The Pollution Prevention and Control (England and Wales) (Amendment) Regulations 2003
Citation and commencement1.
These Regulations may be cited as the Pollution Prevention and Control (England and Wales) (Amendment) Regulations 2003 and shall come into force on 30th July 2003.
Amendment of the Pollution Prevention and Control (England and Wales) Regulations 20002.
(1)
(2)
In Section 2.3 in Part 1 of Schedule 1 (Surface Treating Metals and Plastic Materials)—
(a)
in paragraph (a) of Part A(1) before the word “surface” there are inserted the words “Unless falling within Part A(2) of this Section,”;
(b)
“(a)
Surface treating metals and plastic materials using an electrolytic or chemical process where the aggregated volume of the treatment vats is more than 30m3 and where the activity is carried out at the same installation as one or more activities falling within—
(i)
Part A(2) or B of Section 2.1 (Ferrous Metals);
(ii)
Part A(2) or B of Section 2.2 (Non-Ferrous Metals); or
(iii)
Part A(2) or B of Section 6.4 (Coating Activities, Printing and Textile Treatments)”;
(c)
in paragraph (a) of Part B, after the words “Part A(1)” there are inserted the words “or A(2)”.
(3)
In the Table in paragraph 2(2) of Part 1 of Schedule 3, after the words—
Section 2.3 | |
Part A(1) | 1st May to 31st July 2004 |
there are inserted the words—
Part A(2)
1st May to 31st July 2004
Transitional Provision3.
Where an application for a permit is made before commencement in relation to a Part A(1) installation or Part A(1) mobile plant and by virtue of these Regulations the installation or mobile plant becomes a Part A(2) installation or Part A(2) mobile plant, anything duly done in relation to the application (including the grant of a permit) shall be treated as if it had been duly done in relation to an application for a permit made immediately after commencement.
Signed by authority of the Secretary of State for Environment, Food and Rural Affairs
These Regulations amend the Pollution Prevention and Control (England and Wales) Regulations 2000 (the “PPC Regulations”).
Regulation 2(2) inserts a new category of A(2) activity in Section 2.3 (Surface treating metals and plastic materials) of Chapter 2 of Part 1 of Schedule 1 to the PPC Regulations. The new A(2) category consists of the operation of the activity described in Part A(1) of Section 2.3 where it is carried out in conjunction with one or more of the activities specified in regulation 2(2)(b) namely—
Part A(2) or B of Section 2.1 (Ferrous Metals);
Part A(2) or B of Section 2.2 (Non-Ferrous Metals); or
Part A(2) or B of Section 6.4 (Coating Activities, Printing and Textile Treatments).
Regulation 2(3) prescribes the “relevant period” (which determines the period when applications for permits must be made) for existing installations or mobile plant which as a result of the Regulations fall within Part A(2) of Section 2.3.
Regulation 3 includes a transitional provision for installations and mobile plant which as a result of the Regulations fall within Part A(2) of Section 2.3.