27.—(1) In the case of a pipeline, the construction of which is commenced within 6 months after the coming into force of these Regulations, it shall be sufficient compliance with regulation 20 if the particulars specified in Schedule 4 are notified to the Executive within 3 months after the coming into force of these Regulations.

(2) Subject to paragraph (3), in the case of a major accident hazard pipeline, the construction of which was commenced (and whether or not completed) before the coming into force of these Regulations the particulars specified in Schedule 4 (or, in the case of paragraphs 3, 4, 5, 6 and 8 particulars, where appropriate, of the actual route of the pipeline or of the riser, materials used, fluid conveyed, and the temperature and pressure, and maximum rate of flow of that fluid) shall be notified to the Executive within 6 months after such coming into force.

(3) Paragraph (2) shall not have effect where, pursuant to regulation 3(1) of the Notification of Installations Handling Hazardous Substances Regulations 1982(1), the particulars relating to that pipeline specified in Part II of Schedule 2 to those Regulations have been supplied before such coming into force.

(4) In the case of a pipeline, the design of which was completed before the coming into force of these Regulations, or within 12 months after such coming into force, regulation 23 shall have effect as if, for the words “before the design of a major accident hazard pipeline is completed” in paragraph (1) of that regulation there were substituted the words “within 12 months after the coming into force of these Regulations”.

(5) In the case of a pipeline which was first used before the coming into force of these Regulations it shall be sufficient compliance with the requirement in regulation 24(1) where the matters referred to therein are recorded within 6 months after the coming into force of these Regulations.

(6) Where a local authority receives a notification referred to in paragraph (1) of regulation 25 within 6 months after the coming into force of these Regulations, that regulation shall have effect in relation to the pipeline notified as if the reference in that paragraph to 9 months were a reference to 18 months.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources