Search Legislation

The Weighing Equipment (Automatic Rail-weighbridges) Regulations 2003

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: SCHEDULE 4

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Weighing Equipment (Automatic Rail-weighbridges) Regulations 2003, SCHEDULE 4. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

regulation 6(b)

SCHEDULE 4E+W+S(Descriptive markings and verification markings: Extract from Part 1 of OIML R 106 and additional marking)

3.6.  Automatic rail-weighbridges shall bear the following basic markings at each location having a weight indicating or printing device.E+W+S

3.6.1.   E+W+S

identification mark of the manufacturer
identification mark of the importer (if applicable)
designation of the instrument
serial number of the instrument (on each load receptor, if applicable)
weighing method (for example, full draught weighing or partial weighing; uncoupled wagon, coupled wagon or train weighing; weighing-in-motion or static)
maximum wagon weight....................kg or t
minimum wagon weight....................kg or t
not to be used to weigh liquid products (if applicable)
full draught or number of partial weighings per wagon
maximum transit speed....................km/h
direction of weighing (if applicable)
wagons pushed/pulled (whichever is applicable)
scale interval for stationary load (if applicable)....................kg or t
electric power supply voltage....................V
electric power supply frequency....................Hz

3.6.2.   E+W+S

3.6.2.1.   E+W+S

pattern approval sign in accordance with national requirements
accuracy class (for each weighing method, if applicable)0.2, 0.5, 1 or 2
maximum capacityMax = ....................kg or t
minimum capacityMin = ....................kg or t
scale intervald = ....................kg or t
maximum operating speed v max = ....................km/h
minimum operating speed v min = ....................km/h

3.6.2.2.  Markings required for each weighing method applicable:E+W+S

maximum number of wagons per trainnmax = ....................
minimum number of wagons per trainnmin = ....................

3.6.3.  Depending upon the particular use of the automatic rail-weighbridge, one or more supplementary markings may be required on pattern approval by the metrological authority issuing the pattern approval certificate.E+W+S

3.6.4.  The designation of the liquid(s) which the automatic rail-weighbridge is designed to weigh (if applicable).E+W+S

3.6.5.  Descriptive markings shall be indelible and of a size, shape and clarity that permit legibility under normal conditions of use of the weighbridge.E+W+S

Markings shall be grouped together in a clearly visible place on the weighbridge, either on a descriptive plate fixed near the indicating device or on the indicating device itself.

It shall be possible to seal the plate bearing the markings, unless it cannot be removed without being destroyed.

3.7.   E+W+S

3.7.1.  Automatic rail-weighbridges shall have a place for the application of verification marks. The following applies for this place:E+W+S

  • • the part on which the marks are located cannot be removed from the weighbridge without damaging the marks;

  • • the place shall permit the easy application of the marks without changing the metrological qualities of the weighbridge;

  • • the marks shall be visible when the weighbridge is in service.

3.7.2.  Automatic rail-weighbridges required to bear verification marks shall have a verification mark support located as specified above, which shall ensure the conservation of the marks as follows:E+W+S

• when the mark is made with a stamp, the support may consist of a strip of lead or any other material with similar qualities inserted into a plate fixed to the weighbridge or a cavity bored into the weighbridge.

Additional descriptive markingE+W+S

Automatic rail-weighbridges shall bear the additional descriptive marking “R 106” which shall be presented in accordance with the provisions of clause 3.6.5 of Part 1 of OIML R 106.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources