Search Legislation

The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004

Changes over time for: SCHEDULE 1

 Help about opening options

Alternative versions:

Status:

Point in time view as at 02/04/2004.

Changes to legislation:

There are currently no known outstanding effects for the The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004, SCHEDULE 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Articles 2(1) and 4

SCHEDULE 1E+WSCHEDULED WORKS

(1)(2)(3)
AreaNumber of WorkDescription of work
In the London Boroughs of Newham and GreenwichWork No. 1A railway (2,533 metres in length), mainly located in two parallel bored tunnel structures, commencing at a junction with the proposed DLR Silvertown and London City Airport Extension at the centre of the proposed King George V station, passing eastwards and descending, then passing south-eastwards below Woodman Street, the junction of Albert Road, Woodman Street and Bargehouse Road, Grimsby Grove, and the River Thames, then turning southwards and rising, passing below Tom Cribb Road, then turning south-westwards and continuing to rise, passing under Plumstead Road and Maxey Road, then turning westwards under Burrage Road, Parry Place, the British Telecom access road and car park and the Network Rail Woolwich Arsenal station down passenger platform, then turning north-westwards under Taylor’s Buildings, Woolwich New Road and terminating at a point under the intersection of Greens End with Powis Street in Woolwich town centre, the first section of tunnel (1,975 metres in length) being under part of North Woolwich, the River Thames, the Royal Arsenal site and the eastern part of Woolwich, commencing 252 metres from the commencement of this work and terminating 15 metres west of Parry Place, 2,227 metres from the commencement of this work, the second section of tunnel (74 metres in length) being under the British Telecom telephone exchange access road and car park and Network Rail down passenger platform, commencing 90 metres west of Parry Place, 2,304 metres from the commencement of this work and terminating 22 metres east of Taylor’s Buildings, 2,378 metres from the commencement of this work and the third section of tunnel (109 metres in length) being under part of Woolwich Town Centre, commencing 23 metres west of Taylor’s Buildings, 2,424 metres from the commencement of this work and terminating at the termination point of this work, including sections of bored and cut and cover tunnel, intermittent cross passage tunnels between the two parallel bored tunnel structures and tunnel boring machine launch and reception chambers.
In the London Borough of NewhamWork No. 2A road (380 metres in length) being a realignment of the extension of Hartmann Road, commencing at a point 492 metres west of its junction with Albert Road and Woolwich Manor Way, passing eastwards and terminating at a point 111 metres west of its junction with Albert Road and Woolwich Manor Way.
 Work No. 3A temporary jetty structure (300 metres in length) in King George V Dock commencing 350 metres west of the eastern end of the dock, passing eastwards and terminating 50 metres west of the east end of the dock.
 Work No. 4A temporary access bridge and conveyor (110 metres in length) from King George V Dock to the adjacent dock side land, commencing at an intersection with Work No. 3, 77 metres west of the eastern end of King George V Dock, passing south-eastwards and terminating at a point 75 metres north-west of the intersection of Albert Road, Woolwich Manor Way, the extension of Hartmann Road and Fishguard Way.
In the London Borough of GreenwichWork No. 5An intervention shaft and cross passage structure (68 metres in length) commencing at a point 89 metres north-east of the junction between Argyle Road and Marlborough Road and 4 metres above existing ground level, descending 36 metres vertically and then turning through 90 degrees and passing horizontally eastwards and terminating at an intersection with Work No.1, 1,255 metres from the commencement of that work, including a surface building and underground ventilation and drainage adits and cross passage tunnel structures,
 Work No. 6An access road (16 metres in length) commencing at a point on the north-east side of Marlborough Road 95 metres north-east of its intersection with Argyle Road, passing north-east across Work No. 8 and terminating 16 metres from its commencement.
 Work No. 7A footway (120 metres in length), being a realignment of the existing riverside footway, commencing at a point 43 metres north-east of the junction between Marlborough Road and Argyle Road, passing eastwards, then following the circumference of the intervention shaft in Work No. 5 in a clockwise manner, passing south-eastwards, then north-eastwards and terminating at a junction with the existing footpath 121 metres north-east of the junction between Marlborough Road and Argyle Road.
 Work No. 8A cycleway (99 metres in length), being a realignment of the existing riverside cycleway, commencing at a point 32 metres north-east of the junction between Marlborough Road and Argyle Road, passing eastwards to the south of the intervention shaft in Work No. 5, crossing Work No. 6, passing south-eastwards, then north-eastwards and terminating at a junction with the existing cycleway 121 metres north-east of the junction between Marlborough Road and Argyle Road.
 Work No. 9A road (215 metres in length), commencing at the junction between Marlborough Road and Argyle Road, passing north-eastwards, then south-eastwards and terminating at a point on Cadogan Road 105 metres south-east of its junction with Argyle Road.
 Work No. 10A temporary railway passenger platform (238 metres in length) commencing at the country (east) end of the existing Network Rail Woolwich Arsenal station down passenger platform, passing eastwards under Burrage Road and terminating at a point 10 metres west of Maxey Road.
