- Latest available (Revised)
- Point in Time (01/10/2008)
- Original (As made)
Point in time view as at 01/10/2008.
There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Town and Country Planning (General Permitted Development) Order 1995. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
E. The carrying out by the Coal Authority or a licensed operator, with the prior approval of the mineral planning authority, of development required for the maintenance or safety of a mine or a disused mine or for the purposes of ensuring the safety of the surface of the land at or adjacent to a mine or a disused mine.E+W
E.1(1) The prior approval of the mineral planning authority to development permitted by Class E is not required if—
(a)the external appearance of the mine or disused mine at or adjacent to which the development is to be carried out would not be materially affected;
(b)no building, plant or machinery, structure or erection—
(i)would exceed a height of 15 metres above ground level, or
(ii)where any building, plant, machinery, structure or erection is rearranged, replaced or repaired, would exceed a height of 15 metres above ground level or the height of what was rearranged, replaced or repaired, whichever is the greater,
and
(c)the development consists of the extension, alteration or replacement of an existing building, within the limits set out in paragraph (3).
(2) The approval referred to in Class E shall not be refused or granted subject to conditions unless the authority are satisfied that it is expedient to do so because—
(a)the proposed development would injure the amenity of the neighbourhood and modifications could reasonably be made or conditions reasonably imposed in order to avoid or reduce that injury, or
(b)the proposed development ought to be, and could reasonably be, sited elsewhere.
(3) The limits referred to in paragraph E.1(1)(c) are—
(a)that the cubic content of the building as extended, altered or replaced does not exceed that of the existing building by more than 25%, and
(b)that the floor space of the building as extended, altered or replaced does not exceed that of the existing building by more than 1,000 square metres.
F.1 For the purposes of Part 20—
“active access" means a surface access to underground workings which is in normal and regular use for the transportation of coal, materials, spoil or men;
“coal-mining operations" has the same meaning as in section 65 of the Coal Industry Act 1994 (interpretation) and references to any development or use in connection with coal-mining operations shall include references to development or use for or in connection with activities carried on in association with, or for purposes connected with, the carrying on of those operations;
“licensed operator" has the same meaning as in section 65 of the Coal Industry Act 1994;
“normal and regular use" means use other than intermittent visits to inspect and maintain the fabric of the mine or any plant or machinery; and
“prior approval of the mineral planning authority" means prior written approval of that authority of detailed proposals for the siting, design and external appearance of the proposed building, plant or machinery, structure or erection as erected, installed, extended or altered.
F.2(1) Subject to sub-paragraph (2), land is an authorised site for the purposes of Part 20 if—E+W
(a)it is identified in a grant of planning permission or any instrument by virtue of which planning permission is deemed to be granted as land which may be used for development described in this Part; or
(b)in any other case, it is land immediately adjoining an active access which, on 5th December 1988, was in use for the purposes of that mine in connection with coal-mining operations.
(2) For the purposes of sub-paragraph (1), land is not to be regarded as in use in connection with coal-mining operations if—
(a)it is used for the permanent deposit of waste derived from the winning and working of minerals; or
(b)there is on, over or under it a railway, conveyor, aerial ropeway, roadway, overhead power line or pipe-line which is not itself surrounded by other land used for those purposes.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.