Part IE+W Determination of Questions of Disputed Compensation

Modifications etc. (not altering text)

C1Pt. 1 (ss. 1-4) applied (with modifications) by Agriculture (Miscellaneous Provisions) Act 1968 (c. 34), s. 13(3), Sch. 3 paras. 4, 5; applied by Channel Tunnel Act 1987 (c. 53, SIF 102), ss. 6, 35, Sch. 2 paras. 4(3), 7(3), 13(9), 14(8), 16(8), Sch. 4 para 4(5), Sch. 5 Pt. 1II para. 6(2); applied by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), ss. 2(5), 3, Sch. 2 Pt. 1I para. 5(2), Sch. 3 paras 1(9), 2(5); applied (13.2.1992) by Severn Bridges Act 1992 (c. 3), ss. 2(6), 3, Sch. 2 Pt. 1I para. 4(2), Pt. 1II para. 7(7)(8), Sch. 3 para. 1(6).

Pt. 1 (ss. 1-4) applied (21.7.1994) by 1994 c. xi, ss. 19(3), 20(4), 23(7), 29(3), 34(6), 41(3) (with s. 39)

Pt. 1 (ss. 1-4) applied (21.7.1994) by 1994 c. xv, ss. 10(2)(b), 22(g), 27(3), 34(7), 61(2)(3) (with s. 47)

Pt. 1 (ss. 1-4) applied (11.11.1996) by S.I. 1996/2714, arts. 10(4), 18(6), 21(5), 28(3), 29(6), 32(4), 40(4)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c. 61, s. 2, Sch. 2 para. 8(2)(3)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c. 61, s. 2, Sch. 2 para. 10(8)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c. 61, s. 3, Sch. 3 para. 3(3)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c. 61, s. 6, Sch. 5 para. 1(5)(6)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c. 61, s. 6, Sch. 5 para. 4(7)(8)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c.61, s. 6, Sch. 5 para. 5(3)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c. 61, s. 7(4)(5)

Pt. 1 (ss. 1-4) applied (18.12.1996) by 1996 c. 61, s. 44, Sch. 12 Pt. 1I, para. 3(6)

Pt. 1 (ss. 1-4) applied (10.2.1997) by S.I. 1997/264, arts. 7(4), 14(10), 15(5), 16(6), 20(3), 24(3)

Pt. 1 (ss. 1-4) applied (21.5.1997) by S.I. 1997/1266, arts. 11(5), 19(6), 21(5), 30(6), 33(4) (with art. 41)

Pt. 1 (ss. 1-4) applied (27.8.1998) by S.I. 1998/1936, art. 11(6), 19(6), 21(1), 32(6), 33(7), 36(4) (with art. 45)

Pt. 1 (ss. 1-4) applied (13.1.1999) by S.I. 1998/3269, art. 9(5), 16(7), 18(4), 27(3)

Pt. 1 (ss. 1-4) applied (19.2.1999) by S.I. 1999/537, art. 10(6)

Pt. 1 (ss. 1-4) applied (30.4.1999) by S.I. 1999/1306, arts. 1, 12(5), 14(6), 15(7), 21(3)

Pt. 1 (ss. 1-4) applied (18.5.1999) by S.I. 1999/1664, arts. 8(4), 9(6), 10(7) (with art. 18)

Pt. 1 (ss. 1-4) applied (20.8.1999) by S.I. 1999/2336, arts. 8(3), 9(7), 17(6), 20(3)

Pt. 1 (ss. 1-4) applied (23.8.1999) by S.I. 1999/2981, arts. 6(5), 13(10), 14(5), 20(6), 21(7), 24(3), 25(2), 27

Pt. 1 (ss. 1-4) applied (3.6.1999) by S.I. 1999/1555, art. 7(2)

Pt. 1 (ss. 1-4) applied (24.12.1999) by S.I. 2000/428, art. 8(4)

Pt. 1 (ss. 1-4) applied (29.3.2001) by S.I. 2001/1347, arts. 11(6), 19(10), 21(5), 27(3), 28(6), 29(7), 32(3) (with arts. 15, 37, 38(2))

Pt. 1 (ss. 1-4) applied (2.3.2001) by S.I. 2001/1368, arts. 10(3), 13(4)

Pt. 1 (ss. 1-4) applied (2.3.2001) by S.I. 2001/1369, arts. 8(3), 11(4)

