Search Legislation

The Water Protection Zone (River Dee Catchment) (Procedural and Other Provisions) Regulations 1999

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

2.  The change of control plan required by paragraph 1(a) shall be a plan of the site to which the application relates, drawn to a scale of not less than 1 to 2,500, which identifies the extent of the site and any area under separate control after the proposed change of control.

Back to top

Options/Help