SCHEDULEDEFECTS, REPAIRS OF WHICH ARE QUALIFYING REPAIRS AND MAXIMUM TIME FOR COMPLETION

Regulations 2, 5 and 9

1

2

(Defect)

(Maximum time in working days from date after date of notification of qualifying repair or inspection)

Blocked flue to open fire or boiler

1

Blocked or leaking foul drains, soil stacks, or toilet pans where there is no other toilet in the house.

1

Blocked sink, bath or basins.

1

Electric power–

  • loss of electric power;

1

  • partial loss of electric power.

3

Insecure external window, door or lock.

1

Leaks or flooding from water or heating pipes, tanks, cisterns.

1

Loss or partial loss of gas supply.

1

Loss or partial loss of space or water heating where no alternative heating is available.

1

Toilet not flushing where there is no other toilet in the house.

1

Unsafe power or lighting socket, or electrical fitting.

1

Water supply–

  • loss of water supply;

1

  • partial loss of water supply.

3

Loose or detached bannister or hand rail.

3

Unsafe timber flooring or stair treads.

3

Mechanical extractor fan in internal kitchen or bathroom not working.

7