Search Legislation

The Channel Tunnel Rail Link (Thames Tunnel Approach) Order 2002

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Explanatory Note

(This note is not part of the Order)

This Order makes provision for the following at West Thurrock Marshes between Burnley Road and the river Thames in the borough of Thurrock in connection with the construction of Work No. 10 authorised by the Channel Tunnel Rail Link Act 1996, namely—

  • the compulsory acquisition of land within the limit of land to be acquired shown on the deposited plan;

  • the raising of land within the limit of earth works shown on that plan; and

  • the temporary use of land within the limit of land to be temporarily used shown on that plan.

Copies of the deposited plan, sections and book of reference referred to in the Order may be inspected on weekdays during ordinary office hours in the technical library of Union Railways (North) Limited at 2 Ossulston Street, London NW1 1HT.

Back to top

Options/Help