Design and construction must ensure:
(a)that the risk of overstressing from inadmissible free movement or excessive forces being produced, e.g. on flanges, connections, bellows or hoses, is adequately controlled by means such as support, constraint, anchoring, alignment and pre-tension;
(b)that where there is a possibility of condensation occurring inside pipes for gaseous fluids, means are provided for drainage and removal of deposits from low areas to avoid damage from water hammer or corrosion;
(c)that due consideration is given to the potential damage from turbulence and formation of vortices; the relevant parts of 2.7 are applicable;
(d)that due consideration is given to the risk of fatigue due to vibrations in pipes;
(e)that, where fluids of Group 1 are contained in the piping, appropriate means are provided to isolate `take-off' pipes the size of which represents a significant risk;
(f)that the risk of inadvertent discharge is minimised; the take-off points must be clearly marked on the permanent side, indicating the fluid contained;
(g)that the position and route of underground piping is at least recorded in the technical documentation to facilitate safe maintenance, inspection or repair.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: