SCHEDULE 6U.K. (ANNEX III to the Directive)

PART BU.K.Noise Test Codes for Specific Equipment

The conveying system and the pipe shall be filled with a medium similar to concrete, the cement being replaced by an admixture e.g. finest ash. The machine shall operate at its maximum output, the period of one working cycle being not more than five seconds (if this period is exceeded, water shall be added to the “concrete" in order to reach this value).

(ii)For machines conveying and spraying mortar: