3.—(1) Subject to the provisions of this Order the Trustees may and in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plan and section construct and maintain the works hereinafter described, together with all necessary and proper works and conveniences connected with or incidental thereto, that is to say:
A quay wall of sheet steel piling commencing at the existing Citadel Quay extension and then proceeding in a north-westerly direction for a distance of 230 metres downstream and terminating at this point where it joins an extension upstream of the existing Longman Quay together with an infilling of the bed of the River Ness as impounded by the said wall and the existing embankment and the provision of a deck of reinforced concrete thereover.
(2) The Trustees may within the limits of deviation reconstruct, renew, enlarge or alter temporarily or permanently the works.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: