in the consolidated proceedings;

(b)terms under which that person is to be determined.

(6)For the purposes of this paragraph—

(a)section 38(3) proceedings” means proceedings on arbitration of a difference referred under section 38(3), and

(b)arbitral proceedings are “related” to section 38(3) proceedings if—

(i)the arbitral proceedings are not section 38(3) proceedings,

(ii)at least one of the parties to the arbitral proceedings is also a party to the section 38(3) proceedings, and

(iii)the Secretary of State considers that the subject-matter of the arbitral proceedings is connected with the subject-matter of the section 38(3) proceedings.

Section 40

SCHEDULE 30U.K.Traffic regulation

Traffic authority to consult Secretary of State before making traffic regulation orderU.K.

1(1)This paragraph applies where—U.K.

(a)the traffic authority for a relevant road is a person other than the Secretary of State,

(b)the authority proposes to make a traffic regulation order in relation to the road, and

(c)it appears to the authority that provision made by the order could significantly interfere with the use of the road by heavy commercial vehicles for the purposes of the construction of the works authorised by this Act.

(2)Before making the order, the authority must consult the Secretary of State (in addition to any other person the authority is required to consult under or by virtue of Part 3 of Schedule 9 to RTRA 1984).

(3)In this paragraph—

(4)For the purposes of the definition of “relevant road”, “special road” and “trunk road” have the same meaning as in the Highways Act 1980.

2(1)The Secretary of State may by notice designate—U.K.

(a)a road, or part of a road, in relation to which paragraph 1(2) does not apply;

(b)a description of traffic regulation orders in relation to which paragraph 1(2) does not apply.

(2)A notice under sub-paragraph (1)(a) has effect until further notice.

(3)The Secretary of State must give a notice under sub-paragraph (1)(a) to the traffic authority for the road (or part of the road) to which the notice relates.

(4)A notice under sub-paragraph (1)(b) may have effect generally or in relation to areas specified in the notice.

(5)The Secretary of State must give a notice under sub-paragraph (1)(b) to every traffic authority which would be affected by the notice.

(6)Failure by a traffic authority to comply with paragraph 1(2) in relation to a traffic regulation order does not affect the validity of the order.

3(1)Paragraph 1(2) ceases to apply in relation to a traffic authority if the Secretary of State gives the authority a notice stating that—U.K.

(a)no further works are proposed to be constructed under this Act in the authority's area, and

(b)the use of relevant roads in the authority's area is no longer required by heavy commercial vehicles for the purposes of the construction of the works authorised by this Act.

(2)Paragraph 1(2) ceases to apply in relation to a particular part of the area of a traffic authority (“the relevant part”) if—

(a)the Secretary of State reasonably considers that the relevant part can be treated separately from the rest of the authority's area for the purposes of paragraph 1(2), and

(b)the Secretary of State gives the authority a notice stating that—

(i)no further works are proposed to be constructed under this Act in the relevant part, and

(ii)the use of relevant roads in the relevant part is no longer required by heavy commercial vehicles for the purposes of the construction of the works authorised by this Act.

(3)The Secretary of State must give a traffic authority a notice under sub-paragraph (1) or (2) as soon as reasonably practicable after the Secretary of State forms the view that the applicable requirements are met.

(4)For the purposes of sub-paragraph (3), the applicable requirements are met—

(a)in a sub-paragraph (1) case, if sub-paragraph (1)(a) and (b) apply in relation to the authority's area, and

(b)in a sub-paragraph (2) case, if sub-paragraph (2)(b)(i) and (ii) apply in relation to the relevant part.

(5)In this paragraph, “heavy commercial vehicle” and “relevant road” have the same meaning as in paragraph 1.

Power of Secretary of State to direct traffic authority to make traffic regulation orderU.K.

4(1)The Secretary of State may give a direction to a traffic authority requiring the authority to make a traffic regulation order if the Secretary of State considers that the making of such an order is—U.K.

(a)necessary for the purposes of the timely, efficient and cost-effective construction of the works authorised by this Act, and

(b)reasonable in the circumstances.

(2)Paragraph 1(2) does not apply (if it otherwise would) to the making of a traffic regulation order in pursuance of a direction under this paragraph.

(3)Where a traffic authority makes a traffic regulation order in pursuance of a direction under this paragraph (a “relevant order”), the authority may not without the Secretary of State's consent make a further traffic regulation order which contains—

(a)provision varying or revoking the relevant order, or

(b)provision as respects any length of road for any purpose where—

(i)an order has been made as respects that length of road for a similar purpose, and

(ii)that order has been varied or revoked by the relevant order.

(4)The power to give a direction under this paragraph includes power to vary or revoke a previous direction given under this paragraph.

5(1)This paragraph applies where, in pursuance of a direction under paragraph 4, a traffic authority is required to make an order under section 1 or 9 of RTRA 1984.U.K.

(2)The order is to be treated for the purposes of Part 3 and paragraph 28 of Schedule 9 to RTRA 1984, and regulations made under Part 3 of that Schedule, as if it were required to be made in pursuance of a direction under paragraph 2 of that Schedule.

(3)The provisions mentioned in sub-paragraph (2) have effect accordingly, but as if—

(a)paragraph 26(1) of Schedule 9 to RTRA 1984 (which requires the Secretary of State to take account of objections) were omitted,

(b)for the purposes of the application of paragraph 28 of Schedule 9 to RTRA 1984 (provision about the variation or revocation of certain orders)—

(i)the reference in that paragraph to Part 2 of that Schedule included a reference to paragraph 4(3) of this Schedule, and

(ii)any reference in that Part to paragraph 13(1)(e) and (f) of that Schedule were read instead as a reference to paragraph 4(3) of this Schedule, and

(c)any provision in regulations made under Part 3 of Schedule 9 to RTRA 1984 relating to the holding of a public inquiry were omitted.

(4)Paragraph 35 of Schedule 9 to RTRA 1984 (provision for questioning validity of orders) has effect, in its application to the order, as if—

(a)the reference in sub-paragraph (a) to the relevant powers were to those powers as they apply in the case of an order made in pursuance of a direction under paragraph 4 above, and

(b)the reference in sub-paragraph (b) to the relevant requirements were to those requirements as modified by sub-paragraph (3) above.

6(1)This paragraph applies where, in pursuance of a direction under paragraph 4, a traffic authority is required to make an order under section 14 of RTRA 1984.U.K.

(2)Section 15 of RTRA 1984 (duration of orders under section 14) does not apply to the order.

(3)The order has effect for the period specified or described in the direction.

(4)The period specified or described by virtue of sub-paragraph (3) must be such as the Secretary of State considers is reasonable for the purposes of the construction of the works authorised by this Act.

Further powers of Secretary of State (including in relation to variation or revocation of orders)U.K.

7(1)The Secretary of State may direct a traffic authority to revoke a traffic regulation order made by the authority in pursuance of a direction under paragraph 4.U.K.

(2)The Secretary of State may direct a traffic authority to vary a traffic regulation order made by the authority in pursuance of a direction under paragraph 4, where—

(a)the Secretary of State considers that the variation is—

(i)necessary for the purposes of the timely, efficient and cost-effective construction of the works authorised by this Act, and

(ii)reasonable in the circumstances, or

(b)the effect of the variation is to remove or relax a restriction imposed by the order on the use of any road.

8(1)Where a traffic authority fails to comply with a direction under paragraph 4, the Secretary of State may make the traffic regulation order required by the direction.U.K.

(2)Where a traffic authority fails to comply with a direction under paragraph 7, the Secretary of State may by order vary or revoke the traffic regulation order (as required by the direction).

9(1)The Secretary of State may by order made by statutory instrument vary or revoke a traffic regulation order (whenever made) if the Secretary of State considers the variation or revocation—U.K.

(a)necessary for the purposes of the timely, efficient and cost-effective construction of the works authorised by this Act, and

(b)reasonable in the circumstances.

(2)This paragraph has effect without prejudice to the powers conferred on the Secretary of State by paragraphs 7 and 8.

