Search Legislation

The Network Rail (West Coast Main Line) Order 2003

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Rugby to Stafford Section

In the County of Warwickshire, Borough of Rugby—

  • Work No. 12 – A railway (7,555 metres in length) on the course of the existing railway commencing by a junction with the London to Birmingham Section at a point 183 metres east of Bridge 281 and terminating by a junction with the Rugby to Stafford Section at a point 135 metres east of the bridge carrying Fosse Way over that railway including the partial reconstruction of Bridge 5, Bridge 6 (Little Lawford Lane), Bridge No. 9 (Oxford Canal), Bridge 9a (Footpath FP 117), Bridge 10 (Bridleway BR 86), Bridge 12 and the provision of a drainage outfall into the Oxford Canal.

  • Work No. 13 – A reconstruction of Bridge No. 8 carrying the Little Lawford to Harborough Magna road over the Rugby to Stafford Section commencing at a point 108 metres south west of that bridge and terminating at a point 118 metres north of that bridge including a realignment of that road.

  • Work No. 14 – A footbridge over the Rugby to Stafford Section being a replacement of a footbridge, Bridge No. 11a over that railway, commencing at point F9, 15 metres north of that bridge and terminating at point F13, 17 metres south west of that bridge.

Back to top

Options/Help