Pt. 1 (ss. 1-4) applied (18.7.2001) by S.I. 2001/2870, art. 10(7)

Pt. 1 (ss. 1-4) applied (24.7.2001) by S.I. 2001/3627, arts. 11(6), 27(6), 29(10), 32(5)(6), 40(3), 41(6), 42(7)(8), 45(4), 55(3)(4)

Pt. 1 (ss. 1-4) applied (9.11.2001) by S.I. 2001/3682, arts. 7(4)(5), 15(10), 16(5), 22(3), 26(3)(4) (with Sch. 12 para. 2)

Pt. 1 (ss. 1-4) applied (30.4.2002) by S.I. 2002/1065, arts. 7(11), 8(4), 14(6), 15(7), 19(3)

Pt. 1 (ss. 1-4) applied (12.8.2002) by S.I. 2002/1943, arts. 8(4), 9(7) (with art.9(8)(9))

Pt. 1 (ss. 1-4) applied (31.5.2002) by S.I. 2002/1327, arts. 10(2)(subjet to Sch. 2, para. 5), 15(5), 26(4)

Pt. 1 (ss. 1-4) applied (14.3.2002) by S.I. 2002/412, arts. 13(5), 19(3), 22(2), 28(3), (with saving in art. 38)

Pt. 1 (ss. 1-4) applied (31.12.2002) by S.I. 2002/3127, art. 7(3) (with arts. 16, 17)

C2Pt. 1 (ss. 1-4) applied (28.4.2003) by Network Rail (West Coast Main Line) Order 2003 (S.I. 2003/1075), arts. 1, 7(4), 9(2), 13(8), 30(6) (with art. 40)

C4Pt. 1 (ss. 1-4) applied (2.4.2004) by Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), arts. 1, 10(6), 19(10), 21(5), 29(3), 30(8) (with arts. 30(9), 31(7), 32(5), 35(4)(5), Sch. 12 para. 2)

C5Pt. 1 (ss. 1-4) applied (19.11.2004) by Scarweather Sands Offshore Wind Farm Order 2004 (S.I. 2004/3054), arts. 1, 6(6), 7(5), 21(5)(6) (with art. 38)

C7Pt. 1 (ss. 1-4) applied (11.2.2005) by Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), arts. 1, 11(6), 19(8), 22(10), 25(5), 35(3), 36(6), 37(7), 40(4), 71(8) (with arts. 65, 66)

C8Pt. 1 (ss. 1-4) applied (22.3.2005) by Midland Metro (Wednesbury to Brierley Hill and Miscellaneous Amendments) Order 2005 (S.I. 2005/927), arts. 12, 13(6), 21(6), 23(6), 24(10), 26(5), 28(3), 33(3)(4), 34(6), 35(7), 36(8), 39(3), Sch. 10 para. 2 (with arts. 23(7), 24(9)(11), 34(7), 35(8), 39(4)(8), 51)

C12Pt. 1 (ss. 1-4) applied (26.8.2005) by River Tyne (Tunnels) Order 2005 (S.I. 2005/2222), arts. 1, 14(10), 16(5), 27(6), 28(7), 31(4), 32(3) (with arts. 45(1), 48, Sch. 10 paras. 21, 29)

C14Pt. 1 (ss. 1-4) applied (25.11.2005) by Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), arts. 1, 12(7), 20(10), 22(5), 29, 30(6), 31(7), 34(4), 38(4) (with arts. 3(5), 15(3))

C15Pt. 1 (ss. 1-4) applied (11.1.2006) by The Cambridgeshire Guided Busway Order 2005 (S.I. 2005/3523), arts. 1, 10(4), 19(5), 27(3), 28(6), 29(7), 32(4), 43(3) (with arts. 19(6), 28(7), 52)

C17Pt. 1 (ss. 1-4) applied (14.9.2006) by The Borough of Poole (Poole Harbour Opening Bridges) Order 2006 (S.I. 2006/2310), arts. 1, 5(6), 8(4), 15(10), 16(5), 23(6), 24(7), 27, 28(2) (with arts. 23(7), 24(8), 28(3), 40, Sch. 7 para. 12)

C18Pt. 1 (ss. 1-4) applied (22.11.2006) by Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), arts. 1, 10(6), 11(6), 16(10), 18(5), 26(3), 27(6), 28(7), 31(4), 34(4) (with arts. 27(7), 28(8), 31(5), 43)

C20Pt. 1 (ss. 1-4) applied (13.12.2006) by The Network Rail (Thameslink 2000) Order 2006 (S.I. 2006/3117), arts. 1, 15(8), 16(8), 22(10), 23(5), 28(3), 29(6), 32(3) (with arts. 34, 35(2))

C22Pt. 1 (ss. 1-4) applied (23.8.2007) by Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), arts. 1, 9(6), 10(6), 14(5), 16(10), 18(5), 25(3), 26(6), 27(7), 30(4), 32(4) (with arts. 3(6), 12(3))

C26Pt. 1 (ss. 1-4) applied (21.5.2008) by Teesport (Land Acquisition) Order 2008 (S.I. 2008/1238), arts. 1(1), 6(6), 8(4)

C27Pt. 1 (ss. 1-4) applied (22.7.2008) by Crossrail Act 2008 (c. 18), s. 8(8), Sch. 2 paras. 7(2), 9(8), 10(6), Sch. 3 para. 3(3), Sch. 5 paras. 1(5), 3(3), 4(7), 5(4)

C28Pt. 1 (ss. 1-4) applied (14.10.2008) by Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), arts. 1, 8(6), 10(6), 17(6), 18(3), 20(10), 21(5), 26, 27(6), 28(7), 32(4), 35(3) (with arts. 21(6), 32(5), 36(3))

C30Pt. 1 (ss. 1-4) applied (9.6.2009) by Nottingham Express Transit System Order 2009 (S.I. 2009/1300), arts. 1, 11(6), 12(6), 20(5), 22(10), 25(5), 35(3)(5), 36(6), 37(7), 41(4), 51(3), 76(8) (with arts. 25(6), 37(8), 41(5), 45(2), 51(3), Sch. 13 para. 14(2), Sch. 14 para. 19, Sch. 16)

C31Pt. 1 (ss. 1-4) applied (18.9.2009) by London Underground (Victoria Station Upgrade) Order 2009 (S.I. 2009/2364), arts. 1, 8(3), 9(8), 14(10), 16(5), 23(3), 24(6), 25(7), 29(4), 35(7)

C35Pt. 1 (ss. 1-4) applied (1.2.2011) by The River Mersey (Mersey Gateway Bridge) Order 2011 (S.I. 2011/41), arts. 1, 8(6), 9(6), 15(10), 16(5), 17(4), 25(3), 28(6), 29(7), 33(4), 48(3) (with art. 51, Sch. 10 paras. 68, 85)

C36Pt. 1 (ss. 1-4) applied (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 1, 9(4), 10(6), 15(5), 23(3), 24(7), 25(7), 29(4), 32(3)

C37Pt. 1 (ss. 1-4) applied (7.8.2012) by The Ipswich Barrier Order 2012 (S.I. 2012/1867), arts. 1, 6(8), 7(5), 27(6), 28(7), 32(4) (with arts. 46-48, Sch. 8 para. 18)

C39Pt. 1 (ss. 1-4) applied (16.8.2012) by The Hinkley Point Harbour Empowerment Order 2012 (S.I. 2012/1914), arts. 1(1), 19(5), 20(3) (with arts. 34, 35, 37, 40)

C40Pt. 1 (ss. 1-4) applied (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 11(7), 13(10), 15(5), 19(5), 23(6)(7), 27(3) (with arts. 23(7), 26(2))

C41Pt. 1 (ss. 1-4) applied (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 13(4), 15(6), 19(4), 21(5), 25(5), 29(4)(5), 30(6), 36(3) (with art. 35(2))

C42Pt. 1 (ss. 1-4) applied (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), arts. 1, 9(6), 10(6), 15(4), 17(3), 20(10), 21(5), 28(3), 29(6), 30(7), 35(4), 40(3) (with art. 42(2))

C44Pt. 1 (ss. 1-4) applied (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), arts. 1, 15(8), 17(5), 22(10), 23(5), 28(4), 32(4), 33(6), 34(7), 41(3), 42(4) (with arts. 28(5), 33(7)(11), 34(8), 48, 68, 79)

C45Pt. 1 (ss. 1-4) applied (15.6.2013) by The Galloper Wind Farm Order 2013 (S.I. 2013/1203), arts. 1, 15(5), 19(5), 22(4), 23(7), 24(7) (with arts. 11, 12)

C47Pt. 1 (ss. 1-4) applied (22.8.2013) by The Leeds Railway Station (Southern Entrance) Order 2013 (S.I. 2013/1933), arts. 1, 8(3), 9(5), 14(10), 15(5), 16(4), 26(3), 27(7), 28(7), 32(4), 35(3)

C49Pt. 1 (ss. 1-4) applied (20.11.2013) by The M1 Junction 10a (Grade Separation) Order 2013 (S.I. 2013/2808), arts. 1, 17(5), 25(6), 30(3), 31(4)

C51Pt. 1 (ss. 1-4) applied (with modifications) (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), arts. 1, 23(6) (with arts. 16(2), 23(7), 27(2), 39, Sch. 10 para. 4)

C52Pt. 1 (ss. 1-4) applied (9.1.2014) by The Ashton Vale to Temple Meads and Bristol City Centre Rapid Transit Order 2013 (S.I. 2013/3244), arts. 1, 10(7), 11(6), 16(5), 18(10), 20(5), 27(3), 28(7), 29(7), 33(4), 41(3) (with arts. 57, 58, Sch. 9 para. 2, Sch. 11 para. 19)

C53Pt. 1 (ss. 1-4) applied (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), arts. 1, 16(10), 17(5), 18(4), 24(4), 25(7), 26(7), 30(3) (with arts. 16(9), 20(2), 24(5), 25(8), 26(8))

C55Pt. 1 (ss. 1-4) applied (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), arts. 1, 11(4), 13(5), 17(4), 19(5), 23(5), 27(5)(6), 28(6), 29(6), 30(7), 35(3) (with art. 34(2))

C57Pt. 1 (ss. 1-4) applied (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), arts. 1, 10(5), 18(4), 22(4), 23(6), 24(7), 32(3) (with arts. 23(7), 37, 38, Sch. 9 para. 19)

C61Pt. 1 (ss. 1-4) applied (19.8.2014) by The Network Rail (Huyton) Order 2014 (S.I. 2014/2027), arts. 1, 8(2), 14(10), 21(6), 22(7), 26(5), 30(3) (with arts. 21(7), 22(8), 26(6), 31(2))

C62Pt. 1 (ss. 1-4) applied (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 11(6), 12(5), 16(10), 17(5), 21(5), 25(4), 26(6), 30(3) (with arts. 21(6), 28)

Pt. 1 appled (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 13(5), 15(5), 20(10), 21(10), 22(7), 25(3), 26(4), 27(7), 28(3), 29(4), 35(7), 36(7)

C63Pt. 1 (ss. 1-4) applied (2.10.2014) by The North Killingholme (Generating Station) Order 2014 (S.I. 2014/2434), arts. 1, 10(6), 15(5), 16(3), 18(4), 20(4), 24(4), 25(6), 26(7), 31(3), 32(10) (with arts. 5, 6, 13, 16(4), 32(9), Sch. 8 Pt. 1 para. 6, Pt. 3 paras. 4(3), 6, 17, Pt. 5 para. 9)

C64Pt. 1 (ss. 1-4) excluded (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 28(3) (with art. 33)

C65Pt. 1 (ss. 1-4) applied (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 11(3), 14(5), 19(5), 24(3) (with art. 33)

C66Pt. 1 (ss. 1-4) applied (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), arts. 1, 15(5), 16(3), 18(4), 20(4), 23(4), 24(6), 25(7), 32(3) (with art. 28(8))

C67Pt. 1 (ss. 1-4) applied (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), arts. 1, 12(6), 13(6), 17(10), 18(6), 22(5), 26(4), 27(6), 28(7), 33(3)

C69Pt. 1 (ss. 1-4) applied (15.12.2014) by The London Underground (Northern Line Extension) Order 2014 (S.I. 2014/3102), arts. 1, 10(6), 13(3), 18(10), 20(5), 21(3), 29(3), 30(8), 31(8), 35(4) (with arts. 18(9), 29(5), 30(9), 31(9), 35(5), Sch. 8 para. 45)

C70Pt. 1 (ss. 1-4) applied (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), arts. 1, 8(6), 13(5), 16(6), 18(4), 22(4)(5), 23(7), 24(7), 27(5), 28(4) (with arts. 37, 38)

C73Pt. 1 (ss. 1-4) applied (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), arts. 1, 12(6), 13(5), 17(10), 18(5), 23(5), 27(4)(5), 28(6), 29(7), 33(3) (with art. 31)

C74Pt. 1 (ss. 1-4) applied (26.2.2015) by The Cornwall Council (A30 Temple to Higher Carblake Improvement) Order 2015 (S.I. 2015/147), arts. 1, 12(6), 13(5), 17(10), 18(5), 21(4), 22(5), 27(4), 28(6), 29(7), 35(3) (with arts. 17(9), 22(6), 27(5), 28(7), 29(8))

C75Pt. 1 (ss. 1-4) applied (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), arts. 1, 14(5), 18(10), 19(6), 21(4), 24(6), 25(4), 28(4)(b), 29(6), 30(7), 36(4), 38(3) (with arts. 8(5), 18(9), 25(5), 28(5), 29(7), 30(8), 40, 41, Sch. 12 Pt. 1 paras. 4, 9(2), 10, Pt. 2 paras. 4(2)(3), 19, Pt. 3 para. 3, Pt. 4 paras. 3, 4, 16)

C76Pt. 1 (ss. 1-4) applied (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), arts. 1, 11(4), 16(5), 21(8), 22(4), 26(4), 27(6), 28(7), 34(3) (with arts. 7(6), 22(5)(7), 27(7), 28(8), 31, Sch. 8 para. 10)

C77Pt. 1 (ss. 1-4) applied (21.4.2015) by The Crossrail (Plumstead Sidings) Order 2015 (S.I. 2015/781), arts. 1, 6(3), 7(5), 21(3)

C78Pt. 1 (ss. 1-4) applied (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), arts. 1, 11(4), 12(6), 18(10), 19(5), 20(3), 26(4)(5), 27(6), 28(7), 32(5), 35(3) (with art. 36(2))

C79Pt. 1 (ss. 1-4) applied (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), arts. 1, 10(5), 11(3), 16(3) (with arts. 5, 16(4)(5))

C80Pt. 1 (ss. 1-4) excluded (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), arts. 1, 15(2) (with art. 5)

C81Pt. 1 (ss. 1-4) applied (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 12(6), 14(6), 18(10), 19(5), 24(5), 28(4)(5), 29(6), 30(7), 35(3), 36(5) (with art. 24(6))

C83Pt. 1 (ss. 1-4) applied (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 10(5), 14(10), 15(5), 24(3), 25(5), 26(4), 28(4), 32(4)(5), 33(6), 34(7), 36(2), (with arts. 51, 53)

C85Pt. 1 (ss. 1-4) applied (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 16(10), 17(5), 18(3), 19(4), 24(7), 32(4), 33(4), 37(3) (with arts. 20, 23, 32(5), 33(5), 44)

C86Pt. 1 (ss. 1-4) modified (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 27(7) (with arts. 27(8), 30)

C87Pt. 1 (ss. 1-4) modified (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 27(6), 28(7), 32(3) (with art. 27(5))

C88Pt. 1 (ss. 1-4) applied (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 16(5), , 22(5), 26(4), (with arts. 22(6), 26(5))

C89Pt. 1 (ss. 1-4) applied (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 15(5), 21(5), 25(4), 26(6), 31(3) (with arts. 21(6), 25(5), 26(11), 30)

C90Pt. 1 (ss. 1-4) applied (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), arts. 1, 15(5), 19(10), 20(6), 25(6), 28(4), 29(6), 30(7), 36(4), 38(3) (with arts. 8, 20(7), 24(2), 28(5), 29(7), 30(8), 35, 40, 41, Sch. 12 para. 2)

C96Pt. 1 applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 18(6) (with art. 24(2))

1[F1Upper Tribunal to assess] compensation in respect of land compulsorily acquired.E+W

Where by or under any statute (whether passed before or after the passing of this Act) land is authorised to be acquired compulsorily, any question of disputed compensation and, where any part of the land to be acquired is subject to a lease which comprises land not acquired, any question as to the apportionment of the rent payable under the lease, shall be referred to the [F2Upper Tribunal] and shall be determined by the Tribunal in accordance with the following provisions of this Act.