10(1)This paragraph applies to an order under paragraph 8 or 9.U.K.

(2)Paragraph 4 of Schedule 9 to RTRA 1984 (reserve powers of Secretary of State, including power to recover expenses) applies to the order as it applies to an order made by virtue of paragraph 3 of that Schedule.

(3)Parts 3 and 4 of Schedule 9 to RTRA 1984, and regulations made under paragraph 24 of that Schedule, apply to the order as they apply to an order made by virtue of the relevant paragraph of that Schedule, but as if—

(a)any provision in the regulations relating to the holding of a public inquiry were omitted, and

(b)for the purposes of the application of paragraph 28 of that Schedule (provision about the variation or revocation of certain orders)—

(i)the reference in that paragraph to Part 2 of that Schedule included a reference to paragraph 10(5) of this Schedule, and

(ii)any reference in that Part to paragraph 13(1)(e) and (f) of that Schedule were read instead as a reference to paragraph 10(5) of this Schedule.

(4)For the purposes of sub-paragraph (3), “the relevant paragraph” of Schedule 9 to RTRA 1984 is—

(a)in the case of an order under paragraph 8 of this Schedule, paragraph 3 of that Schedule, and

(b)in the case of an order under paragraph 9 of this Schedule, paragraph 7 of that Schedule.

(5)Where the Secretary of State makes an order to which this paragraph applies, the relevant authority may not without the Secretary of State's consent make a further traffic regulation order which contains—

(a)provision varying or revoking the Secretary of State's order, or

(b)provision as respects any length of road for any purpose where—

(i)an order has been made as respects that length of road for a similar purpose, and

(ii)that order has been varied or revoked by the Secretary of State's order.

(6)Paragraph 16 of Schedule 9 to RTRA 1984 (powers of Secretary of State where an order is submitted for consent) applies for the purposes of sub-paragraph (5) as if the further traffic regulation order had been submitted for consent under Part 2 of that Schedule.

Power to restrict traffic authority from making or implementing traffic regulation orderU.K.

11(1)The Secretary of State may give a direction to a traffic authority prohibiting the authority from making or bringing into operation a traffic regulation order (whenever made) if the Secretary of State considers that such an order could significantly interfere with the use of any road for the purposes of the construction of the works authorised by this Act.U.K.

(2)A prohibition imposed by virtue of this paragraph may be expressed—

(a)so as to have effect generally or for a period specified in the direction;

(b)so as to prohibit the making or bringing into operation of a traffic regulation order without the Secretary of State's consent.

(3)The power to give a direction under this paragraph includes power to vary or revoke a previous direction given under this paragraph.

Consultation requirements applicable to Secretary of StateU.K.

12(1)The Secretary of State must consult a traffic authority—U.K.

(a)before giving a direction to the authority under paragraph 4, 7 or 11, or

(b)before making an order under paragraph 8(2) or 9 in relation to a traffic regulation order made by the authority.

(2)The purpose of consultation is—

(a)to ensure public safety and, so far as reasonably practicable, to reduce public inconvenience, and

(b)to take account of the requirements (however expressed) to which the traffic authority is subject under an enactment or under an agreement or undertaking entered into in pursuance of an enactment.

GuidanceU.K.

13(1)The Secretary of State must prepare a statement setting out, in general terms—U.K.

(a)guidance in connection with the duty under paragraph 1(2) (which requires a traffic authority to consult the Secretary of State before making a traffic regulation order), and

(b)how the Secretary of State proposes to exercise the powers conferred on the Secretary of State by the preceding provisions of this Schedule.

(2)The Secretary of State may from time to time revise the statement.

(3)In preparing or revising the statement, the Secretary of State must consult—

(a)the nominated undertaker, and

(b)those traffic authorities which the Secretary of State considers are likely to be subject to the duty under paragraph 1(2) or to be affected by the exercise of the powers mentioned in sub-paragraph (1)(b) (or both).

Removal of vehiclesU.K.

14(1)An authorised person may remove a vehicle, or arrange for its removal, where conditions 1 and 2 are met.U.K.

(2)Condition 1 is that the vehicle has been permitted to remain at rest, or has broken down and remained at rest—

(a)on any road in contravention of a prohibition or restriction imposed by a traffic regulation order, or

(b)on any road which is stopped up under paragraph 2 or 8 of Schedule 4.

(3)Condition 2 is that it appears to the authorised person that the vehicle is likely, if it is not removed—

(a)to obstruct the carrying out of any of the works authorised by this Act, or

(b)to be at risk of being damaged in consequence of the doing of anything for the purposes of the construction of the works authorised by this Act.

(4)References in sub-paragraphs (1) and (3) to the removal of a vehicle are to its removal to another position on the road in question or to another road.

(5)Before exercising the power under sub-paragraph (1), an authorised person must give notice to—

(a)the local authority (as defined by section 100(5) of RTRA 1984) in whose area the vehicle is situated, and

(b)the chief officer of the police force in whose area the vehicle is situated.

(6)A person removing a vehicle under or by virtue of sub-paragraph (1) may do so—

(a)by towing or driving the vehicle, or

(b)in such other manner as the person thinks necessary,

and may take such measures in relation to the vehicle as the person thinks necessary to enable its removal.

(7)This paragraph is without prejudice to provision made by regulations under section 99 of RTRA 1984.

(8)In this paragraph—

InterpretationU.K.

15U.K.In this Schedule—

Section 42

SCHEDULE 31U.K.Extension of planning permission for statutory undertakers

Case where planning permission extendedU.K.

1(1)Article 3(10) of the General Permitted Development Order (which excepts development requiring an environmental assessment from the general planning permission granted by that Order) does not apply to development which—U.K.

(a)falls within a class of development described as permitted development in a provision of Schedule 2 to that Order that is listed in sub-paragraph (2), and

(b)is covered by an environmental assessment in connection with the High Speed Rail (West Midlands - Crewe) Bill.

(2)The provisions of Schedule 2 to the General Permitted Development Order that are referred to in sub-paragraph (1)(a) are—

(3)References in sub-paragraph (2) to particular provisions of the General Permitted Development Order include references to the corresponding provisions of any instrument replacing that Order.

(4)In this paragraph, “the General Permitted Development Order” means the Town and Country Planning (General Permitted Development) (England) Order 2015 (S.I. 2015/596).

Condition of extended planning permissionU.K.

2(1)Planning permission granted by virtue of paragraph 1 is subject to the condition that development is carried out in accordance with such requirements as the Secretary of State may by notice to the developer specify for the purpose of—U.K.

(a)avoiding a breach of an undertaking given by the Secretary of State to the Select Committee of either House of Parliament to which the High Speed Rail (West Midlands - Crewe) Bill was committed, or

(b)securing that the environmental effects of carrying out the development are not materially different from those envisaged by the statement by virtue of which paragraph 1(1)(b) applies.

(2)The power conferred by sub-paragraph (1) is exercisable after, as well as before, development is commenced.

(3)The power conferred by sub-paragraph (1) includes power, exercisable in the same manner, to vary or revoke a notice under that sub-paragraph.

(4)The condition imposed by sub-paragraph (1) is in addition to any condition to which the planning permission may be subject apart from this paragraph.

Controls on proposed developmentU.K.

3(1)Where—U.K.

(a)it appears to the Secretary of State that a person is proposing to carry out development of a kind mentioned in paragraph 1(1)(a), and

(b)the Secretary of State is of the opinion that the proposed development is not covered by an environmental assessment in connection with the High Speed Rail (West Midlands - Crewe) Bill,

the Secretary of State may give notice of that opinion to the proposed developer.

(2)The power conferred by sub-paragraph (1) includes power, exercisable in the same manner, to withdraw a notice under that sub-paragraph.

(3)Where a notice under sub-paragraph (1) has been given (and not withdrawn), paragraph 1 is to be treated as not applying to the carrying out of the development by the proposed developer.

4(1)Where it appears to the Secretary of State that—U.K.

(a)a person is proposing to carry out development of a kind mentioned in paragraph 1(1)(a),

(b)the development is covered by an environmental assessment in connection with the High Speed Rail (West Midlands - Crewe) Bill, and

(c)it is necessary or desirable to do so for the purpose of avoiding a breach of an undertaking given by the Secretary of State to the Select Committee of either House of Parliament to which that Bill was committed,

the Secretary of State may by notice to the proposed developer disapply paragraph 1(1) in relation to the carrying out of the development by that person.

(2)The power conferred by sub-paragraph (1) includes power, exercisable in the same manner, to revoke a notice under that sub-paragraph.

NoticesU.K.

5(1)A notice under this Schedule must—U.K.

(a)specify the person to whom it is given,

(b)specify the development to which it relates,

(c)explain the reasons for it, and

(d)in the case of a notice under paragraph 3, explain its effect.

(2)The Secretary of State must, when giving a notice under this Schedule, give a copy to the unitary authority or, in a non-unitary area, the district council in whose area the development is or is to be carried out.

Section 43

SCHEDULE 32U.K.Protective provisions

PART 1 U.K.Highways and traffic

1(1)The following provisions of this Part have effect, unless otherwise agreed in writing between the nominated undertaker and the highway authority concerned.U.K.

(2)In this Part—

(3)Part 3 of the New Roads and Street Works Act 1991 does not apply in relation to any matter which is regulated by this Part.

2U.K.Wherever in this Part provision is made with respect to the approval or consent of the highway authority, that approval or consent must be in writing and subject to such reasonable terms and conditions as the highway authority may require, but must not be unreasonably withheld.

3U.K.In exercising the powers conferred by this Act in relation to any highway the nominated undertaker must—

(a)have regard to the potential disruption of traffic which may be caused, and

(b)seek to minimise such disruption so far as is reasonably practicable.

4(1)This paragraph applies to the construction of any tunnel, subway or other structure authorised by this Act under and within 8 metres of the surface of any highway which comprises a carriageway.U.K.

(2)The nominated undertaker must not, without the consent of the highway authority, carry out works to which this paragraph applies except in accordance with plans submitted to, and approved by, the highway authority.

(3)If, within 28 days after such plans have been submitted, the highway authority has not approved or disapproved them, it is deemed to have approved the plans as submitted.

(4)This paragraph does not apply to street works within the meaning of Part 3 of the New Roads and Street Works Act 1991.

5U.K.In the construction of any part of the works to which paragraph 4 applies under a highway no part of it may, except with the consent of the highway authority, be so constructed as to—

(a)interfere with the provision of proper means of drainage of the surface of the highway, or

(b)be nearer than two metres to the surface of the highway.

6(1)The provisions of this paragraph have effect in relation to, and in relation to the construction of, any new bridge, or any extension or alteration of an existing bridge, which carries—U.K.

(a)any part of the works authorised by this Act over a highway, or

(b)a highway over any part of those works.

Any such new bridge, or (as the case may be) any bridge so extended or altered, is referred to in this paragraph as “the bridge”.

(2)Before commencing the construction of, or the carrying out of any work in connection with, the bridge which involves interference with a highway, the nominated undertaker must submit to the highway authority for its approval plans, drawings and particulars (in this paragraph referred to as “plans”) relating to the work, and the bridge must not be constructed and the works must not be carried out except in accordance with the plans submitted to, and approved by, the highway authority.

(3)If, within 28 days after the plans have been submitted, the highway authority has not approved or disapproved them, it is to be deemed to have approved the plans as submitted.

(4)If the bridge carries any part of the works authorised by this Act over any highway—

(a)it must be constructed in such manner as to prevent so far as may be reasonably practicable the dripping of water from the bridge, and

(b)the highway authority may, at the cost of the nominated undertaker, provide and place such lamps and apparatus as may from time to time be reasonably necessary for efficiently lighting any highway under or in the vicinity of the bridge.

7U.K.The nominated undertaker must—

(a)secure that so much of the works authorised by this Act as is constructed under any highway must be so designed, constructed and maintained as to carry the appropriate loading recommended for highway bridges by the Secretary of State at the time of construction of the works, and

(b)indemnify the highway authority against, and make good to the highway authority, the expenses which the highway authority may reasonably incur in the maintenance or repair of any highway, or any tunnels, sewers, drains or apparatus in the highway, by reason of non-compliance with the provisions of this paragraph.

8(1)Any officer of the highway authority duly appointed for the purpose may at all reasonable times, on giving to the nominated undertaker such notice as may in the circumstances be reasonable, enter upon and inspect any part of the works authorised by this Act which—U.K.

(a)is in, over or under any highway, or

(b)which may affect any highway or any property of the highway authority,

during the carrying out of the works.

(2)The nominated undertaker must give to such officer all reasonable facilities for such inspection and, if the officer is of the opinion that the construction of the work is attended with danger to any highway or to any property of the highway authority on or under any highway, the nominated undertaker must adopt such measures and precautions as may be reasonably practicable for the purpose of preventing any damage or injury to the highway.

9(1)The nominated undertaker must not alter, disturb or in any way interfere with any property of the highway authority on or under any highway, or the access to that property, without the consent of the highway authority.U.K.

(2)Any alteration, diversion, replacement or reconstruction of any such property which may be necessary must be made by the highway authority or the nominated undertaker as the highway authority thinks fit, and the expense reasonably incurred by the highway authority in so doing must be repaid to the highway authority by the nominated undertaker.

(3)If, within 28 days after a request for consent has been submitted, the highway authority has not given or refused such consent, it is to be deemed to have consented to the request as submitted.

10U.K.The nominated undertaker must not remove any soil or material from any highway except so much as is excavated in the carrying out of the works authorised by this Act.

11(1)If the highway authority, after giving to the nominated undertaker not less than 28 days' notice (or, in case of emergency, such notice as is reasonably practicable) of its intention to do so, incurs any additional expense in consequence of the construction of the works authorised by this Act—U.K.

(a)in the signposting of traffic diversions,

(b)in the taking of other measures in relation to those diversions, or

(c)in the repair of any highway by reason of the diversion of traffic from a road of a higher standard,

the nominated undertaker must repay to the highway authority the amount of any such expense reasonably so incurred.

(2)Sub-paragraph (3) applies in respect of an amount which, but for that sub-paragraph, would be payable to the highway authority by virtue of sub-paragraph (1) in respect of the repair of any highway.

(3)If the highway fell or would have fallen due for repair as part of the maintenance programme of the highway authority at any time within 10 years of the repair being carried out by the nominated undertaker, so as to confer on the highway authority financial benefit (whether by securing the completion of overdue maintenance work for which the highway authority is liable or by deferment of the time for such work in the ordinary course), the amount payable to the highway authority must be reduced by the amount which represents that benefit.

12U.K.The nominated undertaker must not, except with the consent of the highway authority—

(a)deposit any soil or material, or store any plant, in or over a highway to which the public continues to have access so as to obstruct or render less safe the use of the highway,

(b)deposit any soils or materials on any such highway outside a hoarding,

(c)erect or retain on or over such a highway any scaffolding or other structure which obstructs the highway unless the structure comprises screening which has been approved under Schedule 17 (planning conditions),

but if within 28 days after request for it any such consent is neither given nor refused it is to be deemed to have been given.

13U.K.The nominated undertaker must, if reasonably so required by the highway authority, provide and maintain to the reasonable satisfaction of the highway authority, during such time as the nominated undertaker may occupy any part of a highway for the purpose of the construction of any part of the works authorised by this Act, temporary bridges and temporary ramps for vehicular or pedestrian traffic over any part of the works or in such other position as may be necessary to prevent undue interference with the flow of traffic in the highway.

14(1)Where any part of any highway has been broken up or disturbed by the nominated undertaker and not permanently stopped up or diverted, the nominated undertaker must—U.K.

(a)make good the subsoil, foundations and surface of that part of the highway to the reasonable satisfaction of the highway authority, and

(b)maintain the same to the reasonable satisfaction of the highway authority for such time as may reasonably be required for the permanent reinstatement of the highway.

(2)The reinstatement of that part of the highway must be carried out by the nominated undertaker to the reasonable satisfaction of the highway authority in accordance with such requirements as to specification of material and standards of workmanship as may be prescribed for equivalent reinstatement work by regulations made under section 71 of the New Roads and Street Works Act 1991.

15(1)This paragraph applies where damage to any highway or property of the highway authority on or under any highway is caused by, or results from—U.K.

(a)the construction of any work authorised by this Act, or

(b)any act or omission of the nominated undertaker, its contractors, agents or employees whilst engaged upon such work.

(2)In the case of damage to a highway, the nominated undertaker may make good such damage to the reasonable satisfaction of the highway authority.

(3)The nominated undertaker must pay compensation to the highway authority—

(a)in a case where the nominated undertaker does not make good such damage to a highway;

(b)in the case of damage to property of the highway authority.

16U.K.The fact that any act or thing may have been done in accordance with plans approved by the highway authority must not (if it was not attributable to the act, neglect or default of the highway authority or of any person in its employ or its contractors or agents) exonerate the nominated undertaker from any liability, or affect any claim for damages, under this Part or otherwise.

17(1)Any dispute arising between the nominated undertaker and the highway authority under this Part is to be determined by arbitration if—U.K.

(a)the parties agree, or

(b)the dispute relates to the amount of any sum payable under this Part,

but must otherwise be determined by a person appointed by the Secretary of State.

(2)Any person appointed by the Secretary of State under sub-paragraph (1) must, in determining any dispute arising under this Part, have regard to such matters as may be specified by the Secretary of State on making the appointment.

PART 2 U.K.Electricity, gas, water and sewerage undertakers

18(1)The following provisions of this Part have effect, unless otherwise agreed in writing between the nominated undertaker, or the Secretary of State as the case may be, and the undertakers concerned.U.K.

(2)In this Part—

(3)Except in paragraphs 26(3) and 27, the provisions of this Part are not to apply to any apparatus in respect of which the relations between the nominated undertaker and the undertakers are regulated by the provisions of Part 3 of the New Roads and Street Works Act 1991.

(4)The exercise of the powers under paragraphs 2 to 6 of Schedule 2 in relation to apparatus to which this Part applies is subject to paragraph 25 of this Part, and paragraphs 28 and 29 of this Part apply instead of section 176 (right to compensation) of the Housing and Planning Act 2016, as applied by paragraph 8(2) of Schedule 2 in relation to the exercise of those powers.

19(1)The following provisions of this paragraph have effect in any case where the Secretary of State or the nominated undertaker, in exercise of the powers of this Act, acquires any interest in or temporarily occupies any land in which apparatus is placed.U.K.

(2)Unless a certificate is issued by the appropriate Ministers under sub-paragraph (3) the apparatus must not be removed under this Part, and any right of the undertakers to maintain, repair, renew, adjust, alter or inspect the apparatus in that land is not to be extinguished until any necessary alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the undertakers.

(3)Where the appropriate Ministers certify in relation to any apparatus that—

(a)failure to remove the apparatus would cause undue delay to the construction of the scheduled works, and

(b)the removal of the apparatus before the provision of alternative apparatus in accordance with this paragraph would not substantially prejudice the ability of the undertakers to meet any relevant service obligations,

that apparatus may be removed (or required by the nominated undertaker to be removed) under this Part before any necessary alternative apparatus has been constructed or is in operation to the reasonable satisfaction of the undertakers.

(4)In this paragraph “appropriate Ministers” means the Secretary of State for Transport acting jointly with either the Secretary of State for Environment, Food and Rural Affairs or [F4the Secretary of State for Energy Security and Net Zero].

20(1)This paragraph applies where—U.K.

(a)the nominated undertaker for the purpose of constructing any work authorised by this Act in, on or under any land, requires the removal of any apparatus placed in that land, and gives the undertakers not less than 28 days' written notice of that requirement, together with a plan of the proposed work, and of the proposed position of the alternative apparatus to be provided or constructed, or

(b)in consequence of the exercise of any of the powers of this Act, the undertakers reasonably require to remove any apparatus.

(2)Where it is reasonably practicable to do so, the nominated undertaker or the Secretary of State must afford the undertakers the requisite facilities and rights for the construction of any necessary alternative apparatus in other land which is available for the purpose and which is held or used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act or held by the Secretary of State, or in which either of them has sufficient rights or interests and subsequently for the maintenance, repair, renewal and inspection of such apparatus.

(3)Sub-paragraph (4) applies where facilities and rights required for the construction of apparatus under sub-paragraph (2) are to be afforded elsewhere than in such other land and neither the nominated undertaker nor the Secretary of State is able to afford such facilities and rights.

(4)The undertakers must, on receipt of a written notice from the nominated undertaker that this sub-paragraph applies, as soon as reasonably possible use their best endeavours to obtain the necessary facilities and rights; and neither the nominated undertaker nor the Secretary of State is obliged to provide such facilities and rights in the other land.

21(1)Any alternative apparatus to be constructed by the undertakers in pursuance of paragraph 20 in land held or used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act or held by the Secretary of State, or in which the undertakers have obtained the necessary facilities and rights, must be constructed in such manner, and in such line or situation and in accordance with such programme, as is—U.K.

(a)agreed between the undertakers and the nominated undertaker with a view to securing, among other things, the efficient implementation of the necessary work, the avoidance of unnecessary delay and the continued fulfilment by the undertakers of their service obligations to a standard no less than that achieved prior to the removal of the apparatus which the alternative apparatus replaces, or

(b)in default of agreement, determined in accordance with paragraph 31.

(2)If the undertakers fail to comply with an agreement made under sub-paragraph (1), or with a determination under paragraph 31, they must compensate the nominated undertaker in respect of any loss or damage directly resulting from the failure, other than loss or damage arising from matters outside the reasonable control of the undertakers or loss of, or arising from delayed receipt of, operating revenue due to delayed opening of Phase 2a of High Speed 2.

22(1)This paragraph applies where—U.K.

(a)the manner of construction and the line and situation of any necessary alternative apparatus have been agreed or determined as provided under paragraph 21, and

(b)any such facilities and rights as are referred to in paragraph 20 have been granted to or obtained by the undertakers, or an undertaking has been given that such facilities or rights will be granted.

(2)The undertakers must proceed with all reasonable despatch to—

(a)construct and bring into operation the alternative apparatus, and

(b)remove any apparatus required by the nominated undertaker to be removed under the provisions of this Part.

(3)If the undertakers fail to comply with sub-paragraph (2)(b), the nominated undertaker may remove the apparatus.

(4)Following the removal of apparatus under the provisions of this Part, or its abandonment, any rights of the undertakers relating to that apparatus in or over the land in which it was or is situated are extinguished and all responsibility of the undertakers for any apparatus which is abandoned is to cease.

23(1)This paragraph applies where the nominated undertaker gives notice to the undertakers that it desires to carry out any part of so much of the work necessary in connection with the construction of the alternative apparatus, or the removal of the apparatus required to be removed, as is or will be situated in any lands—U.K.

(a)held or used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act, or

(b)held by the Secretary of State.

(2)Such work, instead of being carried out by the undertakers, must be carried out by the nominated undertaker—

(a)in accordance with plans and specifications and in a position agreed between the undertakers and the nominated undertaker, or, in default of agreement, determined in accordance with paragraph 31, and

(b)with all reasonable despatch under the superintendence (if given) and to the reasonable satisfaction of the undertakers.

(3)Nothing in this paragraph authorises the nominated undertaker to carry out any connection to or disconnection of any existing apparatus or to carry out any works associated with a connection or disconnection within 600 millimetres of the point of connection or disconnection.

24(1)This paragraph applies where, in accordance with the provisions of this Part, the nominated undertaker or the Secretary of State affords to the undertakers facilities and rights for the construction, maintenance, repair, renewal and inspection of alternative apparatus on land—U.K.

(a)held or used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act, or

(b)held by the Secretary of State.

(2)Those facilities and rights must be granted upon such terms and conditions as may be—

(a)agreed between the nominated undertaker or, as the case may be, the Secretary of State, and the undertakers, or

(b)in default of agreement, determined in accordance with paragraph 31.

(3)In determining such terms and conditions in respect of alternative apparatus, a person making a determination under paragraph 31 must have regard to any template provisions issued by the appropriate Ministers and determined in accordance with sub-paragraph (4); and must—

(a)give effect to all reasonable requirements of the nominated undertaker for ensuring the safety and efficient operation of the works authorised by this Act and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the nominated undertaker or the use of the same, and

(b)have regard to the undertakers' ability to fulfil their service obligations.

(4)For the purposes of determining the matters under sub-paragraph (3) the appropriate Ministers must consult the undertakers to which paragraph 24 may apply on the form of the proposed template provisions, and any objections to the form of those provisions which have not been resolved within six months after this Act comes into force must be referred to an independent person acting as an expert appointed to make a final determination as to the form of the template provisions.

(5)The independent person making a determination under sub-paragraph (4) is to be appointed by the President of the Royal Institution of Chartered Surveyors and in making that determination that person must have regard to the matters specified in sub-paragraph (3)(a) and (b).

(6)If the facilities and rights to be afforded by the nominated undertaker or the Secretary of State in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are more or less favourable on the whole to the undertakers than the facilities, rights, terms and conditions applying to the apparatus to be removed, compensation must be paid to or by the nominated undertaker or the Secretary of State to or by the undertakers in respect of the difference as is reasonable having regard to all the circumstances of the case.

(7)In this paragraph “the appropriate Ministers” means the Secretary of State for Transport acting jointly with the Secretary of State for Environment, Food and Rural Affairs and [F5the Secretary of State for Energy Security and Net Zero].

25(1)Not less than 28 days before commencing to construct any work authorised by this Act which is near to, or will or may affect, any apparatus the removal of which has not been required by the nominated undertaker under paragraph 20, the nominated undertaker must submit to the undertakers a plan and description of the work and of any protective measures which the nominated undertaker proposes to take in respect of that apparatus, together with a specification of such measures where appropriate.U.K.

(2)The work must be constructed only in accordance with the plan and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made by the undertakers for the alteration or otherwise for the protection of the apparatus or for securing access to the apparatus, and the undertakers are to be entitled by their officer to watch and inspect the construction of the work.

(3)If the undertakers within 14 days after the submission to them of any such plan and description, in consequence of the works proposed by the nominated undertaker, reasonably require the removal of any apparatus and give written notice to the nominated undertaker of that requirement, this Part has effect as if the removal of such apparatus had been required by the nominated undertaker under paragraph 20.

(4)Nothing in sub-paragraphs (1) to (3) precludes the nominated undertaker from submitting at any time, or from time to time, but in no case less than 28 days before commencing the construction of the work, a new plan and description of it in lieu of the plan and description previously submitted, and having done so the provisions of those sub-paragraphs apply to and in respect of the new plan and description.

(5)The nominated undertaker is not required to comply with sub-paragraphs (1) to (3) in a case of emergency but in such a case it must give notice to the undertakers as soon as reasonably practicable and a plan and description of those works as soon as reasonably practicable subsequently, and must comply with those sub-paragraphs so far as reasonably practicable in the circumstances.

26(1)If in consequence of the exercise of the powers of this Act the access to any apparatus is materially obstructed the nominated undertaker must, so far as reasonably practicable, provide alternative means of access to such apparatus which is no less convenient than the access enjoyed by the undertakers prior to the obstruction.U.K.

(2)The nominated undertaker must, so far as is reasonably practicable, so exercise its powers under paragraphs 2 to 6 of Schedule 2 as not to obstruct or render less convenient the access to any apparatus.

(3)Notwithstanding the temporary stopping up or diversion of any highway under paragraph 8 of Schedule 4, the undertakers may do all such works and things in any such highway as may be reasonably necessary to enable them to inspect, repair, maintain, renew, remove or use any apparatus which at the time of the stopping up or diversion was in that highway.

27U.K.Where, in consequence of this Act, any part of any highway in which any apparatus is situate ceases to be part of a highway, the undertakers may exercise the same rights of access to such apparatus as they enjoyed immediately before the passing of this Act, but nothing in this paragraph is to affect any right of the nominated undertaker or of the undertakers to require removal of that apparatus under this Part or the power of the nominated undertaker to construct works in accordance with paragraph 25.

28(1)Subject to the following provisions of this paragraph, the nominated undertaker must repay to the undertakers the reasonable expenses incurred by the undertakers in, or in connection with—U.K.

(a)the removal and relaying or replacing, alteration or protection of any apparatus or the construction of any new apparatus under any provision of this Part,

(b)the cutting off of any apparatus from any other apparatus in consequence of the exercise by the nominated undertaker of any power under this Act, and

(c)any other work or thing rendered reasonably necessary in consequence of the exercise by the nominated undertaker of any such power.

(2)The value of any apparatus removed under the provisions of this Part is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.

(3)Sub-paragraph (4) applies where, in pursuance of the provisions of this Part—

(a)alternative apparatus of better type, or greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions, except where this has been solely due to using the nearest currently available type, or

(b)apparatus (whether existing apparatus or alternative apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated.

(4)If the placing of apparatus of that type or capacity or of those dimensions, or the placing of apparatus at that depth, as the case may be, is not agreed by the nominated undertaker or, in default of agreement, is not determined to be necessary in accordance with paragraph 31, then, if it involves cost in the construction of works under paragraph 23 exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the undertakers by virtue of sub-paragraph (1) is to be reduced by the amount of that excess

(5)For the purposes of sub-paragraphs (3) and (4)—

(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus except in a case where the apparatus as so extended serves a purpose (either additional to or instead of that served by the existing apparatus) which was not served by the existing apparatus, and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(6)An amount which apart from this sub-paragraph would be payable to the undertakers in respect of works by virtue of this paragraph must, if the works include the placing of apparatus provided in substitution for apparatus placed more than seven and a half years earlier so as to confer on the undertakers any financial benefit by deferment of the time for renewal of the apparatus or of the system of which it forms part in the ordinary course, be reduced by the amount which represents that benefit.

(7)In any case where work is carried out by the nominated undertaker pursuant to paragraph 23 and, if such work had been carried out by the undertakers, the repayment made to the undertakers under this paragraph would fall to be reduced pursuant to sub-paragraphs (3) to (6), the undertakers must pay to the nominated undertaker such sum as represents the amount of that reduction.

29(1)This paragraph applies where, by reason of the construction of any of the works authorised by this Act, or any subsidence resulting from any of those works, any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of the undertakers, or there is any interruption in any service provided by any of the undertakers.U.K.

(2)Subject to sub-paragraphs (3) and (4), the nominated undertaker must—

(a)bear and pay the cost reasonably incurred by the undertakers in making good such damage or restoring the supply,

(b)make reasonable compensation to the undertakers for loss sustained by them by reason of any such damage or interruption, and

(c)indemnify the undertakers against claims, demands, proceedings, and damages which may be made or taken against, or recovered from the undertakers by reason of any such damage or interruption.

(3)Nothing in sub-paragraph (2) is to impose any liability on the nominated undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of the undertakers, their officers, servants, contractors or agents.

(4)The undertakers must give the nominated undertaker reasonable notice of any such claim or demand and no settlement or compromise of any such claim or demand must be made without the consent of the nominated undertaker which, if it withholds such consent, must have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

30U.K.In any case where Network Rail Infrastructure Limited (“Network Rail”) is the nominated undertaker the provisions of this Part have effect subject to any existing agreement between Network Rail and an undertaker relating to apparatus laid or erected on land belonging to Network Rail.

31(1)Any dispute arising between the nominated undertaker and the undertakers under this Part is to be determined by arbitration if—U.K.

(a)the parties agree, or

(b)the dispute relates to the amount of any sum payable under this Part,

but otherwise is to be determined by a person appointed by the appropriate Ministers.

(2)Any person appointed by the appropriate Ministers under sub-paragraph (1) must, in determining any dispute arising under this Part, have regard to such matters as may be specified by the appropriate Ministers on making the appointment.

(3)The costs and fees of the person determining the dispute and the costs of the parties to the dispute are to be allocated between the parties as that person may direct.

(4)In this paragraph “the appropriate Ministers” means the Secretary of State for Transport acting jointly with either the Secretary of State for Environment, Food and Rural Affairs or [F6the Secretary of State for Energy Security and Net Zero].

PART 3 U.K.Electronic communications code networks

32(1)The following provisions of this Part have effect, unless otherwise agreed in writing between the nominated undertaker, or the Secretary of State as the case may be, and an operator of an electronic communications code network.U.K.

(2)In this Part—

33(1)Subject to sub-paragraph (2), Part 10 of the electronic communications code applies for the purposes of the authorised works.U.K.

(2)Parts 6 and 10 of the electronic communications code do not apply for the purposes of the authorised works—

(a)insofar as such works are regulated by the New Roads and Street Works Act 1991 or any regulation made under that Act,

(b)where the nominated undertaker exercises a right under subsection (4)(b) of section 272 of TCPA 1990 or under an order made under that section to remove electronic communications apparatus, or

(c)in respect of any matter regulated by sub-paragraphs (3) to (8) of paragraph 35.

34U.K.The temporary stopping up or diversion of any highway under paragraph 8 of Schedule 4 does not affect any right of an operator under Part 8 of the electronic communications code in respect of any apparatus which at the time of the stopping up or diversion is in the highway.

35(1)Where a highway is stopped up under paragraph 2 or 3 of Schedule 4, any operator of an electronic communications code network whose electronic communications apparatus is under, over, in, on, along or across that highway may exercise the same rights of access in order to inspect, maintain, adjust, repair or alter that apparatus as if this Act had not been passed, but this is subject to sub-paragraph (2).U.K.

(2)Nothing in sub-paragraph (1) affects any right of the nominated undertaker or the operator to require removal of that apparatus under this Part or the power of the nominated undertaker to alter or remove apparatus in accordance with Part 10 of the electronic communications code.

(3)The nominated undertaker must give not less than 28 days' notice of its intention to stop up any highway under paragraph 2 or 3 of Schedule 4 to any operator of an electronic communications code network whose apparatus is under, over, in, on, along or across the highway.

(4)Where a notice under sub-paragraph (3) has been given, the operator, if it reasonably considers that it is necessary for the safe and efficient operation and maintenance of the apparatus, may, and if reasonably requested so to do by the nominated undertaker in the notice, must, as soon as reasonably practicable after the service of the notice—

(a)remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the operator may reasonably determine and have power to place it, or

(b)provide other apparatus in substitution for the existing apparatus and place it in such other position as described in paragraph (a).

(5)Subject to the following provisions of this paragraph the nominated undertaker must pay to any operator of an electronic communications code network an amount equal to the cost reasonably incurred by the operator in or in connection with—

(a)the execution of relocation works required in consequence of the stopping up of the highway, and

(b)the doing of any other work or thing rendered necessary by the execution of relocation works.

(6)Sub-paragraph (7) applies where—

(a)in the course of the execution of relocation works under sub-paragraph (4)—

(i)apparatus of better type, greater capacity or greater dimensions is placed in substitution for existing apparatus of worse type, smaller capacity or smaller dimensions, except where this has been solely due to using the nearest currently available type, capacity or dimension, or

(ii)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which existing apparatus was, and

(b)the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the nominated undertaker, or, in default of agreement, is not determined to be necessary in consequence of the construction of the authorised works in order to ensure the continued efficient operation of the electronic communications code network of the operator.

(7)If the execution of the relocation works involves cost exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this paragraph would be payable to the operator by virtue of sub-paragraph (5) is to be reduced by the amount of that excess.

(8)For the purposes of sub-paragraphs (6) and (7)—

(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus except in a case where the apparatus as so extended provides more than an equivalent service, and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole (in either case of such type, capacity and dimensions as is reasonably appropriate) is to be treated as if it also had been agreed or had been so determined.

(9)The amount which apart from this sub-paragraph would be payable to an operator in respect of works by virtue of sub-paragraph (5) (and having regard, where it applies, to sub-paragraph (7)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than seven and a half years earlier so as to confer on the operator any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

(10)Sub-paragraphs (5) to (9) do not apply where the authorised works constitute major transport works or major highway works for the purpose of Part 3 of the New Roads and Street Works Act 1991 (including that provision as applied by paragraph 10 of Schedule 4 to this Act), but instead—

(a)the allowable costs of any relocation works are to be determined in accordance with section 85 of that Act (sharing of costs of necessary measures) and any regulations for the time being having effect under that section, and

(b)the allowable costs are to be borne by the nominated undertaker and the operator in such proportions as may be prescribed by any such regulations.

36(1)Where the nominated undertaker or the Secretary of State affords to an operator facilities and rights for the construction, maintenance, repair, renewal and inspection of alternative apparatus on land held or used, or intended for use, by the nominated undertaker for the purposes of its undertaking under this Act or held by the Secretary of State, those facilities and rights must be granted upon such terms and conditions as may be agreed between the nominated undertaker or, as the case may be, the Secretary of State, and the operator or, in default of agreement, determined in accordance with paragraph 39.U.K.

(2)In determining such terms and conditions, a person making a determination under paragraph 39 must have regard to any template provisions issued by the appropriate Ministers and determined in accordance with sub-paragraph (3); and must—

(a)give effect to all reasonable requirements of the nominated undertaker for ensuring the safety and efficient operation of the authorised works and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the nominated undertaker or the use of the same; and

(b)have regard to the operator's ability to fulfil its service obligations.

(3)For the purposes of determining the matters under sub-paragraph (2) the appropriate Ministers must consult the operators to which paragraph 36 may apply on the form of the proposed template provisions, and any objections to the form of those provisions which have not been resolved within six months after this Act comes into force must be referred to an independent person acting as an expert appointed to make a final determination as to the form of the template provisions.

(4)The independent person making a determination under sub-paragraph (3) is to be appointed by the President of the Royal Institution of Chartered Surveyors and in making that determination that person must have regard to the matters specified in sub-paragraph (2)(a) and (b).

(5)If the facilities and rights to be afforded by the nominated undertaker or the Secretary of State in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted are more or less favourable on the whole to the operator than the facilities, rights, terms and conditions applying to the apparatus to be removed, compensation must be paid to or by the nominated undertaker or the Secretary of State to or by the operator in respect of the difference as is reasonable having regard to all the circumstances of the case.

37(1)Sub-paragraph (2) applies where, by reason of the construction of the authorised works or any subsidence resulting from any of those works—U.K.

(a)damage is caused to any electronic communications apparatus, other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works,

(b)damage is caused to property of the operator of an electronic communications code network, or

(c)there is any interruption in the supply of the service provided by the operator.

(2)The nominated undertaker must—

(a)bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply,

(b)make reasonable compensation to the operator for loss sustained by it, and

(c)indemnify the operator against all claims, demands, proceedings, or damages which may be made or taken against, or recovered from, the operator, by reason of any such damage or interruption.

But this is subject to sub-paragraphs (3) to (5).

(3)Sub-paragraph (2) does not apply in connection with any apparatus in respect of which the relations between the nominated undertaker and the operator are regulated by the provisions of Part 3 of the New Roads and Street Works Act 1991.

(4)Nothing in sub-paragraph (2) is to impose any liability on the nominated undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of the operator, its officers, servants, contractors or agents.

