Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1. In this Schedule—E+W
“apparatus” means—
in the case of a specified undertaker which is an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989 M1) belonging to, or maintained by, that undertaker;
in the case of a specified undertaker which is a gas undertaker, mains, pipes or other apparatus belonging to, or maintained by, a public gas transporter for the purposes of the transportation and storage of gas;
in the case of a specified undertaker which is a water undertaker, mains, pipes or other apparatus belonging to, or maintained by, the undertaker for the purposes of water supply; and
in the case of a specified undertaker which is a sewerage undertaker,
any drain or works vested in the undertaker under the Water Industry Act 1991 M2; and
any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104;
and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works,
and includes any structure for the lodging therein of apparatus or for giving access to such apparatus;
“construction” includes execution, placing, altering, replacing, relaying and removal and, in its application to works which include or comprise any operation, means the carrying out of that operation;
“emergency works” has the same meaning as in section 52 of the 1991 Act;
“in”, in a context referring to apparatus in land, includes under, over, across, along or upon land;
“necessary alternative apparatus” means alternative apparatus adequate to enable a specified undertaker to fulfil its statutory or licensed functions in a manner no less efficient than previously;
“plans” includes sections, specifications and method statements;
“specified work” means any of the authorised works which—
will or may be situated over, or within 15 metres measured in any direction of, or may in any way adversely affect, any apparatus; or
wherever situated, imposes any load upon any sewer;
the removal of which has not been required under paragraph 8; and
“specified undertaker” means—
Transco plc, whose registered office is 130 Jermyn Street, London SW1Y 4UR;
Scottish and Southern Energy plc, whose registered office is Inveralmond House, 200 Dunkeld Road, Perth PH1 3AQ; or
Thames Water Utilities Limited, whose registered office is Gainsborough House, Manor Farm Road, Reading, Berkshire, RG2 0JN,
or any person succeeding any such company as a licence holder within the meaning of Part I of the Electricity Act 1989, a public gas transporter within the meaning of Part I of the Gas Act 1986 M3, a water undertaker within the meaning of the Water Industry Act 1991 or as a sewerage undertaker within the meaning of Part I of that Act, and “the specified undertaker” in relation to any apparatus means the specified undertaker to whom the apparatus belongs or by whom it is maintained.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: