The Town and Country Planning (General Permitted Development) Order 1995

 Help about what version

What Version

 Help about advanced features

Advanced Features

More Resources

Changes over time for: PART 17

 Help about opening options

Version Superseded: 26/03/2001

Status:

Point in time view as at 01/04/1996.

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Town and Country Planning (General Permitted Development) Order 1995. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

PART 17E+WDEVELOPMENT BY STATUTORY UNDERTAKERS

Class A Railway or light railway undertakingsE+W

Permitted developmentE+W

A.  Development by railway undertakers on their operational land, required in connection with the movement of traffic by rail.

Development not permittedE+W

A.1  Development is not permitted by Class A if it consists of or includes—

(a)the construction of a railway,

(b)the construction or erection of a hotel, railway station or bridge, or

(c)the construction or erection otherwise than wholly within a railway station of—

(i)an office, residential or educational building, or a building used for an industrial process, or

(ii)a car park, shop, restaurant, garage, petrol filling station or other building or structure provided under transport legislation.

Interpretation of Class AE+W

A.2  For the purposes of Class A, references to the construction or erection of any building or structure include references to the reconstruction or alteration of a building or structure where its design or external appearance would be materially affected.

Class B Dock, pier, harbour, water transport, canal or inland navigation undertakingsE+W

Permitted developmentE+W

B.  Development on operational land by statutory undertakers or their lessees in respect of dock, pier, harbour, water transport, or canal or inland navigation undertakings, required—

(a)for the purposes of shipping, or

(b)in connection with the embarking, disembarking, loading, discharging or transport of passengers, livestock or goods at a dock, pier or harbour, or with the movement of traffic by canal or inland navigation or by any railway forming part of the undertaking.

Development not permittedE+W

B.1  Development is not permitted by Class B if it consists of or includes—

(a)the construction or erection of a hotel, or of a bridge or other building not required in connection with the handling of traffic,

(b)the construction or erection otherwise than wholly within the limits of a dock, pier or harbour of—

(i)an educational building, or

(ii)a car park, shop, restaurant, garage, petrol filling station or other building provided under transport legislation.

Interpretation of Class BE+W

B.2  For the purposes of Class B, references to the construction or erection of any building or structure include references to the reconstruction or alteration of a building or structure where its design or external appearance would be materially affected, and the reference to operational land includes land designated by an order made under section 14 or 16 of the Harbours Act 1964 M1 (orders for securing harbour efficiency etc., and orders conferring powers for improvement, construction etc. of harbours), and which has come into force, whether or not the order was subject to the provisions of the Statutory Orders (Special Procedure) Act 1945 M2.

Marginal Citations

M11964 c. 40; section 14 was amended by paragaph 2, and sections 14 and 16 were amended by paragraphs 3, 4 and 14, of Schedule 6 to, and by Part II of Schedule 12 to, the Transport Act 1981 (c. 56); section 14 was amended by paragraph 1, and section 16 was amended by paragraph 2, of Schedule 3 to the Transport and Works Act 1992 (c. 42).

Class C Works to inland waterwaysE+W

Permitted developmentE+W

C.  The improvement, maintenance or repair of an inland waterway (other than a commercial waterway or cruising waterway) to which section 104 of the Transport Act 1968 M3 (classification of the Board’s waterways) applies, and the repair or maintenance of a culvert, weir, lock, aqueduct, sluice, reservoir, let-off valve or other work used in connection with the control and operation of such a waterway.

Marginal Citations

Class D DredgingsE+W

Permitted developmentE+W

D.  The use of any land by statutory undertakers in respect of dock, pier, harbour, water transport, canal or inland navigation undertakings for the spreading of any dredged material.

Class E Water or hydraulic power undertakingsE+W

Permitted developmentE+W

E.  Development for the purposes of their undertaking by statutory undertakers for the supply of water or hydraulic power consisting of—

(a)development not above ground level required in connection with the supply of water or for conserving, redistributing or augmenting water resources, or for the conveyance of water treatment sludge,

(b)development in, on or under any watercourse and required in connection with the improvement or maintenance of that watercourse,

(c)the provision of a building, plant, machinery or apparatus in, on, over or under land for the purpose of survey or investigation,

(d)the maintenance, improvement or repair of works for measuring the flow in any watercourse or channel,

(e)the installation in a water distribution system of a booster station, valve house, meter or switch-gear house,

(f)any works authorised by or required in connection with an order made under section 73 of the Water Resources Act 1991 M4 (power to make ordinary and emergency drought orders),

(g)any other development in, on, over or under operational land other than the provision of a building but including the extension or alteration of a building.

Marginal Citations

Development not permittedE+W

E.1  Development is not permitted by Class E if—

(a)in the case of any Class E(a) development, it would include the construction of a reservoir,

(b)in the case of any Class E(e) development involving the installation of a station or house exceeding 29 cubic metres in capacity, that installation is carried out at or above ground level or under a highway used by vehicular traffic,

(c)in the case of any Class E(g) development, it would consist of or include the extension or alteration of a building so that—

(i)its design or external appearance would be materially affected;

(ii)the height of the original building would be exceeded, or the cubic content of the original building would be exceeded by more than 25%, or

(iii)the floor space of the original building would be exceeded by more than 1,000 square metres, or

(d)in the case of any Class E(g) development, it would consist of the installation or erection of any plant or machinery exceeding 15 metres in height or the height of anything it replaces, whichever is the greater.

ConditionE+W

E.2  Development is permitted by Class E(c) subject to the condition that, on completion of the survey or investigation, or at the expiration of six months from the commencement of the development, whichever is the sooner, all such operations shall cease and all such buildings, plant, machinery and apparatus shall be removed and the land restored as soon as reasonably practicable to its former condition (or to any other condition which may be agreed with the local planning authority).

Class F [F1Public gas transporters] E+W

Permitted developmentE+W

F.  Development by a [F1public gas transporter] required for the purposes of its undertaking consisting of—

(a)the laying underground of mains, pipes or other apparatus;

(b)the installation in a gas distribution system of apparatus for measuring, recording, controlling or varying the pressure, flow or volume of gas, and structures for housing such apparatus;

(c)the construction in any storage area or protective area specified in an order made under section 4 of the Gas Act 1965 M5 (storage authorisation orders), of boreholes, and the erection or construction in any such area of any plant or machinery required in connection with the construction of such boreholes;

(d)the placing and storage on land of pipes and other apparatus to be included in a main or pipe which is being or is about to be laid or constructed in pursuance of planning permission granted or deemed to be granted under Part III of the Act (control over development);

(e)the erection on operational land of the [F1public gas transporter] of a building solely for the protection of plant or machinery;

(f)any other development carried out in, on, over or under the operational land of the [F1public gas transporter].

Marginal Citations

M51965 c. 36; section 4 was amended by paragraph 6 of Schedule 7, and Part I of Schedule 9, to the Gas Act 1986 (c. 44), and by paragraph 12 of Schedule 2 to the Planning (Consequential Provisions) Act 1990 (c. 11).

Development not permittedE+W

F.1  Development is not permitted by Class F if—

(a)in the case of any Class F(b) development involving the installation of a structure for housing apparatus exceeding 29 cubic metres in capacity, that installation would be carried out at or above ground level, or under a highway used by vehicular traffic,

(b)in the case of any Class F(c) development—

(i)the borehole is shown in an order approved by the Secretary of State for Trade and Industry for the purpose of section 4(6) of the Gas Act 1965; or

(ii)any plant or machinery would exceed 6 metres in height, or

(c)in the case of any Class F(e) development, the building would exceed 15 metres in height, or

(d)in the case of any Class F(f) development—

(i)it would consist of or include the erection of a building, or the reconstruction or alteration of a building where its design or external appearance would be materially affected;

(ii)it would involve the installation of plant or machinery exceeding 15 metres in height, or capable without the carrying out of additional works of being extended to a height exceeding 15 metres; or

(iii)it would consist of or include the replacement of any plant or machinery, by plant or machinery exceeding 15 metres in height or exceeding the height of the plant or machinery replaced, whichever is the greater.

