Print Options
PrintThe Whole
Act
PrintThis
Schedule
only
Changes over time for: THIRD SCHEDULE


Timeline of Changes
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Status:
Point in time view as at 01/02/1991.
Changes to legislation:
There are currently no known outstanding effects for the Public Health Act 1961, THIRD SCHEDULE.

Changes to Legislation
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Sections 43, 44 and 51.
THIRD SCHEDULEE+W CONSENTS REQUIRED FOR EXECUTION OF CERTAIN WORKS IN STREETS
Modifications etc. (not altering text)
1E+WIn this Schedule “the authority” means the county council, local authority or parish council having power to carry out the works to which this Schedule applies.
2E+WThe authority shall not carry out any works to which this Schedule applies in any such situation or position as is described in the first column of the following Table except with the consent of the person described in relation thereto in the second column of that Table.
Table
In any street which is a highway for which there is a highway authority other than the authority carrying out the works. | The highway authority. |
In any street belonging to and repairable by any railway, dock, harbour, canal, inland navigation or passenger road transport undertakers and forming the approach to any station, dock, wharf or depot of those undertakers. | The undertakers. |
On any bridge not vested in the authority carrying out the works or on the approaches to any such bridge. | The authority or other person in whom the bridge is vested. |
On any bridge carrying a street over any railway, canal or inland navigation, or on the approaches to any such bridge, or under any bridge carrying a railway, canal or inland navigation over a street. | The railway, canal or inland navigation undertakers concerned. |
Except in the case of works under section forty-four of this Act, in a position obstructing or interfering with any existing access to any land or premises abutting upon a street. | The owner (as defined by the Public Health Act 1936) and the occupier of the land or premises. |
3E+WAny consent required by this Schedule in respect of any works shall not unreasonably be withheld but may be given subject to any reasonable conditions, including a condition that the authority shall remove the works either at any time or at or after the expiration of a period if reasonably required so to do by the person giving the consent.
[4E+WWhere the consent of the Secretary of State or the Minister of Transport is required under this Schedule, any dispute between the Minister whose consent is required and the authority as to whether the Minister’s consent is unreasonably withheld or is given subject to reasonable conditions, or whether the removal of anything to the provision of which the consent relates in accordance with any condition of the consent is reasonably required shall be referred to and determined by an arbitrator to be appointed in default of agreement by the President of the Institution of Civil Engineers]