The Bristol City Docks Harbour Revision Order 1995

Interpretation

2.—(1) In this Order—

“the city” means the City of Bristol;

“the City Docks” means the Docks of the Council known as the Floating Harbour and all basins and other works constructed in connection therewith;

“the Council” means the City Council of Bristol;

“deposited plans and sections” means the plans and sections prepared in triplicate, signed by an Assistant Secretary in the Department of Transport and marked “Bristol City Docks Harbour Revision Order 1995”, of which two copies have been deposited at that Department and one copy has been deposited at the offices of the Council at The Council House, College Green, Bristol, BS1 5YR;

“limits of deviation” means the limits of deviation shown on the deposited plans;

“relevant work” means so much of any work authorised by this Order as is on, under or over the waters of the City Docks;

“Trinity House” means the Corporation of Trinity House of Deptford Strond;

“works” means the works authorised by this Order or, as the case may require, any part thereof.

(2) This Order shall be read as if the words “or thereabouts” were inserted after each distance mentioned in article 3 (Power to construct works) of this Order.

(3) Unless the context otherwise requires—

(a)any reference in this Order to a work identified by the number of such work shall be construed as a reference to the work of that number authorised by this Order;

(b)map reference points specified in this Order are Ordnance Survey National Grid reference points.