xmlns:atom="http://www.w3.org/2005/Atom"
Introductory Text
1.The Principal Scheme is hereby varied by substituting for the...
2.The effect of the variation to the Principal Scheme made...
3.The substituted lengths shall become trunk roads on the date...
4.In this Scheme– “the deposited plan” means the plan numbered...
Signature
SCHEDULE 1
1.The Eastbound Connecting Road Starting at a point adjoining the...
2.The Westbound Connecting Road Starting at a point adjoining the...
SCHEDULE 2
1.The Eastbound Connecting Road Extending for 0.20 kilometres from a...
2.The Westbound Connecting Road Extending for 0.18 kilometres from a...