The Packaging, Labelling and Carriage of Radioactive Material by Rail Regulations 2002 (revoked)

Duties of the designers of packages and manufacturers of packagingsE+W+S

13.  The designer of a package and the manufacturer of a packaging to be used in the carriage of radioactive material shall ensure that the requirements contained in RID Sections 6.4.2 to 6.4.21 relating to the design of the package, or, as the case may be, the manufacture of the packaging, are complied with.