 Work No. 11A temporary footbridge (14 metres in length) commencing at a point 23 metres west of Burrage Road on the north side of Network Rail’s North Kent Railway Line, passing southwards over Work No. 10 and the North Kent railway line, and terminating at a point 25 metres west of Burrage Road on the south side of the North Kent line.
 Work No. 12A temporary access ramp (118 metres in length) commencing at a point on the west side of Burrage Road, 46 metres south of its junction with Spray Street and Burrage Grove, passing eastwards and descending and then turning south and terminating at an intersection with Work No. 10 at a point 158 metres from the commencement of that work.
 Work No. 13An access road (30 metres in length) commencing at a point on the east side of Parry Place 23 metres south of its junction with Spray Street, passing eastwards and terminating 30 metres from its commencement.
 Work No. 14An access road (185 metres in length), being a replacement of the existing British Telecom telephone exchange access road, commencing at a point on the east side of Taylor’s Buildings 36 metres south of its junction with Spray Street, passing south-east eastwards past the south-west side of the existing telephone exchange building, then passing eastwards and terminating at a point on the west side of Parry Place 20 metres south of its junction with Spray Street.
 Work No. 15An access road (20 metres in length) commencing at a point on the north-west side of Taylor’s Buildings 34 metres south of its junction with Spray Street, passing north-westwards and terminating at a point 20 metres from its commencement.
 Work No. 16A footbridge (20 metres in length) commencing at a point 10 metres east of the south end of Taylor’s Buildings on the north side of Network Rail’s Woolwich Arsenal station down passenger platform, passing southwards over Network Rail’s North Kent Railway Line, and terminating at a point 28 metres north-west of the junction between Helen Street and Vincent Road on the south side of Woolwich Arsenal station up passenger platform.
 Work No. 17A road (123 metres in length) being a realignment of the existing Woolwich New Road, commencing at a junction with the existing road 10 metres south-west of its junction with Vincent Road and General Gordon Place, passing north-eastwards and terminating at a point on the existing road 26 metres north-east of its junction with Spray Street.
 Work No. 18A temporary road (110 metres in length), being a temporary diversion of the existing Woolwich New Road, commencing 18 metres north-east of its junction with General Gordon Place and Vincent Road, passing north-eastwards, then northwards and terminating at a point 32 metres north of the junction between Spray Street and Woolwich New Road.
 Work No. 19AA sewer (109 metres in length) being a diversion of part of the existing sewer which passes below Burrage Road, commencing underground at a junction with the existing Thames Water Southern Outfall Sewer No. 2 at a location 12 metres east of Burrage Road and 10 metres south of Arthur Grove, passing north-westwards below Arthur Grove and Burrage Road to a point at the east end of Woolwich Arsenal station car park, 15 metres west of Burrage Road, passing westwards below the car park, then southwards below Vincent Road, to terminate at a point under Vincent Road 35 metres west of its intersection with Burrage Road, including the construction of vertical access shaft structures, the diversion of secondary sewage pipes connecting into the main sewer at intermediate locations and works to stop up the existing sewer between the junction of Burrage Road with Vincent Road and the junction of Burrage Road with Spray Street.
 Work No. 19BA sewer (8 metres in length) being a diversion of part of the existing sewer which passes below Burrage Road, commencing at a point under Burrage Road 3 metres south of its intersection with Arthur Grove passing northwards below Burrage Road and Arthur Grove and terminating at an intersection with Work No. 19A at a point 5 metres east of the junction between Burrage Road and Arthur Grove, including the construction of vertical access shaft structures, and the diversion of secondary sewage pipes connecting into the main sewer at intermediate locations.
 Works No. 20A sewer (151 metres in length), being a diversion of the existing sewer which passes below Woolwich New Road and Beresford Square Market Place, commencing underground at a point 40 metres north-east of the junction between Woolwich New Road, General Gordon Place and Vincent Road, passing south-eastwards below Woolwich New Road to the south east side of the existing Woolwich New Road then passing north-eastwards below Work No. 1 to a point 15 metres south of the junction between Woolwich New Road and Spray Street, then passing north-westwards below Woolwich New Road and Beresford Square Market Place to a point 62 metres north-east of the junction between Greens End and Powis Street, then turning north-eastwards to terminate underground at a junction with the existing Thames Water Southern Outfall Sewer No. 1, 71 metres north-east of the junction between Greens End and Powis Street, including the construction of vertical access shaft structures, the diversion of secondary sewage pipes connecting into the main sewer at intermediate locations, and works to temporarily line and then stop up the existing sewer between a point 40 metres north of the junction between Woolwich New Road, General Gordon Place and Vincent Road and its junction with the Southern Outfall Sewer No. 1 at a point 73 metres north-east of the junction between Greens End and Powis Street.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources