SCHEDULE 6 (ANNEX III to the Directive)
PART BNoise Test Codes for Specific Equipment
The piling equipment is installed at the top of a pile which has sufficient resistance in the ground to allow the equipment to work at a steady speed. In the case of impact hammers, the cap must be supplied with a new, wooden filling. The head of the pile is 0.50 m above the test area.