4.—(1) Subject to the provisions of this Order, the Council may, in the lines and situations and within the limits of deviation shown on the deposited plans and according to the levels shown on the deposited sections, construct and maintain the works hereinafter described with all necessary works and conveniences connected therewith—
Work No. 1
An impounding wall, incorporating a reinforced concrete cill with steel flap gate bounded at both ends by existing harbour walls, having a length of 220 metres and a width of 10 metres commencing at reference point SN 244627 200264 and extending in a westerly direction and terminating at reference point SN 244439 200195.
Work No. 2
An extension of solid construction to the western breakwater formed with battered slopes in stone armouring having a length of 135 metres, commencing at the southen limit of the western breakwater at reference point SS 244461 199962 and extending in a southerly direction, and terminating at reference point SS 244489 199832.
Work No. 3
An extension of solid construction to the eastern breakwater formed with battered slopes in stone armouring having a length of 50 metres commencing at the southern limit of the eastern breakwater at reference point SN 244521 200113 and extending in a southerly direction and terminating at reference point SN 244529 200064.
Work No. 4
Piled moorings with a pontoon system to the west of the eastern wall of the Outer Harbour commencing by a bridge connection to the eastern wall at reference point SN 244654 200358 and extending in a westerly then south westerly direction for a distance of 180 metres and terminating at reference point SN 244566 200219.
Work No. 5
Piled moorings with a pontoon system to the east of the western wall of the Outer Harbour commencing by a bridge connection to the western wall at reference point SN 244439 200259 and extending in an easterly then northerly direction for a distance of 140 metres and terminating at reference point SN 244473 200378.
(2) The Council may, within the limits of deviation, from time to time alter, enlarge, replace, relay, extend or reconstruct temporarily or permanently the authorised works.
(3) During construction of the works the Council shall implement the mitigation measures detailed in Table 13.2.2.2 of the environmental statement entitled “Burry Port Harbour Improvements” and dated February 1999 which was supplied to the Secretary of State in pursuance of paragraph A2 of Schedule 3 to the Harbours Act 1964 and made available for inspection in accordance with paragraph 3 of that Schedule.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: