Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
A. Development by the National Rivers Authority, for the purposes of their functions, consisting of—
(a)development not above ground level required in connection with conserving, redistributing or augmenting water resources,
(b)development in, on or under any watercourse or land drainage works and required in connection with the improvement, maintenance or repair of that watercourse or those works,
(c)the provision of a building, plant, machinery or apparatus in, on, over or under land for the purpose of survey or investigation,
(d)the maintenance, improvement or repair of works for measuring the flow in any watercourse or channel,
(e)any works authorised by or required in connection with an order made under section 73 of the Water Resources Act 1991 M1 (power to make ordinary and emergency drought orders),
(f)any other development in, on, over or under their operational land, other than the provision of a building but including the extension or alteration of a building.
Marginal Citations
A.1 Development is not permitted by Class A if—
(a)in the case of any Class A(a) development, it would include the construction of a reservoir,
(b)in the case of any Class A(f) development, it would consist of or include the extension or alteration of a building so that—
(i)its design or external appearance would be materially affected,
(ii)the height of the original building would be exceeded, or the cubic content of the original building would be exceeded by more than 25%, or
(iii)the floor space of the original building would be exceeded by more than 1,000 square metres,
or
(c)in the case of any Class A(f) development, it would consist of the installation or erection of any plant or machinery exceeding 15 metres in height or the height of anything it replaces, whichever is the greater.
A.2 Development is permitted by Class A(c) subject to the condition that, on completion of the survey or investigation, or at the expiration of six months from the commencement of the development concerned, whichever is the sooner, all such operations shall cease and all such buildings, plant, machinery and apparatus shall be removed and the land restored as soon as reasonably practicable to its former condition (or to any other condition which may be agreed with the local planning authority).
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.