THE SCHEDULE THE COUNTY COUNCIL OF HUMBERSIDE (NEWLAND BRIDGE) SCHEME 1990

The County Council of Humberside (hereinafter referred to as“the Council”) with the benefit of an agreement with the North Yorkshire CountyCouncil pursuant to Section 8 of the Highways Act 1980 make this Schemein exercise of its powers under Section 106(3) of the Highways Act 1980and all other enabling powers:—

1.  The Council are authorised to construct over the navigable waters of the River Aire the Bridge specified in the Schedule to the Scheme as part of the highway which the Council are proposing to construct from the western extremity of the roundabout which it is proposed to provide immediately to the north west of the A614 Rawcliffe Road bridge in the Borough of Boothferry in the County of Humberside generally north westwards to the southern extremityof the roundabout which it is proposed to provide at the junction ofA645 Camblesforth Road and C338 New Road in the District of Selby in theCounty of North Yorkshire.

2.  This Scheme may be cited as The County Council of Humberside (Newland Bridge) Scheme 1990.

SCHEDULE TO THE SCHEME PLANS AND SPECIFICATION OF THE NEWLAND BRIDGE

LOCATION

The location and the general design of the bridge areshown on the general arrangement plan numbered 100/B/89/501C annexedhereto.

The bridge will cross the River Aire generally on the alignmentof the dismantled single span railway bridge.

CONSTRUCTION

The bridge superstructure will be of composite construction consisting of steel plate girders and a reinforced concrete deck. Intermediate piers will belarge diameter bored piles and abutments will be reinforced concrete onpiled foundations.

SPAN

The bridge will have three continuous spans of 19.5, 38 and 16 metres.

WIDTH

The overall width of the bridge will be 13.8 metres.

WATERWAY

The clear width between intermediate piers will be 36.2 metres.

HEADWAY

The minimum headway above Ordnance Datum Newlyn will be 8.077 metres.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources