SCHEDULE 6 (ANNEX III to the Directive)
PART BNoise Test Codes for Specific Equipment
Operating conditions during test
If the machine is equipped with a boom, this is set upright and the pipe shall be led back to the filler funnel. If this is not the case the machine shall be equipped with a horizontal pipe of at least 30 m leading back to the filler funnel.