Regulation 2(1)

SCHEDULE 1INFORMATION FOR INCLUSION IN ENVIRONMENTAL STATEMENTS

PART I

1.  Description of the project, including in particular—

(a)a description of the physical characteristics of the whole project and the land-use requirements during the construction and operational phases;

(b)a description of the main characteristics of the production processes, for instance, nature and quantity of the materials used;

(c)an estimate, by type and quantity, of expected residues and emissions (water, air and soil pollution, noise, vibration, light, heat, radiation, etc.) resulting from the operation of the proposed project.

2.  An outline of the main alternatives studied by the applicant and an indication of the main reasons for his choice, taking into account the environmental effects.

3.  A description of the aspects of the environment likely to be significantly affected by the proposed project, including, in particular, population, fauna, flora, soil, water, air, climatic factors, material assets including the architectural and archaeological heritage, landscape and the interrelationship between the above factors.

4.  A description of the likely significant effects of the proposed project on the environment, which should cover the direct effects and any indirect, secondary, cumulative, short, medium and long-term, permanent and temporary, positive and negative effects of the project, resulting from—

(a)the existence of the project;

(b)the use of natural resources;

(c)the emission of pollutants, the creation of nuisances, and the elimination of waste,

and the description by the applicant of the forecasting methods used to assess the effects on the environment.

5.  A description of the measures envisaged to prevent, reduce and, where possible, offset any significant adverse effects on the environment.

6.  A non-technical summary of the information provided under paragraphs 1 to 5 above.

7.  An indication of any difficulties (technical deficiencies or lack of know-how) encountered by the applicant in compiling the required information.

PART II

1.  A description of the project comprising information on the site, design and size of the project.

2.  A description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant adverse effects.

3.  The data required to identify and assess the main effects which the project is likely to have on the environment.

4.  An outline of the main alternatives studied by the applicant and an indication of the main reasons for his choice, taking into account the environmental effects.

5.  A non-technical summary of the information provided under paragraphs 1 to 4 above.

Regulation 3(3)

SCHEDULE 2THRESHOLDS FOR IDENTIFICATION OF PROJECTS LIKELY TO HAVE SIGNIFICANT EFFECTS ON THE ENVIRONMENT

Interpretation

1.  For the purposes of this Schedule,

Thresholds

2.—(1) For the purposes of regulation 3(3), the threshold for any project of a type specified in an entry in Column 1 in the Table below is the area (if any) specified in the corresponding entry in Column 2 or 3 of the Table, whichever is appropriate to the land covered, or proposed to be covered, by that project.

(2) This paragraph applies subject to paragraph 3 of this Schedule.

TABLE

Column 1Column 2Column 3
Type of project or part of projectThreshold where any part of the land is in a sensitive areaThreshold where no part of the land is in a sensitive area
Afforestation2 hectares, where the sensitive area is a National Park or Area of Outstanding Natural Beauty.5 hectares.
No threshold in the case of other sensitive areas.
Deforestation0.5 hectare, where the sensitive area is a National Park or Area of Outstanding Natural Beauty.1 hectare.
No threshold in the case of other sensitive areas.
Forest road worksNo threshold.1 hectare.
Forest quarry worksNo threshold.1 hectare.

Thresholds for extending projects

3.—(1) Where the project under consideration is an extending project—

(a)the thresholds specified in the Table in paragraph 2 above shall not apply, and

(b)the threshold applicable for that project for the purposes of regulation 3(3) shall be instead such balance (if any), in hectares, of the area specified in Column 2 or, as the case may be, Column 3 in that Table opposite the entry in Column 1 for that type of project as remains after deduction of the accumulated material past project area.

(2) For the purposes of sub-paragraph (b) above, it is immaterial whether any part of the accumulated material past project area is, or is not, in a sensitive area (or any kind of sensitive area).

(3) In this paragraph—

(a)“extending project” means any project covering, or proposed to cover, land adjoining the area of one or more material past projects

(b)“material past project”, in relation to a particular extending project, means a project which—

(i)is of the same type (as specified in regulation 3(2)) as that extending project; and

(ii)was completed after the coming into force of these Regulations; and

(iii)was completed not more than five years before the proposed date for starting the work relating to that extending project;

(c)“accumulated material past project area”, in relation to a particular extending project, means the total area covered by—

(i)the material past project or, if more than one, all of them; and

(ii)every other project—

(A)whose area adjoins the material past project, or one of them; and

(B)which satisfies conditions (i) to (iii) in sub-paragraph (b) above.

Consideration of thresholds in other cases where project adjoins or is near another project

4.—(1) The facts—

(a)that a project is or would be adjoining or, in the opinion of the Commissioners or (as the case may be) the appropriate Authority, near another project of any type specified in regulation 3(2), and

(b)that, for any reason, the case in question does not fall within paragraph 3 above,

may be regarded by the Commissioners or Authority as rendering the circumstances of that project exceptional for the purposes of regulation 6(3) or (as the case may be) 7(6).

(2) This paragraph—

(a)shall not affect the application of those regulations in a case which does fall within paragraph 3, and

(b)shall not be interpreted as limiting the generality of the references in those regulations to circumstances which are, in the opinion of the Commissioners or (as the case may be) the appropriate Authority, exceptional.

Regulations 6(2) and 7(5)

SCHEDULE 3PROJECTS HAVING SIGNIFICANT EFFECTS ON THE ENVIRONMENT: SELECTION CRITERIA

1.  Characteristics of projects

The characteristics of projects must be considered having regard, in particular, to:

  • the size of the project;

  • the cumulation with other projects;

  • the use of natural resources;

  • the production of waste;

  • pollution and nuisances;

  • the risk of accidents, having regard in particular to substances or technologies used.

2.  Location of projects

3.  Characteristics of the potential impact

  • The potential significant effects of projects must be considered in relation to criteria set out under headings 1 and 2 above, and having regard in particular to:

    • the extent of the impact (geographical area and size of the affected population);

    • the transfrontier nature of the impact;

    • the magnitude and complexity of the impact;

    • the probability of the impact;

    • the duration, frequency and reversibility of the impact.

Regulations 15(3), 17(7) and 21(7)

SCHEDULE 4ENVIRONMENTAL FACTORS

(a)

Human beings, fauna and flora;

(b)

soil, water, air, climate and the landscape;

(c)

material assets and the cultural heritage; and

(d)

the interaction between the factors mentioned in paragraphs (a) to (c) above.

(1)

1981 c. 69, amended by the Wildlife and Countryside (Amendment) Act 1985 (c. 31), the Wildlife and Countryside (Service of Notices) Act 1985 (c. 59), the Norfolk and Suffolk Broads Act 1988 (c. 4) and the Planning (Consequential Provisions) Act 1990 (c. 11).

(2)

1949 c. 97. Relevant amendments were made by the Environment Act 1995 (c. 25), Schedule 10, paragraph 2.

(3)

See the Norfolk and Suffolk Broads Act 1988 (c. 4).

(4)

See Command Paper 9424.

(5)

1979 c. 46. See the definition in section 1(11).

(6)

1949 c. 97. Section 87 was amended by paragraph 1(12) of Schedule 8 to the Environmental Protection Act 1990 (c. 43).

(8)

OJ No. L103, 25.4.1979, p.1.

(9)

OJ No. L206, 22.7.1992, p.7.