- Latest available (Revised)
- Original (As made)
There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Town and Country Planning (General Permitted Development) Order 1995. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
G. Development by statutory undertakers for the generation, transmission or supply of electricity for the purposes of their undertaking consisting of—
(a)the installation or replacement in, on, over or under land of an electric line and the construction of shafts and tunnels and the installation or replacement of feeder or service pillars or transforming or switching stations or chambers reasonably necessary in connection with an electric line;
(b)the installation or replacement of any [F1electronic communications line] which connects any part of an electric line to any electrical plant or building, and the installation or replacement of any support for any such line;
(c)the sinking of boreholes to ascertain the nature of the subsoil and the installation of any plant or machinery reasonably necessary in connection with such boreholes;
(d)the extension or alteration of buildings on operational land;
(e)the erection on operational land of the undertaking or a building solely for the protection of plant or machinery;
(f)any other development carried out in, on, over or under the operational land of the undertaking.
Textual Amendments
F1Words in Sch. 2 Pt. 17 Class G substituted (17.9.2003) by The Communications Act 2003 (Consequential Amendments) Order 2003 (S.I. 2003/2155), art. 1(1), Sch. 1 para. 38(2)(a)-(c)
G.1 Development is not permitted by Class G if—
(a)in the case of any Class G(a) development—
(i)it would consist of or include the installation or replacement of an electric line to which section 37(1) of the Electricity Act 1989 M1 (consent required for overhead lines) applies; or
(ii)it would consist of or include the installation or replacement at or above ground level or under a highway used by vehicular traffic, of a chamber for housing apparatus and the chamber would exceed 29 cubic metres in capacity;
(b)in the case of any Class G(b) development—
(i)the development would take place in a National Park, an area of outstanding natural beauty, or a site of special scientific interest;
(ii)the height of any support would exceed 15 metres; or
(iii)the [F1electronic communications line] would exceed 1,000 metres in length;
(c)in the case of any Class G(d) development—
(i)the height of the original building would be exceeded;
(ii)the cubic content of the original building would be exceeded by more than 25% or, in the case of any building on article 1(5) land, by more than 10%, or
(iii)the floor space of the original building would be exceeded by more than 1,000 square metres or, in the case of any building on article 1(5) land, by more than 500 square metres;
(d)in the case of any Class G(e) development, the building would exceed 15 metres in height, or
(e)in the case of any Class G(f) development, it would consist of or include—
(i)the erection of a building, or the reconstruction or alteration of a building where its design or external appearance would be materially affected, or
(ii)the installation or erection by way of addition or replacement of any plant or machinery exceeding 15 metres in height or the height of any plant or machinery replaced, whichever is the greater.
Textual Amendments
F1Words in Sch. 2 Pt. 17 Class G substituted (17.9.2003) by The Communications Act 2003 (Consequential Amendments) Order 2003 (S.I. 2003/2155), art. 1(1), Sch. 1 para. 38(2)(a)-(c)
Marginal Citations
G.2 Development is permitted by Class G subject to the following conditions—
(a)in the case of any Class G(a) development consisting of or including the replacement of an existing electric line, compliance with any conditions contained in a planning permission relating to the height, design or position of the existing electric line which are capable of being applied to the replacement line;
(b)in the case of any Class G(a) development consisting of or including the installation of a temporary electric line providing a diversion for an existing electric line, on the ending of the diversion or at the end of a period of six months from the completion of the installation (whichever is the sooner) the temporary electric line shall be removed and the land on which any operations have been carried out to install that line shall be restored as soon as reasonably practicable to its condition before the installation took place;
(c)in the case of any Class G(c) development, on the completion of that development, or at the end of a period of six months from the beginning of that development (whichever is the sooner) any plant or machinery installed shall be removed and the land shall be restored as soon as reasonably practicable to its condition before the development took place;
(d)in the case of any Class G(e) development, approval of details of the design and external appearance of the buildings shall be obtained, before development is begun, from—
(i)in Greater London or a metropolitan county, the local planning authority,
(ii)in a National Park [F2in England], outside a metropolitan county, the county planning authority,
(iii)in any other case [F3in England], the district planning authority M2.
[F4(iv)in Wales, the local planning authority.]
Textual Amendments
F2Words in Sch. 2 Pt. 17 Class G para. G.2(d)(ii) inserted (1.4.1996) by The Town and Country Planning (General Permitted Development) (Amendment) Order 1996 (S.I. 1996/528), arts. 1, 2(h)(i)
F3Words in Sch. 2 Pt. 17 Class G para. G.2(d)(iii) inserted (1.4.1996) by The Town and Country Planning (General Permitted Development) (Amendment) Order 1996 (S.I. 1996/528), arts. 1, 2(h)(ii)
F4Sch. 2 Pt. 17 Class G para. G.2(d)(iv) added (1.4.1996) by The Town and Country Planning (General Permitted Development) (Amendment) Order 1996 (S.I. 1996/528), arts. 1, 2(h)(iii)
Marginal Citations
M2For cases where functions have been transferred from the county council to the district council or vice versa see regulation 5 of the Local Government Changes for England Regulations 1994 (S.I. 1994/867) and section 1 of the Act.
G.3 For the purposes of Class G(a), “electric line" has the meaning assigned to that term by section 64(1) of the Electricity Act 1989 (interpretation etc. of Part 1).
G.4 For the purposes of Class G(b), “electrical plant" has the meaning assigned to that term by the said section 64(1) and “[F1electronic communications line]" means a wire or cable (including its casing or coating) which forms part of [F1an electronic communications apparatus] within the meaning assigned to that term by paragraph 1 of Schedule 2 to the Telecommunications Act 1984 M3 (the [F1electronic communications code]).E+W
Textual Amendments
F1Words in Sch. 2 Pt. 17 Class G substituted (17.9.2003) by The Communications Act 2003 (Consequential Amendments) Order 2003 (S.I. 2003/2155), art. 1(1), Sch. 1 para. 38(2)(a)-(c)
Marginal Citations
G.5 For the purposes of Class G(d), (e) and (f), the land of the holder of a licence under section 6(2) of the Electricity Act 1989 (licences authorising supply etc.) shall be treated as operational land if it would be operational land within section 263 of the Act M4 (meaning of “operational land") if such licence holders were statutory undertakers for the purpose of that section.E+W
Marginal Citations
M4Section 263 was amended by paragraph 23 of Schedule 6 to the Planning and Compensation Act 1991 (c. 34).
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.