Subsoil or new rights only to be acquired under or in certain lands
28.—(1) This article applies to the land specified in Schedule 9 to this Order.
(2) In the case of the land specified in Part 1 of Schedule 9, subject to paragraph (4) DLRL’s powers of compulsory acquisition under article 23(1)(a) shall be limited to the acquisition of, or of such easements or other new rights in, so much of the subsoil of the land as it may require for or in connection with the authorised works.
(3) Where DLRL acquires any part of, or easements or other new rights in, the subsoil of land specified in Part 1 of Schedule 9, it shall not be required to acquire a greater interest in the land or an interest in any other part of it.
(4) In the case of the land specified in Part 2 of Schedule 9, subject to paragraph (2) DLRL’s powers of compulsory acquisition under article 23(1)(a) shall be limited to the acquisition of such easements or other new rights in the land as it may require for the purposes of constructing, maintaining, protecting, renewing and using the authorised works.
(5) Where DLRL acquires easements or other new rights in the land specified in Part 2 of Schedule 9, article 26(2) shall apply as it applies to the acquisition of a new right under that article.
(6) References in this article to the subsoil of land are references to the subsoil lying more than 5 metres beneath the level of the surface of the land or, in the case of Works Nos. 19A and 19B and any necessary works and conveniences connected therewith, lying more than 4 metres beneath the level of the surface of the land; and for this purpose “the level of the surface of the land” means—
(a)in the case of any land on which a building is erected, the level of the surface of the ground adjoining the building;
(b)in the case of a river, dock, canal, navigation, watercourse or other water area, the level of the surface of the ground nearest to it which is at all times above water level; or
(c)in any other case, ground surface level.