(5)The operator must give the nominated undertaker reasonable notice of any such claim or demand and no settlement or compromise of any such claim or demand is to be made without the consent of the nominated undertaker which, if it withholds such consent, is to have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

(6)This paragraph applies instead of section 176 (right to compensation) of the Housing and Planning Act 2016, as applied by paragraph 8(2) of Schedule 2 in relation to the exercise of the powers of paragraphs 2 to 6 of that Schedule.

38U.K.In any case where Network Rail Infrastructure Limited (“Network Rail”) is the nominated undertaker the provisions of this Part have effect subject to any existing agreement between Network Rail and an operator relating to apparatus laid or erected on land belonging to Network Rail.

39(1)Any dispute arising between the nominated undertaker and an operator under this Part is to be determined by arbitration if—U.K.

(a)the parties agree, or

(b)the dispute relates to the amount of any sum payable under this Part,

but is otherwise to be determined by a person appointed by the appropriate Ministers.

(2)Any person appointed by the appropriate Ministers under sub-paragraph (1) must, in determining any dispute arising under this Part, have regard to such matters as may be specified by the appropriate Ministers on making the appointment.

(3)The costs and fees of the person determining the dispute and the costs of the parties to the dispute are to be allocated between the parties as that person may direct.

PART 4 U.K.Land drainage, flood defence, water resources and fisheries

40(1)The following provisions of this Part have effect, unless otherwise agreed in writing between the nominated undertaker and the drainage authority concerned.U.K.

(2)In this Part—

(3)Where any approval is required under this Part from a local drainage authority, that authority must—

(a)have regard, in imposing any conditions or requirements, to any model conditions issued by the Agency (following consultation with the other drainage authorities and the nominated undertaker);

(b)consult the Agency in any case where it proposes to impose conditions or requirements, or to refuse approval, and must specifically seek the Agency's advice concerning any proposal to depart from the model conditions;

(c)provide the nominated undertaker with reasons and supporting evidence in any case where it gives a decision which does not accord with the view or advice of the Agency given in response to consultation under paragraph (b).

41(1)Before beginning to construct any specified work, the nominated undertaker must submit to the drainage authority plans of the work and such further particulars available to it as the drainage authority may within 28 days of the submission of the plans reasonably require.U.K.

(2)Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the drainage authority, or determined under paragraph 51.

(3)Any approval of the drainage authority required under this paragraph—

(a)must not be unreasonably withheld,

(b)is to be deemed to have been given if it is neither given nor refused within 56 days of the submission of the plans for approval or where further particulars are submitted under sub-paragraph (1), within 56 days of the submission of those particulars, and

(c)may be given subject to such reasonable requirements or conditions as the drainage authority may make for the protection of any drainage work or fishery or for the protection of water resources, or for the prevention of flooding or pollution or in the discharge of its statutory environmental duties.

42(1)This paragraph applies to any request for approval of plans under paragraph 41 to the extent that the plans relate to a groundwater activity within the meaning of paragraph 3 of Schedule 22 to the Environmental Permitting Regulations, except where the circumstances described in paragraph 3(3) of that Schedule apply.U.K.

(2)In exercising its functions in relation to that request the drainage authority must comply with the requirements of paragraph 7(2) to (5) of Schedule 22 to the Environmental Permitting Regulations, subject to paragraph 8 of that Schedule, as if the request for approval were as an application for a permit under those regulations.

43U.K.The requirements which the drainage authority may make under paragraph 41 include conditions requiring the nominated undertaker at its own expense to construct such protective works (including any new works as well as alterations to existing works) as are reasonably necessary—

(a)to safeguard any drainage work against damage, or

(b)to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,

by reason of the specified work.

44(1)Any specified work, and all protective works required by the drainage authority under paragraph 41, must be constructed to the reasonable satisfaction of the drainage authority and an officer of the drainage authority is entitled on giving such notice as may be reasonable in the circumstances, to inspect and watch the construction of such works.U.K.

(2)The nominated undertaker must give to the drainage authority not less than 14 days' notice of its intention to commence construction of any specified work and notice of its completion not later than 7 days after the date on which it is brought into use.

(3)If any part of the works comprising a structure in, over or under a watercourse is constructed otherwise than in accordance with the requirements of this Part, the drainage authority may by notice require the nominated undertaker at the nominated undertaker's own expense to comply with the requirements of this Part or (if the nominated undertaker so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the drainage authority reasonably requires.

(4)Subject to sub-paragraph (5), if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon the nominated undertaker, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the drainage authority may execute the works specified in the notice and any expenditure reasonably incurred by it in so doing is to be recoverable from the nominated undertaker.

(5)In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the drainage authority must not, except in an emergency, exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.

45(1)Subject to sub-paragraph (5) the nominated undertaker must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation and on land held by the nominated undertaker for the purposes or in connection with the specified works, whether the drainage work is constructed under this Act or is already in existence.U.K.

(2)If any such drainage work is not maintained to the reasonable satisfaction of the drainage authority, the drainage authority may by notice require the nominated undertaker to repair and restore the work, or any part of it, or (if the nominated undertaker so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld or delayed), to remove the drainage work and restore the site to its former condition, to such extent and within such limits as the drainage authority reasonably requires.

(3)If, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on the nominated undertaker, the nominated undertaker has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the drainage authority may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the nominated undertaker.

(4)In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the drainage authority must not except in a case of emergency exercise the powers of sub-paragraph (3) until the dispute has been finally determined.

(5)This paragraph does not apply to—

(a)drainage works which are vested in the drainage authority, or which the drainage authority or another person is under an obligation to maintain and is not proscribed by the powers of the Act from doing so;

(b)any obstruction of a drainage work for the purpose of a work or operation authorised by the Act and carried out in accordance with the provisions of this Part.

46(1)If by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that work is otherwise damaged, so as to require remedial action, such impairment or damage must be made good by the nominated undertaker to the reasonable satisfaction of the drainage authority and if the nominated undertaker fails to do so, the drainage authority may make good the same and recover from the nominated undertaker the expense reasonably incurred by it in doing so.U.K.

(2)In any case where immediate action by the drainage authority is reasonably required in order to secure that the imminent flood risk is avoided or reduced, the drainage authority may take such steps as are reasonable for the purpose, and may recover from the nominated undertaker the reasonable cost of so doing provided that notice specifying those steps is served on the nominated undertaker as soon as reasonably practicable after the drainage authority has taken, or commenced to take, the steps specified in the notice.

(3)Nothing in paragraph 44, 45 or 46 authorises the drainage authority to execute works on or affecting an operational railway without the prior consent in writing of the nominated undertaker, such consent not to be unreasonably withheld.

47(1)The nominated undertaker must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in any fishery during the construction of any specified work.U.K.

(2)If by reason of—

(a)the construction of any specified work, or

(b)the failure of any such work,

damage to a fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on the nominated undertaker requiring it to take such steps as may be reasonably practicable to make good the damage or, as the case may be, to protect the fishery against such damage.

(3)If, within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, the nominated undertaker fails to take such steps as are described in sub-paragraph (2), the Agency may take those steps and may recover from the nominated undertaker the expense reasonably incurred by it in doing so.

(4)In any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to a fishery is avoided or reduced, the Agency may take such steps as are reasonable for the purpose, and may recover from the nominated undertaker the reasonable cost of so doing provided that notice specifying those steps is served on the nominated undertaker as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.

48(1)The nominated undertaker must indemnify the drainage authority from all claims, demands, proceedings or damages, which may be made or taken against, or recovered from the drainage authority by reason of—U.K.

(a)any damage to any drainage work so as to impair its efficiency for flood defence purposes,

(b)any damage to a fishery,

(c)any raising or lowering of the water table in land adjoining the works authorised by this Act or adjoining any sewers, drains and watercourses, or

(d)any flooding or increased flooding of any such lands,

which is caused by, or results from, the construction of any specified work or any act or omission of the nominated undertaker, its contractors, agents or employees whilst engaged upon the work.

