- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Article 2(1)
In the metropolitan borough of Gateshead—
Work No. 1—A railway interchange (the Pelaw interchange), including alterations to the existing Pelaw junction, comprising—
Work No. 1A—A railway (755 metres in length) commencing by a junction with the Newcastle-bound track of the Newcastle to South Shields railway of the Metro at a point 60 metres east of the bridge (number 297) carrying the footpath from Shields Road (A 185), Pelaw, to Manor Gardens, Wardley, over that railway, passing eastwards then northwards and terminating by a junction with the Newcastle-bound track of the said Newcastle to South Shields railway at a point 25 metres south of the bridge carrying South Shields Road over that railway, including viaducts over the Leamside branch railway of Railtrack and over the Newcastle to Hartlepool railway of Railtrack and Work No. 1D.
Work No. 1B—A railway (100 metres in length) commencing by a junction with the South Shields-bound track of the Newcastle to South Shields railway at a point 85 metres east of the said bridge number 297, passing eastwards and terminating by a junction with the Newcastle-bound track of the Newcastle to South Shields railway at a point 15 metres west of the bridge carrying that railway over the Leamside branch railway.
Work No. 1C—A railway (390 metres in length) commencing by a junction with Work No. 1A at the eastern end of the viaduct carrying that work over the said Leamside branch railway, passing eastwards and terminating by a junction with the Newcastle-bound track of the Newcastle to Hartlepool railway of Railtrack at a point 1 metre west of the bridge carrying Wardley Lane over that railway.
Work No. 1D—A railway (380 metres in length) commencing by a junction with the Newcastle-bound track of the said Newcastle to South Shields railway at a point 65 metres east of the bridge carrying that railway over the said Leamside branch railway, passing north-eastwards over the bridge carrying the said Newcastle to South Shields railway over the said Newcastle to Hartlepool railway, then eastwards beneath Work No. 1A and terminating by a junction with the Sunderland-bound track of the said Newcastle to Hartlepool railway at a point 2 metres west of the bridge carrying Wardley Lane over that railway.
In the metropolitan borough of South Tyneside—
Work No. 2—A raising of the level of the track known as Monkton Waggonway, Hebburn, including a reconstruction of the bridge (number 294) carrying that track over the said Newcastle to Hartlepool railway.
Work No. 3—A reconstruction of the bridge (number 293) carrying Mill Lane (B 1306), Hebburn, over the said Newcastle to Hartlepool railway.
Work No. 4—An access road commencing at a point in Station Road, Brockley Whins, 44 metres north-east of the eastern end of the steps leading to Nailsworth Close, passing eastwards and terminating at a point 96 metres north of the northern end of the bridge carrying the footpath from Brisbane Avenue to Cotswold Lane over the river Don together with a turning-head at the point of termination.
Work No. 4A—A realignment and improvement of Station Road and Station Approach, East Boldon, commencing at a point in Station Approach 47 metres north-east of the existing East Boldon level crossing, passing south-westwards across the said Newcastle to Hartlepool railway and terminating at a point in Station Road 50 metres south-west of that level crossing.
In the city of Sunderland—
Work No. 5—A reconstruction of the bridge (number 272) carrying Shields Road (A 1018), Seaburn, over the said Newcastle to Hartlepool railway.
Work No. 6—A reconstruction of the bridge (number 271) carrying Station Road, Seaburn over the said Newcastle to Hartlepool railway.
Work No. 7A—A road commencing at a point in Sheepfolds North, Monkwearmouth, 70 metres east of the junction of Hay Street with Sheepfolds North, passing southwards and terminating at a point adjacent to Sheepfolds South 15 metres south of the junction of that road with Sheepfolds Road.
Work No. 7B—A road commencing at a point in Sheepfolds Road 75 metres west of its junction with North Bridge Street (A 1018), passing south-eastwards and terminating by a junction with Work No. 7A at its termination.
Work No. 8—A railway (295 metres in length), being a lowering of the track of part of the Newcastle to Hartlepool railway, commencing by a junction with that railway on the Monkwearmouth Bridge carrying the railway over the river Wear at a point 47 metres north of the southern end of that bridge, passing southwards through the Sunderland North tunnel and terminating by a junction with that railway at the entrance to Sunderland Station.
Work No. 9—A railway (2,000 metres in length) commencing by a junction with the Newcastle to Hartlepool railway at a point below the southern side of the bridge carrying the road known as Holmeside over that railway, passing southwards along the course of the former Pallion railway, then south-westwards under Park Lane, in tunnel under the Park Lane/Cowan Terrace car park, then under Stockton Road, continuing westwards under Tunstall Road, New Durham Road, Chester Road, Chester Street East (Work No. 9C) and Hylton Road (Work No. 9D) and over Lisburn Terrace and terminating at a point 15 metres north of the junction of Neville Road and Shepherd Street including a subway to carry the footpath (Lisburn Terrace) under the railway.
Work No. 9A—A footbridge over Work No. 9 at the proposed University Station, Sunderland.
Work No. 9B—A footbridge over Work No. 9 between the junction of Chester Terrace North with Chester Terrace and University Precinct, Sunderland.
Work No. 9C—A footbridge over Work No. 9 between St Mark’s Crescent and Chester Street East, Sunderland.
Work No. 9D—A reconstruction of Hylton Road bridge, Sunderland, to carry that road over Work No. 9.
Work No. 9E—A footbridge over Work No. 9 between Hadrian Street and Milton Street, Sunderland.
Work No. 10—A railway (3,115 metres in length) commencing by a junction with Work No. 9 at its termination, passing north-westwards along the course of former sidings to the former Pallion railway through the existing tunnel (to be refurbished) under Pallion New Road (B 1405), then along the north side of Pallion New Road, in tunnel under Woodbine Terrace (to be raised), passing westwards along the north side of European Way, then along the course of the former Pallion railway over Keelman’s Lane (to be stopped up) and over Keelman’s Road (to be stopped up) and terminating at a point 47 metres north of the junction of Floral Dene with Hylton Bank, South Hylton, including a subway to carry the footpath and cycleway (Keelman’s Road) under the railway.
Work No. 10A—An access road, being a realignment of the existing access road between Pallion Retail Park and Woodbine Terrace, commencing at its existing junction with Woodbine Terrace and terminating at a point in the said access road 150 metres west of its junction with Woodbine Terrace.
Work No. 10B—A footbridge over European Way and Work No. 10 at the proposed Pallion Station, Sunderland.
Work No. 10C—A footbridge over Work No. 10 at Claxheugh Rock, Sunderland.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: