[F1SCHEDULES]

SECOND SCHEDULEE+W+N.I. Rules for Ascertaining Area for the Purpose of Computing Maximum Liability of Mine Owner in Respect of Authorised Workings.

Modifications etc. (not altering text)

C1Schs. 1-3 incorporated (with modifications) (16.10.1996) by S.I. 1996/2660, art. 4(1)(3)

Schs. 1-3 incorporated (with modifications) (11.11.1996) by S.I. 1996/2714, art. 3(1)(2)

Schs. 1-3 incorporated (with modifications) (10.2.1997) by S.I. 1997/264 art. 3(1)(3)

Schs. 1-3 applied (10.2.1997) by S.I. 1996/264 art. 7(3)

Schs. 1-3 incorporated (with modifications) (21.5.1997) by S.I. 1997/1266, art. 3(1)(2)

Schs. 1-3 incorporated (with modifications) (29.7.1997) by S.I. 1997/1688, arts. 3(1)(2), 13(7)

Schs. 1-3 incorporated (with modifications) (9.10.1997) by S.I. 1997/2534, art. 3(1)(3)

Schs. 1-3 incorporated (with modifications) (27.8.1998) by S.I. 1998/1936, art. 3(1)(2)

Schs. 1-3 incorporated (with modifications) (21.7.1999) by S.I. 1999/2129, art. 3(1)(2)

Schs. 1-3 incorporated (with modifications) (20.8.1999) by S.I. 1999/2336, art. 3(1)(2)

Schs. 1-3 incorporated (with modifications) (4.8.2000) by S.I. 2000/2585, art. 3(1)(2)

Schs. 1-3 incorporated (with modifications) (18.7.2001) by S.I. 2001/2870, art. 3(1)(2)

Schs. 1-3 incorporated (with modifications) (9.11.2001) by S.I. 2001/3682, art. 3(1)(3)

Schs. 1-3 incorporated (with modifications) (12.2.2002) by S.I. 2002/366, art. 3(1) (with Sch. 2)

Schs. 1-3 incorporated (with modifications) (30.4.2002) by S.I. 2002/1065, art. 3(1)

C4Schs. 1-3 incorporated (with modifications) (4.3.2004) by The Network Rail (West Coast Main Line) Order 2004 (S.I. 2004/389), arts. 1, 3(1)(2) (with art. 38)

C5Schs. 1-3 incorporated (with modifications) (4.5.2005) by The Telford Railfreight Terminal (Donnington) Order 2005 (S.I. 2005/1163), arts. 1, 3(1)

C6Schs. 1-3 incorporated (with modifications) (3.7.2006) by Port of Blyth (Battleship Wharf Railway) Order 2006 (S.I. 2006/1518), arts. 1, 3(1)(3)

C7Schs. 1-3 incorporated (with modifications) (13.12.2006) by The Network Rail (Thameslink 2000) Order 2006 (S.I. 2006/3117), arts. 1, 3(1)(2) (with arts. 34, 35(2))

C10Schs. 1-3 incorporated (with modifications) (14.10.2008) by Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), arts. 1, 3(1)(3) (with art. 36(3))

C11Schs. 1-3 incorporated (with modifications) (30.12.2009) by South Devon Railway Order 2009 (S.I. 2009/3281), arts. 1, 3

C12Schs. 1-3 incorporated (with modifications) (E.W.) (20.7.2010) by The Network Rail (Nuneaton North Chord) Order 2010 (S.I. 2010/1721), arts. 1, 3(1)(3)

C13Schs. 1-3 incorporated (with modifications) (E.W.) (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 1, 3

C14Schs. 1-3 incorporated (E.W.) (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 3(1) (with art. 26(2))

C15Schs. 1-3 incorporated (with modifications) (E.W.) (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 3(1)(3) (with art. 35(2))

C16Schs. 1-3 incorporated (with modifications) (E.W.) (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), arts. 1, 3(1)(3) (with art. 42(2))

C17Schs. 1-3 incorporated (E.W.) (21.8.2013) by The Croxley Rail Link Order 2013 (S.I. 2013/1967), arts. 1, 3(1) (with art. 3(3))

C18Schs. 1-3 incorporated (with modifications) (E.W.) (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), arts. 1, 3(1)(3) (with arts. 27(2), 39, Sch. 10 para. 4)

C19Schs. 1-3 incorporated (with modifications) (E.W.) (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), arts. 1, 3(1)(3) (with art. 34(2))

C20Schs. 1-3 incorporated (E.W.) (19.8.2014) by The Network Rail (Huyton) Order 2014 (S.I. 2014/2027), arts. 1, 3(1) (with art. 31(2))

1E+W+N.I.The area shall extend laterally on each side of (but not including) the inner area of protection to the following distance therefrom:—

If the depth of the seam is 160 yards or underNil.
If the depth of the seam exceeds 160 yards, but does not exceed 170 yards1½ yards.
If the depth of the seam exceeds 170 yards, but does not exceed 180 yards2½ yards.
If the depth of the seam exceeds 180 yards, but does not exceed 190 yards4½yards.
If the depth of the seam exceeds 190 yards, but does not exceed 200 yards5½ yards.
If the depth of the seam exceeds 200 yards, but does not exceed 210 yards7 yards.
If the depth of the seam exceeds 210 yards, but does not exceed 220 yards8 yards.
If the depth of the seam exceeds 220 yards, but does not exceed 230 yards9 yards.
If the depth of the seam exceeds 230 yards, but does not exceed 240 yards9½ yards.
If the depth of the seam exceeds 240 yards, but does not exceed 250 yards10 yards.
If the depth of the seam exceeds 250 yardsTo a line descending outwards from the railway or works at an angle of one horizontal to five vertical from a point on the boundary of the railway or works at rail level until the depth of 650 yards is reached and thence descending vertically.

2E+W+N.I.The area shall extend longitudinally for a distance co-extensive with the part of the railway or works upon which expenditure has been incurred in making good the damage, together with a length beyond that distance at either end thereof equal to one-half of the mean depth of the seam or seams in question.