(2)The drainage authority must give to the nominated undertaker reasonable notice of any such claim or demand and no settlement or compromise of any such claim or demand is to be made without the consent of the nominated undertaker which, if it withholds such consent, is to have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

49U.K.Nothing in paragraph 48 requires the nominated undertaker to indemnify the drainage authority in respect of any claim, demand, proceedings or damages which the drainage authority could reasonably make, take against or recover from any other person.

50U.K.The fact that any work or thing has been executed or done in accordance with a plan approved or deemed to be approved by the drainage authority, or to its satisfaction, or in accordance with any determination under paragraph 51, does not (in the absence of negligence on the part of the drainage authority, its officers, contractors or agents) relieve the nominated undertaker from any liability under the provisions of this Part.

51U.K.Any dispute arising between the nominated undertaker and the drainage authority under this Part is to be determined by arbitration.

PART 5 U.K.Canal & River Trust

52(1)The following provisions of this Part have effect, unless otherwise agreed in writing between the nominated undertaker, or the Secretary of State as the case may be, and Canal & River Trust.U.K.

(2)In this Part—

53U.K.The Secretary of State must not under the powers under section 4(1) acquire compulsorily any land of Canal & River Trust or any easement or other right over such land other than such land, or easements or other rights, as is reasonably necessary for, or in connection with, the construction, maintenance or operation of works authorised by this Act having regard also to the statutory duties of Canal & River Trust.

54(1)Before beginning to construct any specified work, the nominated undertaker must submit to Canal & River Trust plans of the work and such further particulars available to it as Canal & River Trust may within 14 days of the submission of the plans reasonably require.U.K.

(2)Any specified work must not be constructed except in accordance with such plans as may be approved in writing by Canal & River Trust or determined under paragraph 62.

(3)Any approval of Canal & River Trust required under this paragraph must not be unreasonably withheld and—

(a)is to be deemed to have been given if it is neither given nor refused (with an indication of the grounds for refusal) within 28 days of the submission of the plans for approval or where further particulars are submitted under sub-paragraph (1), within 28 days of the submission of those particulars; and

(b)may be given subject to such reasonable requirements as Canal & River Trust may make for the purpose of ensuring the safety or stability of the canal, including requirements as to the construction of protective works.

55(1)Any specified work, and any protective works required by Canal & River Trust under paragraph 54(3)(b), must be constructed with all reasonable despatch to the reasonable satisfaction of Canal & River Trust, and in such manner as to cause as little damage to the canal as may be reasonably practicable and as little interference as may be reasonably practicable with the passage of vessels using the canal and use of the towpath, and Canal & River Trust is to be entitled by its officer at all reasonable times, on giving such notice as may be reasonable in the circumstances, to inspect the construction of such work or works.U.K.

(2)The nominated undertaker must give to Canal & River Trust not less than 28 days' notice of its intention to commence construction of any specified work or any protective works and also, except in emergency (when the nominated undertaker is to give such notice as may be reasonably practicable), of its intention to carry out any works for the repair or maintenance of any specified work insofar as such works of repair or maintenance affect or interfere with the canal.

56(1)The nominated undertaker must not deposit any polluting material on, in or over the canal and must not without the consent of Canal & River Trust—U.K.

(a)deposit any other materials on, in or over the canal (other than materials comprised in a specified work); or

(b)notwithstanding anything in this Act, discharge any water directly or indirectly into the canal.

(2)Any consent of Canal & River Trust required under this paragraph is not to be unreasonably withheld and—

(a)is to be deemed to have been given if it is neither given nor refused within 28 days of the submission of the request for it; and

(b)may be given subject to such reasonable requirements as Canal & River Trust may make—

(i)in the case of a deposit, so as to ensure that the use of the canal is not obstructed or rendered less safe, and

(ii)in the case of a discharge, concerning the reimbursement by the nominated undertaker of expenses incurred by Canal & River Trust in disposing of the water so discharged, being expenses which Canal & River Trust would not have incurred but for the discharge.

57U.K.In its application to the discharge of water into the canal, paragraph 10(5) of Schedule 2 has effect subject to the terms of any conditions attached to the consent under paragraph 56(2) and, where such discharge includes a deposit to which consent has been given under paragraph 56(1), to any conditions attached to that consent.

58(1)If as a result of the construction of any specified work any part of the towpath or access way beside the canal, or any public right of way giving access to that path or way, is temporarily closed to pedestrians or cyclists and there is no way which provides a reasonable alternative, the nominated undertaker must, so far as reasonably practicable and to the extent that it is consistent with safety, provide a substitute path or paths for such time as the closure continues.U.K.

(2)This paragraph is without prejudice to the requirements of paragraph 8(2) or (5) of Schedule 4.

59(1)If any canal work is abandoned, Canal & River Trust may by notice require the nominated undertaker to take such reasonable steps as may be specified in the notice to remove the work and (to such extent as Canal & River Trust reasonably requires) to restore the site to its former condition.U.K.

(2)If any canal work is in such condition that it is, or is likely to become, a danger to or to interfere with navigation, Canal & River Trust may by notice require the nominated undertaker to take such reasonable steps as may be specified in the notice—

(a)to repair and restore the work or part of it, or

(b)if the nominated undertaker so elects, to remove the work and (to such extent as Canal & River Trust reasonably requires) to restore the site to its former condition.

(3)If—

(a)a work which consists of a canal work and a non-canal work is abandoned or falls into decay; and

(b)the non-canal work is in such a condition as to interfere with the right of navigation in the relevant canal or as to interfere with the rights of access or use of land adjacent to the relevant canal,

Canal & River Trust may include the non-canal work, or any part of it, in any notice under this paragraph.

(4)If after such reasonable period as may be specified in a notice under this paragraph the nominated undertaker has failed to begin taking steps to comply with the requirements of the notice or after beginning has failed to make reasonably expeditious progress towards their implementation, Canal & River Trust may carry out the works specified in the notice and any expenditure reasonably incurred by it in so doing is to be recoverable from the nominated undertaker.

(5)In this paragraph “canal work” means so much of any specified work or any other work of which the nominated undertaker is in possession under the powers of this Act as is in or over a canal owned or managed by Canal & River Trust and “non-canal work” means so much of any such work as is not in or over a canal.

60(1)The nominated undertaker must indemnify Canal & River Trust from all claims, demands, proceedings or damages, which may be made or given against, or recovered from Canal & River Trust by reason of any damage to the canal which is caused by the construction of any specified work or protective work or any act or omission of the nominated undertaker, its contractors, agents or employees whilst engaged upon the work and from any costs reasonably incurred in making good such damage.U.K.

(2)Canal & River Trust must give to the nominated undertaker reasonable notice of any such claim or demand and no settlement or compromise of any such claim or demand is to be made without the consent of the nominated undertaker which, if it notifies Canal & River Trust that it desires to do so, is to have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

61(1)Nothing in paragraph 60 is to impose any liability on the nominated undertaker with respect to any damage to the extent that it is attributable to the act, neglect or default of Canal & River Trust, its officers, servants, contractors or agents.U.K.

(2)But the fact that any work or thing has been executed or done in accordance with a plan approved or deemed to be approved by Canal & River Trust, or to its satisfaction, or in accordance with a determination under paragraph 62, does not (in the absence of negligence on the part of Canal & River Trust, its officers, servants, contractors or agents) relieve the nominated undertaker from any liability under the provisions of this Part.

62(1)Any dispute arising between the nominated undertaker and Canal & River Trust under this Part of this Schedule is to be determined by arbitration if—U.K.

(a)the parties agree, or

(b)the dispute relates to the amount of any sum payable under this Part,

but must otherwise be determined by a person appointed by the appropriate Ministers.

(2)Any person appointed by the appropriate Ministers under sub-paragraph (1) must, in determining any dispute arising under this Part, have regard to such matters as may be specified by the appropriate Ministers on making the appointment.

(3)In this paragraph, the reference to the appropriate Ministers is to the Secretary of State for Transport and the Secretary of State for Environment, Food and Rural Affairs acting jointly.