ConditionsE+W

F.2  Development is permitted by Class F subject to the following conditions—

(a)in the case of any Class F(a) development, not less than eight weeks before the beginning of operations to lay a notifiable pipe-line, the [F1public gas transporter] shall give notice in writing to the local planning authority of its intention to carry out that development, identifying the land under which the pipe-line is to be laid,

(b)in the case of any Class F(d) development, on completion of the laying or construction of the main or pipe, or at the expiry of a period of nine months from the beginning of the development, whichever is the sooner, any pipes or other apparatus still stored on the land shall be removed and the land restored as soon as reasonably practicable to its condition before the development took place (or to any other condition which may be agreed with the local planning authority),

(c)in the case of any Class F(e) development, approval of the details of the design and external appearance of the building shall be obtained, before the development is begun, from—

(i)in Greater London or a metropolitan county, the local planning authority,

(ii)in a National Park [F2in England], outside a metropolitan county, the county planning authority,

(iii)in any other case [F3in England], the district planning authority M6.

[F4(iv)in Wales, the local planning authority.]

Textual Amendments

Marginal Citations

M6For cases where functions have been transferred from the county council to the district council or vice versa see regulation 5 of the Local Government Changes for England Regulations 1994 (S.I. 1994/867) and section 1 of the Act.

Class G Electricity undertakingsE+W

Permitted developmentE+W

G.  Development by statutory undertakers for the generation, transmission or supply of electricity for the purposes of their undertaking consisting of—

(a)the installation or replacement in, on, over or under land of an electric line and the construction of shafts and tunnels and the installation or replacement of feeder or service pillars or transforming or switching stations or chambers reasonably necessary in connection with an electric line;

(b)the installation or replacement of any telecommunications line which connects any part of an electric line to any electrical plant or building, and the installation or replacement of any support for any such line;

(c)the sinking of boreholes to ascertain the nature of the subsoil and the installation of any plant or machinery reasonably necessary in connection with such boreholes;

(d)the extension or alteration of buildings on operational land;

(e)the erection on operational land of the undertaking or a building solely for the protection of plant or machinery;

(f)any other development carried out in, on, over or under the operational land of the undertaking.

Development not permittedE+W

G.1  Development is not permitted by Class G if—

(a)in the case of any Class G(a) development—

(i)it would consist of or include the installation or replacement of an electric line to which section 37(1) of the Electricity Act 1989 M7 (consent required for overhead lines) applies; or

(ii)it would consist of or include the installation or replacement at or above ground level or under a highway used by vehicular traffic, of a chamber for housing apparatus and the chamber would exceed 29 cubic metres in capacity;

(b)in the case of any Class G(b) development—

(i)the development would take place in a National Park, an area of outstanding natural beauty, or a site of special scientific interest;

(ii)the height of any support would exceed 15 metres; or

(iii)the telecommunications line would exceed 1,000 metres in length;

(c)in the case of any Class G(d) development—

(i)the height of the original building would be exceeded;

(ii)the cubic content of the original building would be exceeded by more than 25% or, in the case of any building on article 1(5) land, by more than 10%, or

(iii)the floor space of the original building would be exceeded by more than 1,000 square metres or, in the case of any building on article 1(5) land, by more than 500 square metres;

(d)in the case of any Class G(e) development, the building would exceed 15 metres in height, or

(e)in the case of any Class G(f) development, it would consist of or include—

(i)the erection of a building, or the reconstruction or alteration of a building where its design or external appearance would be materially affected, or

(ii)the installation or erection by way of addition or replacement of any plant or machinery exceeding 15 metres in height or the height of any plant or machinery replaced, whichever is the greater.

Marginal Citations

ConditionsE+W

G.2  Development is permitted by Class G subject to the following conditions—

(a)in the case of any Class G(a) development consisting of or including the replacement of an existing electric line, compliance with any conditions contained in a planning permission relating to the height, design or position of the existing electric line which are capable of being applied to the replacement line;

(b)in the case of any Class G(a) development consisting of or including the installation of a temporary electric line providing a diversion for an existing electric line, on the ending of the diversion or at the end of a period of six months from the completion of the installation (whichever is the sooner) the temporary electric line shall be removed and the land on which any operations have been carried out to install that line shall be restored as soon as reasonably practicable to its condition before the installation took place;

(c)in the case of any Class G(c) development, on the completion of that development, or at the end of a period of six months from the beginning of that development (whichever is the sooner) any plant or machinery installed shall be removed and the land shall be restored as soon as reasonably practicable to its condition before the development took place;

(d)in the case of any Class G(e) development, approval of details of the design and external appearance of the buildings shall be obtained, before development is begun, from—

(i)in Greater London or a metropolitan county, the local planning authority,

(ii)in a National Park [F5in England], outside a metropolitan county, the county planning authority,

(iii)in any other case [F6in England], the district planning authority M8.

[F7(iv)in Wales, the local planning authority.]

Textual Amendments

Marginal Citations

M8For cases where functions have been transferred from the county council to the district council or vice versa see regulation 5 of the Local Government Changes for England Regulations 1994 (S.I. 1994/867) and section 1 of the Act.

Interpretation of Class GE+W

G.3  For the purposes of Class G(a), “electric line" has the meaning assigned to that term by section 64(1) of the Electricity Act 1989 (interpretation etc. of Part 1).

G.4  For the purposes of Class G(b), “electrical plant" has the meaning assigned to that term by the said section 64(1) and “telecommunications line" means a wire or cable (including its casing or coating) which forms part of a telecommunication apparatus within the meaning assigned to that term by paragraph 1 of Schedule 2 to the Telecommunications Act 1984 M9 (the telecommunications code).E+W

Marginal Citations

G.5  For the purposes of Class G(d), (e) and (f), the land of the holder of a licence under section 6(2) of the Electricity Act 1989 (licences authorising supply etc.) shall be treated as operational land if it would be operational land within section 263 of the Act M10 (meaning of “operational land") if such licence holders were statutory undertakers for the purpose of that section.E+W

Marginal Citations

M10Section 263 was amended by paragraph 23 of Schedule 6 to the Planning and Compensation Act 1991 (c. 34).

Class H Tramway or road transport undertakingsE+W

Permitted developmentE+W

H.  Development required for the purposes of the carrying on of any tramway or road transport undertaking consisting of—

(a)the installation of posts, overhead wires, underground cables, feeder pillars or transformer boxes in, on, over or adjacent to a highway for the purpose of supplying current to public service vehicles;

(b)the installation of tramway tracks, and conduits, drains and pipes in connection with such tracks for the working of tramways;

(c)the installation of telephone cables and apparatus, huts, stop posts and signs required in connection with the operation of public service vehicles;

(d)the erection or construction and the maintenance, improvement or other alteration of passenger shelters and barriers for the control of people waiting to enter public service vehicles;

(e)any other development on operational land of the undertaking.

Development not permittedE+W

H.1  Development is not permitted by Class H if it would consist of—

(a)in the case of any Class H(a) development, the installation of a structure exceeding 17 cubic metres in capacity,

(b)in the case of any Class H(e) development—

(i)the erection of a building or the reconstruction or alteration of a building where its design or external appearance would be materially affected,

(ii)the installation or erection by way of addition or replacement of any plant or machinery which would exceed 15 metres in height or the height of any plant or machinery it replaces, whichever is the greater,

(iii)development, not wholly within a bus or tramway station, in pursuance of powers contained in transport legislation.

Class I Lighthouse undertakingsE+W

Permitted developmentE+W

I.  Development required for the purposes of the functions of a general or local lighthouse authority under the Merchant Shipping Act 1894 M11 and any other statutory provision made with respect to a local lighthouse authority, or in the exercise by a local lighthouse authority of rights, powers or duties acquired by usage prior to the 1894 Act.

Marginal Citations

Development not permittedE+W

I.1  Development is not permitted by Class I if it consists of or includes the erection of offices, or the reconstruction or alteration of offices where their design or external appearance would be materially affected.

Class J Post OfficeE+W

Permitted developmentE+W

J.  Development required for the purposes of the Post Office consisting of—

(a)the installation of posting boxes or self-service machines,

(b)any other development carried out in, on, over or under the operational land of the undertaking.

Development not permittedE+W

J.1  Development is not permitted by Class J if—

(a)it would consist of or include the erection of a building, or the reconstruction or alteration of a building where its design or external appearance would be materially affected, or

(b)it would consist of or include the installation or erection by way of addition or replacement of any plant or machinery which would exceed 15 metres in height or the height of any existing plant or machinery, whichever is the greater.

Interpretation of Part 17E+W

K.  For the purposes of Part 17—

“transport legislation" means section 14(1)(d) of the Transport Act 1962 M12 (supplemental provisions relating to the Boards’ powers) or section 10(1)(x) of the Transport Act 1968 M13 (general powers of Passenger Transport Executive).

Marginal Citations

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.