- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
5.—(1) During the construction of the works the Authority may take from the said River Bellart such water as they may require for such construction.
(2) After completion of the works, the Authority may take from the River Bellart, in any day, a quantity of water not exceeding 300 cubic metres, as measured and recorded by an approved gauge (part of Works No 1), at a rate not exceeding 7 litres per second, except when the flow in the River Bellart, as measured by an approved gauge, is less than 100 litres per second, when the Authority may take water at a rate not exceeding 3.5 litres per second.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: